[0001] The present invention relates to a method and system for conveying and merging two
or more groups of shingled mail items.
[0002] Forming and conveying groups of shingled items is known, i.e. groups of items aligned
in a preferably straight direction, partly overlapping and with respective edges spaced
a constant or variable distance apart.
[0003] Shingled groups are typically conveyed by means of conveyor belt systems with either
one single belt defining a supporting surface for the shingled groups or a pair of
opposite belts, which exert pressure on opposite sides of the shingled groups.
[0004] To merge two shingled groups, the groups are normally fed along respective separate
conveyor belt systems, and made to converge at an area common to both systems and
at which merging of the two into one is obtained.
[0005] For example, Figures 1A and 1B show consecutive stages in the operation of a conveying
system for moving groups of shingled mail items along respective advancement paths.
More specifically, each advancement path comprises a number of segments, each at least
partly defined by a respective one- or two-belt conveyor system.
[0006] As in the example shown, two-belt systems are normally used along segments of an
advancement path arranged vertically or, however, steeply sloping.
[0007] When dealing with groups of shingled mail items, it is normally necessary to merge
two groups into a larger one. In practice, then, two or more paths converge at a given
intersection zone, and therefore are, from that point on, coincident, regardless of
the geometry of the paths. In any case, the converging-path axes being incident, at
least one of the groups of shingled items invariably has to travel along a curved
path or, at any rate, along a path involving a change in the advancement direction.
[0008] In particular, merging of groups of shingled items is made necessary by processing
requirements, e.g. by the presence, along the advancement path, of mail processing
(e.g. sorting) devices, or particular conveying or direction-change devices, which
demand that the incoming supply of mail items be as constant and homogeneous as possible,
so as to both ensure steady operation of the individual devices and, more generally
speaking, to achieve high throughput of the conveying system as a whole.
[0009] Merging two groups of shingled mail items poses, on a practical level, various potential
problems.
[0010] The group resulting from the merging of two groups of shingled items may, for example,
end up being thinner, at the area where the two groups are joined, with respect to
the average thickness of either group of shingled items (see Figure 2).
This is to be avoided at all cost, because it may eventually result in the merged
group parting altogether, e.g. as it is transferred to another part of the conveyor
system, and especially in the event of two consecutive path segments at different
levels. Moreover, the merged group being longer than it should be (by sagging at the
join) may impair the efficiency of the conveyor system as a whole. Finally, the unevenness
described above may impair overall performance of the mail processing (e.g. sorting)
devices, thus resulting in errors in the mail conveying and handling sequence.
[0011] Conversely, the area in the merged group where the two groups join may swell with
respect to the average thickness of either group of shingled items (as shown in Figure
3).
[0012] This too is to be avoided, as it results in distension of the retaining surfaces
(i.e. the opposite surfaces of the two-belt conveyor system between which the group
travels). When the retaining surfaces move apart, contact between the retaining surfaces
and the thinner portions of the group may be lost, with the result that the mail items
in these portions collapse and are no longer conveyed steadily and in controlled manner
by the conveyor belt system.
[0013] Consequently, the correct sequence of the mail items in the merged group is no longer
guaranteed, i.e. items originally in the second group may be located further forward
than items originally in the first group. Furthermore, the type of unevenness described
above may cause a blockage of the mail processing (e.g. sorting) devices.
[0014] Another factor affecting the merging of two groups of shingled mail items is a direct
consequence of at least one of the groups having to travel along a curved path or,
at any rate, change direction on its way to the intersection.
[0015] Each group of shingled mail items is fairly thick, so, as it travels along a curve
or changes direction, the surface of the group on the inside of the curve travels
at a different speed (speed v
i) from the surface on the outside of the curve (speed v
e) as shown in Figure 4.
[0016] This difference in speed has the effect of altering, i.e. increasing or decreasing,
the mean spacing of the mail items in the group, depending on the geometry of the
conveyor system and relative paths.
