[0001] The present invention relates to a method for manufacturing an embedded rail track
with a continuous and elastically supported rail embedded in a continuous concrete
track bed. Such embedded rail systems are generally known in the field of railway
tracks for e.g. train, tram, metro, crane and other railbound vehicle applications.
The resilient behaviour of the elastic support for the rails, both in vertical and
lateral direction, e.g. allows for reduction of noise and vibration.
[0002] In a known manufacturing method first a concrete track bed is made, e.g. using a
slipform machine, with open-topped channels wherein the rails is placed. Then a pourable
resilient compound is poured. This compound cures over time in the channel with the
rail. This compound remains permanent elastic. The compound bonds to the rail and
in cured state provides continuous vertical and horizontal elastic support to the
rail.
[0003] In another approach rails which are covered on the sides of the web and underneath
the foot by a rubber jacket are held in pre-aligned condition by use of portals from
which they are suspended. Then the concrete track bed, or at least the top layer thereof,
is poured so that the rails with rubber jackets are embedded in the track bed. The
rubber material, commonly made of scrap rubber, provides permanent elastic support
both in vertical and lateral direction for the rail.
[0004] EP 1 916 336 discloses a method for manufacturing an embedded rail track with a continuous and
elastically supported rail embedded in a continuous concrete track bed, wherein a
rail has a head, a web and a foot. In this known method a pre-aligned rail is provided
with filler blocks on opposed sides of the web as well as with an elastic strip underneath
the foot. The concrete track bed is poured and allowed to harden so that the pre-aligned
rails is embedded in the concrete track bed.
[0005] In
EP 1 916 336 the filler blocks each have a removable top portion that covers the respective lateral
side of the rail head prior to pouring of the concrete. After the concrete track bed
has hardened the top portions are removed and the voids created by removal of the
top portions are filled with a pourable resilient compound which cures over time and
has permanent elasticity.
[0006] The present invention aims to provide an improved method for manufacturing an embedded
rail track with a continuous and elastically supported rail embedded in a continuous
concrete track bed.
[0007] The present invention achieves this aim by providing a method according to claim
1.
[0008] In the method one or more pre-aligned rails are provided with filler blocks on opposed
sides of the web as well as with an elastic strip underneath the foot, and a concrete
track bed is poured and allowed to harden thereby embedding said one or more pre-aligned
rails in the concrete track bed.
[0009] At the boundary between each filler block and the hardened concrete track bed a layer
of the filler block is removed by machining to create a void down to the level of
the elastic strip.
[0010] These voids that are created by said machining are then filled by pouring into the
voids a pourable resilient compound which cures over time and has permanent elasticity.
[0011] In the method according to the invention the filler blocks can be of low cost as
they need not have a permanent elastic property to obtain the desired elastic support
of the rail. The presence of the filler blocks - after the machining step - allows
for the use of a limited volume of rather expensive resilient compound to obtain the
desired permanent elastic support for the rail, which elastic support is in lateral
direction primarily determined by said compound and in vertical direction by the elastic
strip underneath the foot of the rail.
[0012] In a practical embodiment the filler blocks and the elastic strip are separate parts,
that are mounted onto the rail, e.g. by clamping. In an alternative embodiment the
filler blocks and elastic strip are interconnected similar to a jacket or the elastic
strip is integrated with one of the filler blocks.
[0013] In a practical embodiment the filler blocks have a length between 0.5 and 3 meters,
e.g. 1.2 meter.
[0014] In a preferred embodiment the filler blocks are made of a plastic foam material,
more preferably a rigid plastic foam material, e.g. a polyurethane rigid foam.
[0015] The method of the invention allows to achieve a good electrical insulation of the
rail, as the compound preferably has an electrical insulating property and fills any
joints between the filler blocks, possibly also joints between the elastic strip and
the filler blocks. This is e.g. beneficial in view of electrical stray currents, e.g.
when the track is used for a metro or tram.
[0016] In a preferred embodiment the resilient compound is a polyurethane based compound,
e.g. including cork granules.
[0017] In a practical embodiment the machining of the filler blocks is performed by a brush,
preferably a rotating steel wire disc brush. The brush will gradually remove material
from the filler block, the thickness of the brush preferably being such that it corresponds
to the thickness of the layer to be removed from the filler blocks. A machine having
two spaced apart brushes or other machining tools may be used to remove the layers
at both sides simultaneously. As an alternative a rotating disc saw may be used or
a chain saw type machine or any other suitable machining tool.
[0018] In a preferred embodiment the filler blocks each have a top portion that covers the
respective lateral side of the rail head prior to the pouring of the concrete, and
- after the concrete track bed has hardened - the top portion of each filler block
is removed. The void created by the removal of each top portion is also filled with
said pourable resilient compound. Possibly the void created by removal of a top portion
is filled with another compound than the void at the lateral side of the filler block.
