Field of the invention
[0001] The invention relates to a method for signalling in physical downlink control channels
in subframes from a base station to user terminals allocations of subframes for transmission
in uplink from the user terminals to the base station, and a base station and a user
terminal adapted to perform said method.
Background
[0002] In cellular communication networks using standards like e.g. Third Generation Partnership
Project Long Term Evolution (3GPP LTE) standard, the concept of so-called enhanced
inter-cell interference-coordination (eICIC) is introduced. In case of eICIC, a base
station, as e.g. a macro, pico or femto base station, sends so-called almost blank
subframes (ABS) in downlink, where data channels, as e.g. a physical downlink shared
channel (PDSCH), or control channels, as e.g. a physical downlink control channel
(PDCCH), are either not sent or only sent with a significant reduced transmission
power. This can also be realized by means of so-called multicast broadcast single
frequency network (MBSFN) subframes that in general are used for multicast and broadcast
transmissions. In the following multicast broadcast single frequency network (MBSFN)
subframes should also be covered by the term almost blank subframes (ABS). This leads
to a reduced interference on downlink data and control channels in neighboring cells,
as e.g. macro, pico or femto cells.
[0003] E.g. in 3GPP LTE, the signalling of allocations in certain uplink subframes needs
to be done in predefined downlink subframes, and e.g. in an LTE FDD system (FDD =
Frequency Division Duplex), a physical downlink control channel (PDCCH) in subframe
n contains the signalling for resource allocations in downlink subframe n and for
resource allocations in uplink subframe n+4. In case of an almost blank subframe in
downlink, there is either no physical downlink control channel (PDCCH) or, if control
and data channels are sent with a significant reduced transmission power, the capacity
is severely limited. So, the introduction of almost blank subframes in downlink automatically
leads to the introduction of unused or almost unused uplink subframes 4 subframes
later.
[0004] If an LTE base station sends an almost blank subframe in downlink subframe n, the
current LTE standard only enables the transmission of two kinds of messages on the
physical uplink shared channel (PUSCH) in uplink subframe n+4. The first kind of messages
are synchronous HARQ retransmissions (HARQ = hybrid automatic repeat request), which
are indicated on a physical HARQ indicator channel (PHICH), and the second kind of
messages are semi-persistent scheduled data, with the respective radio resources being
semi-statically configured and allocated to a user terminal for a longer time period
than one subframe, avoiding the need for uplink grant messages over a physical downlink
control channel (PDCCH) for each subframe.
[0005] These two types of messages do not require any explicit uplink grant in downlink
subframe n in order to be transmitted in uplink subframe n+4. Of these two messages,
the semi-persistent scheduled data are the only messages which can be planned for
the usage of uplink resources 4 subframes after an almost blank subframe (ABS). The
usage of semi-persistent scheduling is restricted to a limited number of applications
with constant traffic demands, e.g. Voice over IP (VoIP). Therefore, it can be assumed
that only a fraction of the uplink resources are used 4 subframes after an almost
blank subframe (ABS).
Summary
[0006] The object of the invention is thus to propose a method for dynamic scheduling by
means of uplink grant messages for the allocation of uplink transmission resources,
said allocation being valid for specific single uplink subframes, with an increased
flexibility of the scheduling, allowing e.g. in LTE the usage of uplink resources
4 subframes after an almost blank subframe (ABS) in downlink.
[0007] The basic idea of the invention is to enable that a physical downlink control channel
(PDCCH) in downlink subframe n not only contains uplink grants for e.g. subframe n+4
but also for subframe n+4+k, with k >= 0. This enables e.g. to schedule transmission
resources in uplink subframe n+4, although downlink subframe n was an almost blank
subframe (ABS). The definition of the respective subframes n+4+k for uplink can be
done by a fixed rule, by higher layer signalling e.g. on an RRC layer (RRC = radio
resource control), or by modifying the physical downlink control channel (PDCCH) signalling.
[0008] In an embodiment of the invention, downlink subframe n only contains uplink grants
for only one subframe n+4+k, with k > 0, e.g. in case that uplink subframe n+4 is
completely used for persistent scheduling and/or HARQ retransmissions. As in 3GPP
LTE, allocations of only one uplink subframe are signaled in this embodiment. However,
in 3GPP LTE, the uplink subframe is predefined as 4 subframes after the downlink subframe,
whereas according to the embodiment of the invention, the subframe n+4+k which is
used for transmission in uplink is explicitly signaled from the base station.
