Technical Field
[0001] The present invention relates to a heat pump apparatus capable of defrosting operation,
more particularly to a heat pump apparatus that precisely detects performance degradation
due to frost formation onto an evaporator to execute defrosting start decision control
processing that starts defrosting operation at an optimal timing.
Background Art
[0002] In general, with an evaporator in a heat pump apparatus, a frost formation phenomenon
occurs in which frost grows on the surface of the evaporator when an evaporation temperature
is 0 degree or less, and at the same time, equal to or less than the dew-point temperature
of the air. Such a frost formation phenomenon causes increase in ventilation resistance
and thermal resistance to lower operating efficiency in the evaporator. Therefore,
defrosting operation is necessary for the heat pump apparatus that introduces a discharged
refrigerant from a compressor to the evaporator and removes the frost grown on the
surface thereof.
[0003] Conventionally, the heat pump apparatus exists that can execute defrosting operation
to dissolve frost attached onto the evaporator. For such an apparatus, "an air-conditioner"
is proposed "that specifies an inrush timing of defrosting so that an average COP
(Coefficient Of Performance) becomes a maximum value." (For example, refer to Patent
Document 1) The air-conditioner calculates the average COP during heating operation
using an indoor heat exchange temperature, an indoor temperature, and a current value
to order the start of defrosting when the current average COP becomes smaller than
the previous average COP.
Citation List
[0004]
Patent Document 1: Japanese Unexamined Patent Application Publication No. H10-111050 (page 3, Fig. 3)
Summary of Invention
Technical Problem
[0005] In the air-conditioner according to Patent Document 1, the average COP is estimated
using the indoor heat exchange temperature, indoor air temperature, and compressor
input. When the average COP begins to decrease, the defrosting operation is started.
However, defrosting ability is the difference between the indoor heat exchange temperature
and the indoor air temperature, as frost formation progresses, the indoor heat exchange
temperature decreases and the indoor air temperature decreases as well. Therefore,
there is a possibility of a false judgment that with a constant ability, only compressor
input decreases and, on the contrary, the COP increases.
[0006] In the air-conditioner according to Patent Document 1, frosting operation is not
considered when judging the start of defrosting, however, the COP at the time of the
previous defrosting operation is adapted to be used. When not considering the defrosting
operation, one cycle average COP including defrosting operation possibly deteriorates.
When using the COP of the previous defrosting operation, since the COP at the previous
defrosting operation is for the previous heating operation, the COP possibly deteriorates
if it is applied to the current heating operation, in which operating statuses and
load are changed.
[0007] The present invention is made to resolve the above problems and its object is to
provide a heat pump apparatus capable of starting defrosting operation at the most
efficient (COP is maximized) and optimal timing.
Solution to Problem
[0008] The heat pump apparatus according to the present invention includes a refrigerant
circuit in which a compressor, a condenser, expansion means, and an evaporator are
serially connected. There are provided condensation temperature detection means to
detect the saturation temperature of the condenser, evaporation temperature detection
means to detect the saturation temperature of the evaporator, and a control section
to estimate operation efficiency by a value obtained by dividing heating ability estimated
from the detection value of the condensation temperature detection means by a difference
between the detection value of the condensation temperature detection means and that
of the evaporation temperature detection means or dissipation power estimated from
the difference.
[0009] The heat pump apparatus according to the present invention includes a refrigerant
circuit in which a compressor, a condenser, expansion means, and an evaporator are
serially connected. There are provided condensation temperature detection means to
detect the saturation temperature of the condenser, compressor operation current detection
means to detect the operation current of the compressor, and a control section that
estimates operation efficiency by a value obtained by dividing the heating ability
estimated from the detection value of the condensation temperature detection means
by the detection value of the compressor operation current detection means or dissipation
power estimated by the detection value, and starts defrosting operation when the estimated
operation efficiency is lowered from an averaged value from the start of operation
to now to an estimation value of the operation efficiency from the start of operation
to the end of defrosting operation when defrosting operation is performed now.
Advantageous Effects of Invention
[0010] With the heat pump apparatus according to the present invention, by accurately estimating
heating COP from the condensation temperature and the evaporation temperature, and
by estimating a one-cycle average COP including the defrosting operation, the defrosting
operation can be started at an optimal timing when the one cycle average COP becomes
the best, resulting in energy saving.
[0011] With the heat pump apparatus according to the present invention, by accurately estimating
heating COP from the operation current of the compressor, and by estimating an one-cycle
average COP including the defrosting operation, the defrosting operation can be started
at an optimal timing when the one cycle average COP becomes the best, resulting in
energy saving.