[0017] Because this change in spacing is not normally fully corrected when the group gets
back onto a straight course, a slight increase or decrease in the length of the group
is often observed. If not compensated for, this group length alteration may impair
the accuracy with which the longer/shorter group merges with the other group.
[0018] A simple, effective method is therefore needed to compensate for this group stretching/contracting
effect as the group travels along a curved path or, at any rate, a path involving
a change in direction.
[0019] Demand therefore exists within the sector for a method and system of conveying and
merging converging groups of shingled mail items, which makes it possible to eliminate,
in general, the above drawbacks.
[0020] More specifically, a need is felt for a system of conveying and merging groups of
shingled mail items of the type comprising a number of conveyor belt systems defining
one or more advancement paths for the groups, which provides for effectively merging
the groups with no sagging or swelling, and, when necessary, compensates for any stretching
or contraction of the groups.
[0021] It is therefore an object of the present invention to provide a simple, low-cost
method and system of conveying and merging groups of shingled mail items, which enables
achieving at least one of the above demands.
[0022] The above object is achieved by the present invention, in that it provides a method
of conveying and merging groups of shingled mail items as claimed in Claim 1, and
a system as claimed in Claim 8.
[0023] A preferred, non-limiting embodiment of the present invention will be described by
way of example with reference to the accompanying drawings, in which:
Figures 1A, 1B and 1C show schematics of a system for conveying groups of shingled
mail items at three consecutive stages;
Figures 2 and 3 show schematics of two phenomena (sagging and swelling of a group
formed by merging two groups of shingled mail items) which the method according to
the present invention is designed to eliminate;
Figure 4 shows a schematic of a disturbance phenomenon (stretching/contraction of
a group of shingled mail items) which the method according to the present invention
is designed to compensate;
Figures 5A, 5B, 5C show schematics of three consecutive stages in merging more than
two groups of shingled mail items using the method according to the present invention;
Figure 6 shows one embodiment of the method of conveying and merging groups of shingled
mail items according to the present invention.
[0024] Number 1 in Figures 1A, 1B and 1C indicates as a whole a system for conveying and
merging groups 2, 2' of shingled mail items at consecutive operating stages.
[0025] Each group 2, 2' comprises a number of mail items aligned in a preferably straight
direction, partly overlapping, with respective edges spaced a constant or variable
distance apart. More specifically, each group 2, 2' has a head 2H, 2H' (or front portion
in the travelling direction of the group), and a tail 2T, 2T' (or rear portion in
the travelling direction of the group); and the total distance between the head and
tail of each group 2, 2' defines its length.
[0026] System 1 is, in particular, designed to move groups 2, 2' of shingled mail items
- formed in known manner - along respective advancement paths, each at least partly
defined by one or more powered, one- or two-belt conveyor systems 3, 3', 31, 31'.
[0027] System 1 typically comprises a number of conveyor belt systems 3, 3', 31, 31', which
extend between respective end pulleys arranged to define supporting surfaces, on which
the shingled groups travel at a speed v from respective inputs I to a shared output
U. Along vertical or steeply sloping path segments, system 1 preferably comprises
two-belt systems 31, 31'.
[0028] The known electric motors and transmissions powering conveyor belt systems 3, 3'
are not shown for the sake of simplicity.
[0029] More specifically, system 1 is configured to merge at least one (i-1)
th group 2 of shingled mail items with an i
th group 2' of shingled mail, at an intersection zone CZ
i, to which the (
i-1)th and ith groups 2, 2' are conveyed along respective paths.
[0030] In the Figure 1A example, system 1 conveys an (i-1)th group 2 of length L
i-1, whose head 2H is initially located at a point P
(i-1)0 on a first conveyor belt system 3; and an ith group 2' of length L
i, whose head 2H' is located at a point P
i0 on a second conveyor belt system 3'.
