(19)
(11) EP 2 617 988 B8

(12) CORRECTED EUROPEAN PATENT SPECIFICATION
Note: Bibliography reflects the latest situation

(15) Correction information:
Corrected version no 1 (W1 B1)

(48) Corrigendum issued on:
05.06.2019 Bulletin 2019/23

(45) Mention of the grant of the patent:
13.03.2019 Bulletin 2019/11

(21) Application number: 13000254.6

(22) Date of filing: 18.01.2013
(51) International Patent Classification (IPC): 
F03D 1/00(2006.01)
F03D 80/50(2016.01)

(54)

Manual lifting tool for wind turbines

Manuelles Hebewerkzeug für Windturbinen

Outil de levage manuel pour éoliennes


(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

(30) Priority: 18.01.2012 US 201213353037

(43) Date of publication of application:
24.07.2013 Bulletin 2013/30

(73) Proprietor: SIEMENS GAMESA RENEWABLE ENERGY INNOVATION & TECHNOLOGY, S.L.
31621 Sarriguren (Navarra) (ES)

(72) Inventors:
  • Skaff, Rudy
    48170 Zamudio (Bizkaia) (ES)
  • Palacio Gaviria, Gonzalo
    48170 Zamudio (Bizkaia) (ES)

(74) Representative: Aspacher, Karl-Georg 
Siemens Gamesa Renewable Energy GmbH & Co. KG Otto-Hahn-Ring 6
81739 München
81739 München (DE)


(56) References cited: : 
EP-A2- 1 101 936
WO-A1-2009/155934
US-A- 1 392 066
US-A1- 2005 109 996
WO-A1-2008/098574
DE-A1-102008 013 688
US-A- 4 189 128
   
       
    Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).