(19)
(11) EP 2 578 840 A3

(12) EUROPEAN PATENT APPLICATION

(88) Date of publication A3:
08.11.2017 Bulletin 2017/45

(43) Date of publication A2:
10.04.2013 Bulletin 2013/15

(21) Application number: 12178757.6

(22) Date of filing: 31.07.2012
(51) International Patent Classification (IPC): 
F02C 3/34(2006.01)
F02C 3/20(2006.01)
F02C 7/224(2006.01)
F02C 1/08(2006.01)
F02C 6/18(2006.01)
F23R 3/26(2006.01)
(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA ME

(30) Priority: 07.10.2011 US 201113269356

(71) Applicant: General Electric Company
Schenectady, NY 12345 (US)

(72) Inventors:
  • Anand, Ashok Kumar
    Schenectady, NY New York 12309 (US)
  • Reddy, Thirumala Reddy Nagarjuna
    560066 Bangalore, Karnataka (IN)
  • Shaffer, Jason Brian
    Schenectady, NY New York 12345 (US)
  • York, William David
    Greenville, SC South Carolina 29615 (US)

(74) Representative: Cleary, Fidelma 
GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith
London W6 8BJ
London W6 8BJ (GB)

   


(54) Power plant with exhaust gas recirculation system


(57) A power plant (10) is provided and includes a gas turbine engine (20) having a combustor (40) in which compressed gas and fuel are mixed and combusted, first and second supply lines (35,36) respectively coupled to the combustor (40) and respectively configured to supply the compressed gas and the fuel to the combustor (40) and an exhaust gas recirculation (EGR) system (70) to re-circulate exhaust gas produced by the gas turbine engine (20) toward the combustor. The EGR system (70) is coupled to the first and second supply lines (35,36) and configured to combine first and second portions of the re-circulated exhaust gas with the compressed gas and the fuel at the first and second supply lines (35,36), respectively.







Search report









Search report