TECHNICAL FIELD
[0001] The present invention relates to an air conditioning apparatus.
BACKGROUND ART
[0002] Among air conditioning apparatuses capable of an air-warming operation, there have
been those proposed which include a refrigerant heating function intended to increase
air-warming capability.
[0003] For example, in the air conditioning apparatus disclosed in Patent Literature 1 shown
below (Japanese Laid-open Patent Application Publication No.
2000-97510), the air-warming capability is increased due to the refrigerant flowing into a refrigerant
heating device and being heated by a gas burner.
[0004] In the air conditioning apparatus disclosed in Patent Literature 1 (Japanese Laid-open
Patent Application Publication No.
2000-97510), a technique is proposed in which the combustion rate of the gas burner is adjusted
based on the detection value of a thermistor, in order to prevent the refrigerant
temperature from rising too high and protective action from being taken too frequently
during the air-warming operation.
SUMMARY OF THE INVENTION
<Technical Problem>
[0005] In the technique disclosed in the aforementioned Patent Literature 1, only the frequency
of the protective action is suppressed, and no control is proposed to address the
difference in loads between during startup and after startup.
[0006] For example, in some cases, there is a large difference between the surrounding temperature
and the set temperature at the startup of the air conditioning apparatus and the set
temperature is desired to be quickly reached, while there is also a difference in
loads between during startup and after startup, in which case there is a risk of overshooting
in which the target value is far exceeded.
[0007] When the system for heating the refrigerant is an electromagnetic induction heating
system, the aforementioned overshooting in particular is likely to be a problem because
of the high heating rate.
[0008] The present invention was devised in view of the circumstances described above, and
an object thereof is to provide an air conditioning apparatus capable of quickly ensuring
performance at startup and keeping post-startup overshooting to a minimum.
<Solution to Problem>
[0009] An air conditioning apparatus according to a first aspect is an air conditioning
apparatus which uses a refrigeration cycle having a compression mechanism for circulating
refrigerant, a refrigeration tube that makes thermal contact with the refrigerant
flowing through the refrigerant tube and/or a heat-generating member that makes thermal
contact with the refrigerant flowing through the refrigerant tube; the air conditioning
apparatus comprising a magnetic field generator, a refrigerant state quantity detector,
and a control part. The magnetic field generator generates a magnetic field for induction-heating
a portion to be heated by induction heating. The refrigerant state quantity detector
detects a state quantity relating to refrigerant flowing through a predetermined state
quantity detected portion which is at least part of the refrigeration cycle. The state
quantity in this instance includes at least one of, e.g., the temperature and the
pressure. The control part performs startup magnetic field generation control and
post-startup magnetic field generation control. In startup magnetic field generation
control, during startup involving performing an air-warming operation in the refrigeration
cycle, the control part initiates a state in which the output of the magnetic field
generator is a predetermined maximum output from the time the compression mechanism
has assumed a drive state, and ends this state when the state quantity detected by
the refrigerant state quantity detector reaches a first predetermined target state
quantity. In post-startup magnetic field generation control, after the startup magnetic
field generation control has ended, the control part performs a state of applying
a restriction that a first magnetic field limit reference value lower than the predetermined
maximum output be an upper limit of the output of the magnetic field generator. The
phase "when the refrigeration cycle is performing the air-warming operation" herein
does not include operations such as a defrosting operation. The heating by the electromagnetic
induction heating unit herein includes at least, e.g., electromagnetic induction heating
of a heat-generating member in thermal contact with the refrigerant tube, electromagnetic
induction heating of a heat-generating member in thermal contact with the refrigerant
flowing through the refrigerant tube, and electromagnetic induction heating of a heat-generating
member constituting at least part of the refrigerant tube.
[0010] In the air conditioning apparatus according to the aspect described above, by performing
startup magnetic field generation control so that the output of the magnetic field
generator during startup reaches a maximum, the time needed for warm air to be provided
to the user after initiating the air-warming operation startup can be shortened. It
is also possible to minimize control overshooting caused by the output of the magnetic
field generator being raised too high during post-startup magnetic field generation
control. It is thereby possible for control overshooting to be minimized, while the
supply of warm air to the user is quickly started.
[0011] An air conditioning apparatus according to a second aspect is the air conditioning
apparatus of the first aspect, wherein the portion to be heated by induction heating
includes a magnetic material.
[0012] In the air conditioning apparatus according to the aspect described above, since
the magnetic field generator generates a magnetic field using the portion containing
the magnetic material as a target, heat generation by electromagnetic induction can
be performed efficiently.
[0013] An air conditioning apparatus according to a third aspect is the air conditioning
apparatus according to the first or second aspect, wherein the predetermined state
quantity detection portion is a portion in which a magnetic field is generated by
the magnetic field generator.
[0014] In the air conditioning apparatus according to the aspect described above, since
rapid temperature changes caused by electromagnetic induction heating can be perceived,
control responsiveness can be improved.
[0015] An air conditioning apparatus according to a fourth aspect is the air conditioning
apparatus according to any of the first through third aspects, wherein the state quantity
detected by the refrigerant state quantity detector includes at least one of either
the temperature or pressure relating to the refrigerant flowing through the predetermined
state quantity detection portion.
[0016] In the air conditioning apparatus according to the aspect described above, various
sensors used in order to control the state of the refrigeration cycle can be used
to perform the detections herein.
[0017] An air conditioning apparatus according to a fifth aspect is the air conditioning
apparatus according to any of the first through fourth aspects, wherein the refrigerant
state quantity detector is a temperature detector for detecting a temperature relating
to the refrigerant flowing through the predetermined state quantity detection portion.
In the post-startup magnetic field generation control, the control part performs post-startup
magnetic field generation PI control for performing PI control of the value or frequency
relating to the output of the magnetic field generator so that the temperature detected
by the temperature detector is maintained at a target maintenance temperature. The
target maintenance temperature herein may be the same temperature as the first predetermined
target temperature.
[0018] In the air conditioning apparatus according to the aspect described above, temperature
changes caused by electromagnetic induction heating are commonly more sudden than
temperature changes resulting from changes in the state of the refrigerant passing
through the predetermined state quantity detection portion. Even when the temperature
suddenly changes due to electromagnetic induction heating in this manner, the temperature
detected by the temperature detector can be stabilized at the second predetermined
target temperature by PI-controlling the size of the magnetic field generated by the
magnetic field generator and/or the frequency with which the magnetic field generator
generates a magnetic field.
[0019] An air conditioning apparatus according to a sixth aspect is the air conditioning
apparatus according to any of the first through fifth aspects, wherein the refrigerant
state quantity detector is a temperature detector for detecting a temperature relating
to the refrigerant flowing through the predetermined state quantity detection portion.
The control part executes the startup magnetic field generation control after a magnetic
field level increase condition has been fulfilled. This magnetic field level increase
condition is that there be a change in the detected temperature of the temperature
detector or that the temperature detector detect a temperature change, due to a magnetic
field level change process being performed for raising or lowering the level of the
magnetic field generated by the magnetic field generator within a range below the
predetermined maximum output.
[0020] When the temperature detector is unable to detect a temperature change even though
electromagnetic induction heating has been performed, there is a risk of the state
of attachment of the temperature detector becoming unstable or coming apart.
[0021] As a countermeasure to this, in the air conditioning apparatus according to the aspect
described above, when the state of attachment of the temperature detector becomes
unstable or comes apart in this manner, the temperature change is insufficient and
the magnetic field level increase condition is not fulfilled. Therefore, the control
part limits magnetic field generation to a level lower than the predetermined maximum
output and does not perform magnetic field generation at a high level, and the reliability
of the device can therefore be improved. When the magnetic field level increase condition
has been fulfilled, it is possible to perceive that the portion to be heated by induction
heating is generating heat due to the generation of a magnetic field by the magnetic
field generator, the installed state of the temperature detector is satisfactory,
and the temperature of the heating target portion of induction heating is successfully
and accurately confirmed. It is thereby possible to suppress damage to the devices
caused by abnormal temperature increases from electromagnetic induction heating, and
to improve the reliability of the devices.
[0022] An air conditioning apparatus according to a seventh aspect is the air conditioning
apparatus of the sixth aspect, wherein a maximum magnetic field level outputted in
the magnetic field level change process is a value less than the first magnetic field
limit reference value.
[0023] In the air conditioning apparatus according to the aspect described above, it is
possible to prevent electromagnetic induction heating caused by a magnetic field of
a size approximately equivalent to the first magnetic field limit reference value
in stages in which the state of attachment of the temperature detector has not yet
been confirmed to be satisfactory.
[0024] An air conditioning apparatus according to an eighth aspect is the air conditioning
apparatus according to any of the first through seventh aspects, wherein the refrigerant
state quantity detector is a temperature detector for detecting a temperature relating
to the refrigerant flowing through the predetermined state quantity detection portion.
The control part executes determining of the magnetic field level increase condition
after a flow condition has been fulfilled. The flow condition is that there be a change
in the detected temperature of the temperature detector between a first compression
mechanism state and a second compression mechanism state, when the compression mechanism
is caused to realize two compression mechanism states of different compression mechanism
outputs, one being the first compression mechanism state and the other being the second
compression mechanism state having a higher output level than the first compression
mechanism state. A state in which the compression mechanism is stopped is included
in the first compression mechanism state.
