The former technique
[0001] The technique of execution of tunnels with tunnel boring machines is increasingly
used, by technical, economical and environmental reasons.
[0002] With this technique, the machine excavates the soil with its disc cutter head and
places precast segments around the excavated surface, forming the circular wall of
the tunnel.
[0003] This solution of tunnel building is appropriate for stiff soil, because the tunnels
obtained in this way have their stability assured by the strength of the surrounding
soil, thus, they do not need to have significant strength in both the transversal
direction and the direction of the tunnel axis.
[0004] In the case of weak soil, the execution of tunnels with a tunnel boring machine is
unreliable, because, in the tunnel thus formed, the connections between precast segments
are very weak; hence, the strength and the ductility of the tunnel are low, so it
has the risk of sinking, or collapsing, particularly during earthquakes.
[0005] Document
JP 2005-248656 discloses an underground structure, constituted by three arch portions: an outer
and an inner arch made of square cylinders, and an intermediate portion made with
natural ground between the two arches.
[0006] Document
JP7042181 also discloses an underwater tunnel constituted by three tubes, an inner and an outer
tube and a third tube formed by filling of the space between.
[0007] Document
JP 2-128098 discloses a method of shield lining of a tunnel, in which precast concrete blocks
are fixed to the concrete tunnel behind, through reinforcing bars, projected from
those blocks.
[0008] Document
JP7048851 discloses an underwater tunnel fixed to the bottom ground by mooring members, which
is provided with sensors that activate propellers to react against the tidal current,
in order to stabilise the tunnel.
[0009] Document
US4338045 discloses a device of anchoring a pipeline to the seabed made up of metallic saddle
clamps secured on both extremities to piles embedded on the ground.
Technical domain of the invention
[0010] The present invention constitutes an innovative solution for the construction of
tunnels of the roadway and the railway types, executed with tunnel boring machines,
when the referred tunnels are executed in weak soil (e.g., mud), in seismic areas,
allowing for the tunnel to be provided with the necessary strength and ductility.
Description of the figures
[0011] The present invention is illustrated in figures 1, 2, 3 and 4. Figure 1 shows a perspective
of the tunnel. Figure 2 shows half cross-section of the tunnel and the reinforcements.
Figure 3 shows a detail of the tunnel and the anchor bolts. Figure 4 shows a cross-section
of the tunnel and a support.
Detailed description of the invention
[0012] The tunnel is constituted by two concentric tubes in concrete; an exterior tube (3),
which is built by a tunnel boring machine in the weak soil (1), and an interior tube
(4), which is executed later on, inside the exterior tube (3).
[0013] The tunnel boring machine excavates the weak soil (1) and places precast segments
(10) around the tunnel surface, which are linked together, forming the exterior tube
(3) of the tunnel, which is circular.
[0014] Inside the exterior tube (3) a concentric interior tube (4) is cast, using the exterior
one (3) as exterior formwork and with the help of a supplementary interior formwork.
[0015] Anchor bolts (11) are applied, distributed on the interior surface of the exterior
tube (3), to improve the connection between the two tubes. Epoxy resin or similar
product can also be applied on the interior surface of the exterior tube (3), to improve
the referred connection.
[0016] Longitudinal reinforcements (7) and transversal reinforcements (8) are laid inside
the thickness of the interior tube (4), both confined by confining reinforcements
(9), in order to provide the tunnel with the necessary strength and ductility, to
resist the earthquakes.
[0017] Supports, regularly spaced along the axis of the tunnel, constituted by groups of
reinforced concrete piles (6), horizontally flexible, are provided, in order to resist
vertical loads while allowing for horizontal movements of the tunnel during earthquakes.
[0018] The piles (6) are connected to the tunnel through concrete blocks (5), evolving the
exterior tube (3). The piles are executed by vertically drilling through the weak
soil (1) and the concrete blocks (5), being anchored in those blocks (5) and in the
stiff soil (2) below.
1. Tunnel characterized by being constituted by two concentric tubes in concrete, acting together; an exterior
tube (3) formed by precast segments (10) mounted by a tunnel boring machine, and an
interior tube (4), which is cast inside the exterior tube (3) and is provided with
longitudinal reinforcements (7) and transversal reinforcements (8), both confined
by confining reinforcements (9).
2. Tunnel according to claim 1, characterised by being provided with anchor bolts (11), applied on the interior surface of the exterior
tube (3), in order to improve the connection between the two tubes (3) (4).
3. Tunnel according to claim 1, characterised by being provided with supports, regularly spaced, constituted by groups of piles (6)
horizontally flexible, which are anchored upon in concrete blocks (5), evolving de
exterior tube (3), and in the stiff soil (2) below.
Amended claims in accordance with Rule 137(2) EPC.
1. Tunnel characterized by being constituted by two concentric tubes in concrete: an exterior tube (1) formed
by precast vault segments (3) mounted by a tunnel boring machine, and an interior
tube (2), which is cast against the exterior tube (1) and is provided with two layers
of longitudinal reinforcements (4) and transversal reinforcements (5), in steel bars
of high ductility, confined by confining reinforcements (6).
2. Tunnel according to claim 1, characterized by the confining reinforcements (6) to be made from reinforcing bars, bent in multiple
stirrups, linking the two layers of reinforcements (4) (5).
3. Tunnel according to claim 1, characterised by being provided with anchor bolts (7), applied on the interior surface of the precast
vault segments (3), to improve the connection between the two tubes (1) (2).