[0001] The present invention relates to a managing method. In particular, the present invention
relates to a method for managing a pumping device. In more detail, the present invention
relates to a managing method, which can be used to adjust the flow of a fluid supplied
through a pumping device.
BACKGROUND TO THE INVENTION
[0002] The use of peristaltic pumps is well known in many sectors whenever it is necessary
to pump a fluid maintaining it insulated inside a respective pumping circuit, so as
to avoid the fluid entering into contact with the outside environment, thus preventing
contaminations. Peristaltic pumps are widely used for example in the food industry
and in the hospital sector where it is necessary, for hygienic reasons, to pump fluids
under conditions of high cleanliness or even under controlled atmosphere and/or in
sterile environment.
[0003] As it is well known, a peristaltic pump is provided with a highly elastic flexible
tube, made typically of natural rubber, Hypalon or polypropylene, which is peripherally
compressed by at least one mechanical pressing member, for example a roller, which
occludes the lumen of the tube. Each of these pressing members, in use, is made slide
longitudinally along the tube so that the "squeeze" generated by it displaces in a
concordant and continuous manner along the tube and pushes the fluid, contained inside
the pumping circuit, in the same sliding direction as the rollers. In more detail,
there are various types of peristaltic pumps: for example, in the medical sector linear
peristaltic pumps are commonly used, wherein a flexible tube is arranged linearly
and is engaged in sequence and in a periodic manner by a plurality of rotating and
coaxial cam members, identical to each other and reciprocally synchronised. Alternatively,
the rotary peristaltic pumps are well known, which are characterised by compactness
and great sturdiness. This type of pumps provides for the use of a stator unit, which
presents a first central cylindrical seat housing a respective rotor provided peripherally
with a plurality of rollers. The stator unit furthermore presents a second seat, that
is substantially semi-toroidal, to house stably an elastic tube, which is therefore
folded along at least an arc of a circle concentric with the axis of rotation of the
rotor holding the rollers. These rollers, in use, peripherally push the tube, thus
generating squeezes thereof which, in use, slide longitudinally and cyclically along
the tube in a concordant manner as the rotation of the rotor.
[0004] Independently of the respective type, each peristaltic pump is suitable to supply
each respective fluid pumped by it in a periodic pulsed, and thus inevitably discontinuous,
manner. Actually, the presence of each squeeze, which causes the pumped fluid to move
forwards, causes inevitably a stop, or at least a sudden reduction, and therefore
a discontinuity, in the supplied fluid and this discontinuity will occur periodically
whenever the squeeze passes at the inlet of the delivery duct of the pump.
[0005] The presence of these discontinuities in the supply flow of a peristaltic pump represents
a great disadvantage for the use of these devices when it is necessary to pump a fluid
with a very low flow rate, for example in the order of 1 ml/min, corresponding to
a regime of rotation lower than 5 rpm. It should be noted, in fact, that in order
to supply reduced flow rates of fluid, the sliding speed of the pressing members along
the tube is usually minimised, and this entails that the duration of each stop/discontinuity
in the supply is prolonged, with the result that the supplied flow is not substantially
uniform but, on the contrary, it presents significant non-uniformities. In this regard
it should be noted that the American firm Abbott Laboratories is the holder of the
patent
US5219279 relating to a volumetric pump and to an operative method thereof, which allows to
supply a flow rate of fluid which can be defined substantially at will by the user.
In particular, this volumetric pump comprises a gear motor, which actuates a pumping
device provided to engage the flexible tube, transporting the fluid to be pumped,
with a respective cam member.
[0006] This pumping device is designed so that 24 rotations of the gear motor correspond
to each pumping cycle, in order to allow a fine adjustment of the position of the
cam member engaging the tube. At this point it should be noted that the document
US5219279 specifies that it is possible to adjust, substantially at will, the average flow
rate of the supplied fluid by varying the speed of the gear motor and inserting a
given number of pauses of given duration during the pumping cycles of the cam member;
however, as clearly shown in figure 22 of the mentioned document, the supplied fluid,
although presenting the desired average flow rate, is not uniform, but on the contrary
it alternates a first phase, wherein the supply of fluid is greatly pulsed, with a
second phase, wherein the supply is substantially continuous. It should be furthermore
noted that, in order to obtain such a fine adjustment of the average flow rate of
supplied fluid, the volumetric pump in question comprises a more complex and more
expensive pumping device, which requires more maintenance than the common rotary peristaltic
pumps.
[0007] Alternatively, the American firm Baxter International Inc is holder of the international
patent application
WO96/01371, describing and claiming a peristaltic pumping system for medical applications, suitable
to supply a fluid with a flow rate which can vary between a maximum of 170 ml/min
and a minimum value lower than 10 ml/min. At this end, the pumping system comprises
a rotary peristaltic pump provided with a motor with variable rotational speed, and
with a control device, suitable to control an alternate actuation of the respective
rotor so as to introduce slowdowns or pauses in the supply, aimed at reducing the
average flow rate of the pumped fluid. This pumping system therefore allows to supply
fluid with a reduced average flow rate which can be defined at will, but, on the other
hand, it is not suitable to overcome the drawbacks due to the discontinuity of the
flow of supplied fluid. In particular, the teachings of the document
WO96/01371 are based upon the approximation that the fluid supplied by the respective pumping
system is continuous when the rotor works with a constant angular speed. Consequently,
this document takes only the average flow rate of the peristaltic pump into consideration,
and not the presence of the pauses of the supplying phase, which are intrinsic to
the peristaltic structure of the pumping system. Therefore, the insertion of pauses
during each supplying phase, even though it allows reducing the average flow rate
of the supplied fluid, amplifies the non-uniformity of the flow of fluid supplied
by the rotary peristaltic pump. It should be furthermore noted that the method for
managing the pumping system described in the document
WO96/01371 provides:
- a fixed number of pauses/slowdowns for each pumping cycle;
- that by varying the desired average flow rate of supply, the duration of the phase
of effective supply varies substantially in inverse proportion to the duration of
the pauses/slowdowns in supply. It is therefore readily apparent that, when extremely
reduced average flow rates are chosen, the flow supplied by the pumping system according
to the document WO96/01371 will present high discontinuities, as short periods of effective supply are followed
by long periods of pause/reduction in the supply.
[0008] Moreover, a known alternative solution to increase the uniformity of a flow supplied
by a rotary peristaltic pump is that of increasing the number of rollers carried by
the respective rotor; this solution however entails higher production and maintenance
costs, and is therefore excessively expensive for the largest part of the sectors
wherein the rotary peristaltic pumps are commonly used.
[0009] Therefore, in view of the above description, the problem of managing a peristaltic
pumping device so that it is suitable to supply continuously and substantially uniformly
flows of reduced flow rate, definable at will, is currently unsolved and represents
an interesting challenge for the applicant, that aims at obtaining a managing method
which can be implemented on a simple and economical peristaltic pumping device and
which is suitable to solve the above illustrated problems.
