Technical Field
[0001] The present disclosure relates to a method and device for ensuring working conditions,
and more particularly to a method and device for ensuring working conditions along
a longwall face in an underground mine.
Background
[0002] A known problem in longwall mining of coal seams is gas emission of methane gas.
That methane gas emission results from both natural outflow and generation during
the coal winning process. Capillary bound methane gas is released from the coal as
the extraction machine cuts along the coal seam. That released methane gas bears the
risk of methane gas explosions.
[0003] Generally, ventilation of the mine allows maintaining gas concentrations at an acceptable
level. For example, ventilation provides air from an air inlet side, guides the same
along the longwall, and releases the same at an outlet side, thereby taking with it
any released methane gas.
[0004] Nevertheless safety regulations require measuring the methane gas concentration constantly
in underground mining. If a measured methane gas concentration reaches a critical
value, the entire longwall mine including, for example, extraction machine, shield
supports and haulage systems is stopped until the methane gas concentration undercuts
a statutory level. Those stops and even more the following boot-up procedure of the
longwall mine are responsible for a majority of operation stops and failures in winning
processes having increased methane gas emissions as it is typically the case in longwall
mining of thin coal seams.
[0005] For a longwall mine,
DE 10 2007 014 662 A1 discloses a gas measurement arrangement with a plurality of gas sensors. In case
a calculated extraction rate of the extraction machine does not correlate with a measured
gas concentration, a warning signal is provided.
[0006] The present disclosure is directed, at least in part, to improving or overcoming
one or more aspects of prior systems.
Summary of the Disclosure
[0007] According to a first aspect of the present disclosure, a longwall installation unit
configured to form a longwall installation assembly together with a plurality of longwall
installation units of the same kind to extend along the longwall face in a longwall
mine having a compressor device is disclosed. The longwall installation unit may comprise
a dilution gas nozzle installed in the longwall installation unit and configured to
be fluidly connected to the compressor device.
[0008] According to another aspect of the present disclosure, a method for ensuring working
conditions along a longwall face in an underground mine comprises providing a mine
ventilation, and in addition to the mine ventilation, providing a dilution gas to
the longwall face from at least one of a plurality of dilution gas supply units arranged
at spatially separated positions along the longwall face.
[0009] Other features and aspects of this disclosure will be apparent from the following
description and the accompanying drawings.
Brief Description of the Drawings
[0010] Fig. 1 is a schematic drawing of an exemplary longwall mine; and Fig. 2 is a schematic
drawing of an exemplary shield support and an exemplary face conveyor segment.
Detailed Description
[0011] The following is a detailed description of exemplary embodiments of the present disclosure.
The exemplary embodiments described therein and illustrated in the drawings are intended
to teach the principles of the present disclosure, enabling those of ordinary skill
in the art to implement and use the present disclosure in many different environments
and for many different applications. Therefore, the exemplary embodiments are not
intended to be, and should not be considered as, a limiting description of the scope
of patent protection. Rather, the scope of patent protection shall be defined by the
appended claims.
[0012] The present disclosure is based in part on the realization that conventional ventilation
systems in longwall mining may be not sufficient to dilute released methane gas, and
direct the same away from the longwall face. For example, if mining thin coal seams,
small cross section areas limit ventilation flows as working conditions for man and
machine decrease if ventilation is increased. This may in particular be the case if
local methane gas concentrations are temporarily and locally increased.
[0013] Longwall installation units as disclosed herein may be capable to specifically provide
dilution gas to desired regions of the longwall face, thereby specifically diluting
measured methane gas concentration peaks and ensuring acceptable working conditions
for man and machine.
[0014] An exemplary longwall mine 1 is shown in Fig. 1. For the purpose of mining coal along
a longwall face 2, longwall mine 1 comprises a face conveyor 4 with a main drive 6
and an auxiliary drive 8, and an extraction machine 10 carried by face conveyor 4.
[0015] In operation, extraction machine 10 cuts along longwall face 2 in a reciprocating
manner to extract coal 3. For example, extraction machine 10 may be a shearer or a
plow. Material mined by extraction machine 10 drops onto face conveyor 4 that transports
the extracted pieces of rock and minerals to a main roadway 12 (also referred to as
drift). There, the extracted pieces are passed to a pass-over conveyor or roadway
conveyor 14. The transported pieces may be crushed and further transported via, for
example, a belt conveyor.
