(19)
(11) EP 2 742 759 B8

(12) CORRECTED EUROPEAN PATENT SPECIFICATION
Note: Bibliography reflects the latest situation

(15) Correction information:
Corrected version no 1 (W1 B1)

(48) Corrigendum issued on:
29.07.2015 Bulletin 2015/31

(45) Mention of the grant of the patent:
10.06.2015 Bulletin 2015/24

(21) Application number: 12743788.7

(22) Date of filing: 29.06.2012
(51) International Patent Classification (IPC): 
H04W 72/04(2009.01)
(86) International application number:
PCT/SE2012/050752
(87) International publication number:
WO 2013/025158 (21.02.2013 Gazette 2013/08)

(54)

METHODS AND NODES FOR COORDINATING UPLINK TRANSMISSIONS IN A WIRELESS COMMUNICATION NETWORK

VERFAHREN UND KNOTEN ZUR KOORDINIERUNG VON UPLINK-ÜBERTRAGUNGEN IN EINEM DRAHTLOSEN KOMMUNIKATIONSNETZ

PROCÉDÉS ET NOEUDS POUR COORDONNER DES TRANSMISSIONS SUR LA LIAISON MONTANTE DANS UN RÉSEAU DE COMMUNICATION SANS FIL


(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

(30) Priority: 12.08.2011 US 201161522810 P

(43) Date of publication of application:
18.06.2014 Bulletin 2014/25

(73) Proprietor: Telefonaktiebolaget L M Ericsson (publ)
164 83 Stockholm (SE)

(72) Inventors:
  • SIOMINA, Iana
    S-170 66 Solna (SE)
  • BALDEMAIR, Robert
    S-171 69 Solna (SE)
  • KAZMI, Muhammad
    S-167 39 Bromma (SE)

(74) Representative: Ericsson 
Patent Development Torshamnsgatan 21-23
164 80 Stockholm
164 80 Stockholm (SE)


(56) References cited: : 
US-A1- 2009 131 065
US-A1- 2009 264 077
US-A1- 2009 247 181
US-A1- 2010 216 486
   
  • "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Stage 2 functional specification of User Equipment (UE) positioning in UTRAN (Release 10)", 3GPP STANDARD; 3GPP TS 25.305, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. V10.0.0, 7 October 2010 (2010-10-07), pages 1-80, XP050461874, [retrieved on 2010-10-07]
  • "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); TDD Home eNode B (HeNB) Radio Frequency (RF) requirements analysis (Release 9)", 3GPP STANDARD; 3GPP TR 36.922, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. V9.1.0, 21 June 2010 (2010-06-21), pages 1-74, XP050441979, [retrieved on 2010-06-21]
  • PICOCHIP DESIGNS LTD: "Use of X2 to mitigate interference between HeNBs and macro eNBs", 3GPP DRAFT; R3-082442 (X2 FOR HENB), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Prague, Czech Republic; 20080924, 24 September 2008 (2008-09-24), XP050323727, [retrieved on 2008-09-24]
   
Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).