[0031] At the time to which Figure 1A refers, to reach intersection zone CZ
i, the (i-1)th group 2 must travel along a path portion of length D
(i-1) and which involves a change in direction. So, in addition to first system 3, on which
it is located at the start time shown in Figure 1A, the (i-1)th group 2 will therefore
also be conveyed by a first two-belt conveyor system 31 adjacent to first system 3
and extending in a substantially vertical direction.
[0032] Similarly, to reach intersection zone CZ
i, the ith group 2' must travel along a path portion of length D
i followed by a change in direction. So, in addition to second system 3', on which
it is located at the time shown in Figure 1A, the ith group 2' will therefore also
be conveyed by a second two-belt conveyor system 31' adjacent to second system 3'
and extending in a substantially vertical direction.
[0033] System 1 advantageously comprises first sensor means S1, e.g. photocells, laser sensors,
proximity sensors, etc., located along the paths of the (i-1)th and ith groups 2,
2' to detect passage of heads 2H, 2H'.
[0034] The exact initial positions P
(i-1)0, P
i0 of groups 2, 2' may thus conveniently be determined using motion models (e.g. space
motion vs time equations), preferably on the basis of signals from sensor means S1
upon passage of heads 2H, 2H'.
[0035] The exact lengths L
i-1, L
i of groups 2, 2' may conveniently be determined on the basis of known parameters (means
size, mean spacing, etc.) of the mail items in the groups.
[0036] System 1 preferably also comprises second sensor means S2, e.g. photocells, laser
sensors, proximity sensors, etc., located along the paths of groups 2, 2' to detect
passage of tails 2T, 2T'.
[0037] On the basis of signals from sensor means S2 indicating passage of tails 2T, 2T',
and signals from sensor means S1 indicating passage of heads 2H, 2H', and given the
travelling speed v of groups 2, 2' along respective conveyor belt systems 3, 3', the
exact length L
i-1, L
i of each group 2, 2' can be determined at any time.
[0038] System 1 preferably also comprises further sensor means (not shown), e.g. optical
barriers, photocells, laser sensors, etc., for determining the length L
U of the last mail item in each group 2, 2'. Alternatively, the length L
U of the last mail item in each group may be assumed substantially constant and equal
to a predetermined value.
[0039] System 1 advantageously comprises a control unit 4 connected functionally to at least
first sensor means S1 and the respective drive means (not shown) of conveyor belt
systems 3, 3', 31, 31', and which is designed to start and stop conveyor belt systems
3, 3', 31, 31' on the basis of at least the initial positions P
(i-1)0, P
i0 of heads 2H, 2H', and the lengths L
i-1, L
i of the (i-1)th and ith groups 2, 2' of shingled mail items, so that the leading edge
of the (i-1)th group 2 at least overlaps the trailing edge of the ith group 2' in
a single merged group 30 of shingled mail items at relative intersection CZ
i. Control unit 4 preferably also starts and stops conveyor belt systems 3, 3', 31,
31' on the basis of lengths L
U(i-1), L
Ui of the respective last items in the (i-1)th and ith groups.
[0040] Control unit 4 is preferably also connected functionally to second sensor means S2.
[0041] The target condition, in which two groups of shingled mail items are overlapped and
merged perfectly as described above, is shown in Figure 1C.
[0042] Similarly, Figure 5C shows the target overlap and merge condition of a number of
groups of shingled mail items into one merged group 30 substantially comprising adjacent
groups 2, 2', 2" merged two by two, with the leading edge of the (i-1)th group at
least overlapping the trailing edge of the ith group. Generally speaking, each group
is characterized by a length L
i and an initial position P
i0 of its head, and is initially separated by a distance D
i from a relative intersection CZ
i with the (i-1)th group.
[0043] As will be obvious from the following description, by applying the method according
to the invention to ultimately adjacent pairs of groups of shingled mail items, it
is possible to form a multiple merged group 30 of the type shown in Figure 5C.