[0016] Face conveyor 4 is arranged along longwall face 2 and comprises a plurality of face
conveyor segments 5. Neighboring face conveyor segments 5 are connected to one another,
for example, so as to resist separation when a tensile force is applied and so as
to restrict relative angular movement. For example, face conveyor segments 5 are arranged
in a row between two stations, which respectively accommodate sprockets and use the
sprockets to redirect a conveyor chain of face conveyor 4.
[0017] To maintain longwall face 2 accessible, a shield support assembly 17 is arranged
along longwall face 2. Shield support assembly 17 comprises a plurality of shield
supports 16 arranged along longwall face 2. At each shield support 16, a moving device
(not shown) is supported, which can consist of in each case one pushing or walking
bar, which can be loaded hydraulically in both directions in order to push face conveyor
4 optionally and section by section in the work direction (arrow A) or pull up individual
shield supports 16 in the work direction. Longwall face 2 is further kept open by
shield caps forming an upper unit of each shield support 16. Surrounding rock can
only break in and form the so-called old workings after advancing of shield supports
16.
[0018] Longwall mine 1 is equipped with a plurality of dilution gas supply units 20 connected
via control connection line 22 (indicated by a dashed dotted line in Fig. 1) to a
control unit 24, and connected via a pressurised dilution gas line 26 (indicated by
a solid line in Fig. 1) to a dilution gas source 27.
[0019] Each dilution gas supply unit 20 comprises a dilution gas nozzle 30. A dilution gas
valve 28 may be fluidly interconnected between dilution gas source 27 and dilution
gas nozzle 30. Each dilution gas valve may be associated with dilution gas supply
unit 20 or may be installed within dilution gas line 26. As exemplarily shown in Fig.
1, dilution gas nozzles 30 are installed regularly at every third shield support 16.
Dilution gas nozzles 30 are, thus, spatially separated at various positions along
longwall face 2. Dilution gas nozzle 30 may be oriented, for example facing longwall
face 2, such that dilution gas can be released toward longwall face 2 if dilution
gas valve 28 is opened and, thus, allows flow of dilution gas out of a respective
gas nozzle 30.
[0020] Dilution gas valve 28 is, for example, a shut-off valve configured to either allow
or block flow of dilution gas from dilution gas line 26 to dilution gas nozzle 30.
Alternatively, dilution gas valve 28 may be a control valve configured to control
the amount of said dilution gas flow there through.
[0021] Control unit 24 provides signals causing dilution gas valve 28 to adopt its state
via control connection line 22. Control unit 24 may be a single microprocessor or
plural microprocessors that may includes means for controlling, among others, an operation
of the various components of longwall mine 1. Control unit 24 may include all the
components required to run an application such as, for example, a memory, a secondary
storage device, and a processor such as a central processing unit or any other means
known in the art for controlling longwall mine 1 and its various components. Various
other known circuits may be associated with control unit 24, including power supply
circuitry, signal-conditioning circuitry, communication circuitry, and other appropriate
circuitry. Control unit 24 may analyze and compare received and stored data, and,
based on instructions and data stored in memory or input by a user, determine whether
action is required. For example, control unit 24 may compare received values with
target values or preset threshold values and trends stored in memory, and based on
the results of the comparison, control unit 24 may transmit signals to one or more
components to alter the operation status thereof.
[0022] Control unit 24 may include any memory device known in the art for storing data relating
to operation of longwall mine 1 and its components. The data may be stored in the
form of one or more maps that describe and/or relate, for example, valve opening timing.
Each of the maps may be in the form of tables, graphs, and/or equations, and include
a compilation of data collected from lab and/or field operation of longwall mine 1.
The maps may be generated by performing instrumented tests on the operation of longwall
mine 1 under various operating conditions while varying parameters associated therewith.
Control unit 24 may reference these maps and control operation of one component in
response to the desired operation of another component.
[0023] As used herein, the term "connected" used in connection with the control unit refers
to the presence of a control connection line and the ability of the control unit to
control operation of a connected component, and/or receive control signals or measured
values from a connected component.