[0025] In the air conditioning apparatus according to the aspect described above, there
is a risk of the flow of refrigerant being insufficient when the flow condition is
not fulfilled, and there is a risk of causing an abnormal temperature increase even
with a magnetic field generator output at the level for determining the magnetic field
level increase condition. As a countermeasure to this, In the air conditioning apparatus
according to the aspect described above, since the magnetic field level increase condition
can be determined while ensuring a flow of refrigerant passing through the predetermined
state quantity detection portion, a determination of the magnetic field level increase
condition can be performed while maintaining the reliability of the devices.
[0026] An air conditioning apparatus according to a ninth aspect is the air conditioning
apparatus according to any of the first through eighth aspects, wherein the refrigerant
state quantity detector is a temperature detector for detecting a temperature relating
to the refrigerant flowing through the predetermined state quantity detection portion.
The control part performs a defrosting operation output control for controlling the
output of the magnetic field generator on the basis of the detected temperature of
the temperature detector, the upper limit of the output of the magnetic field generator
being the predetermined maximum output, when the refrigeration cycle executes a defrosting
operation different from the air-warming operation after the post-startup magnetic
field generation control has been initiated.
[0027] In the air conditioning apparatus according to the aspect described above, since
the output of the magnetic field generator can be increased similarly with respect
to the startup magnetic field generation control, the defrosting process can be quickened.
[0028] An air conditioning apparatus according to a tenth aspect is the air conditioning
apparatus of the ninth aspect, wherein during the defrosting operation output control,
the control part performs defrosting PI control in which PI control is performed so
that the temperature detected by the temperature detector is maintained at a second
predetermined target temperature that is lower than the first predetermined target
temperature.
[0029] In the air conditioning apparatus according to the aspect described above, since
abnormal increases in temperature do not occur readily during the defrosting operation
compared to when startup magnetic field generation control is performed, overshooting
during the defrosting operation can be reduced by using the detected temperature of
the temperature detector as the second predetermined target temperature below the
first predetermined target temperature of the startup magnetic field generation control.
[0030] An air conditioning apparatus according to an eleventh aspect is the air conditioning
apparatus of any of the first through tenth aspects, wherein the refrigerant state
quantity detector is a temperature detector for detecting a temperature relating to
the refrigerant flowing through the predetermined state quantity detection portion.
The air conditioning apparatus further comprises an elastic member for applying elastic
force to the temperature detector. The temperature detector is pressed against the
predetermined state quantify detection portion by the elastic force of the elastic
member.
[0031] In the air conditioning apparatus according to the aspect described above, it is
common for sudden temperature increases to occur more readily when electromagnetic
induction heating is performed than temperature increases caused by changes in the
refrigerant circulating condition in the refrigeration cycle.
[0032] As a countermeasure to this, in the air conditioning apparatus according to the aspect
described above, since the temperature detector is kept pressed against the predetermined
state quantity detecting portion by the elastic member, the responsiveness of the
temperature detector can be improved. Thereby, control with improved responsiveness
can be performed.
<Advantageous Effects of Invention>
[0033] In the air conditioning apparatus according to the first aspect, control overshooting
can be kept to a minimum while the supply of warm air to the user is quickly initiated.
[0034] In the air conditioning apparatus according to the second aspect, heat generation
by electromagnetic induction can be performed efficiently.
[0035] In the air conditioning apparatus according to the third aspect, control responsiveness
can be improved.
[0036] In the air conditioning apparatus according to the fourth aspect, various sensors
used in order to control the state of the refrigeration cycle can be used to perform
the detections herein.
[0037] In the air conditioning apparatus according to the fifth aspect, the temperature
detected by the temperature detector can be stabilized at the second predetermined
target temperature.
[0038] In the air conditioning apparatus according to the sixth aspect, it is possible to
suppress damage to the devices caused by abnormal temperature increases from electromagnetic
induction heating, and the reliability of the devices can be improved.
[0039] In the air conditioning apparatus according to the seventh aspect, it is possible
to prevent electromagnetic induction heating caused by a magnetic field at approximately
the size of the first magnetic field limit reference value in stages in which the
state of attachment of the temperature detector has not yet been confirmed to be satisfactory.
[0040] In the air conditioning apparatus according to the eighth aspect, a determination
of the magnetic field level increase condition can be performed while the reliability
of the devices is preserved.
[0041] In the air conditioning apparatus according to the ninth aspect, the defrosting process
can be quickened.
[0042] In the air conditioning apparatus according to the tenth aspect, overshooting during
the defrosting operation can be reduced.
[0043] In the air conditioning apparatus according to the eleventh aspect, control with
improved responsiveness can be performed.
BRIEF DESCRIPTION OF THE DRAWINGS
[0044]
FIG 1 is a refrigerant circuit diagram of an air conditioning apparatus according
to an embodiment of the present invention.
FIG. 2 is an external perspective view including the front side of an outdoor unit.
FIG. 3 is a perspective view of the internal arrangement and configuration of the
outdoor unit.
FIG. 4 is an external perspective view including the rear side of the internal arrangement
and configuration of the outdoor unit.
FIG. 5 is an overall front perspective view showing the internal structure of a machine
chamber of the outdoor unit.
FIG. 6 is a perspective view showing the internal structure of the machine chamber
of the outdoor unit.
FIG. 7 is a perspective view of a bottom plate and an outdoor heat exchanger of the
outdoor unit.
FIG. 8 is a plan view in which an air-blowing mechanism of the outdoor unit has been
removed.
FIG. 9 is a plan view showing the arrangement relationship between the bottom plate
of the outdoor unit and the hot gas bypass circuit.
FIG. 10 is an external perspective view of an electromagnetic induction heating unit.
FIG. 11 is an external perspective view showing a state in which a shielding cover
has been removed from the electromagnetic induction heating unit.
FIG. 12 is an external perspective view of an electromagnetic induction thermistor.
FIG. 13 is an external perspective view of a fuse.
FIG. 14 is a schematic cross-sectional view showing the state of attachment of the
electromagnetic induction thermistor and the fuse.
FIG. 15 is a cross-sectional structural view of the electromagnetic induction heating
unit.
FIG. 16 is a view showing a time chart of electromagnetic induction heating control.
FIG. 17 is a view showing a flowchart of a flow condition judgment process.
FIG. 18 is a view showing a flowchart of a sensor-separation detection process.
FIG. 19 is a view showing a flowchart of a rapid pressure-increasing process.
FIG. 20 is a view showing a flowchart of a steady output process.
FIG. 21 is a view showing a flowchart of a defrosting process.
FIG. 22 is a view showing the attached position of an electromagnetic induction thermistor
according to another embodiment (A).
FIG. 23 is an illustrative view of a refrigerant tube of another embodiment (F).
FIG. 24 is an illustrative view of a refrigerant tube of another embodiment (G).
FIG. 25 is a view showing an example of arranging coils and a refrigerant tube of
another embodiment (H).
FIG. 26 is a view showing an example of arranging bobbin covers of another embodiment
(H).
FIG. 27 is a view showing an example of arranging ferrite cases of another embodiment
(H).
DESCRIPTION OF EMBODIMENTS
[0045] An air conditioning apparatus 1 comprising an electromagnetic induction heating unit
6 in one embodiment of the present invention is described in an example hereinbelow
with reference to the drawings.
<1-1> Air Conditioning Apparatus 1
[0046] FIG. 1 shows a refrigerant circuit diagram showing a refrigerant circuit 10 of the
air conditioning apparatus 1.
[0047] In the air conditioning apparatus 1, an outdoor unit 2 as a heat source-side apparatus
and an indoor unit 4 as a usage-side apparatus are connected by refrigerant tubes,
and air conditioning is performed in the space where the usage-side apparatus is located;
the air conditioning apparatus 1 comprising a compressor 21, a four-way switching
valve 22, an outdoor heat exchanger 23, an outdoor electric expansion valve 24, an
accumulator 25, outdoor fans 26, an indoor heat exchanger 41, an indoor fan 42, a
hot gas bypass valve 27, a capillary tube 28, an electromagnetic induction heating
unit 6, and other components.
[0048] The compressor 21, the four-way switching valve 22, the outdoor heat exchanger 23,
the outdoor electric expansion valve 24, the accumulator 25, the outdoor fans 26,
the hot gas bypass valve 27, the capillary tube 28, and the electromagnetic induction
heating unit 6 are housed within the outdoor unit 2. The indoor heat exchanger 41
and the indoor fan 42 are housed within the indoor unit 4.
[0049] The refrigerant circuit 10 has a discharge tube A, an indoor-side gas tube B, an
indoor-side liquid tube C, an outdoor-side liquid tube D, an outdoor-side gas tube
E, an accumulation tube F, an intake tube G, a hot gas bypass circuit H, a branched
tube K, and a converging tube J. Large quantities of gas-state refrigerant pass through
the indoor-side gas tube B and the outdoor-side gas tube E, but the refrigerant passing
through is not limited to a gas refrigerant. Large quantities of liquid-state refrigerant
pass through the indoor-side liquid tube C and the outdoor-side liquid tube D, but
the refrigerant passing through is not limited to a liquid refrigerant.
[0050] The discharge tube A is connected with the compressor 21 and the four-way switching
valve 22.
[0051] The indoor-side gas tube B connects the four-way switching valve 22 and the indoor
heat exchanger 41. A pressure sensor 29a for sensing the pressure of the refrigerant
passing through is provided at some point along the indoor-side gas tube B.
[0052] The indoor-side liquid tube C connects the indoor heat exchanger 41 and the outdoor
electric expansion valve 24.
[0053] The outdoor-side liquid tube D connects the outdoor electric expansion valve 24 and
the outdoor heat exchanger 23.
[0054] The outdoor-side gas tube E connects the outdoor heat exchanger 23 and the four-way
switching valve 22.