SUMMARY OF THE PRESENT INVENTION
[0010] The present invention relates to a managing method. In particular, the present invention
relates to a method for managing a pumping device. In more detail, the present invention
relates to a managing method which can be used to adjust the flow of a fluid supplied
through a pumping device.
[0011] The object of the present invention is to provide a method which can be validly used
to manage a pumping device of the peristaltic type; this method allows to solve the
above illustrated drawbacks, and it is therefore suitable to satisfy a plurality of
requirements that to date have still not been addressed and therefore suitable to
represent a new and original source of economic interest, capable of modifying the
current market of the pumping devices.
[0012] According to the present invention, a managing method is provided, whose main characteristics
will be described in at least one of the appended claims.
BRIEF DESCRIPTION OF DRAWINGS
[0013] Further characteristics and advantages of the managing method according to the present
invention will be more apparent from the description below, set forth with reference
to the accompanying drawings and diagrams, which illustrate at least one non-limiting
example of embodiment, in which identical or corresponding phases of the method are
identified by the same reference numbers. In particular:
- figure 1 is a schematic perspective view of a pumping device suitable to implement
a managing method according to the present invention;
- figure 2 illustrates diagrams relating to the supply of fluid through the pumping
device of figure 1, functioning according to a first operating mode which does not
form part of the present invention;
- figure 3 illustrates diagrams relating to the supply of fluid through the pumping
device of figure 1, functioning according to a second operating mode which does not
form part of the present invention;
- figure 4 illustrates diagrams relating to the supply of fluid through the pumping
device of figure 1, functioning according to a third operating mode according to the
present invention; and
- figure 5 illustrates diagrams relating to the supply of fluid through the pumping
device of figure 1, functioning according to a variant of the third operating mode
of figure 4.
DETAILED DESCRIPTION OF THE PRESENT INVENTION
[0014] In figure 1, number 1 indicates, in its entirety, a pumping device 10 comprising
a pump 15 provided with an inlet duct 11, which can be used to supply a fluid M to
the pump 15, and an outlet duct 12, through which each pumped portion of fluid M is
supplied. It should been noted that hereinafter the term fluid M will indicate not
only a liquid or a gas, but any type of flowable substance, i.e. any type of substance
which presents macroscopically viscosity features substantially equivalent to those
of a fluid and which can be therefore easily transported through a duct or a tube.
[0015] In particular, as illustrated in figure 1, the pump 15 preferably comprises a peristaltic
pump suitable to supply the fluid M from the outlet duct 12 in a pulsed manner, i.e.
through an intermittent and periodic supply of given quantities (jets) of fluid M
alternated with respective pauses in the supply. In fact, as it is well known, the
previously illustrated functioning principle upon which the peristaltic pumps are
based intrinsically entails the presence of at least first pauses P1 in the supply
of the fluid M, caused by the passage of a squeeze of the tube associated with a respective
pressing member, at the entrance of the outlet duct 12.
[0016] In particular, with reference to figure 1, it should be noted that hereinafter reference
will be made to a peristaltic pump 15 of the rotary type provided with a stator unit
16 housing an elastic tube 17 and with a rotor 18 provided with at least a pressing
roller 19. The rotor 18 is carried into rotation by an actuator, known and therefore
not illustrated, for example a DC electric motor or a brushless motor, so as to be
suitable to rotate with a given and constant angular speed V, which hereinafter will
be considered fixed for the sake of simplicity.
[0017] In use, when the rotor 18 rotates continuously at this angular speed V, the pumping
device 10 will be suitable to supply the fluid M with a flow rate, whose time dependence,
and therefore the dependence from the angular position α of the rotor 18, is illustrated
in figure 2a. From this figure 2a it is clearly understood that, when the pumping
device 10 operates according to this first operating mode A, wherein the rotor 18
rotates continuously at a constant angular speed V, the flow rate of the supplied
fluid M is pulsed and periodic. In more detail, to each complete rotation, or cycle,
of the rotor 18, a number of supply periods T corresponds, equal to the number of
the rollers 19 carried by the rotor 18. In this regard it should be specified that
hereinafter the term supply period T will indicate the time period comprised between
the end of two first pauses P1. Therefore, with reference to the preferred embodiment
of figure 1, the pump 15 will be preferably provided with two rollers 19 peripherally
carried in diametrically opposite positions, and it will therefore present a rotation
cycle equal to two supply periods T.
[0018] With reference to figure 2 again, each period T will correspond to the sum of the
duration TQ of a phase of supply at a constant flow rate PC of a quantity Q of the
fluid M, and the duration T1 of a first pause P1. It is furthermore clearly apparent
that, even if pulsed, the flow of the fluid M, supplied by the pumping device 10 functioning
in the first operating mode A, presents a first average flow rate PM1 equal to the
ration between the quantity Q and the duration of the period T and clearly lower than
the constant flow rate PC.
[0019] Now, with reference to figure 2b, it is possible to note that the fluid M supplied
by the pumping device 10 growths over time (and relative to the angular position α
of the rotor 18) according to a substantially stepped graph presenting a height which
is a whole multiple of the quantity Q wherein each "plateau" represents a first pause
P1.
[0020] With reference to figure 1, the pumping device 10 comprises a control unit 20 electrically
connected to the actuator associated with the rotor 18 so as to be suitable, in use,
to control actuations of this rotor 18 and to monitor, second by second, the angular
position α of the rotor 10. In particular, this control unit 20 comprises a CPU 25
of the programmable type and it is provided with a memory 21 and with an interface
22, through which a user can select operating modes for the pumping device 10 and/or
insert the value to be assigned to parameters of supply. Alternatively, if the pumping
device 10 is part of a more wide apparatus, this interface can be connected to a computer,
suitable to perform a program for supervising the supply of the fluid M and, therefore,
enabled to control the operation of the pumping device 10.
[0021] In particular, the memory 21 stores the numerical values of a function, which associates
the flow of the fluid M, which can be supplied in use by the pumping device 10, with
an independent variable such as, for example, the pumping/rotation time of the rotor
18 or the angular position α of the rotor 18. Just by way of example again, the memory
21 can preferably, but without limitation, contain the numerical data of the function
illustrated in figure 2a and the control unit 20 will be therefore enabled to calculate
easily the values of the function illustrated in figure 2b by means of simple operations
of numerical integration. In other words, as the memory 21 contains information about
the flow rate of the pumping device 10, the control unit 20 is suitable to calculate
the precise quantity of supplied fluid M as a function of the pumping/rotation time
of the rotor 18 and/or of the angular shift described by the rotor 18.