[0024] Dilution gas source 27 may be arranged at any place of the underground mine and/or
the surface and may be connected to control unit 24. Usually, dilution gas source
27 is substantially free of methane gas. To provide a dilution gas to dilution gas
line 26 with a pressure above ambient pressure, dilution gas source 27 may be, for
example, a compressor device. Dilution gas source 27 may provide air drawn from the
surface and/or well-ventilated regions of the underground mine such as roadway 12.
[0025] In the shown configuration of Fig. 1, every third shield support 16 is equipped with
a dilution gas nozzle 30 such that dilution gas nozzles 30 are arranged spaced from
one another along longwall face 2. In other embodiments, the distance between neighboring
dilution gas nozzles 30 may be lower or greater depending on various influences including,
but not limited to, size of shield support 16, strength of ventilation (indicated
by arrow V), height of coal seam 3. For example, dilution gas nozzles 30 may be arranged
every 10 to 30 meters along longwall face 2.
[0026] The present disclosure is not limited to embodiments, in which solely shield supports
16 are equipped with dilution gas nozzles 30. Generally, any longwall installation
unit, such as face conveyor segments 5 or shield supports 16, configured to form a
longwall installation assembly, such as face conveyor 4 or shield support assembly
17, together with a plurality of longwall installation units 5, 16 of the same kind
to extend along longwall face 2 in a longwall mine 1 may comprise dilution gas nozzle
30. Dilution gas nozzle 30 may be installed in longwall installation unit 5, 16 and
configured to be fluidly connected to compressor device 27. It is noted that dilution
gas supply related features described in connection with shield support 16 or face
conveyor segment 5 may be also applicable to other longwall installation units. Face
conveyor segment 5 and shield support 16 are only exemplary embodiments of longwall
installation units.
[0027] In some embodiments, each longwall installation unit 5, 16 may comprise one or more
respective dilution gas nozzles 30, in other embodiments every second to every fifteenth
longwall installation unit 5, 16 may comprise one or more dilution gas nozzles 30.
In other words, of the plurality of longwall installation units 5, 16, at least a
sub-group of the plurality longwall installation units 5, 16 may have a dilution gas
nozzle 30.
[0028] Although shown in Fig. 1, dilution gas nozzles 30 may not necessarily be arranged
equidistantly. For example, a distance between neighboring dilution gas nozzles 30
may decrement towards a centre region of longwall face 2, or may decrement in direction
of mine ventilation (V).
[0029] Referring again to Fig. 1, distributed along longwall face 2, methane gas sensors
32 are installed in longwall mine 1. In the shown configuration, some of shield supports
16 are equipped with methane gas sensors 32 being configured to measure a methane
gas concentration at spatially separated regions. Alternatively, at least some of
face conveyor segments 5 may be equipped with methane gas sensors 32.
[0030] As each methane gas sensor 32 is connected via control connection line 22 to control
unit 24, signals indicating a methane gas concentration at a respective methane gas
sensor 32 can be provided to control unit 24 in form of signals. For example, methane
gas sensors 32 may be arranged along longwall face 2 such that neighboring methane
gas sensors 32 are spaced from one another within a range from 5 m to 50 m, such as
within a range from 10 m to 30 m.
[0031] Each methane gas sensor 32 may have a minimum distance to a neighboring dilution
gas nozzle 30. Said minimum distance may be set to ensure that a methane gas sensor
does not directly come into contact with dilution gas at the moment in which the same
is supplied by respective dilution gas supply unit 20 such that measurements of methane
gas sensors 32 may be not falsified as those would not longer be representative for
the respective region. A minimum distance as used herein refers to a combination of
distances along each spatial axis, which at least ensures a reduction of the effect
of a "short-circuit" between a dilution gas nozzle and a methane gas sensor. For example,
a minimum distance in direction of longwall face 2 between neighboring methane gas
sensor 32 and dilution gas nozzle 30 may be at least 1 m, and/or a distance between
a methane gas sensor 32 and longwall face 2 in direction of working direction A may
be greater than a distance between a neighboring dilution gas nozzle 30 and longwall
face 2 in direction of working direction A.
[0032] A user input device 34 and a display device 36 are arranged, for example, in a displaceable
manner, at an accessible location of longwall mine 1. User input device 34 and display
device 36 are connected via respective connection lines 38, 40 to control unit 24.
