| (84) |
Designated Contracting States: |
|
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL
NO PL PT RO RS SE SI SK SM TR |
| (30) |
Priority: |
13.10.2011 US 201161546878 P
|
| (43) |
Date of publication of application: |
|
20.08.2014 Bulletin 2014/34 |
| (73) |
Proprietor: Huawei Technologies Co., Ltd. |
|
Longgang District
Shenzhen, Guangdong 518129 (CN) |
|
| (72) |
Inventors: |
|
- SARTORI, Philippe
Algonquin, Illinois 60102 (US)
- SOONG, Anthony C.K.
Plano, Texas 75025 (US)
- BERGGREN, Fredrik
SE-194 57 Upplands Vaesby (SE)
|
| (74) |
Representative: Körber, Martin Hans et al |
|
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Karlstraße 7 80333 München 80333 München (DE) |
| (56) |
References cited: :
WO-A1-2010/129605 WO-A2-2011/025195 US-A1- 2009 252 075 US-A1- 2011 044 261 US-A1- 2011 170 496
|
WO-A1-2011/085195 US-A1- 2009 175 159 US-A1- 2010 232 546 US-A1- 2011 165 906
|
|
| |
|
|
- LG ELECTRONICS INC: "PDSCH Starting Symbol Indication for Cross-Carrier Scheduling",
3GPP DRAFT; R1-102707-PCFICH_CA_LG_RAN1-61_FINAL, 3RD GENERATION PARTNERSHIP PROJECT
(3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS
CEDEX ; FRANCE, vol. RAN WG1, no. Montreal, Canada; 20100510, 4 May 2010 (2010-05-04),
XP050419910, [retrieved on 2010-05-04]
- ALCATEL-LUCENT SHANGHAI BELL AND ALCATEL-LUCENT: "Backhaul Performance Requirement
for Relay", 3GPP DRAFT; R4-110354, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE
COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE,
vol. RAN WG4, no. Austin; 20110117, 11 January 2011 (2011-01-11), XP050475071, [retrieved
on 2011-01-11]
- NTT DOCOMO: "On RRC Signaling of PDSCH Starting Position", 3GPP DRAFT; R1-104011 PCFICH,
3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES
LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Dresden, Germany;
20100628, 22 June 2010 (2010-06-22), XP050449340, [retrieved on 2010-06-22]
|
|