[0044] Figure 6 shows in greater detail the operations performed by control unit 4 to convey
two or more groups 2, 2' of shingled mail items to respective intersections zones
CZ
i, i.e. to control starting and stopping of group conveyor belt systems 3.
[0045] Firstly, block 100, control unit 4 determines at least the initial position P
i0 of the head 2H' of each
ith group of shingled mail items to be conveyed and merged, and accordingly determines
the length L
i of the
ith group and the distance D
i from the relative intersection CZ
i with a respective (i-1)th group.
[0046] Similarly, control unit 4 preferably determines the actual initial position of tail
2T', and accordingly also calculates length L
i.
[0047] In other words, groups 2, 2' are assumed to be initially motionless on the respective
conveyor belt systems.
[0048] Next, block 101, the control unit temporarily zeroes the start-off time t
1 of the first group.
[0049] In other words, block 101 basically assumes that the first group in the sequence
of groups to be merged is the one to be set in motion first. As explained below, the
method according to the invention provides for (indirectly) determining the truth
of this assumption, and, if it is disproved, for correcting the sequence in which
the various groups are set in motion.
[0050] Next, block 102, control unit 4 sets a counter
i to 2, and, at block 103, resolves, with respect to variable t
i, a motion equation of the ith and (i-1)th groups, which defines the conditions by
which, at a given following time t
merge, to overlap/merge the two groups at intersection CZ
i as shown in Figure 1C (or Figure 5C in the case of more than two groups). For which
purpose, control unit 4 takes into account the values of the variables determined
at block 100.
[0051] The groups to be conveyed and merged are preferably imposed a target overlap/merge
condition, in which the head 2H of the (i-1)th group overlaps the tail 2T' of the
ith group in such a manner as to trail behind the head of the last mail item in the
ith group by a distance S equal to the mean spacing of the shingled mail items in
each group.
[0052] This relationship is expressed mathematically by the equation :

where :
- P(i-1)_merge is the position of the head of the (i-1)th group at the merge time;
- pi_merge is the position of the tail of the ith group at the merge time;
- S is the mean spacing (known beforehand) of the shingled mail items in each group.
[0053] Equations for calculating the position of the head/tail of each group at the merge
time may be substituted in equation (1).
[0054] This gives the following motion equation of the (i-1)th and ith groups :

where :
- P(i-1)0 is the initial position of head 2H of the (i-1)th group;
- D(i-1) is the initial distance between head 2H of the (i-1)th group and the intersection
zone CZi with the ith group;
- t(i-1) is the start-off time of the (i-1)th group;
- Pi0 is the initial position of the head 2H' of the ith group;
- Li is the length of the ith group;
- LU(i-1) is the length of the last item in the (i-1)th group;
- Di is the initial distance between head 2H' of the ith group and the intersection zone
CZi with the (i-1)th group;
ti is the start-off time of the ith group;
- v is the travelling speed of conveyor belt systems 3, 3';
- S is the mean spacing of the shingled mail items in groups 2, 2'.
[0055] The mean spacing of the shingled mail items in groups 2, 2' may normally be used
for S, but, in some cases - for example, when groups 2, 2' also contain particularly
thick items - this may prove inaccurate and impair the efficiency of the method.
[0056] To prevent this, an alternative embodiment imposes a target overlap/merge condition,
in which the head 2H of the (i-1)th group overlaps the tail 2T' of the ith group in
such a manner as to trail behind the head of the last mail item in the ith group by
a distance S* based on measured dimensions (typically length and thickness) of the
two items eventually contacting directly at the join. Accordingly, system 1 may advantageously
comprise third sensor means (not shown) for determining the actual thickness of head
2H, 2H' and/or tail 2T, 2T' of the (i-1)th and ith groups.
[0057] It should be noted that the term P
i0 - L
i + L
Ui in equation (2) expresses the initial position of the head of the last item in the
ith group.