Brief Description of Drawings
[0012]
[Fig. 1]
Fig. 1 is a schematic configuration diagram showing configuration of a refrigerant
circuit of a heat pump apparatus according to Embodiment 1.
[Fig. 2]
Fig. 2 is a block diagram showing an electrical schematic configuration of the heat
pump apparatus.
[Fig. 3]
Fig. 3 is a graph showing a relation between time and COP.
[Fig. 4]
Fig. 4 is a graph showing a relation between time and COP.
[Fig. 5]
Fig. 5 is a flowchart showing an example of a processing flow regarding defrosting
start decision control of the heat pump apparatus.
[Fig. 6]
Fig. 6 is a graph showing a relation between an instantaneous COP and an average COP.
[Fig. 7]
Fig. 7 is a graph showing a relation between the instantaneous COP and a one-cycle
average COP.
[Fig. 8]
Fig. 8 is a graph showing a relation between the instantaneous COP and the average
COP.
[Fig. 9]
Fig. 9 is a flowchart showing another example of a processing flow regarding a defrosting
start decision control of the heat pump apparatus.
[Fig. 10]
Fig. 10 is a schematic configuration diagram showing a refrigerant circuit configuration
under a state in which the heat pump apparatus includes compressor operation time
measurement means.
[Fig. 11]
Fig. 11 is a graph showing a relation between the instantaneous COP and the one-cycle
average COP of the heat pump apparatus.
[Fig. 12]
Fig. 12 is a graph showing a relation between the instantaneous COP and the one-cycle
average COP of the heat pump apparatus.
[Fig. 13]
Fig. 13 is a flowchart showing another example of the processing flow regarding defrosting
start decision control of the heat pump apparatus.
[Fig. 14]
Fig. 14 is a graph showing a relation between time variation of COP and time of the
heat pump apparatus.
[Fig. 15]
Fig. 15 is a flowchart showing another example of the processing flow regarding defrosting
start decision control of the heat pump apparatus.
[Fig. 16]
Fig. 16 is a schematic configuration diagram showing configuration of a refrigerant
circuit of a heat pump apparatus according to Embodiment 2.
[Fig. 17]
Fig. 17 is a block diagram showing an electrical schematic configuration of the heat
pump apparatus.
[Fig. 18]
Fig. 18 is a flowchart showing an example of the processing flow regarding defrosting
start decision control of the heat pump apparatus.
[Fig. 19]
Fig. 19 is a schematic configuration diagram showing configuration of a refrigerant
circuit under a state in which the heat pump apparatus includes compressor operation
time measurement means.
[Fig. 20]
Fig. 20 is a graph showing a relation between the instantaneous COP and the one-cycle
average COP of the heat pump apparatus.
[Fig. 21]
Fig. 21 is a graph showing a relation between the instantaneous COP and the one-cycle
average COP of the heat pump apparatus.
[Fig. 22]
Fig. 22 is a flowchart showing another example of the processing flow regarding defrosting
start decision control of the heat pump apparatus.
[Fig. 23]
Fig. 23 is a graph showing a relation between time variation of COP and time of the
heat pump apparatus.
[Fig. 24]
Fig. 24 is a flowchart showing further other example of the processing flow regarding
defrosting start decision control of the heat pump apparatus.
Description of Embodiments
[0013] Embodiments of the present invention will be explained based on drawings.
Embodiment 1
[0014] Fig. 1 is a schematic configuration diagram showing configuration of a refrigerant
circuit of a heat pump apparatus 100 according to Embodiment 1. Based on Fig. 1, descriptions
will be given to the configuration and operation of the refrigerant circuit of the
heat pump apparatus 100. The heat pump apparatus 100 performs cooling operation or
heating operation by circulating a refrigerant. Sizes of each component are sometimes
different from actual ones in the following drawings including Fig. 1.
[0015] As shown in Fig. 1, the heat pump apparatus 100 is configured by serially connecting
a compressor 1, a condenser 2, expansion means 3, and an evaporator 4 in order by
refrigerant piping 15. In the vicinity of the condenser 2, a condenser fan 5 and condensation
temperature detection means 11 are provided. In the vicinity of the evaporator 4,
an evaporator fan 6 and evaporation temperature detection means 12 are provided. Detection
values detected by the condensation temperature detection means 11 and the evaporation
temperature detection means 12 are adapted to be transmitted to the control section
50 that integrally controls the entire heat pump apparatus 100.