[0022] Therefore, thanks to this feature of the control unit 20, the pumping device 10 is
suitable to work according to an operating mode B, wherein doses Q', definable substantially
at will, of fluid M are supplied in an intermittent manner. In more detail and with
particular reference to figure 3, when the pumping device 10 operates in this second
operating mode B, the control unit 20 puts the rotor 18 into rotation exactly for
the time necessary to supply a dose Q' and, at this point, stops the rotation of the
rotor 18 and waits for a time interval of duration T2, which can be defined substantially
at will by the user through the interface 22. Therefore, when functioning in the second
operating mode B, the pumping device 10 is suitable to supply doses Q' alternated
with second pauses P2 in supply having duration T2.
[0023] With particular reference to figures 2 and 3 again, it should be noted that the data
contained in the memory 21 allow to take into account also the presence of the first
supply pauses P1 and therefore, contrarily to what occurs in the prior art, the pumping
device 10 is suitable to supply in a repeatable manner a plurality of doses Q' of
fluid M substantially identical to each other. Clearly, in the particular case in
which the end of the supply of a dose Q' corresponds to the end of the supply of a
quantity Q, and therefore to the beginning of a first pause P, the rotor 18 will continue
its run for a time interval of duration T1 and it will then stop for a time interval
presenting a duration substantially identical to the difference between the duration
T2 and the duration T1 so that, in this case, the first pause P1 is overlapped with
the respective second pause P2.
[0024] In any case, the control unit 20 calculates the exact angular position of stopping
of the rotor 18 to obtain each required dose Q' and it is therefore suitable to synchronise
the chronological arrangement of each second pause P2 relative to at least one first
pause P1 so as to supply doses Q' precisely. This feature of the pumping device 10
is particularly useful when one desires to supply first doses Q' reduced relative
to the quantity Q as, in the pumps designed according to the prior art, these reduced
doses are subjected to high uncertainties in supply and non-uniformities due to the
presence of the first supply pause P1.
[0025] At this point, with reference to figure 4, it should be noted that the pumping device
10 is suitable to operate also according to a third operative mode C, wherein the
fluid M is supplied in a substantially uniform manner with a second average flow rate
PM2 which is lower than the first average flow rate PM1 and which can be defined substantially
at will by the user. In particular, to enable this third operative mode C, the control
unit 20 controls an alternate actuation of the rotor 18, wherein this rotor 18 is
repeatedly actuated for a time interval of duration TQ" and subsequently stopped for
a time interval of duration T3. In other words, as it is clear apparent from figure
4a, the third operative mode C of the pumping device 10 is based upon the introduction
of a given number of third pauses P3 in the rotation of the rotor 18 during the supply
of each quantity Q, which is therefore subdivided in a discrete number of fractions
Q".
[0026] At this point, it should be noted that the third operative mode C is significantly
different from what seen in the prior art, wherein the rotor of the peristaltic pump
is brought to a respective minimum angular speed and, for each period, once the quantity
Q has been completely supplied, this rotor is stopped for a given time interval, so
that the supplied average flow rate corresponds to the value set by the user. However,
in this operative mode, which is typical of the prior art, long supply phases alternate
with long pauses, and therefore the flow of supplied fluid is significantly non-uniform.
[0027] Vice versa, in the managing method according to the present invention, when the pumping
device 10 operates according to the third operative mode C, the rotor 18 is alternatively
stopped and brought to the angular speed V for a plurality of times during the supply
of each quantity Q of fluid M, thus obtaining a supplied flow which is substantially
uniform over time.
[0028] In particular, it should be noted that, based upon the flow rate set by the user,
the control device 20 will determine the number and the duration T3 of the third pauses
P3, which shall be inserted during the supply of each quantity Q of fluid. As it is
clearly apparent from figure 4 again, the control device 20 is designed so as to select
a given number of third pauses P3 according to the required flow rate and in such
a manner that all these third pauses P3 present a same duration T3 substantially of
the same order of magnitude of the duration T1 of the first pauses P1. In fact, as
the angular speed V is constant, the duration T1 of the first pauses P1 is fixed and
it is connected with the intrinsic structural features of the pump 15, whilst the
duration of each third pause P3 is controlled by the control unit 20 and is connected
both with the flow rate chosen by the user and by the number of third pauses P3 inserted
in each supply period T comprised between the end of two consecutive first pauses
P1. At this point, with reference to figure 4 again, it should be noted that the third
pauses P3 are distributed during each supply period T in a substantially uniform manner
between the end of a first pause P1 and the beginning of the subsequent first pause
P1; more in particular, each group of third pauses P3 inserted during the supply of
a quantity Q of fluid M results synchronised relative to the pair of consecutive first
pauses P1, which chronologically delimit the supply of this quantity Q, in such a
manner that the flow of supplied fluid M, even though it result "microscopically"
pulsed, presents a flow rate which is substantially uniform over time, independently
of the value chosen by the user for this flow rate.
[0029] In this regard, it should be specified that, in order to maximise the uniformity
over time of the flow of supplied fluid M, the control unit 20 is programmed so as
to select a given number N of third pauses P3 to be introduced during the supply of
each quantity Q based upon the value of the average flow rate PM2 assigned by the
user. In particular, the control unit 20 is preferably enabled to select the given
number N among a plurality of whole values, preset during the programming phase, so
that to each value of the second average flow rate PM2 assigned by the user, a unique
whole value can be associated, preset for the given number N. At this end, it is possible
to subdivide all the values which can be assigned to the second flow rate PM2, i.e.
all the values of flow rate comprised between zero and the first average flow rate
PM1, in a discrete plurality of intervals, or fields, of flow rate, mathematically
contiguous to each other, and to associate to each of these fields a preset whole
value which can be assigned to the given number N. In use, once a value has been assigned
to the second average flow rate PM2, the control unit 20 will identify the field containing
this second average flow rate PM2 and will assign the respective preset whole value
to the given number N.
[0030] At this point, once the given number N of third pauses P3, associated with the supply
of each quantity Q, has been defined, the control unit 20 will calculate the duration
of the supply time intervals TQ" and the durations T3 of the third pauses P3. With
reference to figure 4, it is clear that N+1 phases of supplying a fraction Q" will
correspond to N third pauses P3 for each supply of a quantity Q, and therefore the
durations T3 and TQ" can be calculated, for instance, according to the following formulas:

[0031] Anyway, independently of the algorithms used to calculate the durations T3 and TQ",
it should be noted that, during the phase of programming the control unit 20, each
preset whole value has been associated to a respective flow rate field, so that the
durations T1, TQ" and T3 present substantially identical values or anyway values of
the same order of magnitude, in order to maximise the uniformity over time of the
flow of supplied fluid M.
[0032] Alternatively, instead of associating a preset whole value for each flow rate field,
it is possible to give to the control unit 20 the task of calculating, every time,
a given number N based upon the value of the second average flow rate PM2 inserted
by the user. In this case, the choice of N could be made, for example, through an
algorithm of maximisation of the uniformity over time of the flow rate of the flow
of supplied fluid M; this algorithm can be implemented, for example but without limitation,
by means of a numerical procedure of minimisation of the sum of the square numbers
of the differences between T3 and TQ" relative to T1.