[0009] The invention leads to an increase of the uplink capacity which is almost linearly
depending on the number of configured almost blank subframes (ABS), e.g. if 2 out
of 10 subframes are configured as almost blank subframes (ABS), the described approach
would increase the uplink capacity by the capacity of 2 additional, previously unused,
subframes per 10 subframes, if HARQ retransmissions and semi-persistent scheduling
is ignored.
[0010] The object is thus achieved by a method for signalling in physical downlink control
channels in subframes from a base station to user terminals allocations of transmission
resources of subframes for transmission in uplink from the user terminals to the base
station, the allocations being valid for specific single subframes, wherein in at
least one physical downlink control channel in a single subframe, the base station
signals allocations of at least one signaled subframe for transmission in uplink from
at least one of said user terminals to the base station. In an embodiment of the invention,
each of said at least one of said user terminals uses transmission resources of only
one of said at least one signaled subframe for transmission in uplink. However, in
a further embodiment of the invention, each of said at least one of said user terminals
uses transmission resources of at least two of said at least one signaled subframe
for transmission in uplink. Furthermore, also combinations of said embodiments are
possible, i.e. some of said user terminals use transmission resources of only one
of said at least one signaled subframe for transmission in uplink, and some of said
user terminals use transmission resources of at least two of said at least one signaled
subframe for transmission in uplink.
[0011] The object is furthermore achieved by a base station for signalling in physical downlink
control channels in subframes from the base station to user terminals allocations
of subframes for transmission in uplink from the user terminals to the base station,
the allocations being valid for specific single subframes, wherein the base station
comprises at least one processing means which is adapted to signal in at least one
physical downlink control channel in a single subframe allocations of at least one
signaled subframe for transmission in uplink from at least one of said user terminals
to the base station.
[0012] The object is furthermore achieved by a user terminal for receiving in physical downlink
control channels in subframes from a base station to the user terminal signalling
of allocations of subframes for transmission in uplink from the user terminal to the
base station, the allocations being valid for specific single subframes, wherein the
user terminal comprises at least one processing means which is adapted to receive
in at least one physical downlink control channel in a single subframe allocations
of at least one signaled subframe for transmission in uplink from the user terminal
to the base station.
[0013] The invention is described in the following within the framework of 3GPP LTE, however
as the invention is not restricted to 3GPP LTE, but can in principle be applied in
other networks that are appropriate for wireless communication, like e.g. in WiMAX
networks (WiMAX = Worldwide Interoperability for Microwave Access), in the following,
instead of the term eNodeB used in LTE, the more general term base station is used.
[0014] Further developments of the invention can be gathered from the dependent claims and
the following description.
Brief description of the figures
[0015] In the following the invention will be explained further making reference to the
attached drawings.
Fig. 1 schematically shows a communication network in which the invention can be implemented.
Fig. 2 schematically shows the structure of a user terminal and a base station in
which the invention can be implemented.
Fig. 3 schematically shows exemplarily a method for signalling of uplink grants according
to the prior art.
Fig. 4 schematically shows exemplarily a method for signalling of uplink grants according
to an embodiment of the invention.
Description of the embodiments
[0016] Fig. 1 shows as an example of a communication network in which the invention can
be implemented a communication network CN according to the standard 3GPP LTE.
[0017] Said communication network CN comprises base stations BS1-BS3, user terminals UE1-UE4,
a serving gateway SGW, a packet data network gateway PDNGW, and a mobility management
entity MME.
[0018] Each of said user terminals UE1-UE4 is connected via radio connections to one or
multiple of said base stations BS1-BS3, which is symbolized by flashes in fig. 1.
The base stations BS1-BS3 are in turn connected to the serving gateway SGW and to
the mobility management entity MME, i.e. to the evolved packet core (EPC), via the
so-called S1 interface.
[0019] The base stations BS1-BS3 are connected among each other via the so-called X2 interface.
[0020] The serving gateway SGW is connected to the packet data network gateway PDNGW, which
is in turn connected to an external IP network IPN.
[0021] The S1 interface is a standardized interface between a base station BS1-BS3, i.e.
a eNodeB in this example, and the Evolved Packet Core (EPC). The S1 interface has
two flavours, S1-MME for exchange of signalling messages between the base station
BS1-BS3 and the mobility management entity MME and S1-U for the transport of user
datagrams between the base station BS1-BS3 and the serving gateway SGW.
[0022] The X2 interface is added in 3GPP LTE standard primarily in order to transfer the
user plane signal and the control plane signal during handover.