[0016] The compressor 1 sucks the refrigerant flowing through refrigerant piping 15 to compress
the refrigerant into a high-temperature high-pressure state. The condenser 2 performs
heat exchange between the refrigerant passing through the refrigerant piping 15 and
the air to condense the refrigerant. Expansion means 3 decompresses to expand the
refrigerant passing through the refrigerant piping 15. The expansion means 3 may be
configured by, for example, an electronic expansion valve and the like. The evaporator
4 performs heat exchange between the refrigerant passing through the refrigerant piping
15 and the air to evaporate the refrigerant. The condenser fan 5 supplies air to the
condenser 2. The evaporator fan 6 supplies air to the evaporator 4. Condensation temperature
detection means 11 detects the saturation temperature of the condenser 2. Evaporation
temperature detection means 12 detects the saturation temperature of the evaporator
4.
[0017] A control section 50 is constituted by a microcomputer and the like and has a function
to control the drive frequency of the compressor 1, the rotation speed of the condenser
fan 5 and the evaporator fan 6, switching of a four-way valve (not shown) , which
is a flow path switching device of the refrigerant, and opening of the expansion means
3 based on detection values (condensation temperature information detected by condensation
temperature detection means 11 and evaporation temperature information detected by
evaporation temperature detection means 12) from the above-mentioned each detection
means. Regarding the control section 50, detailed descriptions will be given in Fig.
2.
[0018] Here, brief explanations will be given to the operation of the heat pump apparatus
100.
When the heat pump apparatus 100 starts operation, the compressor 1 is driven at first.
Then, the high-temperature high-pressure gas refrigerant compressed by the compressor
1 is discharged from the compressor 1 to flow into the condenser 2. In the condenser
2, the inflow gas refrigerant condenses to turn into a low-temperature high-pressure
refrigerant while radiating heat to the fluid. The refrigerant flows out of the condenser
2 and decompressed by the expansion means 3 to turn into a gas-liquid two-phase refrigerant.
The gas-liquid two-phase refrigerant flows into the evaporator 4. The refrigerant
flowed into the evaporator 4 is subjected to vaporizing and gasifying by absorbing
heat from the fluid. The refrigerant flows out of the evaporator 4 to be reabsorbed
by the compressor 1. Detection values from the condensation temperature detection
means 11 and the evaporation temperature detection means 12 are transmitted to the
control section 50 during operation of the heat pump apparatus 100.
[0019] Fig. 2 is a block diagram showing an electrical schematic configuration of the heat
pump apparatus. Based on Fig. 2, detailed descriptions will be given to the function
of the control section 50. As shown in Fig. 2, the control section 50 includes a memory
51 and an operation section 52. Detection values detected by the condensation temperature
detection means 11 and the evaporation temperature detection means 12 are transmitted
and stored into a memory 51 of the control section 50. Detected values stored in the
memory 51 are operated by the operation section 52. That is, the control section 50
is adapted to transmit a control signal to each drive section of the compressor 1,
the four-way valve (not shown) , the expansion means 3, the condenser fan 5, and the
evaporator fan 6 based on calculation results information of the memory 51 and the
operation section 52.
[0020] In this case, an instantaneous COP=COP that represents operation efficiency during
heating operation is estimated from formula (1) as follows using the condensation
temperature Tc and evaporation temperature Te. Formula (1) is a Carnot's efficiency
definition formula. Power consumption is estimated by Tc-Te.

[0021] Fig. 3 is a graph showing a relation between time and COP. Based on Fig. 3, descriptions
will be given to a relation between time and COP of the heat pump apparatus 100. In
Fig. 3, a horizontal axis represents time, and a vertical axis COP, respectively.
In the heat exchange between the refrigerant and the air in the evaporator 4, a frost
formation phenomenon occurs, in which water contained in the air attaches onto the
evaporator 4 to grow into frost when the refrigerant temperature is 0 degree or lower
and equal to or less than the dew-point temperature of the air. As the frost formation
phenomenon progresses in the evaporator 4, heat exchange amount in the evaporator
4 decreases and the instantaneous COP is lowered as shown in Fig. 3 due to increase
in the ventilation resistance and thermal resistance, therefore, defrosting operation
is needed.
[0022] With the instantaneous COP = COP shown by formula (1), Te decreases more than Tc
does as frost is formed and the lowering of the instantaneous COP can be accurately
grasped. For example, with the condensation temperature Tc, Tc = 49 degrees C at the
start of operation. Then, Tc = 47 degrees C at the time just before the start of defrosting,
resulting in decrease of approximately two degrees. On the contrary, with the evaporation
temperature Te, while Te = -2 degrees C at the start of operation, Te = -6 degrees
C at the time just before the start of defrosting, resulting in decrease of approximately
4 degrees. As frost formation progresses, COP is lowered.
