|
(11) | EP 2 566 799 A1 |
(12) |
|
|
|
|
|||||||||||||||||||
(54) | INTEGRATED PROCESS FOR THE CONTROL, CENTERING AND REGULATION OF THE CAMBER OF THE METALLIC STRIP IN PROCESS LINES |