(19)
(11) EP 2 679 213 A3

(12) EUROPEAN PATENT APPLICATION

(88) Date of publication A3:
06.08.2014 Bulletin 2014/32

(43) Date of publication A2:
01.01.2014 Bulletin 2014/01

(21) Application number: 13170380.3

(22) Date of filing: 04.06.2013
(51) International Patent Classification (IPC): 
A61G 13/10(2006.01)
A61G 12/00(2006.01)
F24F 3/16(2006.01)
(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA ME

(30) Priority: 25.06.2012 US 201261663712 P
20.11.2012 US 201213682339

(71) Applicant: Huntair Inc.
Tualatin, OR 97062 (US)

(72) Inventor:
  • Schreiber, Kevin Joseph
    Happy Valley, OR Oregon 97086 (US)

(74) Representative: Oxley, Robin John George et al
Marks & Clerk LLP Alpha Tower Suffolk Street Queensway
Birmingham B1 1TT
Birmingham B1 1TT (GB)

   


(54) System and method for delivering air through a boom assembly


(57) A boom assembly (10) is configured to movably secure equipment (20) to a ceiling (12) or plenum (24) extending from the ceiling (12). The assembly (10) may include an arm sub-assembly (18) secured to the ceiling, equipment (20) secured to an end of the arm sub-assembly (18), and an air delivery member (62) extending through the arm sub-assembly (18). The air delivery member (62) may include a first end in communication with an air delivery chamber within the ceiling (12) or plenum (24), and a second end in communication with air passages (64) formed through the equipment (20). Airflow is directed from the air delivery chamber out through the air passages (64) formed through the equipment towards a target location.







Search report









Search report