[0033] Using user input device 34 and optionally display device 36, a miner can control
operation of longwall mine 1 including, but not limited to, cutting depth, cutting
speed, advancing speed, conveyor speed, and/or dilution gas supply. To enable user
inputs, user input device 34 is configured to receive the same, for example, via a
keyboard or a touch panel. Display device 36 is configured to visualize information
received from control unit 24.
[0034] A ventilation system of the mine provides air through roadways 12 and along longwall
face 2 as indicated by direction arrows V. The ventilation system may be set up such
the mine ventilation can be adapted generally by control unit 24.
[0035] Fig. 2 shows an exemplary embodiment of shield support 16 to hold open longwall face
2 and a face conveyor segment 5.
[0036] Shield support 16 comprises skids 42, hydraulic cylinders 44, a shield cap 46, and
a gob shield 50 and is equipped with a dilution gas nozzle 30.
[0037] Shield support 16 has two mutually adjacent skids 42, which in underground mining
are also referred to as floor skids, since they rest on the rock soil forming the
floor of a face. On each floor skid 42, a multitelescopic strong hydraulic cylinder
44 (in underground mining also referred to as a hydraulic prop) is supported. The
cylinder head of hydraulic cylinder 44 presses from below against a shield cap 46.
Shield cap 46, which is in underground mining also referred to as a roof cap, presses
against the rock which forms the ceiling of the face, the so-called roof.
[0038] The distance between floor skids 42 and shield cap 46 can be adjusted by retraction
or extension of hydraulic cylinders 44. A link mechanism 48 ensures by means of a
gob shield 50, as well as by means of a corner cylinder 52, that floor skids 42 and
shield cap 46, in each state of extension of hydraulic cylinders 44, stand substantially
plane-parallel to each other. Link mechanism 48 is exemplary configured as a lemniscate
link mechanism. Link mechanism 48 has a front link 54 and a rear link 56, both being
supported at a distance apart against two bolt receptacles 58 and 60 as well as against
floor skid 42.
[0039] Bolt receptacles 58, 60 are respectively configured on a side plate 62 of gob shield
50, and shield cap 46 is connected to gob shield 50 in an articulated manner by a
hinge bolt. Corner cylinder 52, which is attached by its one end to a supporting bracket
on gob shield 50 and with its other end against shield cap 46, serves for the additional
bracing of the articulated connection between gob shield 50 and shield cap 46 and
can be hydraulically loaded or unloaded as desired. Additionally, a shield canopy
64 may be connected to shield cap 46 in an articulated manner.
[0040] As mentioned above, dilution gas nozzle 30 may be installed in shield support 16.
In the configuration of Fig. 2, dilution gas nozzle 30 is mounted to shield canopy
64, in particular, below shield canopy 64. Alternatively, dilution gas supply unit
20 may have a different installation location on shield support 16. For example, dilution
gas nozzle 30 may be integrated into shield canopy 64, or may be mounted to or integrated
into shield cap 46.
[0041] In the configuration shown in Fig. 2, also face conveyor segment 5 of face conveyor
4 comprises a dilution gas nozzle 30'. Said dilution gas nozzle 30' is installed in
a spill plate 66. Spill plate 66 is arranged at a goaf side of face conveyor segment
5. Spill plate 66 may be formed by a plurality of parts or may formed as one piece.
In dependence of a coal seam height, height of spill plate 66 may be chosen. A plurality
of spill plates 66 may be mounted along face conveyor 4 such that neighboring spill
plates 66 are connected to one another. For example, a spill plate may have a width,
which is substantially equal to a width of a face conveyor segment 5 along longwall
face 2.
[0042] Face conveyor segment 5 may further comprise a material transport strand 68 and a
return travel strand 70. In the shown configuration, the material transport strand
68 is arranged above the return travel strand 70. Both strands 68, 70 are configured
to guide an endless conveyor with transport carriers (not shown). In other embodiments,
both strands 68, 70 may be arranged side by side.
[0043] In some embodiments, dilution gas nozzle 30' may be mounted at or integrated into
spill plate 66, for example, mounted at or integrated into a top section of spill
plate 66.
[0044] As already described in connection with Fig. 1, extraction machine 10 is guided at
face conveyor 4.