[0019] In a preferred embodiment the top portions of the filler blocks each have a greater
lateral dimension than the thickness of the layer of the filler block that is removed
by machining at said boundary with the concrete. This avoids contact between the rail
head and the machining tool when the top portions remain in place during said machining.
[0020] In a preferred embodiment the filler blocks each have a lower portion that covers
or overlaps at least partially the lateral side of the elastic strip that is present
underneath the foot, and the removal by machining of said layer of filler block includes
removal of said lower portion. In this manner the void at the boundary can be made
- if desired - to extend just as deep in the concrete track bed as the bottom side
of the elastic strip. This e.g. enhances the electrical insulation and/or the lateral
elastic support.
[0021] It is preferred that - after removal of the layers of the filler blocks at the boundary
with the concrete - spacer elements, preferably elastic spacer elements, are placed
between the filler blocks and the concrete track bed to maintain the position of the
rail prior to pouring of the resilient compound. It is envisaged that elastic spacers
remain in place and so become embedded in the compound.
[0022] To obtain a reliable adherence of the compound to the rail head and to the concrete
track bed opposite said rail head - prior to pouring the resilient compound - the
sides of the rail head and opposed portions of the concrete track bed are cleaned
and possibly treated with a primer that enhances the bond with the compound. Due to
the high quality adherence e.g. ingress of water can be avoided.
[0023] In a preferred embodiment use is made of support and alignment portals or jiggs from
which the rail or rails is/are kept suspended during the pouring of the concrete track
bed. This is known in the art as the top - down method.
[0024] In a possible embodiment the filler blocks have a preformed cut therein which separates
the top portion to be removed from the remainder of the filler block except for a
bridge near the lateral face of the filler block, such that upon removal by machining
of said layer at the boundary with the track bed said bridge is fully or at least
for 50% removed, thereby facilitating the removal of said top portion. This e.g. allows
to predefine the size of the top portion that is to be removed, e.g. avoiding the
removal of an undersized top portion.
[0025] In a possible embodiment one or preferably both of the filler blocks each have on
the lateral face thereof an elongated protective strip, e.g. as described in
EP1988213. The strip is preferably a steel strip, but other materials are also possible. The
strip is connected to the lateral face of the filler block, e.g. by an adhesive. The
filler block does not extend over the height of the lateral face but is shorter so
as to leave the bottom region of the lateral face exposed. The strip extends essentially
over the length of the filler block, e.g. slightly shorter than the filler block when
the strip is of metal. The strip extends in an upper corner region of the filler block,
preferably so as to have a top face that is level with the adjacent top face of the
track bed (e.g. with a concrete top face of the concrete track bed or with the top
face of a road surface layer, e.g. of asphalt or bricks on top of the concrete track
bed). Preferably the strip has anchoring members protruding sideways, e.g. horizontally
or angled downwards, from the protective strip, e.g. at least 3 centimeters sideways
from the strip, e.g. embodied as hooks, loops, rods (e.g. with a thickened end portion),
etc, to obtain a reliable anchoring in the track bed.
[0026] In an embodiment a road surface layer is placed on top of the concrete track bed,
e.g. an asphalt layer, possibly prior to the steps of removal of the layers from the
filler blocks and filling the voids with pourable resilient compound.
[0027] The invention also relates to an embedded rail track with one or more continuous
elastically supported rails manufactured according to the invention.
[0028] The invention will now be explained with reference to the drawings. In the drawings:
Figure 1 shows schematically in cross-section an example of a rail to be integrated
in an embedded rail track manufactured according to the invention,
Figure 2 the rail with elastic strip clamped onto the foot of the rail,
Figure 3 the rail of figure 2 after mounting of preferred embodiments of the filler
blocks,
Figure 4 the rail after pouring of the concrete track bed,
Figure 5 the track bed and rail of figure 4 after the step of removal by machining
of the layers of the filler blocks at the boundary with the concrete track bed,
Figure 6 illustrates the removal of the top portion of each of the filler blocks,
Figure 7 illustrates the placement of spacers between the filler blocks and the concrete
track bed,
Figure 8 illustrates the cleaning and coating with a primer of the lateral side of
the rail head and the laterally opposed surface of the concrete,
Figure 9 shows the rail and track bed after the filling of the voids with the resilient
compound.
[0029] Figure 1 shows an example of a steel rail 1 for a rail-bound vehicle, e.g. for tram,
metro, train, etc. The rail 1 is destined to be integrated in an embedded rail track,
e.g. with two parallel rails 1, with continuous elastically supported rails that are
embedded in a continuous concrete track bed.
[0030] The rail 1 has a head 2, a web 3, and a foot 4. In this example, as seen in cross-section
of the rail 1, the head 2 and the foot 4 are substantially broader than the web 3,
so that on each lateral side of the rail 1 there is a longitudinal recess 6, 7.
