TECHNICAL FIELD
[0001] The present invention relates to a method of manufacturing a seamless steel pipe
which is capable of manufacturing seamless steel pipes of a wide range of sizes with
high dimensional accuracy. Specifically, the present invention relates to a method
of manufacturing a seamless steel pipe which includes preparing a primary hollow shell
by a mandrel forging pipe-making process, and applying a push bench pipe-making process
to the prepared primary hollow shell.
[0002] Unless otherwise specified, the definitions of certain terms as used in this specification
are as follows.
[0003] "Hollow billet": a billet to be subjected to Step 1 as described in this specification
(mandrel forging pipe-making step). This is a billet prepared by hot piercing an ingot
and forming it into a hollow shape;
[0004] "Primary hollow shell": a shell to be subjected to Step 2 as described in this specification
(diameter reduction step). This is a shell that is formed from a hollow billet in
Step 1;
[0005] "Hollow shell": a shell to be subjected to a push bench thickness reduction process
as described in this specification. This is a shell that was subjected to sizing of
the inner and outer surfaces in a push bench sizing process;
[0006] "Large diameter": a pipe outside diameter of 1000 mm or greater; and
[0007] "Dimensional accuracy": absolute values of size deviations in outside diameter and
wall thickness of a finished pipe from desired sizes.
BACKGROUND ART
[0008] For application in large diameter pipes such as, for example, large diameter reheat
steam pipes for use in a thermal power plant, spiral steel pipes are typically employed.
In recent years, large diameter pipes have been required to meet the increasing demand
for higher performance such as the increase in the vapor pressure setting for large
diameter reheat steam pipes for use in a thermal power plant. Accordingly, there is
an increasing need for large diameter seamless steel pipes of high quality.
[0009] In the past, there were examples in which a mandrel forging pipe-making process was
employed as a method for hot forming of large diameter seamless steel pipes.
[0010] A mandrel forging pipe-making process is a process that includes: providing a hollow
billet with a mandrel inserted therein; and hot working the hollow billet by open-die
forging to gradually reduce the wall thickness thereof, as disclosed in Patent Literature
1.
[0011] One advantage of a mandrel forging pipe-making process lies in the wide range of
pipe sizes that can be achieved by performing repeated forging and reheating. That
is, manufacture of thick-walled, large diameter seamless steel pipes is possible.
[0012] On the other hand, a disadvantage of a mandrel forging pipe-making process is poor
dimensional accuracy which results from the forming by forging. Because of this, in
the finish machining process after the hot pipe making process, the amount of removal
by machining on the steel pipe surface is large, and therefore the yield is low.
CITATION LIST
PATENT LITERATURE
[0013]
PATENT LITERATURE 1: Japanese Patent Publication No. H07-22802
PATENT LITERATURE 2: Japanese Patent Application Publication No. S56-128611
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0014] An object of the present invention is to provide a method of manufacturing a seamless
steel pipe which is capable of achieving high dimensional accuracy, particularly high
wall thickness accuracy, as well as a wide range of manufacturable sizes (large diameter
or thick-walled pipes).
SOLUTION TO PROBLEM
[0015] The present inventor turned his attention to push bench pipe-making processes, which
are capable of manufacturing seamless steel pipes with high wall thickness accuracy.
As disclosed in Patent Literature 2, a push bench pipe-making process is a process
that includes: providing a hollow steel workpiece with a mandrel inserted therein,
the hollow steel workpiece having a closed end; and push-drawing the workpiece through
a die assembly to reduce the wall thickness thereof. One advantage of push bench pipe-making
processes is the high dimensional accuracy which is achieved by the use of inside
and outside sizing tools such as a mandrel and a die assembly. Because of this, in
the finish machining process, the amount of removal by machining on the pipe surface
is small, and therefore the yield is high.