[0023] Fig. 4 is a graph showing a relation between time and COP. Based on Fig. 4, descriptions
will be given to a one -cycle average COP of the heat pump apparatus. In the case
of the operation accompanying defrosting operation, operation efficiency is evaluated
by a one-cycle average COP with from the start of operation to the end of defrosting
operation being one-cycle. That is, to start the defrosting operation becomes important
at a timing of the maximum of one-cycle average COP. If the defrosting operation is
started at this timing, energy saving can be effectively achieved.
[0024] Fig. 5 is a flowchart showing an example of a processing flow regarding defrosting
start decision control of the heat pump apparatus 100. Fig. 6 is a graph showing a
relation between an instantaneous COP and an average COP. Fig. 7 is a graph showing
a relation between the instantaneous COP and a one-cycle average COP. Fig. 8 is a
graph showing a relation between the instantaneous COP and the average COP. Fig. 9
is a flowchart showing another example of a processing flow regarding defrosting start
decision control of the heat pump apparatus 100. Based on Figs. 5 to 9, descriptions
will be given to a processing flow on the defrosting start decision control of the
heat pump apparatus 100. In Figs. 6 to 8, the horizontal axis represents time, and
the vertical axis COP, respectively.
[0025] When the heat pump apparatus 100 starts operation, the control section 50 performs
operation of the instantaneous COP = COP shown by the above formula (1) from the condensation
temperature Tc, which is a detection value detected by the condensation temperature
detection means 11, and the defrosting temperature Te, which is a detection value
detected by the evaporation temperature detection means 12. (step S101) Thereafter,
the control section calculates an average COP = COP_AVE from the start of the normal
operation to now as shown in Fig. 6. (step S102) As shown in Fig. 7, the defrosting
start timing having the highest one-cycle COP = COP_CYCLE is when the instantaneous
COP = COP is lowered to the one-cycle average COP = COP_CYCLE due to frost formation.
[0026] The one-cycle average COP = COP_CYCLE when starting the defrosting operation now
is represented by formula (2) as follows using the average COP = COP_AVE from the
start of the normal operation to now.

[0027] C in the right-hand side of the above formula (2) takes decrease in the average COP
caused by the defrosting operation into consideration as shown in Fig. 7. The C may
be a preset constant. For example, when the one-cycle average COP becomes 96 % of
the average COP = COP_AVE at the time of heating operation due to defrosting, C=0.96.
The C may be optimally set as needed because optimal values depend on method of defrosting
and the specification of the apparatus.
[0028] To calculate the one-cycle average COP from the above formula (2) when starting the
defrosting operation now and compare it with the instantaneous COP = COP now. (step
S103) As a result, to start defrosting operation when the relation shown in formula
(3) as follows holds. (step S103; YES) On the other hand, formula (3) as follows does
not hold (step S103; NO), return to step S101 to repeat the above process.

[0029] In step S103, the defrosting operation may be started when the current instantaneous
COP decreases to the average COP = COP_AVE up to now instead of the one-cycle average
COP. The flowchart then is shown in Fig. 9. In step S203, the defrosting operation
starts when formula (4) as follows comes into effect. Other steps are the same as
Fig. 5.

[0030] Fig. 10 is a schematic configuration diagram showing a refrigerant circuit configuration
under a state in which the heat pump apparatus 100 includes compressor operation time
measurement means 13. Fig. 11 is a graph showing a relation between the instantaneous
COP and the one-cycle average COP of the heat pump apparatus 100. Descriptions will
be given to a case in which defrosting start decision is performed after the operation
of the compressor 1 lasted for a certain time based on Figs. 10 and 11. As shown in
Fig. 10, the compressor 1 is provided with compressor operation time measurement means
13. The measurement time in the compressor operation time measurement means 13 is
adapted to be sent to the control section 50.
[0031] Since the refrigeration cycle is not stable right after the start of the compressor
1, the certain time may be set as the time from when the compressor 1 starts operation
until the refrigeration cycle stabilizes sufficiently, for example 20 minutes, or
may be set to be further shorter unless no problem exists for the defrosting start
decision. Therefore, from Figs. 10 and 11, the heat pump apparatus 100 may start the
defrosting start decision after the elapse of a certain time from the start of the
compressor 1. Preferably, the certain time may be changed.
[0032] The decision start time can be changed depending on the frost formation amount by
setting the certain time to 30 minutes when the previous defrosting time is equal
to 5 minutes or less and to 20 minutes when the previous defrosting time is equal
to 5 minutes or larger.