[0033] At this point, it would be advisable to note that the pumping device 10, when it
operates according to the third operative mode C, is suitable to supply a flow of
fluid M, which simulates the flow which can be supplied by a rotary peristaltic device
provided with N+1 rollers. As it is well known, the greater the number of rollers
carried by the rotor is, the greater the uniformity of the supplied flow is, but with
higher costs for producing and managing the peristaltic pumping device.
[0034] Therefore, thanks to the managing method illustrated above, a simple pumping device
10 provided with an economical rotary peristaltic pump 15 provided with a limited
number of rollers and suitable to operate only with a fixed and non-adjustable angular
speed of the rotor, can be used to supply continuously flows of fluid M with high
uniformity and flow rate which can be set by the user substantially at will, thus
simulating the behaviour of pumping devices provided with a greater number of rollers
and with more expensive actuators with adjustable speed.
[0035] Lastly, it should be noted a further difference between the third operative mode
C of the method according to the present invention and the prior art. In the prior
art, to obtain a supply of the fluid M with particularly reduced flow rates, attempts
have been made to minimise the speed of actuation of the pump 15/of the rotor 18,
thus obtaining a supplied flow non-uniform over time. Vice versa, the managing method
according to the present invention allows to maximise the uniformity over time of
the flow of supplied fluid M by increasing the angular speed V of the rotor 18 and
it is therefore possible to state that the method has been designed based upon a project
trend opposite to that upon which the prior art is based. In fact, as it can be noted
from figures 2 and 4, by increasing the angular speed V it is possible to minimise
each duration T1 and consequently also the durations T3 and TQ", which are calculated
by the control unit 20 so as to be substantially identical to T1. Therefore, in order
to obtain a same given flow rate PM2 when the angular speed V increases, it will be
sufficient to increase the given number N of third pauses P3 and, consequently, a
flow will be supplied, in which the third pauses P3 and the phases of supplying the
fractions Q" alternate with a greater frequency. Lastly, it is apparent by observing
figure 4 that a flow supplied by the pumping device 10 will be the more uniform the
greater the given number N of third pauses P3, and therefore the greater the frequency
with which these third pauses P3 alternate with the phases of supplying a fraction
Q" of fluid M.
[0036] It should be however noted that in practice, in order to carry the rotor 18 into
rotation, it could be economically advantageous to use actuators provided with limited
mechanical characteristics, and therefore unsuitable to perform a series of stops
and subsequent (re)-actuations at high frequency.
[0037] In this case, alternatively to what described above, it could be impossible to insert
a high number N of third pauses P3 during the supply of each quantity Q and therefore,
in order to supply a flow presenting a reduced second flow rate PM2, it is possible
to define a reduced number N of third pauses P3 presenting a respective duration greater
than the duration T1. In more detail, with particular reference to figure 5, it should
be noted that it is possible to supply a flow presenting a reduced second flow rate
PM2 by reducing the given number N of third pauses P comprised between each two first
consecutive pauses P1 and simultaneously by elongating the durations T3 and TQ" so
that they present substantially an equal value greater than the duration T1 of each
first pause P1. In particular, with reference to figure 5 again, it should be noted
that, in order to guarantee the uniformity of the supplied flow, it is necessary that
each first pause P1 is followed by a fourth pause P4 of stopping the rotation of the
rotor 18 presenting a fourth duration T4 substantially equal to the difference between
the third duration T3 and the first duration T1, so that the sum of the first and
fourth durations T1 and T4 of each first and fourth pause P1 and P4 is substantially
equivalent to the duration T3 of each third pause P3.
[0038] In any case, in view of the above description and independently of the variant of
the third operative mode C implemented by means of the pumping device 10, the method
according to the present invention is a method for managing a peristaltic pumping
device 10 which can be implemented by means of a programmable control unit 20, provided
with a user interface 22 and suitable to control the actuation of this pumping device.
[0039] This method can be schematised as follows: first of all, the method according to
the present invention comprises a phase of selecting, through of the interface 22,
an operative mode for the pumping device 10. In particular, a user can select the
first operative mode A when he/she desires to pump the fluid M in a continuous manner
and at the maximum flow rate which can be obtained with the pumping device 10, or
the second operative mode B, when he/she desires to supply given doses Q' at regular
intervals, or, lastly, he/she can select the third operative mode C, when he/she desires
to obtain the supply of the fluid M with a reduced flow rate which can be defined
substantially at will, and in a manner substantially uniform over time.
[0040] In the first case, the phase of selecting an operative mode is followed by a phase
of actuating the pumping device 10 for an indeterminate period of time, which will
prosecute until the user or a supervision program for supervising the control unit
20 will send a stop command. Clearly, this phase of actuating the pumping device 10
will comprise a phase of actuating the rotor 18 into rotation with a constant angular
speed V for a substantially undetermined period of time.
[0041] Moreover, in the case in which the second operative mode B is selected, the phase
of selecting the operative mode will be followed by a phase of assigning a value for
the doses Q' and, as the case may be, a phase of assigning a value for the duration
T2 of each second pause P2 interposed between the supply of two consecutive doses
Q'. At this point, the control unit 20, before supplying each dose Q', will perform
a phase of calculating the given angle, by which the rotor 18 must rotate so that
the pumping device 10 will supply a quantity of fluid equal to the respective dose
Q'. It is clear that this phase of calculating the given angle of rotation of the
rotor 18 is performed by the rotor 18 based upon the data contained in the memory
21 and it can comprise, for instance, a phase of integrating numerically a function
that expresses the flow rate of the pump 15 as a function of the angular position
α of rotation of the rotor 18, and a phase of inverting the integrated function obtained.
It should be noted that, as the angular speed V of the rotor 18 is constant, each
width of the angle of rotation of the rotor 18 is equivalent to a given period of
rotation and therefore the phase of calculating the given angle, by which the rotor
18 shall rotate, is equivalent to a phase of calculating a duration TQ' for each time
interval for which the rotor 18 must rotate so that the pumping device 10 supplies
a respective quantity of fluid equal to a dose Q'. In this regard and with reference
to figure 3, it should be noted that, due to the presence of the first pauses P1,
the duration TQ' of each phase of supplying a dose Q' is generally variable and therefore
it should be each time calculated by the control unit 20 based upon the data contained
in the memory 21.
