[0001] The present invention relates to the field of interior renovation and precisely it
relates to a method for replacing a bathtub with a shower platform.
Background of the invention
[0002] In modern life, a particular attention is paid to water consumption and other factors
such as the reduction of the room sizes of houses and flats, and then of the bathrooms,
that have brought with time to a large diffusion of the shower cabinets and to a subsequent
decrease of the demand for bathtubs.
[0003] Also owing to the presence in families of old or of disabled people a shower platform
is preferable to a bathtub, in particular, for difficulties met by such categories
of people to have access to the bathtub.
[0004] Therefore, in the houses of old construction the need is felt to replace the bathtub
present in the bathroom with a shower platform. This change is carried out through
a succession of demolition and of construction works that time consuming and expensive.
[0005] In particular, during the demolition of the bathtub a big amount of debris is created
that has to be disposed of and is, furthermore, associated with damaging neighbouring
tiles with subsequent need of changing them.
[0006] This step is very complicated also for a difficulty of finding tiles of the same
type of the preexisting ones.
[0007] Another drawback of the used techniques for replacing a bathtub with a shower platform
the difficulty of finding on the market shower cabinets of standard corresponding
size to that of the bathtub. This requires making a shower platform to measure, with
further costs.
[0008] FR 2882243 discloses a shower installing system for bathroom having wallboards with concave
surface applied against existing wall and side surfaces delimiting ceiling space,
destined for passage of valves, between existing wall and front surface. The wallboards
are molded in modular dimensions and include sectile parts (20) for an adjustment
to the standard overall dimensions
[0009] FR 2860411 discloses a shower cabinet comprising a tray having a bottom which leads to an outlet,
fitted with an assembled drainage board on which a person can stand while towelling
off after showering. The drainage board forms an extension to the tray and acts as
a dry area. The cabinet has a hinged panel which can be set parallel to the drainage
board's edge or perpendicular to it, separating the shower tray from the dry area.
Summary of the invention
[0010] It is therefore a feature of the present invention to provide a method for replacing
a bathtub with a shower platform that does not require substantial construction works
for its actuation.
[0011] It is, furthermore, a feature of the present invention to provide a method for replacing
a bathtub with a shower platform that is easy and quick to carry out.
[0012] It is also a feature of the present invention to provide a method for replacing a
bathtub with a shower platform without making large amounts of debris.
[0013] It is a further feature of the present invention to provide a method for replacing
a bathtub with a shower platform that avoids changing the existing taps of the bathtub
with new taps.
[0014] It is another feature of the invention to provide a method for replacing a bathtub
with a shower platform that is particularly adapted to disabled people.
[0015] These and other objects are achieved by a method for replacing a bathtub with a shower
platform having a lateral edge defined between an upper border and a lower rim, said
method comprising the steps of:
- removing an existing bathtub that is defined by containing walls in order to create
a recess of corresponding size as defined by said containing walls of the bathtub,
said step of removing comprising the step of pulling down the bathtub containing walls
up to leaving a shoulder which defines said recess;
- forming a base frame by introducing fragments, or debris, deriving from the above
described demolition in said recess defined by said shoulder, said base frame formed
by a layer of fragments, or debris, within said shoulder;
- levelling said layer of fragments, or debris, within said shoulder, in order to conform
substantially the thickness of the debris level;
- introducing a filling material in spaces present between the fragments, or debris,
in order to level said base frame same in a way substantially uniform that assists
a next step of arranging a shower platform,
- finishing said shoulder;
- arranging a shower platform of determined size on said layer of fragments, or debris;
- cutting said shower platform up to the size of said shoulder;
- levelling said shower platform and fixing it to said shoulder;
- wherein said shower platform is associated with a shower cabinet comprising a frame
consisting of a plurality of vertical rods adapted to support a plurality of side
walls;
- wherein said shoulder and said base frame are configured such that the lower rim of
said shower platform is arranged at the same level of the floor of the room in which
it is installed.
[0016] Preferably, the shower platform can be made of a material selected from the group
comprised of:
- plastic material, in particular an acrylic resin;
- ceramic material.