[0033] Fig. 12 is a graph showing a relation between the instantaneous COP and the one-cycle
average COP of the heat pump apparatus 100. Fig. 13 is a flowchart showing another
example of the processing flow regarding the defrosting start decision control of
the heat pump apparatus 100. Descriptions will be given to the processing flow of
the case in which defrosting operation starts when the instantaneous COP = COP falls
below the one-cycle average COP = COP_CYCLE for a certain time in succession based
on Figs. 12 and 13. In Fig. 12, the horizontal axis represents time, and the vertical
axis COP, respectively. Parts in Fig. 13 with no explanations in particular have the
same contents as those explained in Fig. 5.
[0034] The heat pump apparatus 100 may start defrosting operation when the instantaneous
COP = COP falls below the one-cycle average COP = COP_CYCLE for a certain time in
succession as shown in Fig. 12. The flowchart then is shown in Fig. 13. The defrosting
operation is started when a timer TIMER is counted in step S304 and it is judged in
step S305 that a certain time t has elapsed after the timer TIMER was set. (step S305;
YES) If the conditions of step S303 are not fulfilled (step S305; NO) before the certain
time t elapsed, reset the timer TIMER to redo the judgment. Thereby, the start of
a false defrosting operation can be avoided when the instantaneous COP = COP falls
below the one-cycle average COP = COP_CYCLE due to a sudden change in noises and the
like.
[0035] Fig. 14 is a graph showing a relation between time variation of COP and time of the
heat pump apparatus 100. Fig. 15 is a flowchart showing another example of the processing
flow regarding a defrosting start decision control of the heat pump apparatus 100.
Based on Figs. 14 and 15, descriptions will be given to the processing flow when defrosting
operation starts in the case where the instantaneous COP = COP falls below the one-cycle
average COP = COP_CYCLE, and variations ΔCOP of the instantaneous COP = COP within
a certain time or variations Δ Te of the evaporation temperature within a certain
time fall below a preset value X for a certain time in succession. In Fig. 14, the
horizontal axis represents time, and the vertical axis Δ COP or Δ Te, respectively.
Parts in Fig. 15 with no explanations in particular have the same contents as those
explained in Fig. 5.
[0036] The heat pump apparatus 100 may start defrosting operation when the instantaneous
COP = COP falls below the one-cycle average COP = COP_CYCLE and, as shown in Fig.
14, variations Δ COP of the instantaneous COP = COP within a certain time or variations
ΔTe of the evaporation temperature Te within a certain time fall below a preset value
X for a certain time t in succession. The flowchart then is shown in Fig. 15. If Δ
COP or Δ Te falls below X at step S404 (step S404; YES), count of the timer TIMER
is started at step S405. If it is judged that the timer TIMER undergoes a certain
time t at step S406, defrosting operation is started. (step S406; YES)
[0037] Conditions of step S403 or step S404 are not fulfilled before elapsing a certain
time t (step S403; NO, or step S404; NO), reset the timer TIMER to redo the judgment.
Thereby, a false defrosting operation start can be avoided caused by a sudden change
in noises, a change of compressor frequency, and a temporarily change in COP due to
load variations. The condensation temperature detection means 11 in Embodiment 1 may
be means to directly measure temperature by a thermistor, means to convert a condensation
temperature from a pressure sensor, or means to estimate the condensation temperature.
The evaporation temperature detection means 12 in Embodiment 1 may be means to directly
measure temperature by the thermistor, means to convert the condensation temperature
from the pressure sensor, or means to estimate the condensation temperature.
Embodiment 2
[0038] Fig. 16 is a schematic configuration diagram showing configuration of a refrigerant
circuit of a heat pump apparatus 100a according to Embodiment 2 of the present invention.
Based on Fig. 16, descriptions will be given to configuration and operation of the
refrigerant circuit of the heat pump apparatus 100a. The heat pump apparatus 100a
performs cooling operation or heating operation by circulating the refrigerant. In
Embodiment 2, the same signs will be given to the same portions as Embodiment 1, and
descriptions will be given to differences from Embodiment 1.
[0039] As shown in Fig. 16, the heat pump apparatus 100a is configured by serially connecting
a compressor 1, a condenser 2, expansion means 3, and an evaporator 4 in order by
refrigerant piping 15. In the vicinity of the condenser 2, a condenser fan 5 and condensation
temperature detection means 11 are provided. In the vicinity of the evaporator 4,
the evaporator fan 6 is provided. With the compressor 1, compressor operation current
detection means 14 to detect the operation current of the compressor 1 is provided.