[0055] The accumulation tube F connects the four-way switching valve 22 and the accumulator
25, and extends in a vertical direction when the outdoor unit 2 has been installed.
The electromagnetic induction heating unit 6 is attached to a part or the accumulation
tube F. A heat-generating portion of the accumulation tube F, whose periphery is covered
at least by a coil 68 described hereinafter, is composed of a copper tube F1 through
which refrigerant flows and a magnetic tube F2 provided so as to cover the periphery
of the copper tube F1 (see FIC. 15). This magnetic tube F2 is composed of SUS (stainless
used steel) 430. This SUS 430 is a ferromagnetic material, which creates eddy currents
when placed in a magnetic field and which generates heat by Joule heat created by
its own electrical resistance. Aside from the magnetic tube F2, the tubes constituting
the refrigerant circuit 10 are composed of copper tubes, the same material as the
copper tube F1. The material of the tubes covering the peripheries of these copper
tubes is not limited to SUS 430; it can be, for example, iron, copper, aluminum, chrome,
nickel, other conductors, and alloys containing at least two or more metals selected
from these listed. Possible examples of the magnetic material include ferrite, martensite,
or a combination thereof, but it is preferable to use a ferromagnetic substance which
has a comparatively high electrical resistance and which has a higher Curie temperature
than its service temperature range. The accumulation tube F here requires more electricity,
but may not comprise a magnetic substance and a material containing a magnetic substance,
or may include a material that will be the target of induction heating. The magnetic
material may constitute the entire accumulation tube F, it may be formed only in the
inside surface of the accumulation tube F, or it may be present due to being included
in the material constituting the accumulation tube F, for example. By performing electromagnetic
induction heating in this manner, the accumulation tube F can be heated by electromagnetic
induction, and the refrigerant drawn into the compressor 21 via the accumulator 25
can be warmed. The warming capability of the air conditioning apparatus 1 can thereby
be improved. Even in cases in which the compressor 21 is not sufficiently warmed at
the startup of the air-warming operation, for example, the lack of capability at startup
can be compensated for by the quick heating by the electromagnetic induction heating
unit 6. Furthermore, when the four-way switching valve 22 is switched to the air-cooling
operation state and a defrosting operation is performed for removing frost deposited
on the outdoor heat exchanger 23 or other components, the compressor 21 can quickly
compress the warmed refrigerant due to the electromagnetic induction heating unit
6 quickly heating the accumulation tube F. Therefore, the temperature of the hot gas
discharged from the compressor 21 can be quickly increased. The time required to thaw
the frost through the defrosting operation can thereby be shortened. Thereby, even
when the defrosting operation must be performed at the right time during the air-warming
operation, a return to the air-warming operation can be made as quickly as possible,
and user comfort can be improved.
[0056] The intake tube G connects the accumulator 25 and the intake side of the compressor
21.
[0057] The hot gas bypass circuit H connects a branching point A1 provided at some point
along the discharge tube A and a branching point D1 provided at some point along the
outdoor-side liquid tube D. Disposed at some point in the hot gas bypass circuit H
is the hot gas bypass valve 27, which can switch between a state of permitting the
passage of refrigerant and a state of not permitting the passage of refrigerant. Between
the hot gas bypass valve 27 and the branching point D1, the hot gas bypass circuit
H is provided with a capillary tube 28 for lowering the pressure of refrigerant passing
through. This capillary tube 28 makes it possible to approach the pressure that follows
the refrigerant pressure decrease by the outdoor electric expansion valve 24 during
the air-warming operation, and therefore makes it possible to suppress the rise in
refrigerant pressure in the outdoor-side liquid tube D caused by the supply of hot
gas through the hot gas bypass circuit H to the outdoor-side liquid tube D.
[0058] The branched tube K, which constitutes part of the outdoor heat exchanger 23, consists
of a refrigerant tube extending from a gas-side inlet/outlet 23e of the outdoor heat
exchanger 23 and branching into a plurality of tubes at a branching/converging point
23k described hereinafter, in order to increase the effective surface area for heat
exchange. The branched tube K has a first branched tube K1, a second branched tube
K2, and a third branched tube K3 which extend independently from the branching/converging
point 23k to a converging/branching point 23j, and these branching tubes K1, K2, K3
converge at the converging/branching point 23j. Seen from the side with the converging
tube J, the branched tube K branches at and extends from the converging/branching
point 23j.
[0059] The converging tube J, which constitutes a part of the outdoor heat exchanger 23,
is a tube extending from the converging/branching point 23j to a liquid-side inlet/outlet
23d of the outdoor heat exchanger 23. The converging tube J is capable of equalizing
the subcooling degree of the refrigerant flowing out from the outdoor heat exchanger
23 during the air-cooling operation, and is also capable of thawing ice deposited
in the vicinity of the lower end of the outdoor heat exchanger 23 during the air-warming
operation. The converging tube J has a cross-sectional area approximately three times
each of those of the branching tubes K1, K2, K3, and the amount of refrigerant passing
through is approximately three times greater than in each of the branching tubes K1,
K2, K3.
[0060] The four-way switching valve 22 is capable of switching between an air-cooling operation
cycle and an air-warming operation cycle. In FIG. 1, the connection state during the
air-warming operation is shown by solid lines, and the connection state during the
air-cooling operation is shown by dotted lines. During the air-warming operation,
the indoor heat exchanger 41 functions as a cooler of refrigerant and the outdoor
heat exchanger 23 functions as a heater of refrigerant. During the air-cooling operation,
the outdoor heat exchanger 23 functions as a cooler of refrigerant and the indoor
heat exchanger 41 functions as a heater of refrigerant.
[0061] The outdoor heat exchanger 23 has the gas-side inlet/outlet 23e, the liquid-side
inlet/outlet 23d, the branching/converging point 23k, the converging/branching point
23j, the branched tube K, the converging tube J, and heat exchange fins 23z. The gas-side
inlet/outlet 23e is positioned in the end of the outdoor heat exchanger 23 next to
the outdoor-side gas tube E, and is connected to the outdoor-side gas tube E. The
liquid-side inlet/outlet 23d is positioned in the end of the outdoor heat exchanger
23 next to the outdoor-side liquid tube D, and is connected to the outdoor-side liquid
tube D. The branching/converging point 23k is where the tube extending from the gas-side
inlet/outlet 23e branches, and the refrigerant can branch or converge depending on
the direction in which the refrigerant is flowing. The branched tube K extends as
a plurality of tubes from each of the branched portions in the branching/converging
point 23k. The converging/branching point 23j is where the branched tube K converges,
and the refrigerant can converge or branch depending on the direction in which the
refrigerant is flowing. The converging tube J extends from the converging/branching
point 23j to the liquid-side inlet/outlet 23d. The heat exchange fins 23z are composed
of a plurality of plate-shaped aluminum fins aligned in their plate-thickness direction
and arranged at predetermined intervals. The branched tube K and the converging tube
J both pass through the heat exchange fins 23z. Specifically, the branched tube K
and the converging tube J are arranged so as to penetrate in the plate-thickness direction
through different parts of the same heat exchange fins 23z. Upwind side of the outdoor
fans 26 in the direction of air flow, the outdoor heat exchanger 23 is provided with
an outdoor air temperature sensor 29b for sensing the temperature of the outdoor air.
The outdoor heat exchanger 23 is also provided with an outdoor heat exchange temperature
sensor 29c for sensing the temperature of the refrigerant flowing through the branched
tube air conditioning apparatus.
[0062] An indoor temperature sensor 43 for sensing the indoor temperature is provided inside
the indoor unit 4. The indoor heat exchanger 41 is also provided with an indoor heat
exchange temperature sensor 44 for sensing the refrigerant temperature of the side
next to the indoor-side liquid tube C where the outdoor electric expansion valve 24
is connected.
[0063] An outdoor control part 12 for controlling the devices disposed in the outdoor unit
2 and an indoor control part 13 for controlling the devices disposed in the indoor
unit 4 are connected by a communication line 11a, thereby constituting a control part
11. This control part 11 performs various controls on the air conditioning apparatus
1.
[0064] The outdoor control part 12 is also provided with a timer 95 for counting the elapsed
time when the various controls are performed.
[0065] A controller 90 for receiving a setting input from the user is connected to the control
part 11.
<1-2> Outdoor Unit 2
[0066] FIG. 2 shows an external perspective view of the front side of the outdoor unit 2.
FIG. 3 shows a perspective view depicting the positional relationship between the
outdoor heat exchanger 23 and the outdoor fans 26. FIG. 4 shows a perspective view
of the rear side of the outdoor heat exchanger 23.
[0067] The outside surfaces of the outdoor unit 2 are configured from a substantially rectangular
parallelepiped outdoor unit casing, which is configured from a ceiling plate 2a, a
bottom plate 2b, a front panel 2c, a left side panel 2d, a right side panel 2f, and
a rear side panel 2e.
[0068] The outdoor unit 2 is sectioned via a partitioning plate 2H into an air-blower chamber
next to the left side panel 2d, in which the outdoor heat exchanger 23, the outdoor
fans 26, and other components are placed; and a machine chamber next to the right
side panel 2f, where the compressor 21 and/or the electromagnetic induction heating
unit 6 are placed. The outdoor unit 2 is fixed in place by being screwed onto the
bottom plate 2b, and the outdoor unit 2 has an outdoor unit support stand 2G constituting
the left and right sides of the lowest end of the outdoor unit 2. The electromagnetic
induction heating unit 6 is disposed in the machine chamber, in an upper position
in proximity to the right side panel 2f and the ceiling plate 2a. The heat exchange
fins 23z of the outdoor heat exchanger 23 described above are arranged so as to be
aligned in the plate-thickness direction while the plate-thickness direction runs
generally horizontally. The converging tube J is placed in the lowest parts of the
heat exchange fins 23z of the outdoor heat exchanger 23, by passing through the heat
exchange fins 23z in the thickness direction. The hot gas bypass circuit H is disposed
so as to extend below the outdoor fans 26 and the outdoor heat exchanger 23.