[0031] The rail 1 shown as an example here is a so-called grooved rail having a groove 10
in the rail head 2.
[0032] The rail 1 may also have a different shape, e.g. without groove 10 and/or with other
dimensions of the rail head, web, and/or foot.
[0033] In figure 2 an example of an elastic strip 15 has been mounted onto the rail 1 and
extends underneath the foot 4. In this example the strip 15 has lateral flanges 15a,
b that are adapted to be clamped around the lateral sides of the foot 4.
[0034] The strip is of elastic material that is suitable to provide continuous elastic support
in vertical direction for the rail 1. These strips 15 are known in the art and can
have a static and dynamic stiffness depending on the desired elastic properties of
the rail support.
[0035] In figure 3 it is shown that filler blocks 20 and 25 are mounted to the rail 1. Here,
as is preferred, the filler blocks 20, 25 are clampingly fitted in the recesses 6,
7.
[0036] In an embodiment the strip 15 could extend on the upper side of the foot on both
sides of the web of the rail, a filler block then clamping the strip onto the upper
face of the foot.
[0037] In an embodiment the strip 15 has no lateral clamping flanges 15a, b but is held
by another clamping member onto the rail, or by an adhesive. In an embodiment an additional
clamping strip is provided that has clamping flanges 15a, b, the elastic strip 15
being arranged between said additional clamping strip and the rail foot 4.
[0038] As is preferred the filler blocks 20, 25 are of rigid material, as the blocks themselves
do not need to have permanent elastic properties that contribute to the elastic support
for the rail 1. Preferably the filler blocks 20, 25 do not include rubber.
[0039] In a preferred embodiment that blocks 20, 25 are made of a plastic foam material,
most preferably a rigid plastic foam material, such as rigid polyurethane foam.
[0040] In a possible embodiment such blocks 20, 25 are cut from thick sheets or plates of
rigid plastic foam material.
[0041] Preferably the filler blocks have a very low water absorption.
[0042] Preferably the filler blocks 20, 25 have a length between 0.5 and 3 metres to facilitate
handling of the blocks 20, 25 during installation.
[0043] In this example the rigid foam filler blocks 20, 25 have a preformed cut 21 therein
at the side to be introduced and clamped in the recess of the rail. The cut 21 is
adapted to provide some flexibility to said portion of the block 20, 25 so that the
filler block will remain in place based on the clamping effect alone on the pre-aligned
rail.
[0044] The lateral sides of the filler blocks 20, 25 are shown here to be planar and parallel.
However other embodiments are also possible, e.g. with non-parallel and/or non-planar
vertical sides, e.g. the lateral sides tapering upwards to a smaller cross-sectional
dimension of the assembly and/or the lateral sides having one or more longitudinal
ribs or other formations that cause an uneven surface in the concrete, e.g. to enhance
the engagement of the compound with the concrete track bed.
[0045] If desired the elastic strip 15 and/or the filler blocks 20, 25 can also be held
in a different, possibly temporary, manner on the rail 1, e.g. using adhesive, clips,
tie-wraps, etc prior to the pouring of the concrete into which the assembly of figure
3 is to be embedded..
[0046] As can be seen in figure 3 the filler blocks 20, 25 are - as is a preferred embodiment
- shaped such that they each have a top portion 20a, 25a that covers the respective
lateral side of the rail head 2. As is preferred, these top portions 20a, 25a are
later removed prior to the pouring of the compound.
[0047] As can be seen in figure 3 the filler blocks 20, 25 are - as is a preferred embodiment
- shaped such that they each have a lower portion 20b, 25b that covers the side of
the elastic strip 15. Here, as is preferred, the lower portion 20b, 25b extends down
to the bottom side of the strip 15, but an embodiment with less overlap in vertical
direction between the strip 15 and the lower portion 20b, 25b is also possible. Then
the concrete will lock-in the elastic strip 15 in horizontal direction, which may
be beneficial.
[0048] In this example, as is preferred, the filler blocks 20, 25 each have a preformed
cut 27 therein which separates the top portion 20a, 25a to be removed from the remainder
of the filler block except for a bridge near the outer side face of the filler block.
[0049] The assembly in the condition as shown in figure 3 is held in a pre-aligned state
prior to the pouring of the concrete in which the assembly is to be embedded. As is
known in the art, the top - down method can be used, wherein use is made of support
and alignment portals or jigs (not shown) from which the assembly, or commonly multiple
assemblies at the correct gauge between the rails, is suspended, e.g. above a concrete
foundation that was installed earlier.
[0050] In an alternative approach other support and alignment members are used to hold the
assembly to be embedded at the correct pre-aligned position prior to pouring of the
concrete.
[0051] Figure 4 illustrates that the concrete 30 has been poured, here underneath and at
each of the sides of the assembly of figure 3. In this example the concrete is poured
up to the top face of the filler blocks 20, 25. If desired the top level of the concrete
track bed could be lower, e.g. allowing for an additional cover layer, e.g. a non
concrete road surface, to be placed on top of the concrete track bed.