[0042] At this point, following each phase of calculating a duration TQ', the method comprises
a phase of actuating the pumping device 10/the pump 15 for a time interval of this
duration TQ', followed by a phase of stopping the supply of the fluid M for a time
interval of duration T2. This phase of stopping the supply of the fluid M will comprise,
according to the cases, a phase of stopping the pumping device 10/the pump 15 for
a time interval of duration T2 or a phase of actuating the pumping device 10/the pump
15 for a time interval of duration T1 followed by a phase of stopping the pumping
device 10/the pump 15 for a time interval of duration T4 substantially identical to
the difference between the duration T2 and the duration T1.
[0043] In particular, the three subsequent phases of calculating a duration TQ', of actuating
the pumping device 10/the pump 15 for a time interval of duration TQ' and of stopping
the pumping device 10/the pump 15 for a time interval of duration T2 can be repeated
cyclically and in this order for a substantially undetermined time, so as to enable
a continuous supply of doses Q' substantially identical to each other, until a user
or a program for managing the control unit 20 sends a stop command.
[0044] Lastly, if the user selects the third operative mode C, the phase of selecting an
operative mode will be followed by a phase of assigning a value for the desired second
average flow rate PM2 of supply. This phase of assigning a second average flow rate
PM2 will be therefore followed by a phase of selecting the given number N of third
pauses P3, which will chronologically subdivide the supply of each quantity Q into
N+1 supplies of a fraction Q". It should be noted that this phase of selecting a given
number N of third pauses P3 can comprise a phase of associating a preset whole value
to the given number N according to the value of the second average flow rate PM2,
in order to maximise the uniformity over time of the flow of supplied fluid M. Alternatively,
this phase of selecting a given number N of third pauses P3 can comprise a phase of
calculating this given number N by means, for example, of a given numerical algorithm
of maximisation of the uniformity over time of the flow rate of the flow of fluid
M supplied by the pumping device 10.
[0045] At this point, once the control unit 20 has selected/calculated the given number
N, the method according to the present invention provides for a phase of calculating
the durations T3 and TQ", so that the second average flow rate PM2 resulting for the
supplied flow matches the value selected by the user. This phase of calculating the
durations T3 and TQ" can comprise preferably a phase of calculating numerically the
result of the two formulas F1 and F2 illustrated above.
[0046] At this point a phase can be performed of supplying the fluid M in a manner pulsed
and presenting a substantially uniform second average flow rate PM2. This phase comprises
a phase of synchronising N+1 supply intervals of duration TQ" and N third pauses P3
during each period comprised between the end of a first pause P1 and the start of
the subsequent first phase P1. These N+1 intervals of duration TQ" and these N pauses
shall be therefore distributed in a uniform manner between each two consecutive first
pauses P1 and at this end the phase of synchronising presents the following steps
in sequence:
- a phase of actuating the pumping device 10/the pump 15 for a time interval of duration
TQ'';
- a cyclic repetition, for a given number N of times, of a phase of stopping the pumping
device 10/the pump 15 for a time interval of duration T3 and of a phase of actuating
the pumping device 10/the pump 15 for a time interval of duration TQ''; and
- a phase of actuating the pumping device 10/the pump 15 for a time interval of duration
T1.
[0047] Alternatively, if the second variant of the third operative mode C is used, characterised
by a reduced given number N of third pauses P3, the initial phase of actuating the
pumping device 10/the pump 15 for a time interval of duration TQ" is immediately followed
by a respective phase of stopping the pumping device 10/the pump 15 for a time interval
of duration T4.
[0048] Briefly, the result of this synchronisation phase is that illustrated in figure 4
or 5, and consists in supplying a fluid M in a manner substantially uniform over time
independently of the value selected by the user for the second average flow rate PM2.
At the same time, this synchronisation phase allows to prevent third pauses P3 from
overlapping by mistake first pauses P1, thus causing non-uniformities in the supplied
flow, similarly to what occurs in the illustrated prior art.
[0049] The managing method according to the present invention for managing the peristaltic
pumping device 10 is clearly apparent from the description above and does not require
further explanations.
[0050] Lastly, in view of the above description, it is clearly apparent that the managing
method according to the present invention is suitable to solve the technical problem
in question, and it is therefore suitable to manage a peristaltic pumping device,
so that this latter is suitable to supply in a continuous and substantially uniform
manner flows of reduced flow rate which can be defined at will.
1. A method for managing a pumping device (10) of the peristaltic rotary type provided
with a rotor (18) and suitable, in use, when said rotor (18) rotates with a constant
angular speed (V), to supply in a periodic pulsed manner a plurality of given quantities
(Q) of a given fluid (M) in such a way so as to generate a flow of said given fluid
(M) presenting a first given average flow rate (PM1); the supply of each said given
quantity (Q) being both preceded and followed by respective first pauses (P1) in the
supply of said given fluid (M) presenting a first given duration (T1); said managing
method comprising at least a phase of stopping said pumping device (10) so as to introduce
at least a given second pause (P3) during the supply of at least a said quantity (Q)
of said given fluid (M) ; characterised in that each said phase of stopping said pumping device (10) comprising a phase of synchronising
each said given second pause (P3) relative to at least a corresponding said first
pause (P1) in the supply of said given fluid (M); said phase of synchronising each
said second pause (P3) being performable in an automatic manner through control means
(20) for controlling said pumping device (10); each said phase of stopping said pumping
device (10) is both preceded and followed by a phase of supplying a given fraction
(Q") of said quantity (Q) of said given fluid (M); each said phase of supplying a
given fraction (Q") presenting a given second duration (TQ").
2. A method according to claim 1, characterised by comprising a phase of selecting a given number (N) of said second pauses (P3) interposed
between each two consecutive said first pauses (P1) and suitable to fractionate the
supply of each said quantity (Q) of fluid (M); each said second pause (P3) being associated
with a respective phase of stopping said pumping device (10) and presenting a given
third duration (T3) in such a way so that the flow of said given fluid (M) supplied
by said pumping device (10) presents at least a second average flow rate (PM2) lower
than said first average flow rate (PM1) and definable substantially at will.
3. A method according to claim 2, characterised in that each supply of a said quantity (Q) of said given fluid (M) is carried out through
a number of said phases of supplying a said given fraction (Q") equal to said given
number (N) increased by one unit.
4. A method according to claim 2 or 3, characterised in that said given number (N) can be chosen, in use, among a plurality of preset whole values
so as to maximise the uniformity over time of the flow rate of the flow of fluid (M)
supplied by said pumping device (10).
5. A method according to claim 2 or 3, characterised in that said phase of selecting a given number (N) comprises a phase of calculating said
selected number (N) by means of a numerical algorithm suitable to maximise the uniformity
over time of the flow rate of the flow of said given fluid (M) supplied by said pumping
device (10).
6. A method according to claim 5, characterised in that said numerical algorithm is implemented by means of a numerical procedure of minimisation
of the sum of the square number of the difference between said third duration (T3)
and said first duration (T1), with the square number of the difference between said
second duration (TQ") and said first duration (T1).