<1-3> Internal Configuration of Outdoor Unit 2
[0069] FIG. 5 shows an overall front perspective view showing the internal structure of
the machine chamber of the outdoor unit 2. FIG. 6 shows a perspective view showing
the internal structure of the machine chamber of the outdoor unit 2. F1G. 7 shows
a perspective view depicting the arrangement relationship between the outdoor heat
exchanger 23 and the bottom plate 2b.
[0070] The partitioning plate 2H partitions the outdoor unit 2 frontward to rearward from
the top end to the bottom end, so as to section the outdoor unit 2 into an air-blower
chamber in which the outdoor heat exchanger 23, the outdoor fans 26, and other components
are placed, and a machine chamber in which the electromagnetic induction heating unit
6, the compressor 21, the accumulator 25, and other components are placed. The compressor
21 and the accumulator 25 are placed in a space below the machine chamber of the outdoor
unit 2. The electromagnetic induction heating unit 6, the four-way switching valve
22, and the outdoor control part 12 are placed in an upper space of the machine chamber
of the outdoor unit 2, which is also a space at the top of the compressor 21, the
accumulator 25, and other components. The functional elements constituting the outdoor
unit 2 and placed in the machine chamber, which are the compressor 21, the four-way
switching valve 22, the outdoor heat exchanger 23, the outdoor electric expansion
valve 24, the accumulator 25, the hot gas bypass valve 27, the capillary tube 28,
and the electromagnetic induction heating unit 6, are connected via the discharge
tube A, the indoor-side gas tube B, the outdoor-side liquid tube D, the outdoor-side
gas tube E, the accumulation tube F, the hot gas bypass circuit H, and other components
so that the refrigeration cycle is performed by the refrigerant circuit 10 shown in
FIG. 1. The hot gas bypass circuit H is configured from nine portions linked, which
are a first bypass portion H1 through to a ninth bypass portion H9 as described hereinafter,
and when refrigerant flows through the hot gas bypass circuit H, the refrigerant flows
sequentially from the first bypass portion H1 to the ninth bypass portion H9.
<1-4> Converging Tube J and Branched Tube K
[0071] The converging tube J shown in FIG. 7 has a cross-sectional area equivalent to the
cross-sectional areas of the first branched tube K1, the second branched tube K2,
and the third branched tube K3 as described above, and within the outdoor heat exchanger
23, the portion containing the first branched tube K1, the second branched tube K2,
and the third branched tube K3 can be increased in terms of its heat exchange effective
surface area relative to that of the converging tube J. In the portion of the converging
tube J, a large amount of refrigerant collects and flows more intensively than in
the portion of the first branched tube K1 the second branched tube K2, and the third
branched tube K3; and the growth of ice below the outdoor heat exchanger 23 can therefore
be suppressed more effectively. The converging tube J herein is composed of a first
converging tube portion J1, a second converging tube portion J2, a third converging
tube portion J3, and a fourth converging tube portion J4 connected to each other,
as shown in FIG. 7. Refrigerant that has flowed into the outdoor heat exchanger 23
through the branched tube K converges at the converging/branching point 23j, in which
state the refrigerant in the refrigerant circuit 10 can make a pass through the lowest
end portion of the outdoor heat exchanger 23 after having collected into one flow.
The first converging tube portion J1 extends from the converging/branching point 23j
to the heat exchange fins 23z disposed in the outermost edge of the outdoor heat exchanger
23. The second converging tube portion J2 extends from the end of the first converging
tube portion J1 so as to pass through the plurality of heat exchange fins 23z. As
with the second converging tube portion J2, the fourth converging tube portion J4
also extends so as to pass through the plurality of heat exchange fins 23z. The third
converging tube portion J3 is a U-shaped tube which connects the second converging
tube portion J2 and the fourth converging tube portion J4 in the end of the outdoor
heat exchanger 23. During the air-cooling operation, since the flow of refrigerant
in the refrigerant circuit 10 collects from a multiple-split flow in the branched
tube K into a single flow in the converging tube J, the refrigerant can collect into
a single flow in the converging tube J even if the degree of subcooling of the refrigerant
flowing through the branched tube K in the portion immediately before the converging/branching
point 23j differs with each set of refrigerant flowing through the individual tubes
constituting the branched tube K, and the degree of subcooling of the outlet of the
outdoor heat exchanger 23 can therefore be adjusted. When the defrosting operation
is performed during the air-warming operation, the hot gas bypass valve 27 is opened
and high-temperature refrigerant discharged from the compressor 21 can be supplied
to the converging tube J provided at the bottom end of the outdoor heat exchanger
23 before being supplied to the other portions of the outdoor heat exchanger 23. Therefor,
ice deposited in the lower vicinity of the outdoor heat exchanger 23 can be effectively
thawed.
<1 -5> Hot Gas Bypass Circuit H
[0072] FIG. 8 shows a plan view in which the air-blowing mechanism of the outdoor unit 2
has been removed. FIG. 9 shows a plan view of the placement relationship between the
bottom plate of the outdoor unit 2 and the hot gas bypass circuit H.
[0073] The hot gas bypass circuit H has a first bypass portion H1 through to an eighth bypass
portion H8 as shown in FIGS. 8 and 9, and also a ninth bypass portion H9 which is
not shown. In the hot gas bypass circuit H, the portion that branches at the branching
point A1 from the discharge tube A, extends to the hot gas bypass valve 27, and further
extends from this hot gas bypass valve 27 is the first bypass portion H1. The second
bypass portion H2 extends from the end of the first bypass portion H1 toward the air-blower
chamber near the rear side. The third bypass portion H3 extends toward the front side
from the end of the second bypass portion H2. The fourth bypass portion H4 extends
in the opposite direction of the machine chamber, toward the left, from the end of
the third bypass portion H3. The fifth bypass portion H5 extends toward the rear side
from the end of the fourth bypass portion H4, up to a portion where a gap can be ensured
from the rear side panel 2e of the outdoor unit casing. The sixth bypass portion H6
extends from the end of the fifth bypass portion H5 toward the machine chamber at
the right and toward the rear side. The seventh bypass portion H7 extends from the
end of the sixth bypass portion H6 toward the machine chamber at the right and through
the inside of the air-blower chamber. The eighth bypass portion H8 extends through
the inside of the machine chamber from the end of the seventh bypass portion H7. The
ninth bypass portion H9 extends from the end of the eighth bypass portion H8 until
it reaches the capillary tube 28. When the hot gas bypass valve 27 has been opened,
refrigerant flows through the hot gas bypass circuit H in sequence from the first
bypass portion H1 to the ninth bypass portion H9 as described above. Therefore, the
refrigerant that braches at the branching point A1 of the discharged tube A extending
from the compressor 21 flows to the first bypass portion H1 before the refrigerant
flowing through the ninth bypass portion H9. Therefore, viewing the refrigerant flowing
through the hot gas bypass circuit H as a whole, the refrigerant that has flowed through
the fourth bypass portion H4 then continues to flow to the fifth through eighth bypass
portions H8, the temperature of the refrigerant flowing through the fourth bypass
portion H4 readily becomes higher than the temperature of the refrigerant flowing
through the fifth through eighth bypass portions H8.
[0074] Thus, the hot gas bypass circuit H is placed in the bottom plate 2b of the outdoor
unit casing so as to pass near the portion below the outdoor fans 26 and below the
outdoor heat exchanger 23. Therefore, the vicinity of the portion where the hot gas
bypass circuit H passes can be warmed by the high-temperature refrigerant branched
and supplied from the discharge tube A of the compressor 21 without the use of a heater
or another separate heat source. Consequently, even if the top side of the bottom
plate 2b is wetted by rainwater or by drain water produced in the outdoor heat exchanger
23, the formation of ice can be suppressed in the bottom plate 2b below the outdoor
fans 26 and below the outdoor heat exchanger 23. It is thereby possible to avoid situations
in which the driving of the outdoor fans 26 is hindered by ice and situations in which
the surface of the outdoor heat exchanger 23 is covered by ice, reducing heat exchange
efficiency. The hot gas bypass circuit H is arranged so as to pass below the outdoor
fans 26 after branching at the branching point A1 of the discharge tube A and before
passing below the outdoor heat exchanger 23. Therefore, the formation of ice below
the outdoor fans 26 can be prevented with greater priority.
<1-6> Electromagnetic Induction Heating Unit 6
[0075] FIG. 10 shows a schematic perspective view of the electromagnetic induction heating
unit 6 attached to the accumulation tube F. FIG. 11 shows an external perspective
view in which a shielding cover 75 has been removed from the electromagnetic induction
heating unit 6. FIG. 12 shows a cross-sectional view of the electromagnetic induction
heating unit 6 attached to the accumulation tube F.
[0076] The electromagnetic induction heating unit 6 is placed so as to cover the magnetic
tube F2 from the radially outer side, the magnetic tube F2 being the heat-generating
portion of the accumulation tube F, and the magnetic tube F2 is made to generate heat
by electromagnetic induction heating. This heat-generating portion of the accumulation
tube F has a double-layered tube structure having the copper tube F1 on the inner
side and the magnetic tube F2 on the outer side.