[0023] The serving gateway SGW performs routing of the IP user data between the base station
BS1-BS3 and the packet data network gateway PDNGW. Furthermore, the serving gateway
SGW serves as a mobile anchor point during handover either between different base
stations, or between different 3GPP access networks.
[0024] The packet data network gateway PDNGW represents the interface to the external IP
network IPN and terminates the so-called EPS bearer (EPS = Evolved Packet System)
which is established between a user terminal (UE1-UE4) and the respective serving
base station (BS1-BS3).
[0025] The mobility management entity MME performs tasks of the subscriber management and
the session management, and also performs the mobility management during handover
between different access networks.
[0026] Fig. 2 schematically shows the structure of a user terminal UE and a base station
BS in which the invention can be implemented.
[0027] The base station BS comprises by way of example three modem unit boards MU1-MU3 and
a control unit board CU1, which in turn comprises a media dependent adapter MDA.
[0028] The three modem unit boards MU1-MU3 are connected to the control unit board CU1,
and to a respective remote radio head RRH1, RRH2, or RRH3 via a so-called Common Public
Radio Interface (CPRI).
[0029] Each of the remote radio heads RRH1, RRH2, and RRH3 is connected by way of example
to two remote radio head antennas RRHA1 and RRHA2 for transmission and reception of
data via a radio interface. Said two remote radio head antennas RRHA1 and RRHA2 are
only depicted for the remote radio head RRH1 in fig. 2 for the sake of simplicity.
[0030] The media dependent adapter MDA is connected to the mobility management entity MME
and to the serving gateway SGW and thus to the packet data network gateway PDNGW,
which is in turn connected to the external IP network IPN.
[0031] The user terminal UE comprises by way of example two user terminal antennas UEA1
and UEA2, a modem unit board MU4, a control unit board CU2, and interfaces INT.
[0032] The two user terminal antennas UEA1 and UEA2 are connected to the modem unit board
MU4. The modem unit board MU4 is connected to the control unit board CU2, which is
in turn connected to interfaces INT.
[0033] The modem unit boards MU1-MU4 and the control unit boards CU1, CU2 may comprise by
way of example Field Programmable Gate Arrays (FPGA), Digital Signal Processors (DSP),
micro processors, switches and memories, like e.g. Double Data Rate Synchronous Dynamic
Random Access Memories (DDR-SDRAM) in order to be enabled to perform the tasks described
below.
[0034] The remote radio heads RRH1, RRH2, and RRH3 comprise the so-called radio equipment,
e.g. modulators and amplifiers, like delta-sigma modulators (DSM) and switch mode
amplifiers.
[0035] In downlink, IP data received from the external IP network IPN are transmitted from
the packet data network gateway PDNGW via the serving gateway SGW to the media dependent
adapter MDA of the base station BS on an EPS bearer. The media dependent adapter MDA
allows for a connectivity of different media like e.g. video streaming or web browsing.
[0036] The control unit board CU1 performs tasks on layer 3, i.e. on the radio resource
control (RRC) layer, such as measurements and cell reselection, handover and RRC security
and integrity.
[0037] Furthermore, the control unit board CU1 performs tasks for Operation and Maintenance,
and controls the S1 interfaces, the X2 interfaces, and the Common Public Radio Interface.
[0038] The control unit board CU1 sends the IP data received from the serving gateway SGW
to a modem unit board MU1-MU3 for further processing.
[0039] The three modem unit boards MU1-MU3 perform data processing on layer 2, i.e. on the
PDCP layer (PDCP = Packet Data Convergence Protocol) which is e.g. responsible for
header compression and ciphering, on the RLC layer (RLC = Radio Link Control) which
is e.g. responsible for segmentation and Automatic Repeat Request (ARQ), and on the
MAC layer (MAC = Media Access Control) which is responsible for MAC multiplexing and
Hybrid Automatic Repeat Request (HARQ).
[0040] Furthermore, the three modem unit boards MU1-MU3 perform data processing on the physical
layer, i.e. coding, modulation, and antenna and resource-block mapping.
[0041] The coded and modulated data are mapped to antennas and resource blocks and are sent
as transmission symbols from the modem unit board MU1-MU3 over the Common Public Radio
Interface to the respective remote radio head RRH1, RRH2, or RRH3, and the respective
remote radio head antenna RRHA1, RRHA2 for transmission over an air interface.