7. A method according to any one of claims 2 to 6, characterised in that said phase of selecting a given number (N) is followed by a phase of calculating
said third duration (T3) of each said second pause (P3) and said second duration (TQ")
of each said phase of supplying a said fraction (Q") of said quantity (Q) in such
a way so that the flow of said given fluid (M) supplied by said pumping device (10)
presents said second average flow rate (PM2).
8. A method according to any one of the previous claims, characterised in that said phase of synchronising each said second pause (P3) comprises, following each
said first pause (P1), the performance in sequence of a phase of actuating said pumping
device (10) for a time interval presenting said second duration (TQ"); a cyclical
repetition for a said given number (N) of times of a phase of stopping said pumping
device (10) for a time interval presenting said third duration (T3) and of a phase
of actuating said pumping device (10) for a time interval presenting said second duration
(TQ"); and a phase of actuating said pumping device (10) for a time interval presenting
said first duration (T1).
9. A method according to any one of the previous claims, characterised in that said phase of synchronising each said second pause (P3) comprises, following each
said first pause (P1), the performance in sequence of a phase of stopping said pumping
device (10) for a time interval presenting a fourth duration (T4) substantially equal
to the difference between said third duration (T3) and said first duration (T1); a
phase of actuating said pumping device (10) for a time interval presenting said second
duration (TQ"); a cyclical repetition for a said given number (N) of times of a phase
of stopping said pumping device (10) for a time interval presenting said third duration
(T3) and of a phase of actuating said pumping device (10) for a time interval presenting
said second duration (TQ"); and a phase of actuating said pumping device (10) for
a time interval presenting said first duration (T1).
10. A method according to any one of the previous claims, characterised by being suitable to simulate the supply of a flow of said given fluid (M) by a pumping
device (10) provided with a rotary peristaltic pump (15) equipped with a number of
respective pressing rollers (19) equal to said given number (N) increased by one unit.
11. A method according to any one of the previous claims, characterised in that each phase of actuating said pumping device (10) consists of a phase of actuating
said rotor (18) into rotation at a given constant angular speed (V).
12. A method according to any one of the previous claims, characterised by comprising an initial phase of selecting an operative mode of said pumping device
(10) among at least a first operative mode (B), in which said pumping system (10)
is suitable to supply said given fluid (M) in a plurality of doses (Q') substantially
identical to each other and definable substantially at will, and a second operative
mode (C), in which said pumping system (10) is suitable to supply continuously a flow
(F) of said fluid (M) presenting a flow rate definable substantially at will and substantially
uniform over time.
13. A method according to claim 12, characterised in that said phase of selecting the operative mode of said pumping device (10) is followed
by a phase of assigning a value definable substantially at will to said second average
flow rate (PM2) of the flow of said given fluid (M) to be supplied through said pumping
device (10); said second average flow rate (PM2) being lower than said first average
flow rate (PM1).
1. Ein Verfahren zum Betreiben einer Pumpeneinrichtung (10) von der Art einer Kolbenschlauchpumpe,
die mit einem Rotor (18) versehen ist und geeignet ist, während des Betriebes, wenn
der Rotor (18) mit einer konstanten Winkelgeschwindigkeit (V) rotiert, eine Vielzahl
von vorgegebenen Mengen (Q) eines vorgegebenen Fluids (M) in einer periodischen pulsierenden
Art zu fördern, derart, dass ein Fluss des Fluids (M) erzeugt wird, welcher eine erste
mittlere Flussrate (PM1) darstellt; der Förderung einer jeden der Mengen (Q) in der
Förderung des vorgegebenen Fluids (M) gehen entsprechende erste Pausen (P1) sowohl
voran als auch hinterher, die jeweils eine erste Dauer (T1) darstellen; das Verfahren
zum Betreiben umfasst zumindest eine Phase des Anhaltens der Pumpeneinrichtung (10),
so dass während der Förderung von zumindest einer Menge (Q) des vorgegebenen Fluids
(M )zumindest eine vorgegebene zweite Pause (P3) eingeführt wird;
dadurch gekennzeichnet,
dass jede der Phasen des Anhaltens der Pumpeneinrichtung (10) eine Phase der Synchronisierung
jeder der zweiten Pausen (P3) relativ zu zumindest einer entsprechenden ersten Pause
(P1) während der Förderung der vorgegebenen Fluids (M) umfasst; die Phase der Synchronisierung
jeder der ersten Pausen (P3) ist durchführbar in einer automatischen Weise mittels
Kontrollmitteln (20) zum Steuern der Pumpeneinrichtung (10); jeder der Phasen des
Anhaltens der Pumpeneinrichtung (10) geht eine Phase der Förderung einer Fraktion
(Q") einer Menge (Q) des vorgegebenen Fluids (M) sowohl voran als auch hinterher;
jede der Phasen der Förderung einer vorgegebenen Fraktion (Q") stellt eine vorgegebene
zweite Dauer (TQ") dar.
2. Ein Verfahren nach Anspruch 1,
gekennzeichnet durch
eine Phase des Auswählens einer vorgegebenen Anzahl (N) von zweiten Pausen (P3), die
eingefügt sind zwischen zwei aufeinander folgenden ersten Pausen (P1) und geeignet
ist, die Förderung jeder der Mengen (Q) von Fluid (M) zu fraktionieren; jeder der
zweiten Pausen (P3) ist verknüpft mit einer entsprechenden Phase des Anhaltens der
Pumpenvorrichtung (10) und stellt eine vorgegebene dritte Dauer (T3) derart dar, so
dass der Fluss des durch die Pumpeneinrichtung (10) bereitgestellten vorgegebenen Fluids (M) zumindest eine
zweite durchschnittliche Flussrate (PM2) darstellt, die kleiner ist als die erste
mittlere Flussrate (PM1) und nach Bedarf einstellbar ist.
3. Ein Verfahren nach Anspruch 2,
dadurch gekennzeichnet,
dass jede Förderung der Menge (Q) des vorgegebene Fluids (M) durchgeführt wird durch eine
Anzahl der Phasen des Förderns einer der Fraktionen (Q"), die gleich ist mit der vorgegebenen
Anzahl (N) erhöht um eine Einheit.
4. Ein Verfahren nach Anspruch 2 oder 3,
dadurch gekennzeichnet,
dass die vorgegebene Anzahl (N) im Betrieb ausgewählt werden kann aus einer Vielzahl von
voreingestellten ganzen Zahlen, um die Gleichförmigkeit der Flussrate des durch die
Pumpeneinrichtung (10) bereitgestellten Flusses des Fluids (M) über die Zeit zu maximieren.
5. Ein Verfahren nach Anspruch 2 oder 3,
dadurch gekennzeichnet,
dass die Phase des Auswählens einer vorgegebenen Anzahl (N) eine Phase des Berechnens
der ausgewählten Anzahl (N) mittels eines numerischen Algorithmus umfasst, welcher
geeignet ist, die Gleichförmigkeit der Flussrate des durch die Pumpeneinrichtung (10)
bereitgestellten Flusses des vorgegebenen Fluids (M) über die Zeit zu maximieren.
