[0001] This invention mainly concerns the systems of crane elevators, moving along the rail,
attached to the external side of the construction, and transport facilities for the
transportation and mounting/dismounting of elevators.
[0002] There is a known solution of "Lift System, Lift System Rail, and the Method of Reaching
the Construction Surface" (see document
EA 008 405 B1, published: 27-04-2007 classes B66B 9/00, A62B 1/02, B66B 7/02), wherein the lift crane system is attached
to the external side of the construction. The specified system includes a lifting
unit, which enters in contact with the rail for moving the lifting unit along the
rail, attached to the construction structure. Thus, a boom crane is mounted on the
lifting unit, which has a rotating and rotary mechanism to support one end of the
boom that comprises a telescopic section for reaching any point on the construction
or under it. Besides, the lift crane system has a transport facility with the mechanism
for forwarding and returning the lifting unit, for its holding near the rail for the
fixation or releasing. The indicated system can be used for construction operation
and maintenance of buildings.
[0003] The construction of this system does not allow to secure fixation of the lifting
unit in the construction structure for the increase of load capacity of the boom crane,
as well as mounting of the lifting unit on the transport facility for the possibility
of boom crane operation on the transport facility, and mounting of the lifting unit
on the building surface for the possibility of boom crane operation near the construction,
but separately from the transport facility.
[0004] The present invention is directed to solve the technical task on the fixation of
the lifting unit in the construction structure for the increase of load capacity of
the boom crane, as well as mounting of the lifting unit on the transport facility
for the possibility of boom crane operation on the transport facility, and mounting
of the lifting unit on the building surface for the possibility of boom crane operation
near the construction, but separately from the transport facility.
[0005] The technical result, achieved at the use of this invention, is the operational capability
extension of the lift crane system.
[0006] The indicated technical result is achieved due to the fact that the lift-crane system
is adapted to be connected to the external side of a construction, and contains at
least one lifting unit engaged with at least one rail for moving the lifting unit
along the rail attached to the structure of the construction; a boom crane including
a rotating mechanism and a rotary mechanism for bearing one end of the boom that comprises
at least one telescopic section for reaching any point on the construction or above
the construction; a transport facility with a mechanism for forwarding and returning
the lifting unit for maintaining said unit in the vicinity of the rail for securing
it to or releasing it from the latter; which differs by the fact that the lifting
unit comprises bearing members for attaching the lifting unit to the structure of
the construction in order to increase the load capacity of the boom crane during the
operation thereof on the construction, the transport facility comprises a nominal
location for mounting the lifting unit on the transport facility so that the boom
crane can operate directly on the transport facility, and the building surface of
the construction includes at least one nominal location for mounting the lifting unit
on the building surface so that the boom crane can operate in the vicinity of the
construction and independently from the transport means.
[0007] In the particular embodiment, the supporters, securing the attachment of the lifting
unit to the construction structure are made as steel dismountable beams, interacting
with metal sheaths of the lifting unit and the construction.
[0008] In the particular embodiment, fixation of steel dismountable beams in metal sheaths
of the lifting unit and the construction is made by screw couplings, interacting with
the holes, made in steel dismountable beams, and in metal sheaths of the lifting unit
and the construction.
[0009] In the particular embodiment, the nominal location of transport facility for the
mounting of the lifting unit is made in a form of metal horizontal location, the surface
of which corresponds to the surface of the lower surface of the lifting unit.
[0010] In the particular embodiment, mounting of the lifting unit on the metal horizontal
location of nominal transport facility location is performed by means of screw elements,
which interact with the holes, made in the lower surface of the lifting unit, and
metal horizontal location of nominal transport facility site.
[0011] In the particular embodiment, the transport facility has a nominal location for the
fixation of a balance beam.
[0012] In the particular embodiment, the nominal location of construction building surface
for the mounting of the lifting unit is made in a form of metal horizontal location,
the surface of which corresponds to the surface of the lower surface of the lifting
unit.
[0013] In the particular embodiment, mounting of the lifting unit on the metal horizontal
location of nominal building surface location is performed by means of screw elements,
which interact with the holes, made in the lower surface of the lifting unit, and
metal horizontal location of nominal building surface site.