[0042] The Common Public Radio Interface (CPRI) allows the use of a distributed architecture
where base stations BS, containing the so-called radio equipment control, are connected
to remote radio heads RRH1, RRH2, and RRH3 preferably via lossless fibre links that
carry the CPRI data. This architecture reduces costs for service providers because
only the remote radio heads RRH1, RRH2, and RRH3 containing the so-called radio equipment,
like e.g. amplifiers, need to be situated in environmentally challenging locations.
The base stations BS can be centrally located in less challenging locations where
footprint, climate, and availability of power are more easily managed.
[0043] The user terminal antennas UEA1, UEA2 receive the transmission symbols, and provide
the received data to the modem unit board MU4.
[0044] The modem unit board MU4 performs data processing on the physical layer, i.e. antenna
and resource-block demapping, demodulation and decoding.
[0045] Furthermore, the modem unit board MU4 performs data processing on layer 2, i.e. on
the MAC layer (MAC = Media Access Control) which is responsible for Hybrid Automatic
Repeat Request (HARQ) and for MAC demultiplexing, on the RLC layer (RLC = Radio Link
Control) which is e.g. responsible for reassembly and Automatic Repeat Request (ARQ),
and on the PDCP layer (PDCP = Packet Data Convergence Protocol) which is e.g. responsible
for deciphering and header compression.
[0046] The processing on the modem unit board MU4 results in IP data which are sent to the
control unit board CU2, which performs tasks on layer 3, i.e. on the radio resource
control (RRC) layer, such as measurements and cell reselection, handover and RRC security
and integrity.
[0047] The IP data are transmitted from the control unit board CU2 to respective interfaces
INT for output and interaction with a user.
[0048] In the uplink, data transmission is performed in an analogue way in the reverse direction
from the user terminal UE to the external IP network IPN.
[0049] In the sequel, a method for signalling of uplink grants is described according to
the prior art and embodiments of the invention.
[0050] Fig. 3 schematically shows exemplarily a method for signalling of uplink grants according
to the prior art.
[0051] In the upper row in fig. 3, subframes n-2 to n+5 used for downlink transmission are
depicted.
[0052] In the lower row in fig. 3, subframes n-2 to n+5 used for uplink transmission are
depicted.
[0053] For LTE applying frequency division duplex (FDD), an uplink grant received in a downlink
subframe applies to an uplink subframe 4 subframes later, i.e. downlink subframe n-2
comprises an uplink grant for uplink subframe n+2, downlink subframe n-1 comprises
an uplink grant for uplink subframe n+3 and so on, which is indicated by arrows in
fig. 3.
[0054] Downlink subframe n in fig. 3 is a so-called almost blank subframe (ABS), in which
data channels or control channels are either not sent or only sent with a significant
reduced transmission power. Thus, no uplink grant for uplink subframe n+4 is comprised
in downlink subframe n, and thus, the uplink subframe n+4 is empty except for synchronous
HARQ retransmissions and semi-persistent scheduled data as described above, which
leads to a reduced uplink capacity.
[0055] Fig. 4 schematically shows exemplarily a method for signalling of uplink grants according
to an embodiment of the invention.
[0056] In the upper row in fig. 4, subframes n-2 to n+5 used for downlink transmission are
depicted.
[0057] In the lower row in fig. 4, subframes n-2 to n+5 used for uplink transmission are
depicted.
[0058] For LTE applying frequency division duplex (FDD), an uplink grant received in a downlink
subframe can apply to an uplink subframe 4 subframes later, e.g. downlink subframe
n-2 comprises an uplink grant for uplink subframe n+2, which is indicated by solid
arrows in fig. 4, and which is similar to the situation according to the prior art
as depicted in fig. 3 and described above.
[0059] However, according to an embodiment of the invention, an uplink grant received in
a downlink subframe can apply not only to an uplink subframe 4 subframes later, but
also to an uplink subframe 4+k subframes later. In fig. 4, e.g. downlink subframe
n-1 comprises not only an uplink grant for uplink subframe n+3, but also an uplink
grant for uplink subframe n+4, which is indicated by dashed arrows in fig. 4.
[0060] As downlink subframe n in fig. 4 is a so-called almost blank subframe (ABS), in which
data channels or control channels are either not sent or only sent with a significant
reduced transmission power, no uplink grant for uplink subframe n+4 is comprised in
downlink subframe n, if signalling is performed according to the prior art, and thus,
the uplink subframe n+4 is empty except for synchronous HARQ retransmissions and semi-persistent
scheduled data as described above, which leads to a reduced uplink capacity.