[0016] Taking advantage of both the mandrel forging pipe-making process and the push bench
pipe-making process may enable manufacture of seamless steel pipes of a wide range
of sizes with high dimensional accuracy. However, in push bench pipe-making processes,
it is necessary to use hollow steel workpieces that have a closed end. That is, seamless
steel pipes prepared by a mandrel forging pipe-making process cannot be used in a
push bench pipe-making process in the as-prepared state as a workpiece to be processed.
This is because since they do not have a closed end, they cannot be pushed by a mandrel
to pass through a die assembly.
[0017] In view of the above, the present inventor contemplated methods that will allow seamless
steel pipes prepared by a mandrel forging pipe-making process to be subjected to a
push bench pipe-making process. After an undue amount of trial and error, the present
inventor has found that the two pipe-making methods can be utilized in combination
by: subjecting a seamless steel pipe prepared by a mandrel forging pipe-making process
to diameter reduction at one end portion thereof so that the outside and inside diameters
of the end portion are reduced and the diameter reduced end portion can serve as a
substitute for a closed end.
[0018] The present invention has been accomplished based on the results of the contemplation
and is summarized as a method of manufacturing a seamless steel pipe which includes
the steps of:
- (1) providing a hollow billet with a mandrel inserted therein and forging the hollow
billet into a primary hollow shell of a predetermined diameter and thickness;
- (2) subjecting the primary hollow shell to diameter reduction at one end portion thereof
to reduce outside and inside diameters of the end portion; and
- (3) providing the primary hollow shell with a mandrel inserted therein, the primary
hollow shell having the diameter reduced portion at the one end portion thereof, and
subjecting the primary hollow shell to push-drawing using a push bench.
ADVANTAGEOUS EFFECTS OF INVENTION
[0019] The method of manufacturing a seamless steel pipe of the present invention is advantageous
in that: it is capable of manufacturing seamless steel pipes of a wide range of sizes
(large diameter or thick-walled pipes) with high dimensional accuracy, particularly
with high wall thickness accuracy due to the push bench pipe-making process that is
applied after the application of the mandrel forging pipe-making process.
BRIEF DESCRIPTION OF DRAWINGS
[0020]
[FIG. 1] FIG. 1 is a longitudinal sectional view of a primary hollow shell after being
subjected to diameter reduction at one end portion thereof.
[FIG. 2] FIG. 2 is a side view of a front end portion of a mandrel to be used in the
push bench pipe-making step.
[FIG. 3] FIG. 3 is a diagram showing a configuration including a primary hollow shell,
a mandrel, and a die assembly in the push bench pipe-making step.
[FIG. 4] FIG. 4 is a diagram illustrating a comparison of the manufacturable sizes
of seamless steel pipes between a conventional push bench pipe-making process and
the manufacturing method of the present invention.
DESCRIPTION OF EMBODIMENTS
[0021] The manufacturing method includes: Step 1 (mandrel forging pipe-making step); Step
2 (diameter reduction step); and Step 3 (push bench pipe-making step). Each of the
steps is described below.
[Step 1 (mandrel forging pipe-making step)]
[0022] In Step 1, primary hollow shells are formed by the following procedure:
- (1) Pressing a tool having a sharpened end against a top surface of an ingot disposed
with the longitudinal direction thereof oriented vertically while the tool is being
rotated, and piercing the ingot into a hollow billet by hot working;
- (2) Arranging the hollow billet with the longitudinal direction thereof oriented horizontally
and pressing a mandrel against the inner surface of the hollow billet to reduce the
wall thickness thereof by hot working while the hollow billet is being rotated.
- (3) Repeating the above step (2) one or several times to form a primary hollow shell
having a predetermined outside diameter and wall thickness.
[0023] In the mandrel forging pipe-making step, hot forging of the hollow billet is preferably
performed within a temperature range of 900°C to 1250°C.