[0045] In some embodiments, dilution gas nozzle 30, 30' may comprise a mounting mechanism
that is configured for retrofitting dilution gas nozzle 30, 30' to shield support
16 and/or face conveyor segment 5. Existing shield supports and/or face conveyor segments
can be equipped with dilution gas nozzle 30, 30'. It will be appreciated by those
having skill in the art that exemplary disclosed shield support 16 is of a specific
type as described above, however, any known shield support type may be equipped with
dilution gas supply nozzle 30.
[0046] Dilution gas nozzle 30, 30' may be installed at shield support 16 and/or face conveyor
segment 5 in an adjustable manner facilitating adjustment of the direction in which
a nozzle outlet of dilution gas nozzle 30 is directed. For example, dilution gas nozzle
30, 30' may be pivotally installed at shield support 16 and/or face conveyor segment
5.
[0047] Although not shown in Fig. 2, shield support 16 and/or face conveyor segment 5 may
be further equipped with a methane gas sensor (referred to as 32 in Fig. 1). For example,
dilution gas nozzle 30 and methane gas sensor 32 may be arranged side by side at shield
canopy 64 at aforementioned minimum distance apart.
[0048] In some embodiments, support 16 and/or face conveyor segment 5 may further comprise
a dilution gas valve 32 (not shown in Fig. 2) as described in connection with Fig.
1.
[0049] In some embodiments, a dilution gas line 26 (not shown in Fig. 2) may be guided below
shield cap 46, for example, below a rear section of shield cap 46, or at face conveyor
4.
Industrial Applicability
[0050] In the following, functionality of dilution gas supply units is described.
[0051] During the extraction process, longwall face 2 moves in direction of arrow A (also
referred to as working direction and advancing direction) as well as particular components
of longwall mine 1 such as shield supports 16, face conveyor 4, and extraction machine
10 work its way into the seam in direction of arrow A.
[0052] As coal 3 is extracted from longwall face 2 by extraction machine 10, capillary-bound
methane gas may be released from coal 3. However, not only the extraction process
itself generates methane gas, but methane gas is also released due to natural outflow.
[0053] To dilute methane gas along longwall face 2, mine ventilation (along arrows V in
Fig. 1) is provided. In addition to providing mine ventilation, dilution gas can be
provided to longwall face 2 from at least one of a plurality of dilution gas nozzles
30 arranged at spatially separated positions along longwall face 2. For example, control
unit 24 may cause compressor device 27 to pressurize a dilution gas such as air, which
than can be provided via dilution gas nozzles 30. It is noted that for providing dilution
gas from dilution gas supply units 20 not necessarily measurements of methane gas
concentrations need to be carried out.
[0054] Control unit 24 may further receive signals from methane gas sensors 32 measuring
a methane gas concentration at a plurality of spatially separated regions along longwall
face 2 around respective methane gas sensors 32. Control unit 24 may determine a methane
gas concentration value for each region, and may determine at least one region for
which the methane gas concentration value is greater than a preset threshold value.
In addition to mine ventilation, dilution gas from at least one of the plurality of
dilution gas nozzles 30 may be provided to those regions for which the methane gas
concentration value is greater than the preset threshold value.
[0055] For example, methane gas sensor 32 measures a methane gas concentration that is greater
than a preset threshold value and provides a respective signal to control unit 24.
Control unit 24 than identifies at least one dilution gas supply unit 20 neighboring
the respective methane gas sensor 32. Then, that/those dilution gas supply units 20
determined by control unit 24 is/are caused to provide dilution gas via dilution gas
supply nozzle 30. To facilitate flow of dilution gas, control unit 24 may provide
a control signal to the respective dilution gas valve(s) 28. In other words, each
dilution gas supply unit 20 is associated with at least one methane gas sensor 32,
and control unit 24 is configured to control dilution gas valve 28 of each dilution
gas supply unit 20 based on a signal received from associated methane gas sensor 32.
Association between methane gas sensor 32 and dilution gas valve 28 may be based on
a minimum distance between both.
[0056] For example, the dilution gas may be ambient air drawn from the surface, and/or methane
gas-free regions of the underground. In the activated state of dilution gas supply
units 20, dilution gas source 27 may ensure presence of dilution gas in a pressurised
state in dilution gas line 26, for example, in a pressure range between 5 bar and
6 bar.