[0014] In the particular embodiment, the lifting unit is equipped with stabbing boards for
the work of personnel and positioning of load.
[0015] The indicated signs are essential, and are interrelated with each other for the creation
of a stable complex of essential features, necessary for the achievement of the required
technical result.
[0016] No differential peculiarities of the declared system were revealed at the search
of known systems with the similar mission, which certifies that this technical decision
is in compliance with patentability condition.
[0017] The present invention is explained with certain examples, which, however, are not
unique, but clearly demonstrate the achievement possibility with the enumerated cumulative
evidence of the required technical result.
[0018] The variants of lift crane system execution are presented in the following figures:
Fig. 1 - external view of the lift crane system during its operation at the transport
facility;
Fig. 2 - external view of the lift crane system during its operation at the construction
site (separately from the transport facility);
Fig. 3 - external view of the lift crane system during its operation on the construction;
[0019] According to the present invention a lift crane system is considered, which is attached
to the external side of a construction 1, and contains at least one lifting unit 2,
entering in contact with the at least one rail 3 for moving the lifting unit 2 along
the rail 3, attached to the construction structure 1; boom crane 4, which has a rotating
5 and rotary 6 mechanism to support one end of the boom that comprises at least telescopic
section 7 (one or several) for reaching any point on the construction or under it;
transport facility 8 with the mechanism for forwarding and returning the lifting unit
2, for its holding near the rail 3 for the the fixation or releasing (fig. 1 - 3).
[0020] It is possible to use a lifting unit and an H-shaped rail, known from the indicated
system prototype in the introduced system (see
EA 008 405 B1), as a running gear of the lifting unit 2 and the rail, being in the interaction
with it 3 to secure moving of the lift crane system along the construction. The lifting
unit and the H-shaped rail enter in contact with each other with the help of supporting
wheels of the lifting unit, located in the H-shaped rail. Movement of the lift is
performed due to the interaction of driver gears of the lifting unit, driven by electric
engines of the lift crane system with the rail skids of the H-shaped rail. Although
a lifting unit is presented with the engines inside, a cable or hydraulic system may
me alternatively used for the transportation of the lifting unit along the rail, attached
to the construction. Other means of attachment of the lifting unit to the construction
may be used besides the rail with wheels, which stays within the present invention.
[0021] The mechanism for forwarding and returning the lifting unit 2 of transport facility
8 (also known from patent
EA 008 405 B1) contains the rotating mechanism 9, fixed at the transport facility 8, rotary mechanism
10, fixed at the rotating mechanism 9, a telescopic boom 11 and secondary rotating
12 and a rotary mechanism 13, which have a movable supporting area 14. With the help
of bifurcated elements 15 of supporting area 14, which interact with the axial slots
16, located in the body of the lifting unit 2, clutch of the lifting unit 2 is possible,
as well as performance of various manipulations with it: loading at the transport
facility 8, transportation in the transport facility 8, delivery of the lift device
to the rail 3 of construction 1, and to nominal locations for the mounting of the
lifting unit 2 on the transport facility 8, and building surface (figure 1).
[0022] Also, as it is known from patent
EA 008 405 B1 a dismountable rail section 17 of the rail 3 is attached to the running gear of the
lifting unit 2 in the transporting state, which enables to perform loading of the
lifting unit to the rail 3 of construction 1. This operation is performed by means
of attachment of dismountable rail section 17 in the nominal location 18, placed at
the line of the main rail 3 of construction 1. The delivery of the lift device with
dismountable rail section 17 to the nominal location 18 is performed with the help
of the c described above mechanism for forwarding and returning the lifting unit 2
of transport facility 8. Fixation of dismountable rail section 17 on the nominal location
18 is performed by personnel at the auxiliary site 19 with the help of rail retainers
20 of dismountable rail section 17 (figures 1 and 3). As a result of the described
operation the dismountable rail section 17 with the lifting unit 2 is connected on
it with the rail 3 of construction, and the lifting unit 2 gets an opportunity to
move along the common rail 3 up and down of construction 1 (figure 3).