[0017] The step of cutting the shower platform up to the size of said shoulder is provided
because the shower platform is oversized with respect to the standard size of the
bathtubs. Therefore, before being located on a base frame made with masonry material
and/or with the fragments generated by the demolition of the bathtub, the shower platform
is subject to a cutting step in order to fit it to the desired size. This way, it
is possible to mould a single universal shower platform, or a limited series of shower
platforms, and then fitting it to the size of the shoulder, by cutting the exceeding
part.
[0018] In particular, the base frame may have a height set between 2 and 50 cm, advantageously
between 4 and 30 cm.
[0019] More in detail, the shower platform has the following size:
- width set between 60 and 80 cm;
- length set between 160 and 180 cm.
[0020] Alternatively, the shower platform can be selected among a plurality of shower platforms
of different size, each of which having corresponding size to traditional bathtubs.
[0021] In particular, the vertical rods of the shower cabinet are configured in such a way
to be capable of approaching/moving away from each other for adapting to the size
of the shower platform. The shower platform can be defined laterally by at least one
wall of the room in which is installed.
[0022] In particular, when removing the bathtub, the original taps are not pulled out, whereby
the final shower platform comprises the taps of the original bathtub. This reduces
remarkably the work made by the operator for carrying out the transformation of the
bathtub into a shower platform, with subsequent time saving and reduced costs.
[0023] Since when removing the bathtub portions of wall are uncovered that used to define
laterally the bathtub, said portions of wall are coated by at least one lining sheet.
In particular, the, or each, lining sheet coats the plaster uncovered when removing
the bathtub.
[0024] Therefore, the lining sheet coats the side walls of the final shower platform only
for a measured height. This solution allows to limit remarkably the finishing work
that has to be carried out after the demolition of the bathtub. Advantageously, the
shower platform comprises at least one lining sheet that defines laterally at least
one wall side, or the wall of the room in which it is installed.
[0025] In particular, the or each lining sheet can be connected to the above described portions
of wall, by means of screws, glue for building industry, etc.
[0026] In particular, the lining sheet can be made using a plurality of tiles, for example
the same tiles that cover the walls of the room in which the shower platform is installed.
[0027] Alternatively, the lining sheet is made using at least one plate of plastic material.
[0028] In particular, the sheets are located in order to result flush with the walls of
the bathroom that are not involved with removing the bathtub, or with the possible
tiles fastened to them.
[0029] Advantageously, said filling material is polyurethane foam, that is arranged in spaces
present between the fragments, or debris, in order to level the base frame same. This
way, it is possible to provide a platform substantially uniform that assists the next
step of arranging the shower platform.
[0030] In particular, the lining sheet has at least one graphical sign selected from the
group comprised of:
a combination thereof.
[0031] Advantageously, the graphical sign can be made on the vertical sheet by means of
litographic techniques.
Brief description of the drawings
[0032] Further characteristic and the advantages of the method for replacing any bathtub
with a shower platform, according to the invention, will be made clearer with the
following description of an exemplary embodiment thereof, exemplifying but not limitative,
with reference to the attached drawings, in which like reference characters designate
the same or similar parts, throughout the figures of which:
- Figures from 1 to 8 show diagrammatically perspective views and an elevational side
view of a possible succession of steps obtainable by the method, according to the
invention, for replacing a bathtub with a shower platform.
Description of a preferred exemplary embodiment
[0033] With reference to figures from 1 to 8, the method for replacing a bathtub 1 associated
with taps 10 with a shower platform, according to the invention, begins with the step
of removing the preexisting bathtub 1. This can be effected extracting the still entire
bathtub body 3 from the containing walls 5a-5d, as diagrammatically shown in figure
2A, obtaining a recess 4 (figure 4). Preferably, bathtub 3 is pulled out cutting,
or crushing in situ the body 3 of the bathtub (figure 2B).