6. Ein Verfahren nach Anspruch 5,
dadurch gekennzeichnet,
dass der numerische Algorithmus implementiert ist mittels einer numerischen Prozedur des
Minimierens der Summe des Quadrates der Differenz zwischen der dritten Dauer (T3)
und der ersten Dauer (T1), mit dem Quadrat der Differenz aus der zweiten Dauer (TQ")
und der ersten Dauer (T1).
7. Verfahren nach einem der Ansprüche 2 bis 6,
dadurch gekennzeichnet,
dass die Phase des Auswählens einer vorgegebene Anzahl (N) gefolgt wird von einer Phase
des Berechnens der dritten Dauer (T3) von jeder der zweiten Pausen (P3) und der zweiten
Dauer (TQ") von jeder der Phasen des Förderns der Fraktionen (Q") der Menge (Q) derart,
dass der Fluss des durch die Pumpeneinrichtung (10) bereitgestellten vorgegebenen
Fluids (M) die zweite durchschnittliche Flussrate (PM2) darstellt.
8. Verfahren nach einem der vorherigen Ansprüche,
dadurch gekennzeichnet,
dass die Phase der Synchronisierung von jeder der zweiten Pausen (P3), nachfolgend jeder
der ersten Pause (P1), die Ausführung der Reihe nach umfasst eine Phase der Betätigung
der Pumpeneinrichtung (10) für ein Zeitintervall, welches die zweite Dauer (TQ") darstellt;
eine zyklische Wiederholung für eine vorgegebene Anzahl (N) einer Phase des Anhaltens
der Pumpeneinrichtung (10) für ein Zeitintervall, welches die dritte Dauer (T3) darstellt
und für eine Phase des Betätigens der Pumpeneinrichtung (10) für ein Zeitintervall,
welches die zweite Dauer (TQ") darstellt; und eine Phase des Betätigens der Pumpeneinrichtung
(10) für ein Zeitintervall, welches die erste Dauer (T1) darstellt.
9. Ein Verfahren nach einem der vorherigen Ansprüche,
dadurch gekennzeichnet,
dass die Phasen zum Synchronisieren jeder der zweiten Pausen (P3), nachfolgend jeweils
der ersten Pause (P1), die Ausführung der Reihe nach umfasst eine Phase des Anhaltens
der Pumpeneinrichtung (10) für ein Zeitintervall, welches eine vierte Dauer (T4) darstellt,
welche im Wesentlichen gleich ist zur Differenz zwischen der dritten Dauer (T3) und
der ersten Dauer (T1); eine Phase des Betätigens der Pumpeneinrichtung (10) für ein
Zeitintervall, welches die zweite Dauer (TQ") darstellt; eine zyklische Wiederholung
für eine vorgegebene Anzahl (N) einer Phase des Anhaltens der Pumpeneinrichtung (10)
für ein Zeitintervall, welches die dritte Dauer (T3) darstellt, und eine Phase des
Betätigens der Pumpeneinrichtung (10) für ein Zeitintervall, welches die zweite Dauer
(TQ") darstellt; und eine Phase des Betätigens der Pumpeneinrichtung (10) für ein
Zeitintervall, welches die erste Dauer (T1) darstellt.
10. Ein Verfahren nach einem der vorherigen Ansprüche,
dadurch gekennzeichnet,
dass das Verfahren geeignet ist, die Förderung des Fluids (M) durch eine Pumpeneinrichtung
(10) zu simulieren, die versehen ist mit einer Kolbenschlauchpumpe (15) und ausgerüstet
ist mit einer Anzahl von entsprechenden Andrückrollen (19), entsprechend der vorgegebenen
Anzahl (N) erhöht um eine Einheit.
11. Ein Verfahren nach einem der vorherigen Ansprüche,
dadurch gekennzeichnet,
dass jede Phase des Betätigens der Pumpeneinrichtung (10) aus einer Phase des Antreiben
des Rotors (18) in die Rotation mit einer konstanten Winkelgeschwindigkeit (V) besteht.
12. Ein Verfahren nach einem der vorherigen Ansprüche,
gekennzeichnet durch
eine initiale Phase des Auswählens eines Betriebsmodus der Pumpeneinrichtung (10)
aus zumindest eines ersten Betriebsmodus (B), in dem das Pumpensystem (10) geeignet
ist, das Fluid (M) in einer Vielzahl von Dosen (Q') zu fördern, die im Wesentlichen
identisch zueinander sind und nach Bedarf einstellbar sind, und eines zweiten Betriebsmodus
(C), in welchem das Pumpensystem (10) geeignet ist, kontinuierlich einen Fluss (F)
des Fluids (M) zu fördern, der eine nach Bedarf einstellbare und eine im Wesentlichen
über die Zeit gleichförmige Flussrate darstellt.
13. Ein Verfahren nach Anspruch 12,
dadurch gekennzeichnet,
dass die Phase des Auswählens des Betriebsmodus der Pumpeneinrichtung (10) gefolgt wird
von einer Phase des Zuordnens eines nach Bedarf einstellbaren Wertes zu der zweiten
durchschnittlichen Flussrate (PM2) des Flusses des vorgegebenen Fluids (M), welches
durch die Pumpeneinrichtung (10) gefördert wird; die zweite durchschnittliche Flussrate
(PM2) ist geringer als die erste durchschnittliche Flussrate (PM1).
1. Procédé de gestion d'un dispositif de pompage (10) du type rotatif péristaltique comportant
un rotor (18) et approprié, lors de l'utilisation, lorsque ledit rotor (18) tourne
avec une vitesse angulaire (V) constante, pour fournir d'une manière pulsée périodique
une pluralité de quantités données (Q) d'un fluide donné (M) de façon à générer un
écoulement dudit fluide donné (M) présentant un premier débit moyen donné (PM1) ;
la fourniture de chaque quantité donnée précitée (Q) étant à la fois précédée et suivie
par des premières pauses respectives (P1) dans la fourniture dudit fluide donné (M)
présentant une première durée donnée (T1) ; ledit procédé de gestion comprenant au
moins une phase d'arrêt dudit dispositif de pompage (10) de façon à introduire au
moins une seconde pause donnée (P3) pendant la fourniture d'au moins une quantité
précitée (Q) dudit fluide donné (M) ; caractérisé par le fait que chaque phase d'arrêt précitée dudit dispositif de pompage (10) comprend une phase
de synchronisation de chaque seconde pause donnée précitée (P3) par rapport à au moins
une première pause précitée correspondante (P1) dans la fourniture dudit fluide donné
(M) ; ladite phase de synchronisation de chaque seconde pause précitée (P3) pouvant
être réalisée d'une manière automatique grâce à un moyen de commande (20) pour commander
ledit dispositif de pompage (10) ; chaque phase d'arrêt précitée dudit dispositif
de pompage (10) étant à la fois précédée et suivie par une phase de fourniture d'une
fraction donnée (Q") de ladite quantité (Q) dudit fluide donné (M) ; chaque phase
précitée de fourniture d'une fraction donnée (Q") présentant une deuxième durée donnée
(TQ").