[0023] Lifting unit 2 is equipped with supporters, securing the attachment of the lifting
unit 2 to the construction structure 1 for the increase of the load capacity of the
boom crane 4 during the operation thereof on the construction. The indicated elements
are made as dismountable steel beams 21, interacting with metal sheaths 22 and 23
of the lifting unit 2 and the construction 1 respectively. Fixation of dismountable
steel beams 21 in the metal sheaths 22 and 23 of the lifting unit 2 and the construction
1 is performed by means of screw couplings 24, interacting with the holes, made in
dismountable steel beams 21, and in metal sheaths 22 and 23 of the lifting unit 2
and the construction 1 (figure 3).
[0024] Transport facility 8 comprises a nominal location 25 for mounting the lifting unit
2 on the transport facility 8 so that the boom crane 4 can operate directly on the
transport facility 8. The indicated nominal location 25 is made in a form of metal
horizontal location 26, the surface of which corresponds to the surface of the lower
surface of the lifting unit 2. Mounting of the lifting unit 2 on the metal horizontal
location 26 of nominal location 25 of transport facility 8 is performed by means of
screw elements 27, which interact with the holes, made in the lower surface of the
lifting unit 2, and metal horizontal location 26 of nominal site 25 of transport facility
8. Besides, transport facility 8 has a nominal location 28 for the attachment of balance
beam 29 (fig. 1).
[0025] The building surface of the construction 1 includes at least one nominal location
30 for mounting of lifting unit 2 on the building surface, so that the boom crane
4 can operate in the vicinity of the construction 1, but separately from the transport
facility 8. The indicated nominal location 30 is made in a form of metal horizontal
location 31, the surface of which corresponds to the surface of the lower surface
of the lifting unit 2. Mounting of the lifting unit 2 on the metal horizontal location
26 of nominal location 25 of the building surface of construction 1 is performed by
means of screw elements 27, which interact with the holes, made in the lower surface
of the lifting unit 2, and metal horizontal location 26 of nominal site 25 of the
building surface of construction 1 (fig. 2).
[0026] The lifting unit 2 is equipped with stabbing boards 33 for the work of personnel
and positioning of load (fig. 3).
[0027] The variant of operation of the claimed lift crane system is as follows:
[0028] The lift crane system in the folded (for the transportation) position is transported
via transport facility 8 to the building surface of construction 1. Transport facility
8 is mounted at the flat level surface in the immediate neighborhood of location of
the construction site 1, and the transport facility 8 is being prepared to operation
(for example, its support structures are pulled out).
[0029] After that with the help of a mechanism for forwarding and returning the lifting
unit 2 of transport facility 8 the lift crane system is moved to nominal location
25 of transport facility 8, which is intended for the mounting of system lifting unit
2. This operation involves the mechanism for forwarding and returning the lifting
unit 2: rotating 9 and rotary mechanisms 10 for of transport facility 8, telescopic
boom 11, rotary 12 and rotating 13 mechanisms of telescopic boom 11.
[0030] With the help of the enumerated elements, the supporting area 14, fixed flexibly
on the telescopic boom 11 with the lifting unit 2, situated at it, mounts the lifting
unit 2 with its lower surface on the metal horizontal location 26 of the nominal location
25 of transport facility 8. Further the personnel performs the attachment of lifting
unit 2 on the metal horizontal location 26 of nominal location 25 of transport facility
8 by means of screw elements 27, which interact with the holes, made in the lower
surface of the lifting unit 2, and metal horizontal location 26 of nominal site 25
of transport facility 8.
[0031] Upon the completion of this operation the bifurcated elements 15 are unblocked, which
join the lifting unit 2 with the supporting area 14. Then the bifurcated elements
15 are taken from the axial slots 16 of the lifting unit 2 with the help of corresponding
manipulations with the elements of mechanism for forwarding and returning the lifting
unit 2; and the whole mechanism for forwarding and returning the lifting unit 2 is
fixed in such position that it will not further interfere with the work of the crane
system (for example, as shown in fig. 1).
[0032] As a result of these operations the lift crane system is maintained on the body of
transport facility 8 in the upright (operating) position. After the all necessary
communications are connected with the system, and all tests are passed, the lift crane
system is fully operationally ready.
[0033] A successive load of balance beam 29 elements to the nominal location 28 of transport
facility 8 is performed with the help of the boom crane to increase the load capacity
of the lift crane system during its performance.