[0057] Supply of dilution gas may be stopped if a methane gas concentration of the respective
region, which is measured by a respective methane gas sensor 32, returns to a value
that is lower than a preset safety concentration threshold value.
[0058] In some embodiments, in addition to mine ventilation along arrows V, dilution gas
from at least one of the plurality of dilution gas supply units 20 may be provided
before, to, and/or behind the cutting region relative to a moving direction of a cutting
region around reciprocating extraction machine. For example, high methane gas concentrations
generated during cutting may be reduced due to preliminary measures (dilution before
cutting region), direct measures (dilution of cutting region), and subsequent measures
(dilution behind cutting region). Note that, for providing dilution gas from dilution
gas supply units 20 before, to, and/or behind the cutting region, no measurements
of methane gas concentrations are necessary.
[0059] Alternatively or additionally, control unit 24 may react on measured methane gas
concentrations in that a cutting speed of extraction machine 10, a cutting depth of
extraction machine 10, and/or an advancing speed of shield supports 16, and/or a conveyor
speed of face conveyor 4. For example, cutting speed, cutting depth, conveyor speed,
and/or advancing speed may be reduced if a methane gas concentration value is greater
than a preset threshold value.
[0060] In some embodiments, control unit 24 may be configured to control a mine ventilation
(for example along arrows V in Fig. 1) within its useable range to increase or decrease
ventilation through roadways 12 and along longwall face 2 based on measured methane
gas concentrations.
[0061] As described above, control unit 24 may be further configured to control advancing
of shield supports 16, which may facilitate control over the ventilation cross section,
which may be defined by the longwall face 2, the roof, shield support 16 and floor.
The per se known sequenced advancing of the shield supports 16 may be decelerated
or stopped at or before regions where an increased methane gas concentration is measured,
which may keep the ventilation cross section at that region as large as possible to
vent off methane gas.
[0062] Alternatively or additionally, control unit 24 may be connected to face conveyor
4 to control operation thereof. Control of a speed of face conveyor 4 may have the
effect that a faster transportation of extracted material on face conveyor 4 may reduce
the amount of outflow of capillary-bound methane gas of already extracted material
transported on face conveyor 4 adjacent to longwall face 2. Instead, capillary-bound
methane gas of already extracted material may then outflow in a considerable amount
after pass-over to roadway conveyor 14.
[0063] Additionally, dilution gas supply units 20 may be assisted by a water based deduster
system (not shown). The water based deduster system may be connected to control unit
24, which may also control operation of the water based deduster system based on signals
received from methane gas sensors 32. For example, a plurality of water nozzles may
be provided at shield supports 16 along longwall face 2.
[0064] In some embodiments, dilution gas nozzle 30 may be integrated into a nozzle unit
(not shown) of a shield support, which also comprises a water spray nozzle of the
aforementioned water-based deduster system.
[0065] Based on a chronological sequence of measured methane gas concentrations in each
region by a respective methane gas sensor 32, control unit 24 may be further configured
to determine a temporal development of a methane gas concentration at each region.
Thereby, control unit 24 may derive a methane gas concentration trend for each region.
Control unit 24 may further determine at least one region for which the methane gas
concentration trend is greater than a preset threshold trend, and, in addition to
mine ventilation, control unit 24 may provide the dilution gas to those regions for
which the methane gas concentration trend is greater than the preset threshold trend.
[0066] As described above, in some embodiments, dilution gas nozzle 30 may be mounted to
or integrated into shield support 16 or face conveyor segment 5 in an adjustable manner
such that a direction in which a nozzle outlet of dilution gas nozzle 30 is directed
may be adjusted by control unit 24, for example, based on measured methane gas concentrations.
For example, nozzle outlet of dilution gas nozzle 30 may be directed to the region
where an increased methane gas concentration is measured. Providing dilution gas nozzles
30 in an adjustable manner may further facilitate decreasing overall quantity of dilution
gas nozzles 30 along longwall face 2. The reason is that an adjustable dilution gas
nozzle 30 may be capable to provide dilution gas to a greater region compared to a
dilution gas nozzle 30, which is not adjustable.