[0061] By applying the invention, an uplink grant received in downlink subframe n-1 applies
not only to an uplink subframe 4 subframes later, but also to an uplink subframe 4+k
subframes later. Thus, in case of e.g. k=1, downlink subframe n-1 can comprise not
only an uplink grant for uplink subframe n+3, but also an uplink grant for uplink
subframe n+4, and uplink subframe n+4 can thus be used for dynamic uplink transmission,
which leads to an increased uplink capacity.
[0062] In an embodiment of the invention, downlink subframe n-1 only contains uplink grants
for only one uplink subframe 4+k subframes later, with k > 0, e.g. in case that uplink
subframe n+3 is completely used for persistent scheduling and/or HARQ retransmissions.
[0063] More generally, according to further embodiments of the invention, an uplink grant
received in a downlink subframe can also apply to multiple uplink subframes, i.e.
allocations of transmission resources of multiple subframes for transmission in uplink
are comprised.
[0064] Allocations of transmission resources of subframes for transmission in uplink, which
are signalled in downlink in an uplink grant, comprise e.g. resource block allocations,
modulation and coding schemes, transmit power control for physical uplink shared channels,
or identities of the user terminals for which the signalling in the physical downlink
control channels is intended.
[0065] According to a preferred embodiment of the invention, the principle of the invention
that an uplink grant received in a downlink subframe can apply not only to an uplink
subframe 4 subframes later, but also to an uplink subframe 4+k subframes later, is
applied if at least one downlink subframe is used in which control channels are either
not sent or only sent with a significant reduced transmission power, as e.g. an almost
blank subframe.
[0066] The subframes for which an uplink grant received in a downlink subframe applies to,
as e.g. uplink subframes n+3 and n+4 in fig. 4, must be known to the respective user
terminals for which the uplink grant is intended. Thus, a definition of said at least
two subframes n+3 and n+4 is performed by means of a predefined rule known to the
user terminals, downlink signalling on a radio resource control layer, or physical
downlink control channel signalling. The physical downlink control channel signalling
can e.g. comprise a field used for definition of at least one of said at least two
subframes n+3 and n+4. Said field can e.g. be a redefined optional field used for
definition of at least one of said at least two subframes n+3 and n+4.
[0067] In order to implement the invention, in an embodiment of the invention for an LTE
system, the so-called downlink control information DCI 0, which is used to signal
uplink allocations of transmission resources, has to comprise a field which indicates
that a downlink control information DCI 0 in downlink subframe n is not related to
an uplink allocation of transmission resources in subframe n+4 but to subframe n+4+k
(k >= 0). So, it is required to signal the value k in the downlink control information
DCI 0. Based on this additional information in the downlink control information DCI
0, it is possible to signal uplink allocations of transmission resources for subframe
n+4, even if subframe n is an almost blank subframe (ABS).
[0068] Different approaches are possible to include k in the downlink control information
DCI 0:
[0069] The first possibility is the definition of a new separate field, which contains k.
The definition of a separate field provides the highest degree of freedom to cope
with different almost blank subframe patterns.
[0070] The second possibility is the redefinition of existing optional fields to contain
k. By using this approach, the downlink control information DCI 0 is kept unchanged,
but the meaning of optional fields is changed. The flexibility of this approach is
defined by the current meaning of the respective optional field and its size. Possible
optional fields which might contain k are:
First, the so-called carrier indicator field (CIF) with a size of 3 bits that identify
particular carriers in a system that utilizes multiple carriers. This field might
be reused in case of a single carrier solution and would enable to signal 0<=k<=7.
Second, the so-called uplink subframe index field with a size of 2 bits that indicate
the uplink subframe index in time direction. This field is currently only available
in case of downlink control information format DCI 0 in time division duplex (TDD)
configuration. The redefinition of this field would enable to signal 0<=k<=3 and would
mean that downlink control information format DCI 0 is changed for frequency division
duplex (FDD) configuration.
[0071] The load on a physical downlink control channel (PDCCH) is increased, if it contains
the signalling of uplink allocations for more than a single uplink subframe. Therefore,
e.g. the usage of the modified downlink control information format DCI 0 described
above might be combined with a scheduling which improves the physical downlink control
channel (PDCCH) load. This can be realized, if a base station preferably schedules
user terminals with good channel conditions, i.e. with a good wide-band channel quality
indicator (CQI), to downlink subframes in which uplink allocations relating to more
than a single uplink subframe are signaled. For user terminals with good channel conditions,
a low aggregation level might be used on the physical downlink control channel (PDCCH).