[0077] The electromagnetic induction heating unit 6 comprises a first hexagonal nut 61,
a second hexagonal nut 66, a first bobbin cover 63, a second bobbin cover 64, a bobbin
main body 65, a first ferrite case 71, a second ferrite case 72, a third ferrite case
73, a fourth ferrite case 74, a first ferrite 98, a second ferrite 99, a coil 68,
the shielding cover 75, an electromagnetic induction thermistor 14, a fuse 15, and
other components.
[0078] The first hexagonal nut 61 and the second hexagonal nut 66 are made of a resin, and
are used to stabilize the fixed state between the electromagnetic induction heating
unit 6 and the accumulation tube F with the aid of a C ring (not shown). The first
bobbin cover 63 and the second bobbin cover 64 are made of a resin and are used to
cover the accumulation tube F from the radially outer side in the top end position
and bottom end position, respectively. The first bobbin cover 63 and the second bobbin
cover 64 have four screw holes for screws 69, whereby the first through fourth first
ferrite cases 71 to 74 described hereinafter are screwed in via the screws 69. Furthermore,
the second bobbin cover 64 has an electromagnetic induction thermistor insertion opening
64f for inserting the electromagnetic induction thermistor 14 shown in FIG. 12 and
attaching it to the outer surface of the magnetic tube F2. The second bobbin cover
64 has a fuse insertion opening 64e (see FIG. 14) for inserting the fuse 15 shown
in FIG. 13 and attaching it to the outer surface of the magnetic tube F2. The electromagnetic
induction thermistor 14 has an electromagnetic induction thermistor detector 14a,
an outer projection 14b, a side projection 14c, and electromagnetic induction thermistor
wires 14d for converting the detection result of the electromagnetic induction thermistor
detector 14a to a signal and sending it to the control part 11, as shown in FIG. 12.
The electromagnetic induction thermistor detector 14a has a shape that conforms to
the curved shape of the outer surface of the accumulation tube F, and has a substantial
contact surface area. The fuse 15 has a fuse detector 15a, an asymmetrical shape 15b,
and fuse wires 15d for converting the detection result of the fuse detector 15a to
a signal and sending it to the control part 11, as shown in FIG. 13. Having received
from the fuse 15 a notification that a temperature exceeding a predetermined limit
temperature has been detected, the control part 11 performs a control for stopping
the supply of electricity to the coil 68, avoiding heat damage to the equipment. The
bobbin main body 65 is made of a resin and the coil 68 is wound over the bobbin main
body 65. The coil 68 is wound in a helical shape over the outer side of the bobbin
main body 65, the axial direction being the direction in which the accumulation tube
F extends. The coil 68 is connected to a control print board (not shown), and the
coil receives a supply of high-frequency electric current. The output of the control
print board is controlled by the control part 11. The electromagnetic induction thermistor
14 and the fuse 15 are attached in a state in which the bobbin main body 65 and the
second bobbin cover 64 have been joined together, as shown in FIG. 14. When the electromagnetic
induction thermistor 14 has been attached, a satisfactory state of pressurized contact
with the outer surface of the magnetic tube F2 is maintained by a plate spring 16
pushing radially inward on the magnetic tube F2. Similarly, in the attachment of the
fuse 15, a satisfactory state of pressurized contact with the outer surface of the
magnetic tube F2 is maintained by a plate spring 17 pushing radially inward on the
magnetic tube F2. Thus, since the electromagnetic induction thermistor 14 and the
fuse 15 stay satisfactorily in firm contact with the outer surface of the accumulation
tube F, responsiveness is improved and sudden temperature changes caused by electromagnetic
induction heating can be quickly detected. The first bobbin cover 63 and the second
bobbin cover 64 are held in by the first ferrite case 71 from the direction in which
the accumulation tube F extends and are screwed in place by the screws 69. The first
ferrite case 71 through the fourth ferrite case 74 house the first ferrite 98 and
the second ferrite 99, which are configured from the highly magnetically permeable
material ferrite. The first ferrite 98 and the second ferrite 99 absorb the magnetic
field created by the coil 68 and form a magnetic flux pathway, thereby impeding the
magnetic field from leaking out to the exterior, as shown in the cross-sectional view
of the accumulation tube F and electromagnetic induction heating unit 6 of FIG. 15.
The shielding cover 75 is placed around the outermost periphery of the electromagnetic
induction heating unit 6, and collects a magnetic flux that cannot be contained with
the first ferrite 98 and the second ferrite 99 alone. The magnetic flux mostly does
not leak out past the shielding cover 75, and the locations where the magnetic flux
is created can be determined arbitrarily.
<1-7> Electromagnetic Induction Heating Control
[0079] The electromagnetic induction heating unit 6 described above performs a control for
causing the magnetic tube F2 of the accumulation tube F to generate heat, during startup
in which the air-warming operation is initiated when the refrigeration cycle is caused
to perform the air-warming operation, during air-warming capability assistance, and
during performing of the defrosting operation.
[0080] The description hereinbelow pertains to the time of startup.
[0081] When an air-warming operation command is inputted to the controller 90 from the user,
the control part 11 initiates the air-warming operation. When the air-warming operation
is initiated, the control part 11 waits until the compressor 21 has started up and
the pressure detected by the pressure sensor 29a has risen to 39 kg/cm
2, and then causes the indoor fan 42 to be driven. This prevents discomfort for the
user due to unwarmed air flowing into the room in the stage at which the refrigerant
passing through the indoor heat exchanger 41 has not yet been warmed. Electromagnetic
induction heating using the electromagnetic induction heating unit 6 is performed
here in order to shorten the time for the compressor 21 to start up and the pressure
detected by the pressure sensor 29a to reach 39 kg/cm
2. During this electromagnetic induction heating, since the temperature of the accumulation
tube F rises rapidly, prior to initiating electromagnetic induction heating, the control
part 11 performs a control for determining whether or not conditions are suitable
for initiating electromagnetic induction heating. Examples of such a determination
include a flow condition judgment process, a sensor-separation detection process,
a rapid pressure-increasing process, and the like, as shown in the time chart of FIG.
16.
<1-8> Flow condition judgment process
[0082] When electromagnetic induction heating is performed, the heating load is only the
refrigerant accumulated in the portion of the accumulation tube F where the electromagnetic
induction heating unit 6 is attached while refrigerant is not flowing to the accumulation
tube F. Thus, when electromagnetic induction heating by the electromagnetic induction
heating unit 6 is performed while refrigerant is not flowing to the accumulation tube
F, the temperature of the accumulation tube F rises abnormally to an extent such that
the refrigerator oil deteriorates. The temperature of the electromagnetic induction
heating unit 6 itself also rises, and the reliability of the equipment is reduced.
Therefore, a flow condition judgment process is performed herein which ensures that
refrigerant flows to the accumulation tube F during a stage prior to initiating electromagnetic
induction heating, so that electromagnetic induction heating by the electromagnetic
induction heating unit 6 is not performed while refrigerant is not flowing to the
accumulation tube F.
[0083] In the flow condition judgment process, the following processes are performed as
shown in the flowchart of FIG. 17.
[0084] In step S11, the control part 11 determines whether or not the controller 90 has
received a command from the user for the air-warming operation and not for the air-cooling
operation. Such a determination is made because the refrigerant must be heated by
the electromagnetic induction heating unit 6 under the conditions in which the air-warming
operation is performed.
[0085] In step S12, the control part 11 initiates startup of the compressor 21, and the
frequency of the compressor 21 gradually increases.
[0086] In step S13, the control part 11 determines whether or not the frequency of the compressor
21 has reached a predetermined minimum frequency Qmin, and proceeds to step S14 when
it has determined that the minimum frequency has been reached.
[0087] In step S14, the control part 11 initiates the flow condition judgment process, stores
detected temperature data of the electromagnetic induction thermistor 14 and detected
temperature data of the outdoor heat exchange temperature sensor 29c at the time the
frequency of the compressor 21 reached the predetermined minimum frequency Qmin (see
point a in FIG. 16), and initiates a count of the flow detection time by the timer
95. If the frequency of the compressor 21 has not yet reached the predetermined minimum
frequency Qmin, the refrigerant flowing through the accumulation tube F and the outdoor
heat exchanger 23 is in a gas-liquid double phase and maintains a constant temperature
at the saturation temperature, and the temperatures detected by the electromagnetic
induction thermistor 14 and the outdoor heat exchange temperature sensor 29c are therefore
constant and unchanging at the saturation temperature. However, the frequency of the
compressor 21 continues to increase after some time, the refrigerant pressures in
the outdoor heat exchanger 23 and in the accumulation tube F continue to decrease
further, and the saturation temperature begins to decrease, whereby the temperatures
detected by the electromagnetic induction thermistor 14 and the outdoor heat exchange
temperature sensor 29c begin to decrease. Since the outdoor heat exchanger 23 herein
is positioned farther downstream than the accumulation tube F in relation to the intake
side of the compressor 21, the timing at which the temperature of refrigerant passing
through the outdoor heat exchanger 23 begins to decrease is earlier than the timing
at which the temperature of refrigerant passing through the accumulation tube F begins
to decrease (see points b and c in FIG. 16).
[0088] In step S15, the control part 11 determines whether or not the flow detection time
of 10 seconds has elapsed since the timer 95 began counting, and the process transitions
to step S16 when the flow detection time has elapsed. When the flow detection time
has not yet elapsed, step S15 is repeated.
[0089] In step S16, the control part 11 acquires detected temperature data of the electromagnetic
induction thermistor 14 and detected temperature data of the outdoor heat exchange
temperature sensor 29c at the time that the flow detection time has elapsed and the
refrigerant temperatures in the outdoor heat exchanger 23 and in the accumulation
tube F have decreased, and the process then transitions to step S17.