[0052] The poured concrete 30 is now allowed to harden.
[0053] Figure 5 illustrates the step of removing a layer of the lateral side of the filler
block by machining away said layer at the boundary between each filler block and the
concrete track bed. As is shown in figure 5 in this manner a void 40, 45, preferably
narrow and deep slot, is formed. The machining is performed so deep that even the
lower portions 20b, 25b are removed.
[0054] In a practical embodiment the layer to be removed from each filler block 20, 25 by
machining at the boundary with the concrete track bed has a thickness of between 5
and 25 millimetres, preferably between 10 and 25 millimetres, e.g. about 15 millimetres.
It will be appreciated that the thickness of the layer that is removed relates to
the thickness of the layer of compound that is filled into the void, and thereby to
the finally obtained elastic support of the rail.
[0055] As is possible the machining is performed with a brush, preferably a rotating disc
brush, e.g. a steel wire disc brush. A suitable machine has a motor driven shaft on
which such a brush can be mounted. It is envisaged that an embodiment of the filler
block made of rigid plastic foam can well be machined with such a brush. An advantage
of the disc brush is that the side face of the concrete is also brushed and loose
particles are removed. As an alternative a saw, e.g. a disc saw, or a milling machine
can be used to machine away said side layers of the filler blocks. A vacuum device
may be used to suck away the machined filler particles.
[0056] If desired the filler blocks 20, 25 may include one or more preformed cuts, cut-outs
or internal cavities in the region of the layer to be machined away. This may e.g.
reduce the volume of filler block to be removed, the energy needed for said removal,
or be otherwise be beneficial for the removal by machining and/or the adherence to
the compound that is poured later into the voids.
[0057] Here, as is preferred, the top portion 20a, 25a of the filler blocks each have a
greater lateral dimension than the thickness of the layer of the filler block that
is removed by machining at said boundary.
[0058] In the embodiment of the filler blocks 20, 25 with the top portion 20a, 25a and the
associated preformed cut in the filler block, the machining step may lead to the complete
or at least 50% removal of the bridge that was present in the filler block between
said top portion and the remainder of the filler block. In figure 5 it is suggested
that a fraction of said bridge is let intact. Now with minimal effort the remains
of the filler blocks can be removed, e.g. by some pulling action, as is illustrated
in figure 6.
[0059] The cut now forms a predefined surface of the void to be filled with compound near
the rail head 2.
[0060] Due to the removal of the layers from the vertical outer sides of the filler blocks
20, 25 the assembly with the rail 1 now has a reduced sideways stability. In order
to avoid undue sideways shifting of the rail, it is preferred to introduce at selected
positions along the track spacers 50 in the voids between the filler blocks 20, 25
and the opposed face of the concrete track bed, e.g. wedge shaped spacers.
[0061] Preferably said spacers 50 are made of elastic material, e.g. from the same material
as the compound to be poured into the void, and are to be embedded in the compound
permanently. Their presence then does not disturb the desired elastic property of
the lateral support for the rail 1.
[0062] As is preferred - prior to the pouring of the compound into the voids 40, 45 - extra
measures are taken to enhance the adhesion of said compound to the lateral side of
the rail head 2 and the opposed surface of the concrete track bed. This is done to
counter ingress of water, most desirable if prevention of electrical stray currents
is desired.
[0063] For example the lateral side of the rail head 2 and said opposed surface (indicated
with arrows A) are cleaned and coated with a suitable primer. This is illustrated
in figure 8.
[0064] Figure 9 shows the embedded rail system after the resilient compound 60 has been
poured into the voids 40, 45. It can be seen that the void created by removal of each
top portion 20a, 25b is also filled with said pourable resilient compound.
[0065] The compound may for example be a polyurethane based compound, e.g. including cork
granules.
[0066] The compound cures over time and forms a layer that remains permanently elastic,
and thereby provides a continuous elastic support primarily in lateral direction for
the rail 1.
[0067] It is envisaged that once the manufacturing of the rail system is completed no fasteners
are present between the rails and the concrete track bed as is known in the art.
[0068] If the filler blocks 20, 25b were absent far more elastic compound would have been
needed, which is more expensive and less efficient than with the method according
to the invention. The filler blocks 20, 25 need not be elastic themselves, and thus
can be made of a rather cheap material, such as rigid plastic foam. The machining
step to remove the layers from the filler blocks can be effected quite rapidly and
cost-efficient.
[0069] As mentioned above a concrete foundation bed may be present prior to the rails with
elastic strip and filler blocks being aligned above said concrete foundation bed.