[0034] Then, the partial demolition of the containing walls 5a-5d that define recess 4 is
carried out. The removing step of bathtub 3 does not involve the original taps 10,
such that, in particular, neither the faucets 10a nor the ducts are removed, leaving
the shower platform obtained at the end of the operation with the same taps 10 of
the original bathtub, thus saving work of the operator. This confers high savings
to the client that requires turning the bathtub into a shower platform.
[0035] As diagrammatically shown in figure 5, when pulling down the bathtub containing walls
5a-5d, only part of them is involved. In this way, a portion 11 of the walls 5a-5d
of height H and any tiles 6 to them connected remain intact.
[0036] According to the invention, the fragments and the debris 7 produced during the demolition
of the walls 5a-5d are stored in recess 4' defined by the lower portion of walls 5a-5d,
which forms a shoulder 11, thus avoiding of disposing of the debris and the fragments
produced by the demolition (figure 5).
[0037] The layer of fragments 7 that is obtained can then be flattened to provide a base
frame 8 on which shower platform 20 is then located. For making the base frame 8 substantially
homogeneous it is possible to add filling material, for example polyurethane foam
50 (figure 6). By penetrating, in fact, in the spaces between the fragments 7, the
filling material 50 levels the layer of fragments 7 assisting the arrangement of shower
platform 20 on base frame 8.
[0038] Shower platform 20, preferably of acrylic material, is selected among a plurality
of shower platforms of size corresponding to bathtubs of different standard sizes.
In general, shower platform 20 is oversized with respect to a bathtub 1 standard size.
As shown in figure 7, according to the invention, the shower platform 20 is arranged
at a same level of the floor of the room 100 in which the shower platform is installed,
which can be on a masonry layer 11'.
[0039] Therefore, before being put on a base frame 8, shower platform 20 is subject to a
preliminary cutting step for example by a common manual saw, in order to fit it to
a desired size.
[0040] According to what provided by an advantageous step of the invention, to surfaces
25, or wall portions, which have been uncovered when removing bathtub 1 (figure 6),
a lining sheet 15 is applied, for example fixing it to the surfaces 25 by means of
nails, screws, glue for building industry (figure 7).
[0041] Alternatively, the lining sheets 15 can cover a higher surface, for example up to
coating all the height of a shower cabinet 100 associated with shower platform 20
(figure 7).
[0042] The lining sheet 15 can be made using tiles 150 like those of the bathroom in which
the shower platform is installed (figure 7), or alternatively, can be sheets of plastic
material. In this case, the lining sheet 15 can be decorated with images, or text
as desired.
[0043] The shower cabinet 100 comprises, in particular, a frame consisting of a plurality
of vertical rods, for example four rods 101a-101d, adapted to support a plurality
of side walls 105. The vertical rods 101a-101d can be approached/moved away with respect
to each other for example by means of connection guides 105 mounted telescopically
in order to adapt the shower cabinet 100 to the size of shower platform 20.
[0044] The foregoing description of a specific embodiment will so fully reveal the invention
according to the conceptual point of view, so that others, by applying current knowledge,
will be able to modify and/or adapt for various applications such an embodiment without
further research and without parting from the invention, and it is therefore to be
understood that such adaptations and modifications will have to be considered as equivalent
to the specific embodiment. The means and the materials to realise the different functions
described herein could have a different nature without, for this reason, departing
from the field of the invention. It is to be understood that the phraseology or terminology
employed herein is for the purpose of description and not of limitation.
1. Method for replacing a bathtub (1) with a shower platform (20) having a lateral edge
defined between an upper border and a lower rim, said method comprising the steps
of:
- removing an existing bathtub (1) that is defined by containing walls in order to
create a recess (4) of corresponding size as defined by said containing walls (5a-5d)
of the bathtub (1), said step of removing comprising the step of pulling down said
containing walls (5a-5d) up to leaving a shoulder (11) which defines said recess (4);
- forming a base frame by introducing fragments, or debris (7), deriving from said
pulling down step into said recess (4) defined by said shoulder (11), said base frame
formed by a layer of fragments, or debris (7), within said shoulder (11);
- levelling said layer of fragments, or debris (7), within said shoulder (11) in order
to conform substantially the thickness of the debris (7) level;
- introducing a filling material in spaces present between the fragments, or debris,
in order to level said base frame same in a way substantially uniform that assists
a next step of arranging a shower platform,
- finishing said shoulder (11);
- arranging a shower platform (20) of determined size on said layer of fragments,
or debris (7);
- cutting said shower platform (20) up to the size of said shoulder;
- levelling said shower platform (20) and fixing it to said shoulder (11);
- wherein said shower platform (20) is associated with a shower cabinet comprising
a frame consisting of a plurality of vertical rods adapted to support a plurality
of side walls (5a-5d);
- wherein said shoulder and said base frame are configured such that the lower rim
of said shower platform is arranged at the same level of the floor of the room in
which it is installed.