[0090] In step S17, the control part 11 determines whether or not the detected temperature
of the electromagnetic induction thermistor 14 acquired in step S16 has fallen 3°C
or more below the detected temperature data of the electromagnetic induction thermistor
14 stored in step S14, and also determines whether or not the detected temperature
of the outdoor heat exchange temperature sensor 29c acquired in step S16 has fallen
3°C or more below the detected temperature data of the outdoor heat exchange temperature
sensor 29c stored in step S14. Specifically, it is determined whether or not a decrease
in the refrigerant temperature was successfully detected during the flow detection
time. When either the detected temperature of the electromagnetic induction thermistor
14 or the detected temperature of the outdoor heat exchange temperature sensor 29c
has fallen by 3°C or more, it is determined that refrigerant is flowing through the
accumulation tube F and a refrigerant flow has been ensured, the flow condition judgment
process is ended, and a transition is made either to the rapid pressure-increasing
process during startup in which the output of the electromagnetic induction heating
unit 6 is used at its maximum limit, to the sensor-separation detection process, or
to another process.
[0091] On the other hand, when neither the detected temperature of the electromagnetic induction
thermistor 14 nor the detected temperature of the outdoor heat exchange temperature
sensor 29c has fallen by 3°C or more, the process transitions to step S18.
[0092] In step S18, the control part 11 assumes that the quantity of refrigerant flowing
through the accumulation tube F is insufficient for induction heating by the electromagnetic
induction heating unit 6, and the control part 11 outputs a flow abnormality display
on the display screen of the controller 90.
<1-9> Sensor-separation detection process
[0093] The sensor-separation detection process is a process for confirming the state of
attachment of the electromagnetic induction thermistor 14, and is performed after
the electromagnetic induction thermistor 14 is attached to the accumulation tube F
and the air conditioning apparatus 1 is finished being installed (after installation
is finished, including after the breaker supplying electricity to the electromagnetic
induction heating unit 6 has tripped), when the air-warming operation is first initiated.
Specifically, the control part 11 performs the sensor-separation detection process
after it has been determined in the above-described flow condition judgment process
that the flow quantity of refrigerant in the accumulation tube F has been ensured,
and prior to the performing of the rapid pressure-increasing process during startup
in which the output of the electromagnetic induction heating unit 6 is used at its
maximum limit.
[0094] When the air conditioning apparatus 1 is being transported, unanticipated vibrations
or other factors can cause the electromagnetic induction thermistor 14 to be in an
unstably attached state or a detached state, and when a newly transported electromagnetic
induction heating unit 6 is operated for the first time, its reliability in particular
is required, and when a newly transported electromagnetic induction heating unit 6
operates for the first time in the proper manner, it can be forecast, to a certain
extent, that subsequent operations will be stable. Therefore, the sensor-separation
detection process is performed with the timing described above.
[0095] In the sensor-separation detection process, the following processes are performed
as shown in the flowchart of FIG. 18.
[0096] In step S21, the control part 11 initiates the supply of electricity to the coil
68 of the electromagnetic induction heating unit 6, while ensuring the refrigerant
flow quantity in the accumulation tube F that was confirmed by the flow condition
judgment process, or a greater refrigerant flow quantity, and while storing detected
temperature data of the electromagnetic induction thermistor 14 (see point d in FIG.
16) at the time the flow detection time has ended (i.e., the starting time point of
the sensor-separation detection time). Electricity is supplied to the coil 68 of the
electromagnetic induction heating unit 6 here for the sensor-separation detection
time of 20 seconds, at a separation detection supply of electricity M1 (1 kW) of an
output 50% less than a predetermined maximum supplied electricity Mmax (2 kW). In
this stage, since the state of attachment of the electromagnetic induction thermistor
14 is not yet confirmed to be satisfactory, the output is reduced to 50%, so that
the fuse 15 will not be damaged and the resin members of the electromagnetic induction
heating unit 6 will not melt due to the electromagnetic induction thermistor 14 being
unable to detect this abnormal rise in temperature regardless of any abnormal rise
in temperature in the accumulation tube F. At the same time, the continuous heating
time duration of the electromagnetic induction heating unit 6 is set in advance so
as not to exceed the maximum continuous output time of 10 minutes, and the control
part 11 therefore causes the timer 95 to begin counting the elapsed time in which
the electromagnetic induction heating unit 6 continues to output. The supply of electricity
to the coil 68 of the electromagnetic induction heating unit 6 and the size of the
magnetic field generated by the coil 68 around itself are correlated values.
[0097] In step S22, the control part 11 determines whether or not the sensor-separation
detection time has ended. If the sensor-separation detection time has ended, the process
transitions to step S23. If the sensor-separation detection time has not yet ended,
step S22 is repeated.
[0098] In step S23, the control part 11 acquires the detected temperature of the electromagnetic
induction thermistor 14 at the point in time when the sensor-separation detection
time ended (point e of FIG. 16), and the process transitions to step S24.
[0099] In step S24, the control part 11 determines whether or not the detected temperature
of the electromagnetic induction thermistor 14 at the end of the sensor-separation
detection time acquired in step S23 has risen 10°C or more above the detected temperature
data of the electromagnetic induction thermistor 14 at the start of the sensor-separation
detection time stored in step S21. Specifically, a determination is made as to whether
or not the refrigerant temperature has risen by 10°C or more due to the induction
heating by the electromagnetic induction heating unit 6 during the sensor-separation
detection time. When the detected temperature of the electromagnetic induction thermistor
14 has risen by 10°C or more, it is determined that confirmation could be made that
the state of attachment of the electromagnetic induction thermistor 14 to the accumulation
tube F is satisfactory and that the accumulation tube F has been appropriately warmed
by the induction heating of the electromagnetic induction heating unit 6, the sensor-separation
detection process is ended, and the process transitions to the rapid pressure-increasing
process at startup in which the output of the electromagnetic induction heating unit
6 is used to its maximum limit. On the other hand, if the detected temperature of
the electromagnetic induction thermistor 14 has not risen by 10°C or more, the process
transitions to step S25.
[0100] In step S25, the control part 11 counts the number of times a sensor-separation retry
process was performed. When the number of retries is less than ten, the process transitions
to step S26, and when the number of retries exceeds ten, the process transitions to
step S27 without transitioning to step S26.
[0101] In step S26, the control part 11 executes the sensor-separation retry process. Herein
the detected temperature data of the electromagnetic induction thermistor 14 at the
elapse of 30 more seconds (not shown in FIG. 16) is stored, electricity is supplied
at a separation detection supply of electricity M1 to the coil 68 of the electromagnetic
induction heating unit 6 for 20 seconds, the same processes of steps S22 and S23 are
performed, the sensor-separation detection process is ended when the detected temperature
of the electromagnetic induction thermistor 14 has risen by 10°C or more, and the
process transitions to the rapid pressure-increasing process at startup in which the
output of the electromagnetic induction heating unit 6 is used to its maximum limit.
On the other hand, if the detected temperature of the electromagnetic induction thermistor
14 has not risen by 10°C or more, the process returns to step S25.
[0102] In step S27, the control part 11 determines that the state of attachment of the electromagnetic
induction thermistor 14 to the accumulation tube F is unstable or unsatisfactory,
and outputs a sensor-separated abnormality display on the display screen of the controller
90.
<1-10> Rapid Pressure-Increasing Process
[0103] The control part 11 initiates the rapid pressure-increasing process in a state in
which the flow condition judgment process and the sensor-separation detection process
have ended, confirmation has been made that sufficient refrigerant flow in the accumulation
tube F has been ensured, the state of attachment of the electromagnetic induction
thermistor 14 to the accumulation tube F is satisfactory, and the accumulation tube
F has been appropriately warmed by induction heating by the electromagnetic induction
heating unit 6.
[0104] Even if induction heating by the electromagnetic induction heating unit 6 is performed
here at high output, the reliability of the air conditioning apparatus 1 is successfully
improved because it is confirmed that there is no abnormal rise in temperature in
the accumulation tube F.
[0105] In the rapid pressure-increasing process, the following processes are performed as
shown in the flowchart of FIG. 19.
[0106] In step S31, the control part 11 sets the supply of electricity to the coil 68 of
the electromagnetic induction heating unit 6 not to the separation detection supply
of electricity M1 limited to 50% output as it was during the sensor-separation detection
process described above, but rather to the predetermined maximum supplied electricity
Mmax (2 kW). This output by the electromagnetic induction heating unit 6 is continued
until the pressure sensor 29a reaches a predetermined target high pressure Ph.
[0107] To prevent abnormal high-pressure increases in the refrigeration cycle of the air
conditioning apparatus 1, the control part 11 forces the compressor 21 to stop when
the pressure sensor 29a detects an abnormally high pressure Pr. The target high pressure
Ph during this rapid pressure-increasing process is provided as a separate threshold
that is a pressure value smaller than the abnormally high pressure Pr.
[0108] In step S32, the control part 11 determines whether or not the maximum continuous
output time of 10 minutes of the electromagnetic induction heating unit 6 has elapsed
since the start of the count in step S21 of the sensor-separation detection process.
If the maximum continuous output time has not elapsed, the process advances to step
S33. If the maximum continuous output time has elapsed, the process advances to step
S34.
[0109] In step S33, the control part 11 determines whether or not the detected pressure
of the pressure sensor 29a has reached the target high pressure Ph. If the target
high pressure Ph has been reached, the process transitions to step S34. If the target
high pressure Ph has not been reached, step S32 is repeated.