[Step 2 (diameter reduction step)]
[0024] FIG. 1 is a longitudinal sectional view of a primary hollow shell after being subjected
to diameter reduction. In Step 2, diameter reduction is performed on one end portion
of the primary hollow shell 1 formed in Step 1, while it is being rotated, to reduce
the inside and outside diameters thereof.
[0025] The diameter reduced portion is composed of a front end portion 1a located at the
front edge of the primary hollow shell 1 and a narrowing diameter portion 1b. The
narrowing diameter portion 1b is located between the front end portion 1a and the
body portion on which diameter reduction is not performed. The front end portion 1a
has a constant outside diameter and wall thickness. The narrowing diameter portion
1b has inside and outside diameters that are reduced toward the front edge.
[0026] If the portion subjected to the diameter reduction step is deformed in Step 3, the
diameter reduction step may be performed again as needed. As the method for diameter
reduction, not only stamping but also a method of hitting one end portion of the primary
hollow shell 1 with a hammer as well as a method of rotary forging with a swager or
the like may be employed.
[Shape of the Portion Subjected to Diameter Reduction]
[0027] FIG. 2 is a side view of a front edge portion of a mandrel to be used in the push
bench pipe-making step. The mandrel 2 includes: a body portion 2a having a cylindrical
shape and a narrowing diameter portion 2b having a truncated cone shape disposed at
the front edge of the body portion 2a. The narrowing diameter portion 2b has a diameter
that is reduced toward the front edge of the mandrel 2. Typically, the narrowing diameter
portion 2b is formed in a tapered shape.
[0028] It is preferred that the diameter reduced portion of the primary hollow shell 1 as
processed in Step 2 satisfy the following formula (1) where B (mm) represents an inside
diameter at the edge of the diameter reduced portion of the primary hollow shell and
D (mm) represents a diameter at the front edge of the mandrel that is used in the
push bench pipe-making step. The aim of this is to reduce the possibility that the
mandrel 2 breaks through the front end portion 1a and the narrowing diameter portion
1b of the primary hollow shell 1 during the push-drawing process in Step 3 (push bench
pipe-making step). Cases that satisfy the formula (1) include a case in which the
diameter reduced portion forms a closed end.

[Step 3 (push bench pipe-making step)]
[0029] FIG. 3 is a diagram showing a configuration of a primary hollow shell, a mandrel,
and a die assembly in the push bench pipe-making step. The die assembly 3 may be provided
as a set of a plurality of dies or a single die. In the die assembly 3, a tapered
die is typically employed with a die semi-angle α of 10 to 20° and a die width W of
150 to 200 mm.
[0030] In Step 3, the primary hollow shell 1 having the diameter reduced portion at one
end portion thereof is provided with a mandrel 2 inserted therein and subjected to
push-drawing using a push bench. Step 3 is preferably divided into two steps, a sizing
step and a wall thickness reduction step (hereinafter also referred to as "push bench
sizing step" and "push bench wall thickness reduction step," respectively).
[Sizing Step]
[0031] In the sizing step, the primary hollow shell 1 having the diameter reduced portion
at one end portion thereof is provided with a mandrel 2 inserted therein and is pushed
through the die assembly 3 by hot working to size the inner and outer surfaces. The
primary hollow shell 1 is subjected to push-drawing through a tapered die as described
above with soft reduction to size the inner and outer surfaces, thereby providing
a hollow shell 1 to be processed in the wall thickness reduction step.
[0032] The sizing step is intended to reduce longitudinal variations in the outside diameter
and the wall thickness of the primary hollow shell 1 using the die assembly 3. If,
for example, there are large irregularities on the outer surface of the primary hollow
shell 1, the irregularities may interfere with the tapered die when the primary hollow
shell 1 is pushed through the tapered die, thereby making the push-drawing operation
difficult or impossible.
[0033] The reduction rate in the sizing step is preferably about 3 to 7%.