Then an upper bed portion of concrete is poured on top of the foundation bed which
forms the lower bed portion so as to embed the one or more pre-aligned rails in the
concrete track bed. In another approach a monolithic concrete track bed is poured
in one pouring action. Possibly a road surface layer is placed on top of the concrete
track bed, e.g. an asphalt layer, paving blocks, possibly prior to the step of filling
the voids with the pourable compound.
[0070] In an embodiment of the method parallel pre-aligned rails are interconnected by transverse
gauge rods at intervals along the length of the rails, said gauge rods preferably
being sheathed by a permanent elastic sheath, e.g. a tubular sheath, prior to the
pouring of the concrete track bed. The sheathed gauge rods then also become embedded
in the concrete track bed. The gauge rod may extend through the filler block or through
a specially designed filler block to be arranged at the location where the gauge rod
is connected to the rail. When removing by machining the layer of filler block at
the boundary with the concrete at the side of the gauge rod, it is possible that a
portion of said layer below the gauge rod may remains in place and only the portion
of the filler block above the gauge rod is removed.
[0071] It will be appreciated that the pre-aligned rail or rails may be combined with rail
fixtures, e.g. a water drainage element, e.g. a drainage box fitted to a rail or a
drainage element extending transverse between rails. It is envisaged that such elements
are sheathed with a permanent elastic sheath or e.g. with a sheathing, e.g. of filler
block material, that is subjected to the same process including layer removal at the
boundary with the concrete as explained above.
1. Method for manufacturing an embedded rail track with a continuous and elastically
supported rail embedded in a continuous concrete track bed, wherein a rail (1) has
a head (2), a web (3) and a foot (4), which method comprises the steps of:
- providing one or more pre-aligned rails (1) provided with filler blocks (20,25)
on opposed sides of the web as well as with an elastic strip (15) underneath the foot,
- pouring the concrete track bed (30) and allowing said concrete to harden thereby
embedding said one or more pre-aligned rails (1) in the concrete track bed,
characterised in that
at the boundary between each filler block (20,25) and the hardened concrete track
bed a layer of the filler block is removed by machining to create a void (40,45) to
the level of the elastic strip (15),
and in that said voids (40, 45) created by said machining are filled by pouring into the voids
a pourable resilient compound (60) which cures over time and has permanent elasticity.
2. Method according to claim 1, wherein the filler blocks (20, 25) each have a top portion
(20a, 25a) that covers the respective lateral side of the rail head prior to pouring
of the concrete, and wherein - after the concrete track bed has hardened - the top
portion is removed (20a, 25a),
and wherein the void created by removal of each top portion (20a, 25a) is also filled
with pourable resilient compound (60).
3. Method according to claim 2, wherein the top portions (20a, 25a) of the filler blocks
each have a greater lateral dimension than the thickness of the layer of the filler
block that is removed by machining at said boundary.
4. Method according to one or more of the preceding claims, wherein the filler blocks
each have a lower portion (20b, 25b) that overlaps the lateral side of the elastic
strip (15), and wherein the removal by machining of said layer of filler block includes
removal of said lower portion.
5. Method according to one or more of the preceding claims, wherein after removal of
said layers elastic spacer elements (50) are placed between the filler blocks and
the concrete track bed to maintain the position of the rails prior to pouring of the
resilient compound (60).
6. Method according to one or more of the preceding claims, wherein - prior to pouring
the resilient compound - the lateral sides of the rail head (2) and opposed portions
of the concrete track bed are cleaned, and preferably treated with a primer, to enhance
adhesion of the resilient compound to said surfaces.
7. Method according to one or more of the preceding claims, wherein the step of machining
of the filler blocks (40, 45) is performed by a rotating steel wire disc brush.
8. Method according to one or more of the preceding claims, wherein the filler blocks
(20, 25) are made of a foam material, preferably a rigid foam material, preferably
polyurethane rigid foam.
9. Method according to one or more of the preceding claims, wherein use is made of support
and alignment portals from which the rails are kept suspended during the pouring of
the concrete track bed.
10. Method according to claim 2 or 3, wherein the filler blocks (20, 25) have a preformed
cut therein which separates the top portion to be removed from the remainder of the
filler block except for a bridge near the outer side face of the filler block, such
that upon removal by machining of said layer at the boundary with the track bed said
bridge is fully or for at least 50% removed, thereby facilitating the removal of said
top portion.
11. Method according to one or more of the preceding claims, wherein the layer that is
removed from the filler block by machining at the boundary with the concrete track
bed has a thickness of between 5 and 25 millimetres.
12. Method according to one or more of the preceding claims, wherein the head and the
foot (4) of the rail (1) are broader than the web (3), and wherein the filler blocks
are clamped between the head and the foot of the pre-aligned rail.
13. Method according to one or more of the preceding claims, wherein the elastic strip
(15) has lateral flanges clamped on the sides of the foot of the rail.