[0067] In some embodiments, control unit 24 determines a methane gas concentration profile
of longwall face 2 based on signals received from the methane gas sensors 32. Based
on the determined methane gas concentration profile, a plurality of different operation
scenarios of longwall mine 1 may be determined by control unit 24. Those operation
scenarios may relate to at least one of variation of cutting speed, cutting depth,
conveyor speed, dilution gas supply, ventilation, and advancing speed. For example,
in the case one methane gas sensor 32 may measure an increasing methane gas concentration,
a first operation scenario may include a reduced cutting speed, a second operation
scenario may include a reduced cutting depth, a third operation scenario may include
activation of at least one neighboring dilution gas supply unit 20, and a third operation
scenario may be a combination of the first, second and third operation scenario. Those
operation scenarios may be output from control unit 24 to display device 36. There,
the different operation scenarios may be presented to a user. The user may choose
one of the proposed operation scenarios via user input device 34. Based on the user
chosen operation scenario, control unit 24 then may control longwall mine 1.
[0068] A plurality of preset dilution gas supply programs may be stored in control unit
24. Examples of dilution gas supply programs may be a dilution gas curtain, sequential
spraying, and hot spot spraying. Dilution gas curtain may refer to a program, in which
at least two neighboring dilution gas units 20 may be caused to supply dilution gas.
Sequential spraying may refer to a program, in which at least two neighboring dilution
gas units are activated sequentially, and hot spot spraying may refer to a program,
in which at least one dilution gas unit is caused to supply dilution gas. For example,
based on measured methane gas concentrations measured by methane gas sensors 32, control
unit 24 may determine one of the plurality of preset dilution gas supply programs,
and may control dilution gas supply units 20 based on the determined dilution gas
supply program. Alternatively, control unit 24 may determine a dilution gas supply
program in accordance with a user input.
[0069] Contrary to a conventional mine ventilation, dilution gas supply units 20 are specifically
designed to allow providing dilution gas to methane gas concentration peak regions
for diluting methane gas. Moreover, dilution gas supply units 20 and mine ventilation
may work hand in hand by increasing the effects of each other. For example, diluted
methane gas diluted by dilution gas supply units 20 may be vented away from longwall
face 2 by mine ventilation (along arrows V in Fig. 1).
[0070] Methane gas concentration peaks may move (flow) along longwall face 2 in direction
of mine ventilation V (along arrow V in Fig. 1). Control unit 24 may monitor movement
of a methane gas concentration peak as signals received from methane gas sensors 32
may indicate the same. Control unit 24 may be configured to control dilution gas supply
by dilution gas nozzles 30 to "chase" moving gas concentration peaks and/or to carry
out pre-measures before a moving methane gas concentration peak reaches a specific
region. Pre-measures may be supply of dilution gas to that specific region before
the moving (flowing) methane gas concentration peak reaches said specific region.
[0071] Accordingly, methane gas concentration peaks are considerably reduced, which may
increase operational hours of longwall mine 1 as well as productivity and safety while
ensuring working conditions for man and machine as dilution gas is only supplied to
specific predetermined regions.
[0072] According to another aspect, a dilution gas supply unit 20 is configured for use
in a longwall mine 1 with a longwall face 2. Dilution gas supply unit 20 comprises
a dilution gas line 26, a dilution gas valve 28 installed in dilution gas line 26,
and a dilution gas nozzle 30 fluidly connected to dilution gas line 26, and configured
to be installed at a position facing longwall face 2.
[0073] In some embodiments, the dilution gas nozzle 30 of dilution gas supply unit 20 is
configured to provide dilution gas in an adjustable direction and/or amount.
[0074] Although the preferred embodiments of this invention have been described herein,
improvements and modifications may be incorporated without departing from the scope
of the following claims.
1. A longwall installation unit (5; 16) configured to form a longwall installation assembly
(4; 17) together with a plurality of longwall installation units (5; 16) of the same
kind to extend along the longwall face (2) in a longwall mine (1) having a compressor
device (27), the longwall installation unit (5; 16) comprising:
a dilution gas nozzle (30) installed in the longwall installation unit (5; 16) and
configured to be fluidly connected to the compressor device (27).
2. The longwall installation unit (5; 16) of claim 1, wherein the longwall installation
unit (5; 16) is configured as a shield support (16).