[0110] In step S34, the control part 11 initiates driving of the indoor fan 42, ends the
rapid pressure-increasing process, and transitions to a steady output process.
[0111] When the process advances herein from step S33 to step S34, the indoor fan 42 begins
to operate under conditions in which sufficiently warm conditioned air is successfully
being provided to the user. When the process advances from step S32 to step S34, a
state of successfully providing the user with sufficiently warm conditioned air has
not been reached, but conditioned air that is somewhat warm can be supplied and the
supply of warm air can be initiated in a range wherein the elapsed time since the
start of the air-warming operation is not too long.
<1-11> Steady Output Process
[0112] In the steady output process, a steadily supplied electricity M2 (1.4 kW), which
is equal to or greater than the separated-detection supply of electricity M1 (1 kW)
and equal to or less than the maximum supplied electricity Mmax (2 kW), is designated
as a fixed output value, and the frequency at which electricity is supplied to the
electromagnetic induction heating unit 6 is PI controlled so that the detected temperature
of the electromagnetic induction thermistor 14 is maintained at the startup target
accumulation tube temperature of 80°C.
[0113] In the steady output process, the following processes are performed as shown in the
flowchart of FIG. 20.
[0114] In step S41, the control part 11 stores the detected temperature of the electromagnetic
induction thermistor 14 and the process transitions to step S42.
[0115] In step S42, the control part 11 compares the detected temperature of the electromagnetic
induction thermistor 14 stored in step S41 with the startup target accumulation tube
temperature of 80°C, and determines whether or not the detected temperature of the
electromagnetic induction thermistor 14 is equal to or less than a predetermined maintained
temperature that is lower than the startup target accumulation tube temperature of
80°C by a predetermined temperature. If the detected temperature is equal to or less
than the predetermined maintained temperature, the process transitions to step S43.
If the detected temperature is not equal to or less than the predetermined maintained
temperature, the process stands by until the detected temperature is equal to or less
than the predetermined maintained temperature.
[0116] In step S43, the control part 11 perceives the time elapsed since the end of the
most recent supply of electricity to the electromagnetic induction heating unit 6.
[0117] In step S44, the control part 11 designates, as one set, the continuous supply of
electricity to the electromagnetic induction heating unit 6 fixed at the steadily
supplied electricity M2 (1.4 kW) for 30 seconds, and performs PI control in which
the frequency of this set is increased in response to a longer elapsed time ascertained
in step S43.
<1-12> Defrosting Process
[0118] When the steady output process described above is continued and the detected temperature
of the outdoor heat exchange temperature sensor 29c of the outdoor heat exchanger
23 is a predetermined value or lower, the defrosting process, which is an operation
for melting frost adhering to the outdoor heat exchanger 23, is performed. Specifically,
similar to setting the connection state of the four-way switching valve 22 to the
air-cooling operation (the connection state shown by the dashed lines of FIG. 1),
high-pressure, high-temperature gas refrigerant discharged from the compressor 21
is supplied to the outdoor heat exchanger 23 before passing through the indoor heat
exchanger 41, and the heat of condensation of the refrigerant is used to melt the
frost adhering to the outdoor heat exchanger 23.
[0119] In the defrosting process, the following processes are performed as shown in the
flowchart of FIG. 21.
[0120] In step S51, the control part 11 confirms that the frequency of the compressor 21
is equal to or greater than the predetermined minimum frequency Qmin, which ensures
a predetermined refrigerant circulating quantity; that a refrigerant flow quantity
is ensured by the flow condition judgment process to an extent such that electromagnetic
induction heating can be performed; and that the state of attachment of the electromagnetic
induction thermistor 14 is proper according to the sensor-separation detection process;
and transitions to step S52.
[0121] In step S52, the control part 11 determines whether or not the detected temperature
of the outdoor heat exchange temperature sensor 29c is less than 10°C. If it is less
than 10°C, the process transitions to step S53. If it is not less than 10°C, step
S52 is repeated.
[0122] In step S53, the control part 11 brings induction heating by the electromagnetic
induction heating unit 6 to a halt and transmits a defrost signal.
[0123] In step S54, after transmitting a defrost signal, the control part 11 sets the connection
state of the four-way switching valve 22 to the connection state of the air-cooling
operation, and also performs a count, using the timer 95, of the time elapsed after
defrosting is initiated, once the connection state of the four-way switching valve
22 has become the connection state of the air-cooling operation.
[0124] In step S55, the control part 11 determines whether or not 30 seconds has elapsed
since defrosting was initiated. If 30 seconds has elapsed, the process transitions
to step S56. If 30 seconds has not elapsed, step S55 is repeated.
[0125] In step S56, the control part 11 brings the electricity supplied to the coil 68 of
the electromagnetic induction heating unit 6 to a predetermined maximum supplied electricity
Mmax (2 kW), and PI controls the frequency of induction heating by the electromagnetic
induction heating unit 6 so that the detected temperature of the electromagnetic induction
thermistor 14 reaches the target defrosting temperature, which is 40°C (different
from the startup target accumulation tube temperature during the steady output process).
When the detected temperature of the outdoor heat exchange temperature sensor 29c
falls below 0°C, the hot gas bypass valve 27 of the hot gas bypass circuit H then
opens, high-temperature, high-pressure gas refrigerant is supplied to the area below
the outdoor fans 26 and below the outdoor heat exchanger 23 on the top surface of
the bottom plate 2b of the outdoor unit 2, and the ice formed on the top surface of
the bottom plate 2b is removed. Since the connection state of the four-way switching
valve 22 is switched to the state of the air-cooling operation, the high-temperature,
high-pressure gas refrigerant discharged from the compressor 21 flows from the branching/converging
point 23k to the converging/branching point 23j of the outdoor heat exchanger 23 and
converges into a single flow in the converging/branching point 23j, whereby refrigerant
three times greater in quantity than that of the branched tube K flows collectively
through the converging tube J. Since the converging tube J is positioned in the vicinity
of the bottom end of the outdoor heat exchanger 23, much heat of condensation can
be collectively supplied to the bottom end vicinity of the outdoor heat exchanger
23. Defrosting can thereby be further quickened.
[0126] In step S57, the control part 11 determines whether or not the defrost initiation
elapsed time has exceeded 10 minutes. If it has not exceeded 10 minutes, the process
transitions to step S58. If it has exceeded 10 minutes, the process transitions to
step S59. The connection state of the four-way switching valve 22 can thereby be prevented
from remaining for 10 minutes or more in the air-cooling state, making it unlikely
that the user will experience discomfort from a decrease in the indoor temperature.
[0127] In step S58, the control part 11 determines whether or not the detected temperature
of the outdoor heat exchange temperature sensor 29c exceeds 10°C. If it exceeds 10°C,
the process transitions to step S59. If it does not exceed 10°C, the process returns
to and repeats step S56.
[0128] In step S59, the control part 11 stops the compressor 21 to equalize the high and
low pressures in the refrigeration cycle, and ends induction heating by the electromagnetic
induction heating unit 6.
[0129] In step S60, the control part 11 switches the connection state of the four-way switching
valve 22 to the connection state of the air-warming operation.
[0130] The control part 11 then transmits a signal which ends defrosting. Furthermore, the
control part 11 progressively raises the frequency of the compressor 21 to the predetermined
minimum frequency Qmin or greater, and performs the steady output process until a
condition is reached in which the defrosting process will be performed again. The
hot gas bypass valve 27 of the hot gas bypass circuit H closes after 5 seconds following
the transmission of the signal that ends defrosting.
<Characteristics of Air conditioning apparatus 1 of Present Embodiment>
[0131] In the air conditioning apparatus 1, performing the rapid pressure-increasing process
causes a process to be performed in which the output of the electromagnetic induction
heating unit 6 is brought to the maximum supplied electricity Mmax (2 kW), and the
refrigerant flowing toward the indoor heat exchanger 41 is quickly brought to a high
temperature and high pressure. It is thereby possible to shorten the time needed for
warm air to be supplied to the user after startup of the air-warming operation is
initiated. Furthermore, by performing the steady output process in a state in which
the room interior has been warmed to some extent, the steadily supplied electricity
M2 (1.4 kW), which is the output of the electromagnetic induction heating unit 6 limited
below the maximum supplied electricity Mmax (2 kW), is brought to a fixed output value.
It is thereby possible to minimize control overshooting caused by excessively raising
the output of the electromagnetic induction heating unit 6.
[0132] When electromagnetic induction heating is performed, sudden temperature increases
typically occur more readily than temperature increases caused by changes in the refrigerant
circulation conditions in the refrigeration cycle. As a countermeasure to this, in
the electromagnetic induction heating unit 6 of the air conditioning apparatus 1,
the electromagnetic induction thermistor 14, which is pressed against the magnetic
tube F2 by the elastic force of the plate spring 16, maintains satisfactory responsiveness
to rapid temperature changes caused by electromagnetic induction heating during the
above-described steady output process achieved by electromagnetic induction heating.
Therefore, the responsiveness of the steady output process is satisfactory, and control
overshooting can be further minimized.
[0133] In the defrosting process, since induction heating by the electromagnetic induction
heating unit 6 is performed at the maximum supplied electricity Mmax (2 kW), the defrosting
process can be quickened. Since the detected temperature of the electromagnetic induction
thermistor 14 is brought to the target defrosting temperature of 40°C and suppressed
lower than the startup target accumulation tube temperature during the steady output
process, overshooting caused by control is kept to a minimum.