[0058] The t
(i-1) value being imposed or calculated beforehand, and all the other quantities being
known (i.e. imposed beforehand as operating parameters of system 1, or measured by
the sensors described, or calculated/estimated on the basis of acquired quantities),
equation (2) is easily resolvable with respect to variable t
i.
[0059] In other words, each t
i represents the start-off time of an ith group, determined with respect to the previously
determined start-off time t
i-1 of the (i-1)th group, i.e. the absolute algebraic difference between them represents
the time lag with which the ith group must start off with respect to start-off of
the (i-1)th group to merge the two groups correctly as designed by the present invention.
[0060] When the advancement path of the ith group involves a change in direction, equation
(2) is preferably modified (see equation (3) below) by inserting a correction term
to compensate for stretching, as typically occurs when a group changes direction.
In which case, the initial position of tail 2T' of the ith group is given, not by
P
i0 - L
i + L
Ui, but by a respective modified term (P
i0 - L
i + L
Ui)
MOD.
[0061] Mathematically, the modified initial position value of a direction-change ith group
can be calculated using the equation :

where :
- Li is the initial length of the ith group;
- LUi is the length of the last item in the ith group;
- KS is the group stretch/contraction coefficient.
[0062] The value of group stretch/contraction coefficient K
S substantially depends on the geometry of system 1 and the thickness of the group.
For example, a coefficient K
S value of roughly 1.05 - 1.10 may be assumed when the geometry of system 1 causes
the group to stretch.
[0063] At block 104, the control unit determines whether there are any other groups for
conveying and merging. This is done in known manner, e.g. using an optoelectronic
sensor (S1) defining an optical path that is interrupted by any mail items.
[0064] In the event of an affirmative response, block 104 goes on to a block 105, where
control unit 4 increments counter i by one unit, and then returns to block 103.
[0065] Conversely, in the event of a negative response, control unit 4 goes on to a block
106, where it searches for the minimum start-off time t
i_MIN of all the start-off times t
i determined.
[0066] At the next block 107, control unit 4 subtracts the minimum start-off time t
i_MIN from each start-off time t
i to calculate corrected start-off times t
i* according to the equation:

[0067] It should be noted that each start-off time t
i may be greater than, less than, or equal to zero. More specifically, t
i_MIN may be greater than, less than, or equal to zero, so the operation performed in block
107 is an algebraic subtraction (which takes into account the sign of t
i_MIN).
[0068] In other words, if start-off times t
i are all positive or zero, block 107 leaves them unchanged, i.e. each t
i* = t
i.
[0069] Alternatively, if at least one of start-off times t
i is negative, control unit 4 determines the negative start-off time with the highest
absolute value, and subtracts it algebraically from all the start-off times to 'normalize'
them. In other words, after block 107, all the start-off times t
i are 'corrected' so that none have a negative sign. In fact, the minimum start-off
time t
i determined is replaced with a corresponding zero start-off time t
i, and the group of mail items associated with this start-off time is moved first,
as explained below.
[0070] Finally, at block 108, control unit 4 carries out the conveying and merging procedure
by moving each ith group off at the corrected start-off times t
i* calculated in block 107. In other words, each ith group is started off with a time
lag, equal to the respective modified start-off time t
i*, with respect to the start time t
START of the conveying and merging procedure.
[0071] In other words, the control unit starts a number of timers, each associated with
starting off an
ith group of shingled mail items.
[0072] Accordingly, control unit 4 moves conveyor belt systems 3, 3' along respective paths
to respective intersections with respective time lags, equal to corrected start-off
times t
i*, with respect to the start time of the conveying and merging procedure.
[0073] It should be noted that, in the example described with reference to the drawings
and motion equations (1) and (2) - possibly with the correction in equation (3) -
conveyor belt systems 3, 3' move respective groups of shingled mail items all at the
same constant speed v.