2. Method for replacing a bathtub (1) with a shower platform (20), according to claim
1, wherein said shower platform (20) is made of a material selected from the group
comprised of:
- plastic material, in particular, an acrylic resin;
- ceramic material.
3. Method for replacing a bathtub (1) with a shower platform (20), according to claim
1, wherein said shower platform (20) is selected among a plurality of shower platforms
(20) of different size.
4. Method for replacing a bathtub (1) with a shower platform (20), according to claim
1, wherein said shower platform (20) has the following size:
- width set between 60 and 80 cm;
- length set between 160 and 180 cm.
5. Method for replacing a bathtub (1) with a shower platform (20), according to claim
1, wherein during said removing step of said bathtub (1) portions (25) of wall defining
laterally said bathtub (1) are uncovered, on said portions of uncovered wall (25)
at least one lining sheet (15) being arranged.
6. Method for replacing a bathtub (1) with a shower platform (20), according to claim
1, wherein said vertical rods of said shower cabinet are configured such that they
can move towards/away from each other for adapting to the size of said shower platform
(20).
7. Method for replacing a bathtub (1) with a shower platform (20), according to claims
5 and 6, wherein said shower platform (20) is defined laterally from said, or each,
lining sheet (15).
8. Method for replacing a bathtub (1) with a shower platform (20), according to claim
6, wherein said, or each, lining sheet (15) is connected to said uncovered portions
(25) of wall by means of screws, glue for building industry, and the like.
9. Method for replacing a bathtub (1) with a shower platform (20), according to claim
6, wherein said, or each, lining sheet (15) is arranged in order to result flush with
the walls (5a-5d), or with the possible tiles fastened to them, of the room in which
said shower platform (20) is installed.
10. Method for replacing a bathtub (1) with a shower platform (20), according to claim
1, wherein said filling material is polyurethane foam.
11. Method for replacing a bathtub (1) with a shower platform (20), according to claim
6, wherein said lining sheet (15) have at least one graphical sign selected from the
group comprised of:
- an image;
- a text;
- a combination thereof.
12. Method for replacing a bathtub (1) with a shower platform (20), according to claims
1 and 6, wherein during said step of removing said bathtub (1), any taps to it associated
are not pulled out, whereby said shower platform (20) has said taps.
1. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) mit einem Seitenrand,
der zwischen einer oberen Umrandung und einem unteren Rand festgelegt ist, wobei das
Verfahren die folgenden Schritte umfasst:
- Entfernen einer bestehenden Badewanne (1), die durch Umfassungswände festgelegt
ist, um eine Ausnehmung (4) einer entsprechenden Größe, die durch die Umfassungswände
(5a-5d) der Badewanne (1) festgelegt ist, zu bilden, wobei der Schritt des Entfernens
den Schritt des Abbauens der Umfassungswände (5a-5d) bis zum Zurücklassen einer Schulter
(11), die die Ausnehmung (4) festlegt, umfasst,
- Ausbilden eines Grundrahmens durch Einführen von Fragmenten oder Schutt (7), die
von dem Abbauschritt stammen, in die durch die Schulter (11) festgelegte Ausnehmung
(4), wobei der Grundrahmen durch eine Schicht von Fragmenten oder Schutt (7) innerhalb
der Schulter (11) gebildet wird,
- Nivellieren der Schicht von Fragmenten oder Schutt (7) innerhalb der Schulter (11),
um im Wesentlichen eine Übereinstimmung des Niveaus der Dicke des Schutts (7) herzustellen,
- Einführen eines Füllmaterials in zwischen den Fragmenten oder dem Schutt vorhandene
Zwischenräume, um den Grundrahmen in im Wesentlichen gleichförmiger Weise auf ein
gleiches Niveau zu bringen, was einen nächsten Schritt des Anordnens einer Duschwanne
unterstützt,
- Fertigstellen der Schulter (11),
- Anordnen einer Duschwanne (20) einer gegebenen Größe auf der Schicht von Fragmenten
oder Schutt (7),
- Beschneiden der Duschwanne (20) auf die Größe der Schulter,
- Nivellieren der Duschwanne (20) und Befestigen derselben an der Schulter (11),
- wobei die Duschwanne (20) einer Duschkabine zugeordnet ist, die einen Rahmen aufweist,
der aus mehreren vertikalen Stäben besteht, die zum Abstützen von mehreren Seitenwänden
(5a-5d) eingerichtet sind,
- wobei die Schulter und der Grundrahmen derart konfiguriert sind, dass der untere
Rand der Duschwanne auf dem gleichen Niveau des Fußbodens des Raums, in dem sie installiert
ist, angeordnet ist.
2. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
1, wobei die Duschwanne (20) aus einem Material hergestellt ist, das aus der Gruppe
von:
- einem Kunststoffmaterial, insbesondere einem Acrylharz,
- einem Keramikmaterial ausgewählt ist.
3. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
1, wobei die Duschwanne (20) aus mehreren Duschwannen (20) unterschiedlicher Größe
ausgewählt wird.
4. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
1, wobei die Duschwanne (20) die folgende Größe aufweist:
- eine Breite, die zwischen 60 und 80 cm eingestellt ist,
- eine Länge, die zwischen 160 und 180 cm eingestellt ist.
5. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
1, wobei während des Entfernungsschritts der Badewanne (1) Wandabschnitte (25), die
die Badewanne (1) seitlich festlegen, nicht abgedeckt sind, wobei auf den Abschnitten
von nicht abgedeckter Wand (25) mindestens eine Bekleidungslage (15) angeordnet wird.
6. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
1, wobei die vertikalen Stäbe der Duschkabine derart konfiguriert sind, das sie sich
zur Anpassung an die Größe der Duschwanne (20) aufeinander zu bewegen bzw. voneinander
weg bewegen können.
7. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach den Ansprüchen
5 und 6, wobei die Duschwanne (20) seitlich durch die Auskleidungslage (15)oder jede
Auskleidungslage (15) festgelegt wird.
8. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
6, wobei die Auskleidungslage (15) oder jede Auskleidungslage (15) mittels Schrauben,
einem Baukleber und dergleichen mit den nichtabgedeckten Abschnitten (25) der Wand
verbunden wird.
9. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
6, wobei die Auskleidungslage (15) oder jede Auskleidungslage (15) derart angeordnet
wird, dass sie bündig mit den Wänden (5a-5d) oder mit den möglichen, daran befestigten
Fliesen des Raums, in dem die die Duschwanne (20) installiert wird, ist.
10. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
1, wobei das Füllmaterial ein Polyurethanschaum ist.
11. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach Anspruch
6, wobei die Auskleidungslage (15) mindestens ein graphisches Kennzeichen aufweist,
das aus der Gruppe von:
- einem Bild,
- einem Text,
- einer Kombination derselben ausgewählt ist.
12. Verfahren zum Ersetzen einer Badewanne (1) durch eine Duschwanne (20) nach den Ansprüchen
1 und 6, wobei während des Schritts des Entfernens der Badewanne (1) keiner der damit
verbundenen Wasseranschlüsse herausgezogen wird, wodurch die Duschwanne (20) die Wasseranschlüsse
aufweist.
1. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20) présentant
un bord latéral défini entre une bordure supérieure et un rebord inférieur, le procédé
comprenant les étapes :
- de retrait d'une baignoire existante (1) qui est définie par des parois contenantes
afin de créer un évidement (4) de taille correspondante tel que défini par les parois
contenantes (5a - 5d) de la baignoire (1), l'étape de retrait comprenant l'étape d'enlever
les parois contenantes (5a - 5d) jusqu'à laisser un épaulement (11) qui définit l'évidement
(4) ;
- de formation d'un cadre de base en introduisant des fragments, ou des débris (7),
venant de l'étape d'enlèvement, dans l'évidement (4) défini par l'épaulement (11),
le cadre de base étant formé par une couche de fragments, ou débris (7), à l'intérieur
de l'épaulement (11) ;
- de mise à niveau de la couche de fragments, ou débris (7), à l'intérieur de l'épaulement
(11) afin de conformer essentiellement l'épaisseur du niveau de débris (7) ;
- d'introduction d'un matériau de remplissage dans les espaces présents entre les
fragments, ou débris, afin de mettre à niveau le cadre de base d'une façon essentiellement
uniforme qui facilite une étape suivante d'agencement d'une plateforme de douche,
- de finition de l'épaulement (11) ;
- d'agencement d'une plateforme de douche (20) de taille déterminée sur la couche
de fragments, ou débris (7) ;
- de découpe de la plateforme de douche (20) à la taille de l'épaulement ;
- de mise à niveau de la plateforme de douche (20) et de fixation de celle-ci à l'épaulement
(11) ;
- sachant que la plateforme de douche (20) est associée à une cabine de douche comprenant
un cadre consistant en une pluralité de tiges verticales adaptées pour supporter une
pluralité de parois latérales (5a - 5d) ;
- sachant que l'épaulement et le cadre de base sont configurés de telle façon que
le rebord inférieur de la plateforme de douche est agencé au même niveau que le sol
de la pièce dans lequel elle est installée.
2. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 1, dans lequel la plateforme de douche (20) est fabriquée dans un
matériau sélectionné parmi le groupe comprenant :
- du matériau plastique, en particulier une résine acrylique ;
- du matériau céramique.
3. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 1, dans lequel la plateforme de douche (20) est sélectionnée parmi
une pluralité de plateformes de douche (20) de différentes tailles.
4. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 1, dans lequel la plateforme de douche (20) présente la taille suivante
:
- largeur définie entre 60 et 80 cm ;
- longueur définie entre 160 et 180 cm.
5. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 1, dans lequel pendant l'étape de retrait de la baignoire (1), des
parties (25) de paroi définissant latéralement la baignoire (1) sont découvertes,
au moins un film de revêtement (15) étant agencé sur les parties de paroi découverte
(25).
6. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 1, dans lequel les tiges verticales de la cabine de douche sont configurées
de telle façon qu'elles peuvent se déplacer en direction/en s'éloignant l'une de l'autre
pour s'adapter à la taille de la plateforme de douche (20).
7. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
les revendications 5 ou 6, dans lequel la plateforme de douche (20) est définie latéralement
par le ou chaque film de revêtement (15).
8. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 6, dans lequel le ou chaque film de revêtement (15) est relié aux
parties découvertes (25) de la paroi par des vis, de la colle pour le secteur de la
construction, et similaire.
9. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 6, dans lequel le ou chaque film de revêtement (15) est agencé afin
d'arriver en affleurement avec les parois (5a - 5d) ou avec les éventuels carreaux
fixés sur celles-ci, de la pièce dans laquelle la plateforme de douche (20) est installée.
10. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 1, dans lequel le matériau de remplissage est de la mousse polyuréthane.
11. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
la revendication 6, dans lequel le film de revêtement (15) présente au moins un signe
graphique sélectionné parmi le groupe comprenant :
- une image ;
- un texte ;
- une combinaison de ceux-ci.
12. Procédé de remplacement d'une baignoire (1) par une plateforme de douche (20), selon
les revendications 1 et 6, dans lequel pendant l'étape de retrait de la baignoire
(1), tout robinet associé à celle-ci n'est pas retiré, ce qui fait que la plateforme
de douche (20) a ces robinets.