14. Method according to one or more of the preceding claims, wherein the track bed includes
a lower bed portion of concrete and an upper bed portion of concrete, said lower bed
portion being poured prior to the step of providing one or more pre-aligned rails
provided with filler blocks on opposed sides of the web as well as with an elastic
strip underneath the foot, the upper bed portion being poured on top of the lower
bed portion so as to embed the one or more pre-aligned rails in the concrete track
bed.
15. Embedded rail track with one or more continuous elastically supported rails embedded
in a continuous concrete track bed, wherein the rail (1) has a head (2), a web (3)
and a foot (4), and wherein the rail (1) is provided with filler blocks (20,25) on
opposed sides of the web as well as with an elastic strip (15) underneath the foot,
wherein the concrete has been poured and allowed to harden thereby embedding the rail
in the concrete track bed,
characterised in that
at the boundary between each filler block (20,25) and the hardened concrete track
bed a void that has been filled by pouring a resilient compound (60) which cures over
time and has permanent elasticity is present, which void has been created by removal
of a layer of the filler block by machining to the level of the elastic strip (15)
of the rail embedded in the concrete track bed.
1. Verfahren zur Herstellung eines eingebetteten Schienenstrangs mit einer kontinuierlichen
und elastisch gelagerten Schiene, welche in einem kontinuierlichen Beton-Gleisbett
eingebettet ist, wobei eine Schiene einen Kopf (2), einen Steg (3) und einen Fuß (4)
aufweist, wobei das Verfahren die Schritte umfasst:
- Bereitstellen von einer oder von mehreren vorausgerichteten Schienen (1), welche
mit Füllblöcken (20, 25) auf gegenüberliegenden Seiten des Stegs wie auch mit einem
elastischen Streifen (15) unterhalb des Fußes versehen sind,
- Gießen des Beton-Gleisbetts (30) und Ermöglichen, dass der Beton aushärtet, wodurch
die eine oder die mehreren vorausgerichteten Schienen (1) in dem Beton-Gleisbett eingebettet
werden,
dadurch gekennzeichnet,
dass an der Grenze zwischen jedem Füllblock (20, 25) und dem gehärteten Beton-Gleisbett
eine Schicht des Füllblocks durch maschinelles Bearbeiten entfernt wird, um einen
Hohlraum (40, 45) bis zu dem Niveau des elastischen Streifens (15) zu erzeugen,
und dass die Hohlräume (40, 45), welche durch die maschinelle Bearbeitung erzeugt werden,
gefüllt werden, indem eine gießbare nachgiebige Compound (60) in die Hohlräume gegossen
wird, welche mit der Zeit aushärtet und eine dauerhafte Elastizität aufweist.
2. Verfahren nach Anspruch 1, wobei die Füllblöcke (20, 25) jeweils einen oberen Abschnitt
(20a, 25a) aufweisen, welcher die entsprechende Seite des Schienenkopfes vor einem
Gießen des Betons abdeckt, und wobei - nachdem das Beton-Gleisbett ausgehärtet ist
- der obere Abschnitt (20a, 25a) entfernt wird,
und wobei der Hohlraum, welcher durch das Entfernen jedes oberen Abschnitts (20a,
25a) erzeugt wird, auch mit einer gießbaren nachgiebigen Compound (60) gefüllt wird.
3. Verfahren nach Anspruch 2, wobei die oberen Abschnitte (20a, 25a) der Füllblöcke jeweils
eine größere seitliche Abmessung als die Dicke der Schicht des Füllblocks, welche
durch Bearbeiten an der Grenze entfernt wird, aufweisen.
4. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei die Füllblöcke
jeweils einen unteren Abschnitt (20b, 25b) aufweisen, welcher die seitliche Seite
des elastischen Streifens (15) überlappt, und wobei das Entfernen der Schicht des
Füllblocks durch Bearbeiten ein Entfernen des unteren Abschnitts beinhaltet.
5. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei nach dem Entfernen
der Schichten elastische Abstandselemente (50) zwischen den Füllblöcken und dem Beton-Gleisbett
angeordnet werden, um die Position der Schienen vordem Gießen der nachgiebigen Verbindung
(60) beizubehalten.
6. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei - vor dem Gießen
der nachgiebigen Compound - die seitlichen Seiten des Schienenkopfes (2) und die gegenüberliegenden
Abschnitte des Beton-Gleisbetts gereinigt, und vorzugsweise mit einem Primer behandelt
werden, um ein Haftvermögen der nachgiebigen Compound mit den Flächen zu verbessern.
7. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei der Schritt
der Bearbeitung der Füllblöcke (40, 45) durch eine sich drehende Stahldraht-Tellerbürste
durchgeführt wird.
8. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei die Füllblöcke
(20, 25) aus einem Schaumstoffmaterial, vorzugsweise aus einem Hartschaummaterial,
vorzugsweise aus einem Polyurethan-Hartschaum hergestellt sind.
9. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei Halte- und
Ausrichtungs-Portale verwendet werden, von welchen die Schienen während des Gießens
des Beton-Gleisbetts aufgehängt gehalten werden.
10. Verfahren nach Anspruch 2 oder 3, wobei die Füllblöcke (20, 25) einen vorausgebildeten
Schnitt darin aufweisen, welcher den oberen Abschnitt, der von dem Rest des Füllblocks
zu entfernen ist, außer einer Brücke in der Nähe der äußeren Seitenfläche des Füllblocks
abtrennt, so dass beim Entfernen der Schicht an der Grenze zu dem Gleisbett durch
das Bearbeiten die Brücke vollständig oder zumindest zu 50 % entfernt wird, wodurch
das Entfernen des oberen Abschnitts erleichtert wird.
11. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei die Schicht,
welche von dem Füllblock durch das Bearbeiten an der Grenze zu dem Beton-Gleisbett
entfernt wird, eine Dicke zwischen 5 und 25 mm aufweist.
12. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei der Kopf und
der Fuß (4) der Schiene (1) breiter als der Steg (3) sind, und wobei die Füllblöcke
zwischen den Kopf und den Fuß der vorausgerichteten Schiene geklemmt sind.
13. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei der elastische
Streifen (15) seitliche Flansche aufweist, welche auf die Seiten des Fußes der Schiene
geklemmt sind.
14. Verfahren nach einem oder mehreren der vorhergehenden Ansprüche, wobei das Gleisbett
einen unteren Bettabschnitt aus Beton und einen oberen Bettabschnitt aus Beton aufweist,
wobei der untere Bettabschnitt vor dem Schritt des Bereitstellens von einer oder von
mehreren vorausgerichteten Schienen, welche mit Füllblöcken auf gegenüberliegenden
Seiten des Stegs wie auch mit einem elastischen Streifen unterhalb des Fußes versehen
sind, gegossen wird, wobei der obere Bettabschnitt auf den unteren Bettabschnitt gegossen
wird, um so die eine oder die mehreren vorausgerichteten Schienen in das Beton-Gleisbett
einzubetten.
15. Eingebettetes Gleisbett mit einer oder mit mehreren kontinuierlich elastisch gelagerten
Schienen, welche in ein kontinuierliches Beton-Gleisbett eingebettet sind, wobei die
Schiene (1) einen Kopf (2), einen Steg (3) und einen Fuß (4) aufweist, und wobei die
Schiene (1) mit Füllblöcken (20, 25) auf gegenüberliegenden Seiten des Stegs wie auch
mit einem elastischen Streifen (15) unterhalb des Fußes versehen ist, wobei der Beton
geschüttet worden ist und diesem ermöglicht wird, auszuhärten, wodurch die Schiene
in das Beton-Gleisbett eingebettet wird, dadurch gekennzeichnet,
dass an der Grenze zwischen jedem Füllblock (20, 25) und dem ausgehärteten Beton-Gleisbett
ein Hohlraum vorhanden ist, welcher durch Gießen einer nachgiebigen Compound (60)
gefüllt worden ist, welche mit der Zeit aushärtet und eine dauerhafte Elastizität
aufweist, wobei der Hohlraum durch ein Entfernen einer Schicht des Füllblocks bis
zu dem Niveau des elastischen Streifens (15) der Schiene, welche in das Beton-Gleisbett
eingebettet ist, durch maschinelles Bearbeiten erzeugt worden ist.
1. Procédé pour la fabrication d'une voie ferrée intégrée avec un rail supporté de manière
continu et élastique intégré dans une assiette de voie en béton continue, dans lequel
un rail (1) comporte un champignon (2), une âme (3) et un patin (4), lequel procédé
comprend les étapes consistant à :
- fournir un ou plusieurs rails alignés au préalable (1) pourvus d'entretoises (20,
25) sur les côtés opposés de l'âme ainsi que d'une bande élastique (15) au-dessous
du patin,
- déverser l'assiette de voie en béton (30) et permettre au dit béton de durcir, intégrant
de ce fait lesdits un ou plusieurs rails alignés au préalable (1) dans l'assiette
de voie en béton,
caractérisé en ce que
au niveau de la frontière entre chaque entretoise (20, 25) et l'assiette de voie en
béton durcie, une couche de l'entretoise est retirée par façonnage pour créer un vide
(40, 45) jusqu'au niveau de la bande élastique (15),
et en ce que lesdits vides (40, 45) créés par ledit façonnage sont remplis en déversant dans les
vides un composé élastique déversable (60) qui durcit dans le temps et qui a une élasticité
permanente.
2. Procédé selon la revendication 1, dans lequel les entretoises (20, 25) ont chacune
une partie supérieure (20a, 25a) qui recouvre le côté latéral respectif du champignon
de rail avant le déversement du béton, et dans lequel, après que l'assiette de voie
en béton a durci, la partie supérieure (20a, 25a) est retirée,
et dans lequel le vide créé par le retrait de chaque partie supérieure (20a, 25a)
est également rempli avec le composé élastique déversable (60).