[0074] However, equations (1) and (2) may obviously be corrected to allow for movement at
a non-constant speed.
[0075] For example, the constant v term in equations (1) and (2) may be replaced with a
predetermined function v
i(t) describing, or at least approximating, the speed-time pattern of head 2H' of each
ith group, to take into account acceleration and deceleration of the group along the
respective path.
[0076] In the above description, all the path portions - each defined by one or more powered,
single- or two-belt conveyor systems 3, 3', 31, 31' - are assumed free at the start
of the actual conveying and merging procedure, whereas, in actual fact, this is obviously
not always so, i.e. quite often, at least one of powered systems 3, 3', 31, 31' is
temporarily inaccessible, by already being engaged by another group in transit, or
an intersection CZ
i is temporarily occupied.
[0077] This can be taken into account in a variation of the method according to the invention,
in which an access time lag r
i is added to the corrected start-off times t
i* calculated in block 107, depending on the engaged/free status of a relative path
portion, i.e. of a corresponding powered, single- or two-belt conveyor system 3, 3',
31, 31'.
[0078] In other words, each group, particularly the one with the lowest corrected start-off
time t
i*, is set in motion with a time lag r
i with respect to the relative corrected start-off time, to allow the relative path
to clear.
[0079] Accordingly, system 1 according to the invention may advantageously comprise access
sensor means (not shown), e.g. photocells, for instantly determining the engaged/free
status of critical path portions, and which are preferably located at the intersections
CZ
i defined by system 1.
[0080] The advantages of the conveying and merging method and system according to the invention
will be clear from the above description.
[0081] In particular, the method according to the invention clearly provides, in a simple,
low-cost manner, for merging two or more groups of shingled mail items into one with
a high degree of precision, reliability and repeatability, as typically required in
the mail processing sector.
[0082] Moreover, because the groups of shingled mail items to be merged are set in motion
in a start-off time sequence that takes into account at least the initial position
and actual length of the groups, the method according to the invention prevents sagging
and swelling of merged groups at the join, as frequently occurs in less precise systems.
[0083] Another important point to note is how the conveying and merging method and system
according to the invention also take into account the geometry of system 1, and in
particular any change in direction and consequent stretching of the groups, which
may conveniently be compensated by adapting the motion equation of the groups to the
actual characteristics of the respective paths.
[0084] Clearly, changes may be made to the conveying and merging method and system as described
and illustrated herein without, however, departing from the protective scope of the
accompanying independent Claims.
1. A method of conveying and merging, at a relative intersection zone (CZ
i), at least one (i-1)th group (2) of shingled mail items with an ith group (2') of
shingled mail items, the method comprising the step of :
a) conveying said (i-1)th and ith groups (2, 2'), as of a start time (tSTART), along respective advancement paths to said intersection zone (CZi);
the method being characterized by comprising the steps of :
b) determining, for each group (2, 2') of shingled mail items to be conveyed and merged,
at least the position (P(i-1)0, Pi0) of its head (2H, 2H') at said start time (tSTART), and the length Li of the ith group (2'); and
c) controlling start-off of each group (2, 2') to said intersection zone (CZi) on the basis of at least said position (P(i-1)0, Pi0) of its head (2H, 2H') at said start time (tSTART), and said length Li-1, Li so that a leading edge of said (i-1)th group (2) overlaps at least partially a trailing edge of said ith group (2') to form a single merged group (30) of shingled mail items at said intersection
zone (CZi).
2. A method as claimed in Claim 1, wherein step c) of controlling start-off of each group
(2, 2') to the intersection zone (CZ
i) comprises the steps of :
d) calculating (103) a start-off time (ti) for each group (2, 2') at least on the basis of said position (P(i-1)0, Pi0); and
e) starting off each group (2, 2') with a time lag (ti*), with respect to said start time (tSTART), calculated on the basis of said start-off time (ti).