[0034] After the completion of this operation the necessary load capacity is secured for
the lift crane system, and the system starts the construction of its nominal location
30 at the building surface. 11 The completion of the nominal location construction
30 on the building surface is mounting of metal horizontal location 31 on it.
[0035] Upon the construction completion of the nominal location 30 at the building surface
the necessity to use transport facility 8 as a support for the lift crane system is
eliminated.
[0036] All elements of balance beam are taken away from the transport facility 8 with the
help of boom crane 4 of the lift crane system. The bifurcated elements 15 are inserted
and blocked in the axial slots 16 of the lifting unit 2 after all necessary manipulations
with the elements of the mechanism for forwarding and returning the lifting unit 2
of transport facility 8. All communications are removed from the system, and all screw
elements 27 are unscrewed.
[0037] Then, with the help of a mechanism for forwarding and returning the lifting unit
2 of transport facility 8, the lift crane system is moved from the body of transport
facility 8 to the nominal location 30 on the building surface. After the lifting unit
2 of the system is mounted on metal horizontal location 31, the personnel fixes the
lifting unit 2 with screw elements 32 (fig. 2).
[0038] As a result of these operations the lift crane system is maintained in the nominal
location 30 on the building surface in the upright (operating) position. After all
necessary communications are connected with the system and all tests are passed, the
lift crane system is ready for the erection of the lower part of construction 1.
[0039] Simultaneously with the erection of construction 1, with the help of the lift crane
system 1, the rail 3, nominal location 18 for the dismountable rail section 17, auxiliary
location 19 of the nominal location 18, as well as metal sheaths 23 are mounted on
location 1. Access to any point of the erected construction 1 for the boom crane 4
of the system is secured by means of its rotating 5 and rotary 6 mechanisms, as well
as telescopic sections 7. However, while the system is not moved vertically, its possibilities
are limited on the hight of operation, and along with the growth of the erected construction,
there is a moment, when the system possibilities are limited in such position, and
there appears a necessity of moving of the lift crane system to the surface of construction
1.
[0040] In order to perform this operation, transport facility 8 arrives again at the building
surface, and with the help of its mechanism for forwarding and returning, the system
is moved to the nominal location 18 of construction 1. Then dismountable rail section
17, fixed on the lifting unit 2, is mounted on the nominal location 18, and, with
the help of personnel on the auxiliary location 19, the indicated section 17 is fixed
with rail retainers 20. All necessary communications are connected to the system,
and all tests are passed. Then with the help of the boom crane 4 and personnel, stabbing
boards 33 are mounted to the lifting unit 2 for the operation of personnel and load
placement.
[0041] Transport facility 8 leaves the building surface, and the lift crane system is moved
from the dismountable rail section 17 to the basic rail 3 of construction 1 for the
resumption of its work on the construction site. To increase the load capacity of
the lift crane, mounting of the support structures, steel dismountable beams 21 is
performed in the process of its operation directly at construction 1, at certain elevation
points of construction 1, where the system is stopped for work, with the help of the
boom crane 4 of the system and personnel at the stabbing boards 33,
[0042] During this mounting, performed with the , boom crane 4, beams 21 are inserted in
metal sheaths 22 of the lifting unit 2 by personnel, are moved further into metal
sheaths 23 of construction 1, and are fixed in both sheaths 22 and 23 by screw couplings
24. Dismounting of beams 21 is performed in the reverse sequence.
[0043] During the growth of the erected construction (and the rail 3 accordingly) the lift
crane system is moved higher and higher, and at each elevation point of construction
1, specified for the placement of the system in the operating position, the indicated
operations of mounting/dismounting of beams 21 are repeated. During the movement of
the system along the rail 3 of construction 1 the indicated beams can be stored on
the upper surface of the erected construction.
[0044] After the completion of the construction erection, the lift crane system may stay
on the rail of construction 1 constantly for everyday maintenance of construction,
and may be brought and mounted at construction occasionally for the performance of
certain operations.
[0045] This invention is used in the industry, as it may be realized with the use of known
technologies, used at production of lift and crane devices, including transport machine
building.