2. Procédé selon la revendication 1, caractérisé par le fait qu'il comprend une phase de sélection d'un nombre donné (N) desdites secondes pauses
(P3) interposée entre toutes deux pauses consécutives desdites premières pauses (P1)
et approprié pour fractionner la fourniture de chaque quantité précitée (Q) de fluide
(M) ; chaque seconde pause précitée (P3) étant associée à une phase respective d'arrêt
dudit dispositif de pompage (10) et présentant une troisième durée donnée (T3) d'une
manière telle que l'écoulement dudit fluide donné (M) fourni par ledit dispositif
de pompage (10) présente au moins un second débit moyen (PM2) inférieur audit premier
débit moyen (PM1) et pouvant être défini sensiblement à volonté.
3. Procédé selon la revendication 2, caractérisé par le fait que chaque fourniture d'une quantité précitée (Q) dudit fluide donné (M) est effectuée
grâce à un nombre desdites phases de fourniture d'une fraction donnée précitée (Q")
égal audit nombre donné (N) augmenté d'une unité.
4. Procédé selon l'une des revendications 2 ou 3, caractérisé par le fait que ledit nombre donné (N) peut être choisi, lors de l'utilisation, parmi une pluralité
de valeurs entières préfixées de façon à rendre maximale l'uniformité au cours du
temps du débit de l'écoulement de fluide (M) fourni par ledit dispositif de pompage
(10).
5. Procédé selon l'une des revendications 2 ou 3, caractérisé par le fait que ladite phase de sélection d'un nombre donné (N) comprend une phase de calcul dudit
nombre choisi (N) au moyen d'un algorithme numérique approprié pour rendre maximale
l'uniformité au cours du temps du débit de l'écoulement dudit fluide donné (M) fourni
par ledit dispositif de pompage (10).
6. Procédé selon la revendication 5, caractérisé par le fait que ledit algorithme numérique est implémenté au moyen d'une procédure numérique de minimisation
de la somme du nombre carré de la différence entre ladite troisième durée (T3) et
ladite première durée (T1), avec le nombre carré de la différence entre ladite deuxième
durée (TQ") et ladite première durée (T1).
7. Procédé selon l'une quelconque des revendications 2 à 6, caractérisé par le fait que ladite phase de sélection d'un nombre donné (N) est suivie par une phase de calcul
de ladite troisième durée (T3) de chaque seconde pause précitée (P3) et de ladite
deuxième durée (TQ") de chaque phase précitée de fourniture d'une fraction précitée
(Q") de ladite quantité (Q) d'une manière telle que l'écoulement dudit fluide donné
(M) fourni par ledit dispositif de pompage (10) présente ledit second débit moyen
(PM2).
8. Procédé selon l'une quelconque des revendications précédentes, caractérisé par le fait que ladite phase de synchronisation de chaque seconde pause précitée (P3) comprend, à
la suite de chaque première pause précitée (P1), la réalisation en séquence d'une
phase d'actionnement dudit dispositif de pompage (10) pendant un intervalle de temps
présentant ladite deuxième durée (TQ") ; une répétition cyclique pour un nombre donné
précité (N) de fois d'une phase d'arrêt dudit dispositif de pompage (10) pendant un
intervalle de temps présentant ladite troisième durée (T3) et d'une phase d'actionnement
dudit dispositif de pompage (10) pendant un intervalle de temps présentant ladite
deuxième durée (TQ") ; et une phase d'actionnement dudit dispositif de pompage (10)
pendant un intervalle de temps présentant ladite première durée (T1).
9. Procédé selon l'une quelconque des revendications précédentes, caractérisé par le fait que ladite phase de synchronisation de chaque seconde pause précitée (P3) comprend, à
la suite de chaque première pause précitée (P1), la réalisation en séquence d'une
phase d'arrêt dudit dispositif de pompage (10) pendant un intervalle de temps présentant
une quatrième durée (T4) sensiblement égale à la différence entre ladite troisième
durée (T3) et ladite première durée (T1) ; une phase d'actionnement dudit dispositif
de pompage (10) pendant un intervalle de temps présentant ladite deuxième durée (TQ")
; une répétition cyclique pour un nombre donné précité (N) de fois d'une phase d'arrêt
dudit dispositif de pompage (10) pendant un intervalle de temps présentant ladite
troisième durée (T3) et d'une phase d'actionnement dudit dispositif de pompage (10)
pendant un intervalle de temps présentant ladite deuxième durée (TQ") ; et une phase
d'actionnement dudit dispositif de pompage (10) pendant un intervalle de temps présentant
ladite première durée (T1).
10. Procédé selon l'une quelconque des revendications précédentes, caractérisé par le fait qu'il est approprié pour simuler la fourniture d'un écoulement dudit fluide donné (M)
par un dispositif de pompage (10) comportant une pompe péristaltique rotative (15)
équipée d'un nombre de rouleaux de pression respectifs (19) égal audit nombre donné
(N) augmenté d'une unité.
11. Procédé selon l'une quelconque des revendications précédentes, caractérisé par le fait que chaque phase d'actionnement dudit dispositif de pompage (10) consiste en une phase
d'actionnement dudit rotor (18) en rotation à une vitesse angulaire constante donnée
(V).
12. Procédé selon l'une quelconque des revendications précédentes, caractérisé par le fait qu'il comprend une phase initiale de sélection d'un mode de fonctionnement dudit dispositif
de pompage (10) parmi au moins un premier mode de fonctionnement (B), dans lequel
ledit système de pompage (10) est approprié pour fournir ledit fluide donné (M) dans
une pluralité de doses (Q') sensiblement identiques les unes aux autres et pouvant
être définies sensiblement à volonté, et un second mode de fonctionnement (C), dans
lequel ledit système de pompage (10) est approprié pour fournir en continu un écoulement
(F) dudit fluide (M) présentant un débit pouvant être défini sensiblement à volonté
et sensiblement uniforme au cours du temps.
13. Procédé selon la revendication 12, caractérisé par le fait que ladite phase de sélection du mode de fonctionnement dudit dispositif de pompage (10)
est suivie par une phase d'attribution d'une valeur pouvant être définie sensiblement
à volonté audit second débit moyen (PM2) de l'écoulement dudit fluide donné (M) à
fournir à travers ledit dispositif de pompage (10), ledit second débit moyen (PM2)
étant inférieur audit premier débit moyen (PM1).