3. A method as claimed in Claim 1 or 2, wherein, to merge the groups, said step a) comprises
the step of overlapping the head (2H) of the (i-1)th group (2) on the tail (2T') of
the ith group (2'), so that said head (2H) trails behind the head of the last mail
item in the ith group (2') by a distance (S) equal to the mean spacing of the shingled
mail items in each group.
4. A method as claimed in Claim 1 or 2, wherein, to merge the groups, said step a) comprises
the step of overlapping the head (2H) of the (i-1)th group (2) on the tail (2T') of
the ith group (2'), so that said head (2H) trails behind the leading edge of the last
mail item in the ith group (2') by a distance (S*) based on the measured dimensions
of the head (2H) of the (i-1)th group (2) and the tail (2T') of the ith group (2').
5. A method as claimed in any one of Claims 2 to 4, wherein said start-off time (t
i) of the ith group is also calculated on the basis of :
- the position (P(i-1)0) of the head (2H) of the (i-1)th group at said start time (tSTART) ;
- the distance D(i-1), at said start time (tSTART), between the head (2H) of the (i-1)th group and said intersection zone (CZi) with the ith group;
- the start-off time (t(i-1) of the (i-1)th group;
- the distance Di, at said start time (Tstart), between the head (2H') of the ith group and said intersection zone (CZi) with the (i-1)th group;
- the travelling speed (v) of said groups along their respective paths; and
- the mean spacing (S) of the shingled mail items in each group (2, 2').
6. A method as claimed in Claim 5, wherein said respective start-off times (t
i-1, t
i) of said (i-1)th group and said ith group (2, 2') are related by the equation :

where t
merge represents the instant in which said (i-1)th group and said ith group (2, 2') merge
at the intersection zone (CZ
i).
7. A method as claimed in any one of Claims 2 to 6, wherein said step e) of starting
off each ith group comprises the steps of :
f) determining the minimum start-off time (ti_MIN) of all the start-off times (ti) calculated; and
g) calculating a corrected start-off time (ti*) for each ith group by subtracting said minimum start-off time (ti_MIN) algebraically from the relative start-off time (ti).
8. A method as claimed in any one of Claims 2 to 7, wherein said step e) of starting
off each group (2, 2') commences with a time lag ri with respect to the relative corrected start-off time (ti*), so as to allow the relative path to clear.
9. A method as claimed in any one of Claims 1 to 8, wherein, for each ith group whose
path involves a change in direction, the value of said position (Pi0) of the head (2H') of the ith group at said start time (tSTART) is corrected on the basis of a stretch coefficient KS of the group.
10. A conveying and merging system comprising :
- a number of conveyor systems (3, 3'; 31, 31') for conveying at least one (i-1)th
and one ith group (2, 2') of shingled mail items along respective paths, and merging
them at a relative intersection (CZi);
- first sensor means (S1) located along the paths of said groups (2, 2') to detect
passage of the respective heads (2H, 2H') of the groups (2, 2') and determine the
respective positions (P(i-1)0, Pi0) of the heads at a start time (tSTART) ; and
- a control unit (4) connected functionally to at least the first sensor means (S1)
and to drive means of the conveyor systems (3, 3'; 31, 31'), and programmed to control
travel of each group (2, 2') to said intersection (CZi) using the method as claimed in any one of Claims 1 to 9.
11. A system as claimed in Claim 10, and comprising second sensor means (S2) located along
the paths of said groups (2, 2') to detect passage of the respective tails (2T, 2T')
of the groups (2, 2').
12. A system as claimed in Claim 10 or 11, and comprising third sensor means located along
the paths of said groups (2, 2') to determine the thickness of the respective tails
(2T, 2T') and/or heads (2H, 2H') of the groups (2, 2').
13. A system as claimed in Claim 10 or 12, and comprising access sensor means located
along the paths of said groups (2, 2') to instantly determine the engaged/free status
of relative portions of said paths.