3. Procédé selon la revendication 2, dans lequel les parties supérieures (20a, 25a) des
entretoises ont chacune une dimension latérale plus grande que l'épaisseur de la couche
de l'entretoise qui est retirée par façonnage au niveau de ladite frontière.
4. Procédé selon une ou plusieurs des revendications précédentes, dans lequel les entretoises
comportent chacune une partie inférieure (20b, 25b) qui recouvre le côté latéral de
la bande élastique (15), et dans lequel le retrait par façonnage de ladite couche
d'entretoise comprend le retrait de ladite partie inférieure.
5. Procédé selon une ou plusieurs des revendications précédentes, dans lequel, après
le retrait desdites couches, des éléments d'espacement élastiques (50) sont placés
entre les entretoises et l'assiette de voie en béton pour maintenir la position des
rails avant le déversement du composé élastique (60).
6. Procédé selon une ou plusieurs des revendications précédentes, dans lequel, avant
le déversement du composé élastique, les côtés latéraux du champignon de rail (2)
et les parties opposées de l'assiette de voie en béton sont nettoyés, et de préférence
traités avec une couche primaire, pour améliorer l'adhérence du composé élastique
aux dites surfaces.
7. Procédé selon une ou plusieurs des revendications précédentes, dans lequel l'étape
de façonnage des entretoises (40, 45) est effectuée par un disque en fil d'acier rotatif.
8. Procédé selon une ou plusieurs des revendications précédentes, dans lequel les entretoises
(20, 25) sont réalisées en un matériau expansé, de préférence un matériau expansé
rigide, de préférence une mousse rigide de polyuréthane.
9. Procédé selon une ou plusieurs des revendications précédentes, dans lequel il est
utilisé un support et des portiques d'alignement par lesquels les rails sont maintenus
suspendus pendant le déversement de l'assiette de voie en béton.
10. Procédé selon la revendication 2 ou 3, dans lequel les entretoises (20, 25) comportent
une découpe préformée dans celles-ci qui sépare la partie supérieure à retirer du
reste de l'entretoise, à l'exception d'un pont à proximité de la face latérale extérieure
de l'entretoise, de sorte que, lors du retrait par façonnage de ladite couche au niveau
de la frontière avec l'assiette de voie, ledit pont est retiré entièrement ou sur
au moins 50 %, facilitant de ce fait le retrait de ladite partie supérieure.
11. Procédé selon une ou plusieurs des revendications précédentes, dans lequel la couche
qui est retirée de l'entretoise par façonnage au niveau de la frontière avec l'assiette
de voie en béton a une épaisseur entre 5 et 25 millimètres.
12. Procédé selon une ou plusieurs des revendications précédentes, dans lequel le champignon
et le patin (4) du rail (1) sont plus larges que l'âme (3), et dans lequel les entretoises
sont serrées entre le champignon et le patin du rail aligné au préalable.
13. Procédé selon une ou plusieurs des revendications précédentes, dans lequel la bande
élastique (15) comporte des rebords latéraux serrés sur les côtés du patin du rail.
14. Procédé selon une ou plusieurs des revendications précédentes, dans lequel l'assiette
de voie comprend une partie d'assiette inférieure en béton et une partie d'assiette
supérieure en béton, ladite partie d'assiette inférieure étant déversée avant l'étape
de fourniture d'un ou de plusieurs rails alignés au préalable pourvus d'entretoises
sur les côtés opposés de l'âme ainsi que d'une bande élastique au-dessous du patin,
la partie d'assiette supérieure étant déversée au-dessus de la partie d'assiette inférieure
de manière à intégrer lesdits un ou plusieurs rails alignés au préalable dans l'assiette
de voie en béton.
15. Voie ferrée intégrée avec un ou plusieurs rails supportés de manière continu et élastique
intégrés dans une assiette de voie en béton continue, dans laquelle le rail (1) comporte
un champignon (2), une âme (3) et un patin (4), et dans laquelle le rail (1) est pourvu
d'entretoises (20, 25) sur les côtés opposés de l'âme ainsi que d'une bande élastique
(15) au-dessous du patin, dans laquelle le béton a été déversé et autorisé à durcir,
intégrant de ce fait le rail dans l'assiette de voie en béton,
caractérisée en ce que
au niveau de la frontière entre chaque entretoise (20, 25) et l'assiette de voie en
béton durcie, un vide qui a été rempli en déversant un composé élastique (60) qui
durcit dans le temps et qui a une élasticité permanente est présent, lequel vide a
été créé par le retrait d'une couche de l'entretoise par façonnage au niveau de la
bande élastique (15) du rail intégré dans l'assiette de voie en béton.