1. A lift-crane system adapted to be connected to an external side of a construction
(1), and containing at least one lifting unit (2) engaged with at least one rail (3)
attached to the structure of the construction (1) for moving the lifting unit (2)
along the rail(3); a boom crane (4) including a rotating mechanism (5) and a rotary
mechanism (6) for bearing one end of the boom crane (4) that comprises at least one
telescopic section (7) for reaching any point on the construction (1) or above the
construction (1); a transport facility (8) with a mechanism for forwarding and returning
the lifting unit (2), for maintaining said lifting unit (2) in the vicinity of the
rail (3) for securing it to or releasing it from the rail (3);
characterized in that the lifting unit (2) comprises bearing members for attaching the lifting unit (2)
to the structure of the construction (1) in order to increase the load capacity of
the boom crane (4) during the operation thereof on the construction (1),
wherein the transport facility (8) comprises a nominal location (25) for mounting
the lifting unit (2) on the transport facility (8) so that the boom crane (4) can
operate directly on the transport facility (8), and
wherein a building surface of the construction (1) includes at least one nominal location
(30) for mounting the lifting unit (2) on the building surface so that the boom crane
(4) can operate in the vicinity of the construction (1) and independently from the
transport facility (8).
2. The lift crane system of claim 1, characterized in that the bearing members, securing the attachment of the lifting unit (2) to the construction
structure are made as dismountable steel beams (21), interacting with metal sheaths
(22, 23) of the lifting unit (2) and the construction (1) correspondingly.
3. The lift crane system of claim 2, characterized in that the fixation of the dismountable steel beams (21) in the metal sheaths (22, 23) of
the lifting unit (2) and the construction (1) is made by screw couplings (24), interacting
with the holes, made in the dismountable steel beams (21), and in the metal sheaths
(22, 23) of the lifting unit (2), and the construction (1) correspondingly.
4. The lift crane system of claim 1, characterized in that the nominal location (25) of the transport facility (8) for mounting the lifting
unit (2) is made in form of a metal horizontal location (26), which surface corresponds
to the surface of the lower surface of the lifting unit (2).
5. The lift crane system of claim 4, characterized in that the mounting of the lifting unit (2) on the metal horizontal location (26) of the
transport facility (8) is performed by means of screw elements (27), which interact
with holes, made in the lower surface of the lifting unit (2), and in the metal horizontal
location (26) of the nominal location (25) of the transport facility (8).
6. The lift crane system of claim 1, characterized in that the transport facility (8) has a nominal location (28) for fixation of a balance
beam (29).
7. The lift crane system of claim 1, characterized in that the nominal location (30) of the building surface of the construction (1) for mounting
the lifting unit (2) is made in form of a metal horizontal location (31), which surface
corresponds to the surface of the lower surface of the lifting unit (2).
8. The lift crane system of claim 7, characterized in that the mounting of the lifting unit (2) on the metal horizontal location (31) of the
nominal location (30) on the building surface of the construction (1) is performed
by means of screw elements (32), which interact with holes, made in the lower surface
of the meaning unit (2), and in the metal horizontal location (31) of the nominal
location (30) on the building surface of the construction (1).
9. The lift crane system of claim 1, characterized in that the lifting unit (2) is equipped with stabbing boards (33) for the work of personnel
and positioning of loads.
1. Hebekransystem, das für eine Verbindung mit einer Außenseite eines Bauwerks (1) angepasst
ist und wenigstens
- eine Hebeeinheit (2), die mit wenigstens einer an der Struktur des Bauwerks (1)
befestigten Schiene (3) in Eingriff steht, um die Hebeeinheit (2) entlang der Schiene
(3) zu bewegen;
- einen Auslegerkran (4) mit einem rotierenden Mechanismus (5) und einem Drehmechanismus
(6) zum Tragen eines Endes des Auslegerkrans (4), der wenigstens einen Teleskopabschnitt
(7) zum Erreichen irgendeines Punkts an dem Bauwerk (1) oder über dem Bauwerk (1)
umfasst; und
- eine Transporteinrichtung (8) mit einem Mechanismus zum Hinbringen und Zurückbringen
der Hebeeinheit (2) umfasst, um die Hebeeinheit (2) in der Nähe der Schiene (3) zu
halten, um sie an der Schiene (3) zu sichern oder sie von ihr zu lösen;
dadurch gekennzeichnet, dass die Hebeeinheit (2) Lagerelemente zur Befestigung der Hebeeinheit (2) an der Struktur
des Bauwerks (1) umfasst, um die Lastkapazität des Auslegerkrans (4) während seiner
Betätigung an dem Bauwerk (1) zu erhöhen,
wobei die Transporteinrichtung (8) eine nominale Stelle (25) zur Anbringung der Hebeeinheit
(2) an der Transporteinrichtung (8) umfasst, so dass der Auslegerkran (4) direkt an
der Transporteinrichtung (8) arbeiten kann, und
wobei eine Gebäudefläche des Bauwerks (1) wenigstens eine nominale Stelle (30) zur
Anbringung der Hebeeinheit (2) an der Gebäudefläche aufweist, so dass der Auslegerkran
(4) in der Nähe des Bauwerks (1) und unabhängig von der Transporteinrichtung (8) arbeiten
kann.