3. The longwall installation unit (5; 16) of claim 2, wherein the shield support (16)
further comprises:
a shield canopy (64), and wherein the dilution gas nozzle (30) is mounted at or integrated
into the shield canopy (64); and/or
a shield cap (46), and wherein the dilution gas nozzle (30) is mounted at or integrated
into the shield cap (46).
4. The longwall installation unit (5; 16) of claim 1, wherein the longwall installation
unit (5; 16) is configured as a face conveyor segment (5).
5. The longwall installation unit (5) of claim 4, wherein the face conveyor segment (5)
further comprises a spill plate (66) mounted at a goaf side of the face conveyor segment
(5), and wherein the dilution gas nozzle (30) is mounted at or integrated into the
spill plate (66).
6. The longwall installation unit (5; 16) of any one of the preceding claims, wherein
the dilution gas nozzle (30) is configured to provide dilution gas in an adjustable
direction and/or amount; and/or
wherein the longwall installation unit (5; 16) further comprises a dilution gas valve
(28) fluidly connected to the dilution gas nozzle (30) and configured to be connectable
to the compressor device (27).
7. A longwall installation assembly (4; 17) configured to be installed along a longwall
face (2) in a longwall mine (1), the longwall installation assembly (4; 17) comprising:
a plurality of longwall installation units (5; 16) configured to be arranged along
the longwall face (2), at least a sub-group of the plurality longwall installation
units (5; 16) configured according to any one of claim 1 to claim 6 to comprise a
respective dilution gas nozzle (30),
a compressor device (27) fluidly connected to a respective dilution gas nozzle (30)
to provide pressurized dilution gas; and
a control unit (24) configured to control the dilution gas flow from the compressor
device (27) to the respective dilution gas nozzle (30).
8. The longwall installation assembly (4; 17) of claim 7, wherein the control unit (24)
is further configured to control the dilution gas valves (28) of the plurality longwall
installation units (5; 16).
9. The longwall installation assembly (4; 17) of claim 7 or claim 8, further comprising:
a plurality of methane gas sensors (32) installed at spatially separated positions
along the longwall face (2), each methane gas sensor (32) being connected to the control
unit (24), and
wherein the control unit (24) is further configured to control the dilution gas valve
(28) and/or the compressor device (27) based on signals received from the methane
gas sensors (32).
10. The longwall installation assembly (4; 17) of claim 9, wherein the control unit (24)
is further configured to control, based on signals received from the methane gas sensors
(32), at least one of a cutting speed of an extraction machine (10), a cutting depth
of the extraction machine (10), an advancing of a plurality of shield supports (16),
and/or a conveyor speed of a face conveyor (4).
11. The longwall installation assembly (4; 17) of any one of claim 8 to claim 10,
wherein, within the plurality of longwall installation units (5; 16), every longwall
installation unit (5; 16) within a range from every second to every fifteenth is configured
according to any one of claim 1 to claim 6 to comprise a respective dilution gas nozzle
(30), and/or
the plurality of methane gas sensors (32) is arranged along the longwall face (2)
such that neighboring methane gas sensors (32) are spaced from one another within
a range from 10 m to 30 m.
12. A method for ensuring working conditions along a longwall face (2) in a longwall mine
(1), the method comprising:
providing a mine ventilation; and,
in addition to providing the mine ventilation, providing a dilution gas to the longwall
face (2) from at least one of a plurality of dilution gas supply units (20) arranged
at spatially separated positions along the longwall face (2).
13. The method of claim 12, further comprising:
measuring a methane gas concentration at a plurality of spatially separated regions
along the longwall face (2), thereby determining a methane gas concentration value
for each region; and
determining at least one region for which the methane gas concentration value is greater
than a preset threshold value, and,
wherein the dilution gas is provided from at least one of the plurality of dilution
gas supply units (20) to a region for which the methane gas concentration value is
greater than the preset threshold value.
14. The method of claim 12 or claim 13, further comprising:
cutting material in a cutting region reciprocating along the longwall face (2), and
wherein the dilution gas is provided before, to, and/or behind the cutting region
relative to a moving direction of the cutting region.
15. The method of any one of claim 12 to claim 14, further comprising:
spraying a liquid to the region for which the methane gas concentration value is greater
than the preset threshold value; and/or
reducing at least one of a cutting speed, a cutting depth, a conveyor speed, and/or
an advancing speed if a methane gas concentration value is greater than a preset threshold
value.