Detection values detected by condensation temperature detection means 11 and compressor
operation current detection means 14 are adapted to be sent to the control section
50 that integrally controls the entire heat pump apparatus 100. That is, the heat
pump apparatus 100a is different from the heat pump apparatus 100 in that no evaporation
temperature detection means 12 is provided but compressor operation current detection
means 14 is provided.
[0040] Here, operation of the heat pump apparatus 100a will be briefly explained.
When the heat pump apparatus 100a starts operation, the compressor 1 is driven. The
high-temperature high-pressure gas refrigerant compressed in the compressor 1 is discharged
therefrom to flow into the condenser 2. In the condenser 2, the incoming gas refrigerant
is decompressed while radiating heat to the fluid to turn into a low-temperature high-pressure
refrigerant. The refrigerant flows out of the condenser 2 and decompressed by expansion
means 3 to turn into a gas-liquid two-phase refrigerant. The gas-liquid two-phase
refrigerant flows into the evaporator 4. The refrigerant flowed into the evaporator
4 is vaporized and gasified by absorbing heat from the fluid. The refrigerant flows
out of the evaporator 4 to be re-absorbed by the compressor 1. During the operation
of the heat pump apparatus 100, detection values from condensation temperature detection
means 11 and compressor operation current detection means 14 are sent to the control
section 50.
[0041] Fig. 17 is a block diagram showing an electrical schematic configuration of the heat
pump apparatus 100a. Based on Fig. 17, detailed descriptions will be given to the
function of the control section 50. As shown in Fig. 17, the control section 50 includes
a memory 51 and an operation section 52. Detection values by condensation temperature
detection means 11 or compressor operation current detection means 14 are sent to
the memory 51 of the control section 50 to be stored. The detection values stored
in the memory 51 are operated by the operation section 52. That is, the control section
50 is adapted to send control signals to each drive section of the compressor 1, a
four-way valve (not shown), expansion means 3, the condenser fan 5, and the evaporator
fan 6 based on calculation results information in the memory 51 and the operation
section 52.
[0042] In this case, COP representing operation efficiency during heating operation is estimated
by formula (5) as follows using the condensation temperature Tc and the compressor
operation current Ac. Dissipation power is estimated by Ac

[0043] As mentioned above, with the heat exchange between the refrigerant and the air in
the evaporator 4, when the temperature of the refrigerant is 0 degree or less and
equal to or less than the dew-point temperature of the air, a frost formation phenomenon
occurs in which the water contained in the air attaches to the evaporator 4 to grow
into frost. As the frost formation phenomenon progresses in the evaporator 4, the
heat exchange amount in the evaporator 4 decreases due to increase in the ventilation
resistance and thermal resistance to lower COP as shown in Fig. 3, resulting in the
need of defrosting operation. In the case of the operation accompanying the defrosting
operation, COP is evaluated by one-cycle average COP, in which one cycle is from the
start of the normal operation to the end of the defrosting operation as shown in Fig.
4. That is, it is important to start defrosting operation at the timing when the one-cycle
average COP becomes the highest. Energy saving can be effectively achieved if the
defrosting operation is started at this timing.
[0044] Fig. 18 is a flowchart showing an example of the processing flow regarding defrosting
start decision control of the heat pump apparatus 100a. Based on Fig. 18, descriptions
will be given to the processing flow in relation to defrosting start decision control
of the heat pump apparatus 100a. When the heat pump apparatus 100a starts operation,
the control section 50 performs operation of instantaneous COP = COP represented by
the above formula (5) from the condensation temperature Tc, which is the detection
value detected by the condensation temperature detection means 11, and the compressor
operation current Ac, which is the detection value detected by the compressor operation
current detection means 14. (step S501)
[0045] Thereafter, the control section 50 calculates average COP =COP_AVE from the start
of the normal operation up to now as shown in Fig. 6. (step S502) As shown in Fig.
7, the defrosting start timing at which one-cycle COP = COP_CYCLE becomes the highest
is when the instantaneous COP = COP is decreased to one-cycle average COP = COP_CYCLE
due to frost formation. The one-cycle average COP = COP_CYCLE at the start of the
defrosting operation at present is represented by formula (6) as follows using the
average COP = COP_AVE from the start of the normal operation up to now.

[0046] C in the right-hand side of the above formula (6) takes decrease in the average COP
caused by the defrosting operation into consideration as shown in Fig. 7. The C may
be a preset constant. For example, when the one-cycle average COP becomes 96 % of
the average COP =COP_AVE at the time of heating operation due to defrosting, C =0.96.