[0034] In the sizing step, the portion of the primary hollow shell 1 to be subjected to
push-drawing (the portion that was not subjected to diameter reduction) is preferably
heated to a temperature ranging from 900°C to 1250°C. The aim of this is to reduce
the deformation resistance and facilitate the processing.
[0035] Since the diameter reduced portion is a portion against which the mandrel 2 is pressed,
it is preferably cooled by water injection to minimize deformation that may occur
during the push-drawing process. In order to make sure that the push-drawing of the
primary hollow shell 1 by the mandrel 2 is performed without failure, it is preferred
that the diameter reduced portion be kept to a temperature of 500 °C or less. Its
lower limit temperature is preferably 400°C. This is because, when cooled to a low
temperature, certain types of steel such as, for example, a 9% Cr steel may suffer
thermal stress cracking during the martensitic transformation.
[Wall Thickness Reduction Step]
[0036] The hollow shell 1, obtained by the push-drawing process with soft reduction in the
sizing step, is processed in the wall thickness reduction step. The wall thickness
reduction step also uses a mandrel 2 and a die assembly 3 that have the same configuration
as shown in FIG. 2. In selecting the die assembly 3 to be used, it is required that
it have the ability to impart a predetermined reduction to the hollow shell 1.
[0037] The wall thickness reduction step includes the following operations:
- (1) The hollow shell which has undergone sizing of inner and outer surfaces in the
sizing step is pushed through the die assembly 3 having a smaller inside diameter
by hot working, whereby it is given a predetermined reduction while the wall thickness
thereof is reduced.
- (2) By repeating the above step (1) one or several times, it is possible to manufacture
seamless steel pipes with high wall thickness accuracy. Specifically, it is possible
to limit the deviation from the desired wall thickness to 10 mm or less regardless
of the thickness of the wall that has been subjected to the push-drawing process.
[0038] In the wall thickness reduction step too, the body portion to be subjected to push-drawing
is preferably heated to a temperature of 900°C to 1250°C to reduce the deformation
resistance and facilitate the processing. On the other hand, the temperature of the
diameter reduced portion is preferably controlled to 500°C or less by performing water
injection or the like in order to make sure that the push-drawing of the hollow shell
1 by the mandrel 2 is performed without failure. Its lower limit temperature is preferably
400°C.
[0039] After Steps 1 to 3 as described above, a finishing process may be incorporated. The
finishing step may include the following operations:
- (1) Cutting the diameter reduced portion of the seamless steel pipe manufactured in
Step 3;
- (2) Heat treating the seamless steel pipe as needed after the diameter reduced portion
was cut; and
- (3) Subjecting the resultant seamless steel pipe to a finishing process by machining
or polishing the inner and outer surfaces of the steel pipe to finish it to predetermined
surface properties and size.
[Suitable Steel Type]
[0040] Examples of steel types suitable for the above described manufacturing method include
the following three types of steel:
- (1) Carbon steel having a chemical composition of, by mass %, C: 0.3% or less, Si:
1% or less, Mn: 0.1 to 2%, and N: 0.02% or less, with the balance being Fe and impurities;
- (2) Low alloy steel having a chemical composition of, by mass %, C: 0.15% or less,
Si: 1% or less, Mn: 0.1 to 2%, Cr: 0.5 to 3.0%, Ni: 0.5% or less, Mo: 0.1 to 3.0%,
W: 0 to 2%, Cu: 0.1% or less, and N: 0.002 to 0.030%, with the balance being Fe and
impurities; and
- (3) High Cr ferritic heat resistant steel having a chemical composition of, by mass
%, C: 0.15% or less, Si: 1% or less, Mn: 0.1 to 2%, Cr: 8.0 to 12.5%, Ni: 1.0% or
less, Mo: 0.1 to 3.0%, W: 0 to 4%, Cu: 0 to 1.5%, and N: 0.01 to 0.10%, with the balance
being Fe and impurities.