So, preferring user terminals with good channel conditions increases the total number
of DCI messages which might be placed on the physical downlink control channel (PDCCH)
of a certain downlink subframe.
[0072] In an embodiment of the invention, for each physical downlink control channel (PDCCH)
only allocations for transmission in uplink related to a specific subframe is contained.
[0073] In another embodiment of the invention, this could be changed and e.g. two allocations
for transmission in uplink for two different uplink subframes could be allowed in
a single physical downlink control channel (PDCCH).
1. A method for signalling in physical downlink control channels in subframes (n-2...n+1)
from a base station (BS1) to user terminals (UE1, UE2) allocations of transmission
resources of subframes (n+2...n+5) for transmission in uplink from the user terminals
(UE1, UE2) to the base station (BS1), the allocations being valid for specific single
subframes, wherein in at least one physical downlink control channel in a single subframe
(n-1), the base station (BS1) signals allocations of at least one signaled subframe
(n+3, n+4) for transmission in uplink from at least one of said user terminals (UE1,
UE2) to the base station (BS1).
2. A method according to claim 1, wherein said signaled allocations comprise at least
one of a group of resource block allocations, modulation and coding schemes, transmit
power control for physical uplink shared channels, and identities of the user terminals
(UE1, UE2) for which the signalling in the physical downlink control channels is intended.
3. A method according to claim 1, wherein said allocations are signaled in the at least
one physical downlink control channel in said single subframe (n-1), if at least one
almost blank subframe (n) is used in downlink.
4. A method according to claim 1, wherein a definition of said at least one signaled
subframe (n+3, n+4) is performed by means of at least one of a group of a predefined
rule known to the user terminals (UE1, UE2), downlink signalling on a radio resource
control layer, and physical downlink control channel signalling.
5. A method according to claim 4, wherein the physical downlink control channel signalling
comprises a field used for definition of at least one of said at least one signaled
subframe (n+3, n+4).
6. A method according to claim 5, wherein said field is a redefined optional field used
for definition of at least one of said at least one signaled subframe (n+3, n+4).
7. A method according to claim 5 or 6, wherein the physical downlink control channel
signalling is performed by using a downlink control information message of format
DCI 0.
8. A method according to claim 6, wherein said redefined optional field is one of a group
of a carrier indicator field and an uplink subframe index field.
9. A method according to claim 3, wherein the definition of said at least one signaled
subframe (n+3, n+4) is performed by means of at least one number indicating the distance
between said at least one signaled subframe (n+3, n+4) and a default subframe location.
10. A method according to any of the preceding claims,
wherein at least two of said user terminals (UE1, UE2) are scheduled in an order of
an aggregation level of said at least two of said user terminals (UE1, UE2).
11. A method according to any of the preceding claims,
wherein in each of the at least one physical downlink control channel an allocation
of only one of said at least one signaled subframe (n+3, n+4) for transmission in
uplink is comprised.
12. A method according to any of the claims 1 to 10, wherein in at least one of the at
least one physical downlink control channel allocations of at least two of said at
least one signaled subframe (n+3, n+4) for transmission in uplink are comprised.
13. A base station (BS1) for signalling in physical downlink control channels in subframes
(n-2...n+1) from the base station (BS1) to user terminals (UE1, UE2) allocations of
subframes (n+2...n+5) for transmission in uplink from the user terminals (UE1, UE2)
to the base station (BS1), the allocations being valid for specific single subframes,
wherein the base station (BS1) comprises at least one processing means which is adapted
to signal in at least one physical downlink control channel in a single subframe (n-1)
allocations of at least one signaled subframe (n+3, n+4) for transmission in uplink
from at least one of said user terminals (UE1, UE2) to the base station (BS1).
14. A user terminal (UE1, UE2) for receiving in physical downlink control channels in
subframes (n-2...n+1) from a base station (BS1) to the user terminal (UE1, UE2) signalling
of allocations of subframes (n+2...n+5) for transmission in uplink from the user terminal
(UE1, UE2) to the base station (BS1), the allocations being valid for specific single
subframes, wherein the user terminal (UE1, UE2) comprises at least one processing
means which is adapted to receive in at least one physical downlink control channel
in a single subframe (n-1) allocations of at least one signaled subframe for transmission
in uplink from the user terminal (UE1, UE2) to the base station (BS1).
15. A communication network (CN) comprising at least one base station (BS1) according
to claim 13, and at least one user terminal (UE1, UE2) according to claim 14.