(19)
(11) EP 2 573 521 B8

(12) CORRECTED EUROPEAN PATENT SPECIFICATION
Note: Bibliography reflects the latest situation

(15) Correction information:
Corrected version no 1 (W1 B1)

(48) Corrigendum issued on:
11.06.2014 Bulletin 2014/24

(45) Mention of the grant of the patent:
30.04.2014 Bulletin 2014/18

(21) Application number: 12197533.8

(22) Date of filing: 28.07.2005
(51) International Patent Classification (IPC): 
G01C 21/34(2006.01)

(54)

Selective download of corridor map data

Selektives Herunterladen von Korridorkartendaten

Téléchargement sélectif de données cartographiques de couloirs


(84) Designated Contracting States:
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

(30) Priority: 28.07.2004 US 900707

(43) Date of publication of application:
27.03.2013 Bulletin 2013/13

(62) Application number of the earlier application in accordance with Art. 76 EPC:
05764605.1 / 1784655

(73) Proprietor: Intel Corporation
Santa Clara, CA 95052 (US)

(72) Inventors:
  • Dotan, Emanuel
    25147 Kfar Vradim (IL)
  • Kupferman, Michael, Menachem
    30900 Zichron Ya'akov (IL)
  • Elad, Tal
    58672 Holon (IL)

(74) Representative: Hutchinson, Glenn Stanley 
HGF Limited Fountain Precinct Balm Green
Sheffield S1 2JA
Sheffield S1 2JA (GB)


(56) References cited: : 
WO-A1-02/101331
US-A- 5 410 485
   
       
    Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).