EXAMPLES
[0041] Set forth below are examples illustrating how it is possible to manufacture seamless
steel pipes with high wall thickness accuracy and to extend the manufacturable size
of seamless steel pipes.
(Example 1)
[0042] Example 1 illustrates a case in which the extension of the manufacturable size of
the outside diameter was achieved.
1. Pipe Making Schedule in Each Step
(Mandrel Forging Pipe-Making Step)
[0043] A hollow billet (weight: 13850 kg) produced from high Cr ferritic heat resistant
steel as described above was provided with a mandrel inserted therein, and formed
into a primary hollow shell of 1250 mm in outside diameter, 1090 mm in inside diameter,
80 mm in wall thickness, and 6000 mm in length by the mandrel forging pipe-making
process.
(Diameter Reduction Step)
[0044] The resultant primary hollow shell was subjected to diameter reduction at one end
portion thereof where the inside and outside diameters were reduced. The resulting
inside diameter B at the edge of the diameter reduced portion of the primary hollow
shell was 200 mm.
(Push Bench Sizing Step)
[0045] The primary hollow shell having the diameter reduced portion at one end portion thereof
was provided with a mandrel having an outside diameter of 1060 mm inserted therein.
Then it was subjected to soft reduction in a push bench using a die having an inside
diameter of 1240 mm, and was formed into a hollow shell with the inner and outer surfaces
thereof sized. The diameter D at the front edge of the mandrel was 950 mm and therefore
the formula (1) as previously noted was satisfied.
(Push Bench Wall Thickness Reduction Step)
[0046] The resultant hollow shell was subjected to push-drawing in the push bench using
a mandrel having an outside diameter of 1060 mm and dies having inside diameters of
1210 mm and 1190 mm, and was formed into a seamless steel pipe.
(Finishing Step)
[0047] The size of the manufactured seamless steel pipe was 1190 mm in outside diameter,
1060 mm in inside diameter, 65 mm in wall thickness, and 7600 mm in length. A 300
mm length of the seamless steel pipe was cut at the diameter reduced end portion,
followed by heat treatment and subsequent machining of the inner and outer surfaces.
2. Comparison of Wall Thickness Accuracy
[0048] The seamless steel pipe manufactured in Example 1 had a size of 1190 mm in outside
diameter, 1060 mm in inside diameter, and 65 mm in wall thickness and thus was a large
diameter pipe. Nevertheless, it achieved a wall thickness accuracy of less than 10
mm. Subsequently, it was subjected to machining of the inner and outer surfaces, and
finished into a size of 1170 mm in outside diameter, 1080 mm in inside diameter, and
45 mm in wall thickness.
[0049] That is, in Example 1, the amount of machining necessary for the finishing process
was not more than 10 mm for both inner and outer surfaces.
[0050] For comparison with Example 1, a primary hollow shell, as manufactured from the mandrel
forging pipe-making process, having an outside diameter of 1250 mm, an inside diameter
of 1090 mm, and a wall thickness of 80 mm, exhibited a wall thickness accuracy of
more than 20 mm.
[0051] Based on the above, in Example 1, the amount of machining required is 10 mm at a
maximum for both inner and outer surfaces, whereas in Comparative Example, it is assumed
that the amount of finish machining required exceeds 25 mm for both inner and outer
surfaces. It is therefore seen that Example 1 produces an advantageous effect.
(Example 2)
[0052] Example 2 illustrates a case in which the extension of the manufacturable size of
the wall thickness was achieved.
1. Pipe Making Schedule in Each Step
(Mandrel Forging Pipe-Making Step)
[0053] A hollow billet (weight: 25600 kg) produced from high Cr ferritic heat resistant
steel as described above was provided with a mandrel inserted therein, and formed
into a primary hollow shell of 1050 mm in outside diameter, 640 mm in inside diameter,
205 mm in wall thickness, and 6000 mm in length by the mandrel forging pipe-making
process.