C may be optimally set as needed because optimal values depend on method of defrosting
and the specification of the apparatus.
[0047] To calculate the one-cycle average COP from the above formula (6) when starting the
defrosting operation now and compare it with the instantaneous COP = COP now. (step
S503) As a result, to start defrosting operation when the relation shown in formula
(7) as follows holds. (step S503; YES) On the other hand, formula (7) as follows does
not hold (step S503; NO), return to step S501 to repeat the above process.

[0048] Fig. 19 is a schematic configuration diagram showing a refrigerant circuit configuration
under a state in which the heat pump apparatus 100a includes compressor operation
time measurement means 13. Fig. 20 is a graph showing a relation between the instantaneous
COP and the one-cycle average COP of the heat pump apparatus 100a. Descriptions will
be given to a case in which defrosting start decision is performed after the operation
of the compressor 1 lasted for a certain time based on Figs. 19 and 20. As shown in
Fig. 19, the compressor 1 is provided with compressor operation time measurement means
13. The measurement time in the compressor operation time measurement means 13 is
adapted to be sent to the control section 50.
[0049] Since the refrigeration cycle is not stable right after the start of the compressor
1, the certain time may be set as the time from when the compressor 1 starts operation
until the refrigeration cycle stabilizes sufficiently, for example 20 minutes, or
may be set to be further shorter unless no problem exists for the defrosting start
decision. Therefore, from Figs. 10 and 11, the heat pump apparatus 100 may start the
defrosting start decision after the elapse of a certain time from the start of the
compressor 1. Preferably, the certain time may be changed.
[0050] Fig. 21 is a graph showing a relation between the instantaneous COP and the one-cycle
average COP of the heat pump apparatus 100a. Fig. 22 is a flowchart showing another
example of the processing flow regarding the defrosting start decision control of
the heat pump apparatus 100a. Descriptions will be given to the processing flow of
the case in which defrosting operation starts when the instantaneous COP = COP falls
below the one-cycle average COP = COP_CYCLE for a certain time in succession based
on Figs. 21 and 22. In Fig. 21, the horizontal axis represents time, and the vertical
axis COP, respectively. Parts in Fig. 22 with no explanations in particular have the
same contents as those explained in Fig. 18.
[0051] The heat pump apparatus 100a may start defrosting operation when the instantaneous
COP = COP falls below the one-cycle average COP = COP_CYCLE for a certain time in
succession as shown in Fig. 21. The flowchart then is shown in Fig. 22. The defrosting
operation is started when a timer TIMER is counted in step S604 and it is judged in
step S605 that a certain time t has elapsed after the timer TIMER was set. (step S605;
YES) If the conditions of step S603 are not fulfilled (step S603; NO) before the certain
time t elapsed, reset the timer TIMER to redo the judgment. Thereby, the start of
a false defrosting operation can be avoided when the instantaneous COP = COP falls
below the one-cycle average COP = COP_CYCLE due to a sudden change in noises and the
like.
[0052] Fig. 23 is a graph showing a relation between time variation of COP and time of the
heat pump apparatus 100a. Fig. 24 is a flowchart showing still another example of
the processing flow regarding defrosting start decision control of the heat pump apparatus
100a. Based on Figs. 23 and 24, descriptions will be given to the processing flow
when defrosting operation starts in the case where the instantaneous COP = COP falls
below the one-cycle average COP = COP_CYCLE, and variations Δ COP of the instantaneous
COP = COP within a certain time falls below a preset value X for a certain time t
in succession. In Fig. 23, the horizontal axis represents time, and the vertical axis
Δ COP, respectively. Parts in Fig. 24 with no particular explanations have the same
contents as those explained in Fig. 18.
[0053] The heat pump apparatus 100a may start defrosting operation when the instantaneous
COP = COP falls below the one-cycle average COP = COP_CYCLE and, as shown in Fig.
23, variations Δ COP of the instantaneous COP = COP within a certain time fall below
a preset value X for a certain time t in succession. The flowchart then is shown in
Fig. 24. If Δ COP falls below X at step S704 (step S704; YES), count of the timer
TIMER is started at step S705. If it is judged that a certain time t has elapsed after
the timer TIMER was set at step S706, defrosting operation is started. (step S706;
YES)
[0054] If conditions of step S703 or step S704 are not fulfilled before elapsing a certain
time t (step S703; NO, or step S704; NO), reset the timer TIMER to redo the judgment.