2. Hebekransystem nach Anspruch 1, dadurch gekennzeichnet, dass die Lager-elemente, die die Befestigung der Hebeeinheit (2) an der Bauwerksstruktur
sichern, als abmontierbare Stahlträger (21) ausgebildet sind, die mit Metallumhüllungen
(22, 23) der Hebeeinheit (2) bzw. des Bauwerks (1) zusammenwirken.
3. Hebekransystem nach Anspruch 2, dadurch gekennzeichnet, dass die Fixierung der abmontierbaren Stahlträger (21) in den Metallumhüllungen (22, 23)
der Hebeeinheit (2) und des Bauwerks (1) durch Schraubverbindungen (24) erfolgt, die
mit den Löchern zusammenwirken, die in den abmontierbaren Stahlträgern (21) und in
den Metallumhüllungen (22, 23) der Hebeeinheit (2) bzw. des Bauwerks ausgebildet sind.
4. Hebekransystem nach Anspruch 1, dadurch gekennzeichnet, dass die nominale Stelle (25) der Transporteinrichtung (8) zur Anbringung der Hebeeinheit
(2) in Form einer metallischen horizontalen Stelle (26) ausgebildet ist, deren Oberfläche
der Oberfläche der unteren Fläche der Hebeeinheit (2) entspricht.
5. Hebekransystem nach Anspruch 4, dadurch gekennzeichnet, dass die Anbringung der Hebeeinheit (2) an der metallischen horizontalen Stelle (26) der
Transporteinrichtung (8) mittels Schraubelementen (27) durchgeführt wird, die mit
Löchern zusammenwirken, die in der unteren Fläche der Hebeeinheit (2) und in der metallischen
horizontalen Stelle (26) der nominalen Stelle (25) der Transporteinrichtung (8) ausgebildet
sind.
6. Hebekransystem nach Anspruch 1, dadurch gekennzeichnet, dass die Transporteinrichtung (8) eine nominale Stelle (28) zur Fixierung eines Ausgleichsträgers
(29) aufweist.
7. Hebekransystem nach Anspruch 1, dadurch gekennzeichnet, dass die nominale Stelle (30) der Gebäudefläche des Bauwerks (1) zur Anbringung der Hebeeinheit
(2) in Form einer metallischen horizontalen Stelle (31) ausgebildet ist, deren Oberfläche
der Oberfläche der unteren Fläche der Hebeeinheit (2) entspricht.
8. Hebekransystem nach Anspruch 7, dadurch gekennzeichnet, dass die Anbringung der Hebeeinheit (2) an der metallischen horizontalen Stelle (31) der
nominalen Stelle (30) an der Gebäudefläche des Bauwerks (1) mittels Schraubelementen
(32) durchgeführt wird, die mit Löchern zusammenwirken, die in der unteren Fläche
der Hebeeinheit (2) und in der metallischen horizontalen Stelle (31) der nominalen
Stelle (30) an der Gebäudefläche des Bauwerks (1) ausgebildet sind.
9. Hebekransystem nach Anspruch 1, dadurch gekennzeichnet, dass die Hebeeinheit (2) mit Verrohrungsbühnen (33) für die Arbeit des Personals und die
Positionierung von Lasten ausgestattet ist.