(Diameter Reduction Step)
[0054] The resultant primary hollow shell was subjected to diameter reduction at one end
portion thereof where the inside and outside diameters were reduced. The resulting
inside diameter B at the edge of the diameter reduced portion of the primary hollow
shell was 100 mm.
(Push Bench Sizing Step)
[0055] The primary hollow shell having the diameter reduced portion at one end portion thereof
was provided with a mandrel having an outside diameter of 610 mm inserted therein.
Then it was subjected to soft reduction in a push bench using a die having an inside
diameter of 1040 mm, and was formed into a hollow shell with the inner and outer surfaces
thereof sized. The diameter D at the front edge of the mandrel was 500 mm and therefore
the formula (1) as previously noted was satisfied.
(Push Bench Wall Thickness Reduction Step)
[0056] The resultant hollow shell was subjected to push-drawing in the push bench using
a mandrel having an outside diameter of 610 mm and dies having inside diameters of
1010 mm and 990 mm, and was formed into a seamless steel pipe.
(Finishing Step)
[0057] The size of the manufactured seamless steel pipe was 990 mm in outside diameter,
610 mm in inside diameter, 190 mm in wall thickness, and 6800 mm in length. A 300
mm length of the seamless steel pipe was cut at the diameter reduced end portion,
followed by heat treatment and subsequent machining of the inner and outer surfaces.
2. Comparison of Wall Thickness Accuracy
[0058] The seamless steel pipe manufactured in Example 2 had a size of 990 mm in outside
diameter, 610 mm in inside diameter, and 190 mm in wall thickness and thus was a thick
walled pipe. Nevertheless, it achieved a wall thickness accuracy of less than 10 mm.
Subsequently, it was subjected to machining of the inner and outer surfaces, and finished
into a size of 970 mm in outside diameter, 630 mm in inside diameter, and 170 mm in
wall thickness.
[0059] That is, in Example 2 too, the amount of machining necessary for the finishing process
was not more than 10 mm for both inner and outer surfaces.
[0060] For comparison with Example 2, a primary hollow shell, as manufactured from the mandrel
forging pipe-making process, having an outside diameter of 1050 mm, an inside diameter
of 640 mm, and a wall thickness of 205 mm, was examined to find the wall thickness
accuracy thereof. As with Example 1, it was found that its wall thickness accuracy
was more than 20 mm.
[0061] Based on the above, in Example 2, the amount of machining required is 10 mm at a
maximum for both inner and outer surfaces, whereas in Comparative Example, it is assumed
that the amount of finish machining required exceeds 25 mm for both inner and outer
surfaces. It is therefore seen that Example 2 produces an advantageous effect.
[0062] FIG. 4 is a diagram illustrating a comparison of the manufacturable size of seamless
steel pipes between a conventional push bench pipe-making process and Example 1 or
Example 2. The manufacturable size is defined herein as a size that meets the requirement
of the wall thickness accuracy of 10 mm or less.
[0063] As can be seen from FIG. 4, when the push bench pipe-making process was employed
alone (comparative example), the largest size that was achieved in manufacturing the
seamless steel pipe while meeting the wall thickness accuracy of 10 mm or less was
as follows: the largest outside diameter of 850 mm or the largest wall thickness of
150 mm. In contrast, in Example 1 or 2, the manufacturable size of seamless steel
pipes was extended to the largest outside diameter of 1200 mm or the largest wall
thickness of 170 mm.
INDUSTRIAL APPLICABILITY
[0064] With the method of manufacturing a seamless steel pipe according to the present invention,
it is possible to manufacture seamless steel pipes of a wide range of sizes (large
diameter or thick-walled pipes) with high dimensional accuracy, particularly with
high wall thickness accuracy.
REFERENCE SIGNS LIST
[0065]
1: primary hollow shell, hollow shell, 1a: front end portion,
1b: narrowing diameter portion, 2: mandrel, 2a: body portion,
2b: narrowing diameter portion, 3: die assembly