Thereby, a false defrosting operation start can be avoided caused by a sudden change
in noises, a change of compressor frequency, and a temporarily change in COP due to
load variations. The condensation temperature detection means 11 in Embodiment 2 may
be means to directly measure temperature by the thermistor, means to convert the condensation
temperature from the pressure sensor, or means to estimate the condensation temperature.
[0055] In Embodiments 1 and 2, no descriptions are given to kinds of the refrigerant circulating
in the refrigeration cycle, however, kinds of the refrigerant are not limited in particular.
For example, a natural refrigerant such as carbon dioxide, hydrocarbon, and helium,
the refrigerant including no chloride such as an alternative refrigerant like HFC410A
and HFC407C, or a fluorocarbon refrigerant such as R22 and R134a used for existing
products may be allowable. The compressor 1 may be any of a variety of types, for
example, reciprocating, rotary, scroll, or screw. The rotation speed may be either
variable or fixed.
Reference Signs List
[0056]
- 1
- compressor
- 2
- condenser
- 3
- expansion means
- 4
- evaporator
- 5
- condenser fan
- 6
- evaporator fan
- 11
- condensation temperature detection means
- 12
- evaporation temperature detection means
- 13
- compressor operation time measurement means
- 14
- compressor operation current detection means
- 15
- refrigerant piping
- 50
- control section
- 51
- memory
- 52
- operation section
- 100, 100a
- heat pump apparatus
1. A heat pump apparatus (100, 100a) including a refrigerant circuit, in which a compressor
(1), a condenser (2), expansion means (3), and an evaporator (4) are serially connected,
comprising:
condensation temperature detection means (11) that detects the saturation temperature
of said condenser (2);
evaporation temperature detection means (12) that detects the saturation temperature
of said evaporator (4); and
a control section (50) that estimates operation efficiency by a value obtained by
dividing heating ability estimated from a detection value of said condensation temperature
detection means (11) by a difference between the detection value of said condensation
temperature detection means (11) and the detection value of said evaporation temperature
detection means (12) or dissipation power estimated from said difference.
2. The heat pump apparatus (100, 100a) of claim 1, wherein
said control section (50) starts defrosting operation when said estimated operation
efficiency decreases down to a predetermined value.
3. The heat pump apparatus (100, 100a) of claim 2, wherein
said predetermined value is an estimation value of an average operation efficiency
from the start of operation to the end of defrosting operation when performing defrosting
operation now from an average value of said operation efficiency from the start of
operation to now.
4. The heat pump apparatus (100, 100a) of claim 2, wherein
said predetermined value is an average value of said estimated operation efficiency
from the start of operation to now.
5. A heat pump apparatus (100, 100a) including a refrigerant circuit, in which a compressor
(1), a condenser (2), expansion means (3), and an evaporator (4) are serially connected,
comprising:
condensation temperature detection means (11) that detects the saturation temperature
of said condenser (2);
compressor operation current detection means (14) that detects an operation current
of said compressor (1); and
a control section (50) that estimates operation efficiency from a value obtained by
dividing heating ability estimated by a detection value from said condensation temperature
detection means (11) by the detection value of said compressor operation current detection
means (14) or dissipation power estimated from said detection value, and
starts defrosting operation when said estimated operation efficiency decreases from
an average value of said operation efficiency from the start of operation up to now
down to an estimation value of the operation efficiency from the start of operation
to the end of defrosting operation when performing defrosting operation now.
6. The heat pump apparatus (100, 100a) of any of claims 2 to 5, comprising compressor
operation time measurement means (13) that measures operation time of said compressor
(1), wherein
said control section (50) starts defrosting operation according to any of embodiments
of claims 2 to 5 when the detection time of said compressor operation time measurement
means (13) becomes a predetermined time or more.
7. The heat pump apparatus (100, 100a) of claim 6, wherein
said predetermined time is decided based on said defrosting operation time in the
operation after said defrosting operation is started and completed.
8. The heat pump apparatus (100, 100a) of any of claims 3 to 7, wherein
said control section (50) starts defrosting operation when said estimated operation
efficiency decreases down to a predetermined value and said operation efficiency falls
below a predetermined value for a certain time in succession.
9. The heat pump apparatus (100, 100a) of any of claims 3 to 7, wherein
said control section (50) starts defrosting operation when said operation efficiency
falls below a predetermined value and variations of said operation efficiency within
a certain time falls below a preset value for a certain time in succession.
10. The heat pump apparatus (100, 100a) of any of claims 3 to 7, wherein
said control section (50) starts defrosting operation when said operation efficiency
falls below a predetermined value and variations of said evaporation temperature within
a certain time falls below a preset value for a certain time in succession.