|
(11) | EP 2 507 494 A1 |
| (12) |
|
|
|
|
|||||||||||||||
| (54) | PROCEDE DE CONTROLE D'UNE SURALIMENTATION A DEUX ETAGES DE TURBOCOMPRESSEURS A GEOMETRIE FIXE AVEC ESTIMATEUR DYNAMIQUE ET LIMITATION DE LA PRESSION AVANT TURBINE |