| (84) |
Designated Contracting States: |
|
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL
NO PL PT RO RS SE SI SK SM TR |
| (30) |
Priority: |
10.08.2011 US 201113136793
|
| (43) |
Date of publication of application: |
|
18.06.2014 Bulletin 2014/25 |
| (73) |
Proprietor: Nokia Technologies Oy |
|
02610 Espoo (FI) |
|
| (72) |
Inventors: |
|
- ZHANG, Yi
Beijing 100010 (CN)
- ZAUS, Robert
80686 Munich (DE)
- HWANG, Woonhee
FI-02180 Espoo (FI)
- DU, Lei
Beijing 100016 (CN)
- CHANDRAMOULI, Devaki
Plano, TX 75074 (US)
|
| (74) |
Representative: Style, Kelda Camilla Karen |
|
Page White & Farrer
Bedford House
John Street London, WC1N 2BF London, WC1N 2BF (GB) |
| (56) |
References cited: :
|
| |
|
|
- LG ELECTRONICS INC: "Further Discussion on EAB", 3GPP DRAFT; R2-113339 EAB-R1, 3RD
GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES
; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Barcelona, Spain; 20110509,
3 May 2011 (2011-05-03), XP050495447, [retrieved on 2011-05-03]
- NOKIA SIEMENS NETWORKS ET AL: "Extended Access Barring for LTE and UMTS", 3GPP DRAFT;
R2-112995 (EAB FOR LTE-UMTS), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE
CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN
WG2, no. Barcelona, Spain; 20110509, 2 May 2011 (2011-05-02), XP050495120, [retrieved
on 2011-05-02]
- ZTE ET AL: "Clarification on how EAB is applied in Shared Network", 3GPP DRAFT; S1-111376,
3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES
LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. SA WG1, no. Xian; 20110509,
16 May 2011 (2011-05-16), XP050515452, [retrieved on 2011-05-16]
- TELEFON AB LM ERICSSON ET AL: "Realizing Extended Access Barring", 3GPP DRAFT; GP-110355,
3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES
LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. TSG GERAN, no. Chengdu; 20110304,
3 March 2011 (2011-03-03), XP050486659, [retrieved on 2011-03-03]
- ZTE: "Clarification on how to control access attempts from UEs configured for EAB",
3GPP DRAFT; S1-111056, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE
CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. SA
WG1, no. Xian; 20110509, 2 May 2011 (2011-05-02), XP050514741, [retrieved on 2011-05-02]
- NOKIA SIEMENS NETWORKS ET AL: "Extended Access Barring", 3GPP DRAFT; C1-113093-EAB-DISC,
3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES
LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. CT WG1, no. Malta; 20110822,
13 August 2011 (2011-08-13), XP050533581, [retrieved on 2011-08-13]
|
|