<Other Embodiments>
[0134] Embodiments of the present invention were described above based on the drawings,
but the specific configuration is not limited to these embodiments, and modifications
can be made within a range that does not deviate from the scope of the invention.
(A)
[0135] In the embodiment described above, an example was described of a case in which the
rapid pressure-increasing process of causing the electromagnetic induction heating
unit 6 to output at the maximum supplied electricity Mmax (2 kW) is ended at the point
in time when the detected pressure of the pressure sensor 29a reaches the target high
pressure Ph.
[0136] However, the present invention is not limited to this example.
[0137] The rapid pressure-increasing process of causing the electromagnetic induction heating
unit 6 to output at the maximum supplied electricity Mmax (2 kW) may, for example,
be ended at the point in time when the electromagnetic induction thermistor 14 detects
a temperature established based on the temperature corresponding to the refrigerant
of the target high pressure Ph passing through the attached portion of the pressure
sensor 29a.
[0138] In this case as well, since it is possible to confirm that the refrigerant supplied
to the indoor heat exchanger 41 is sufficiently high in temperature, this confirmation
can be used as a determination indicator for initiating the supply of warm conditioned
air to the user at the start of the air-warming operation.
[0139] With this type of electromagnetic induction thermistor 14, detecting temperature
changes when determining the time of ending the rapid pressure-increasing process
may be done by detecting the temperature of an electromagnetic induction downstream-side
thermistor 214 which detects temperature changes in the vicinity downstream in the
refrigerant flow direction of the accumulation tube F having the magnetic tube F2,
as shown in FIG. 22, for example; and detecting temperature changes is not limited
to detecting the temperature of the accumulation tube F.
(B)
[0140] In the embodiment described above, an example was described of a case in which the
state of attachment of the electromagnetic induction thermistor 14 is confirmed to
be satisfactory by detecting a change in the detected temperature of the electromagnetic
induction thermistor 14 resulting from the electromagnetic induction heating unit
6 being changed from a stopped state to creating a magnetic field.
[0141] However, the present invention is not limited to this example.
[0142] For example, the state of attachment of the electromagnetic induction thermistor
14 may be confirmed by changing the electromagnetic induction heating unit 6 from
a state of creating a magnetic field to a state of not creating a magnetic field,
In this case, the state of attachment of the electromagnetic induction thermistor
14 can be confirmed to be satisfactory by detected temperature changes in which the
detected temperature of the electromagnetic induction thermistor 14 decreases.
[0143] The state of attachment of the electromagnetic induction thermistor 14 may also be
confirmed merely by changing the electricity supplied to the coil 68 of the electromagnetic
induction heating unit 6, thereby varying the strength of the magnetic field being
created, and by finding the resulting change in the detected temperature of the electromagnetic
induction thermistor 14.
(C)
[0144] In the embodiment described above, an example was described of a case in which a
determination is made as to whether or not the state of attachment of the electromagnetic
induction thermistor 14 is satisfactory, focusing on changes in the detected temperature
of the electromagnetic induction thermistor 14 which detects the temperature of the
magnetic tube F2 constituting the outer side of the accumulation tube F.
[0145] However, the present invention is not limited to this example.
[0146] In another option, for example, temperature changes in the accumulation tube F may
be detected by using a detection device of bimetal or the like for detecting if the
temperature is greater than a predetermined temperature or less than a predetermined
temperature, and setting the predetermined temperature of the detection device to
a value between the temperature prior to the sensor-separation detection process and
the subsequent temperature. In this case, even if it is not possible to detect the
specific temperature when the sensor-separation detection process is performed, the
state of attachment of the sensor can be confirmed by detecting the temperature changes.
(D)
[0147] In the embodiment described above, an example was described of a case in which the
output of the electromagnetic induction heating unit 6 for electromagnetic induction
heating is fixed at 70% in the steady output process while the output frequency thereof
is controlled.
[0148] However, the present invention is not limited to this example.
[0149] For example, in the steady output process, the output of the electromagnetic induction
heating unit 6 may be controlled based on the detected temperature of the electromagnetic
induction thermistor 14 while the frequency of performing electromagnetic induction
heating remains fixed.
[0150] Another option is for both the frequency of performing electromagnetic induction
heating and the output of the electromagnetic induction heating unit 6 to be controlled
based on the detected temperature of the electromagnetic induction thermistor 14 in
the steady output process.
(E)
[0151] In the embodiment described above, an example was described of a case in which the
electromagnetic induction heating unit 6 is attached to the accumulation tube F within
the refrigerant circuit 10.
[0152] However, the present invention is not limited to this example.
[0153] For example, the electromagnetic induction heating unit 6 may be provided to a refrigerant
tube other than the accumulation tube F. In this case, the magnetic tube F2 or another
magnetic component is provided to the refrigerant tube portion where the electromagnetic
induction heating unit 6 is provided.
(F)
[0154] In the embodiment described above, an example was described of a case in which the
accumulation tube F is configured as a double-layer pipe comprising the copper tube
F1 and the magnetic tube F2.
[0155] However, the present invention is not limited to this example.
[0156] For example, a magnetic member F2a and two stoppers F1a, F1b may be disposed inside
the accumulation tube F or a refrigerant tube as a heated object, as shown in FIG.
23. The magnetic member F2a is a member containing a magnetic material whereby heat
is generated by electromagnetic induction heating in the embodiment described above.
The stoppers F1a, F1b are placed in two locations inside the copper tube F1, constantly
allowing refrigerant to pass through but not allowing the magnetic member F2a to pass
through. The magnetic member F2a thereby does not move despite the flow of refrigerant.
Therefore, the intended heating position in the accumulation tube F or the like can
be heated. Furthermore, since the heat-generating magnetic member F2a and the refrigerant
are in direct contact, heat transfer efficiency can be improved.
(G)
[0157] The magnetic member F2a described in the other embodiment (F) above may be positioned
within the tube without the use of the stoppers F1a, F1b.
[0158] For example, bent portions FW may be provided in two locations in the copper tube
F1, and the magnetic member F2a may be disposed inside the copper tube F1 between
these two bent portions FW, as shown in FIG. 24. The movement of the magnetic member
F2a can be suppressed while refrigerant is allowed to pass through in this manner
as well.
(H)
[0159] In the embodiment described above, an example was described of a case in which the
coil 68 is wound around the accumulation tube F in a helical formation.
[0160] However, the present invention is not limited to this example.
[0161] For example, a coil 168 wound around a bobbin main body 165 may be disposed around
the periphery of the accumulation tube F without being wound over the accumulation
tube F, as shown in FIG. 25. The bobbin main body 165 is disposed so that its axial
direction is substantially perpendicular to the axial direction of the accumulation
tube F. The bobbin main body 165 and the coil 168 are disposed in two separate parts
so as to sandwich the accumulation tube F.
[0162] In this case, for example, a first bobbin cover 163 and a second bobbin cover 164
which pass through the accumulation tube F may be arranged in a state of being fitted
over the bobbin main body 165, as shown in FIG. 26.
[0163] Furthermore, the first bobbin cover 163 and the second bobbin cover 164 may be fixed
in place by being sandwiched by a first ferrite case 171 and a second ferrite case
172, as shown in FIG. 27. In FIG. 27, an example is shown of a case in which two ferrite
cases are arranged so as to sandwich the accumulation tube F, but they may be arranged
in four directions similar to the embodiment described above. The ferrite may also
be accommodated similar to the embodiment described above.
<Other>
[0164] Embodiments of the present invention were described above in several examples, but
the present invention is not limited to these embodiments. For example, the present
invention also includes combined embodiments obtained by suitably combining different
portions of the above embodiments, within a range that can be carried out based on
the above descriptions by those skilled in the art.
INDUSTRIAL APPLICABILITY
[0165] According to the present invention, performance during startup can be quickly ensured
while overshooting after startup can be kept to a minimum; therefore, the present
invention is particularly useful in an electromagnetic induction heating unit and
an air conditioning apparatus in which refrigerant is heated using electromagnetic
induction.
REFERENCE SIGNS LIST
[0166]
- 1
- Air conditioning apparatus
- 6
- Electromagnetic induction heating unit
- 10
- Refrigerant circuit
- 11
- Control part
- 14
- Electromagnetic induction thermistor (refrigerant state quantity detector, temperature
detector)
- 15
- Fuse
- 16
- Plate spring (elastic member)
- 17
- Plate spring (elastic member)
- 21
- Compressor
- 22
- Four-way switching valve
- 23
- Outdoor heat exchanger
- 24
- Electric expansion valve
- 25
- Accumulator
- 29a
- Pressure sensor (refrigerant state quantity detector)
- 29b
- Outdoor air temperature sensor
- 29c
- Outdoor heat exchange temperature sensor
- 41
- Indoor heat exchanger
- 43
- Indoor temperature sensor
- 44
- Indoor heat exchange temperature sensor
- 65
- Bobbin main body
- 68
- Coil (magnetic field generator)
- 71-74
- First ferrite case - fourth ferrite case
- 75
- Shielding cover
- 90
- Controller
- 95
- Timer
- 98, 99
- First ferrite, second ferrite
- F
- Accumulation tube, refrigerant tube (predetermined state quantity detected portion)
- F2
- Magnetic tube (heating target portion)
- M1
- Separated-detection supply of electricity (magnetic field level)
- M2
- Steadily supplied electricity (first magnetic field limit reference value)
- Mmax
- Maximum supplied electricity (predetermined maximum output)
- Ph
- Target high pressure (first predetermined target state quantity)
CITATION LIST
PATENT LITERATURE
[0167]
<Patent Literature 1> Japanese Laid-open Patent Application Publication No. 2000-97510