1. Système de grue de levage adapté à être connecté à un côté externe d'une construction
(1), et contenant au moins une unité (2) de levage engagée avec au moins un rail (3)
fixé à la structure de la construction (1) pour déplacer l'unité (2) de levage le
long du rail (3) ; une grue (4) à flèche incluant un mécanisme de rotation (5) et
un mécanisme rotatif (6) pour supporter une extrémité de la grue (4) à flèche qui
comprend au moins une section (7) télescopique pour atteindre un point quelconque
sur la construction (1) ou au-dessus de la construction (1) ; une installation (8)
de transport avec un mécanisme pour faire avancer et reculer l'unité (2) de levage,
pour maintenir ladite unité (2) de levage à proximité du rail (3) pour la fixer au
ou la libérer du rail (3) ;
caractérisé en ce que l'unité (2) de levage comprend des éléments supports pour fixer l'unité (2) de levage
à la structure de la construction (1) afin d'augmenter la capacité de charge de la
grue (4) à flèche lors du fonctionnement de celle-ci sur la construction (1),
dans lequel l'installation (8) de transport comprend un emplacement (25) nominal pour
monter l'unité (2) de levage sur l'installation (8) de transport de façon à ce que
la grue (4) à flèche puisse fonctionner directement sur l'installation (8) de transport,
et
dans lequel une surface de bâtiment de la construction (1) inclut au moins un emplacement
(30) nominal pour monter l'unité (2) de levage sur la surface de bâtiment de façon
à ce que la grue (4) à flèche puisse fonctionner à proximité de la construction (1)
et indépendamment de l'installation (8) de transport.
2. Système de grue de levage selon la revendication 1, caractérisé en ce que les éléments supports, assurant la fixation de l'unité (2) de levage à la structure
de construction, sont constitués de poutres (21) en acier démontables, interagissant
avec des gaines (22, 23) métalliques de l'unité (2) de levage et de la construction
de façon correspondante.
3. Système de grue de levage selon la revendication 2, caractérisé en ce que la fixation des poutres (21) en acier démontables dans les gaines (22, 23) métalliques
de l'unité (2) de levage et de la construction (1) est réalisée par des accouplements
(24) à vis, interagissant avec les trous, ménagés dans les poutres (21) en acier démontables,
et dans les gaines (22, 23) métalliques de l'unité (2) de levage, et de la construction
(1) de façon correspondante.
4. Système de grue de levage selon la revendication 1, caractérisé en ce que l'emplacement (25) nominal de l'installation (8) de transport pour monter l'unité
(2) de levage est constitué sous la forme d'un emplacement (26) horizontal métallique,
dont la surface correspond à la surface de la surface inférieure de l'unité (2) de
levage.
5. Système de grue de levage selon la revendication 4, caractérisé en ce que le montage de l'unité (2) de levage sur l'emplacement (26) horizontal métallique
de l'installation (8) de transport est effectué au moyen d'éléments (27) à vis, qui
interagissent avec des trous, ménagés dans la surface inférieure de l'unité (2) de
levage, et dans l'emplacement (26) horizontal métallique de l'emplacement (25) nominal
de l'installation (8) de transport.
6. Système de grue de levage selon la revendication 1, caractérisé en ce que l'installation (8) de transport a un emplacement (28) nominal pour la fixation d'une
poutre (29) d'équilibre.
7. Système de grue de levage selon la revendication 1, caractérisé en ce que l'emplacement (30) nominal de la surface de bâtiment de la construction (1) pour
monter l'unité (2) de levage est constitué sous la forme d'un emplacement (31) horizontal
métallique, dont la surface correspond à la surface de la surface inférieure de l'unité
(2) de levage.
8. Système de grue de levage selon la revendication 7, caractérisé en ce que le montage de l'unité (2) de levage sur l'emplacement (31) horizontal métallique
de l'emplacement (30) nominal sur la surface de bâtiment de la construction (1) est
effectué au moyen d'éléments (32) à vis, qui interagissent avec des trous, ménagés
dans la surface inférieure de l'unité (2) de levage, et dans l'emplacement (31) horizontal
métallique de l'emplacement (30) nominal sur la surface de bâtiment de la construction
(1).
9. Système de grue de levage selon la revendication 1, caractérisé en ce que l'unité (2) de levage est équipée de passerelles (33) de tubage pour le travail du
personnel et le positionnement de charges.