TECHNICAL FIELD
[0001] Embodiment of the present invention relates to a novel process for hydraulic mining
and fluid carrying of deep-seam coal, mainly aiming at mining of coal seams buried
in the ground under 500 meters to thousands of meters of depth.
BACKGROUND
[0002] It is in developing that by processes such as well drilling, tubular columns and
the like, coal deeply buried in the ground is washed and cut, and the cut coal is
brought out of the ground through the circulation of fluid. The tubular columns are
utilized to transmit hydraulic power to the coal seams for tunneling and then transmit
coal to the ground through fluid, realizing downhole unmanned tunneling.
SUMMARY
[0003] The novel process is a coal development technology for realizing the integration
of synchronous mining of gas and solid of coal fields, is especially suitable for
the coal seams which can not be mined with a conventional method or are uneconomically
mined, and is suitable for establishment of gasification tunnels of underground gasification
of coal.
[0004] To overcome the deficiencies of the prior art, embodiment of the present invention
provides a novel process for hydraulic mining and fluid carrying of deep-seam coal,
particularly a method for hydraulic mining and fluid carrying of coal seams buried
in the ground with a depth under one thousand meters. The process includes:
- 1. an overall development scheme in resource area is drawn up according to the amount
of resources from coal resource exploration and the actual situation of the geological
formation;
- 2. the simultaneous development of a same layer of a single well or multiple wells
is implemented according to the overall scheme;
- 3. the development of several sets of coal seams is required to follow a principle
of development from a deeper seam coal seam to a less deeper coal seam;
- 4. the pressure coefficient of coal seams needs to be greater than 0.9 to ensure the
economical implementation of the development scheme;
- 5. a well drilling process is utilized to establish a production well, that is, after
drilling to the top of the deepest coal seam by utilizing the well drilling process,
a casing is put down for well cementation, and then a cement plug is drilled to open
the coal seams;
- 6. a directional drilling process is utilized, a specific hydraulic cutting drill
and specific double-layer tubular columns are used, fluid with a certain performance
is prepared, and production is performed by a ground mud pump;
- 1) a directional drilling process is utilized, and a downhole television set, a position
finder and a direction instrument are used to ensure the quality of tunneling;
- 2) for a specific hydraulic cutting drill, hydraulic cutting drills of different parameters
are customized according to thicknesses and dip angles of the coal seams, and the
parameters mainly include rotation speed, the diameter of nozzles, and the jet angle
of nozzles;
- 3) for specific double-layer tubular columns, tubular columns of different diameters
are utilized according to capacity;
- 4) the performance of the fluid is configured according to the pressure coefficient
and density of coal seams, and the main performance indexes include density, viscosity
and cutting force; the fluid (also called coal alkali liquor) is mainly prepared from
water, bentonite, caustic soda (sodium hydroxide), coal powder and gangue powder;
- 5) the main parameters of a mud pump include pressure (generally high pressure, which
is greater than 10MPa) and displacement;
- 7. mixture of coal briquettes and coal gas (CH4) is brought out of the ground through
fluid with a certain flow velocity and then enters a processing system on the ground;
- 1) the mixture of mud, coal and gas enters a three-phase separation system first so
that the mud, coal and gas are separated simultaneously;
- 2) the coal gas (CH4) enters a gas processing station, is then compressed and transmitted
to users;
- 3) the coal briquettes enter a coal washing workshop and are then processed into cleaned
coal, which is transferred to a cleaned coal warehouse for sale; ash and gangue from
the coal washing workshop enter a gangue grinding plant and are then processed into
materials below 200 meshes for preparing mud; and waste water from the coal washing
workshop is transferred to a mud preparation plant and used for preparing mud; and
- 4) the mud flows into a sedimentation tank from the three-phase separator for settling
powdered coal and fine sand particles; and the sediment is transferred to the coal
washing workshop for processing, and the mud is recycled to a circulation pool for
recycling.
[0005] According to the development scheme, a multi-well and multilayer well pattern is
implemented so as to perform the underground hydraulic mining of coal.
[0006] For a mining area having multiple coal seams, it is preferred to mine bottom coal
seams and then upper coal seams successively.
[0007] Embodiments of the present invention has the following advantages:
- 1. the synchronous mining of gas and solid of a coal field is realized, and the utilization
ratio of resources is high; the recovery ratio of coal may be 80% and above; the gas
is completely recycled;
- 2. downhole unmanned and hydraulic operations are realized, so as to avoid production
accidents such as gas explosion, collapse and the like during conventional coal mining;
- 3. this novel process is more advantageous in terms of environmental protection than
the conventional coal mining, is free of damages to the ambient environment, and has
small occupation of production land, no sewage discharge, no waste, gangue and dust;
and, the coal gas is fully recycled;
- 4. stock resources in various places may be fully utilized, thereby avoiding the long-distance
transportation of coal and reducing the energy consumption;
- 5. less investment in construction, short cycle and high production efficiency are
realized; and
- 6. vigorous exploration and development of deep resources, mainly coking coal, may
significantly make up the resource shortage and has good benefit.
BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Fig. 1 is a cross-sectional view of flow of a process according to an embodiment
of the present invention.
[0009] Reference numerals and corresponding explanation Fig. 1 are listed as below:
| 1 |
Electricity transformer and distributor |
7 |
Natural gas processing station |
13 |
Specific hydraulic mining drill |
| 2 |
Power distribution cabinet |
8 |
Separated liquid phase |
14 |
Inner tubular column |
| 3 |
Fluid circulating pump |
9 |
Separated coal |
15 |
Outer tubular column |
| 4 |
Well winch |
10 |
Sedimentation tank |
16 |
Casing |
| 5 |
Derrick |
11 |
Sediment processing device |
17 |
Coal seams |
| 6 |
Three-phase separator |
12 |
Fluid |
|
|
[0010] Fig. 2 is a planar graph of flow of the process according to an embodiment of the
present invention.
[0011] Reference numerals and corresponding explanation in Fig. 2 are listed as below:
| 1 |
Electricity transformer and distributor |
6 |
Natural gas processing station |
11 |
Separated coal |
| 2 |
Pump |
7 |
Users |
12 |
Coal washing workshop |
| 3 |
Mud circulating pool |
8 |
Sedimentation tank |
13 |
Cleaned coal warehouse |
| 4 |
Wellhead |
9 |
Sediment processing device |
|
|
| 5 |
Three-phase separator |
10 |
Separated liquid phase |
|
|
DETAILED DESCRIPTION
[0012] The specific embodiments of the present invention will be further described hereinafter
with reference to the accompanying drawings.
[0013] Referring to Fig. 1, according to the well drilling process of an embodiment of the
present invention, a system which includes an electricity transformer and distributor
(1), a power distribution cabinet (2), a mud circulating pump (3), a well winch (4)
and a derrick (5) is utilized to perform drilling to the top of the deepest coal seam,
a casing (16) is put down for well cementation, and then a cement plug is drilled
to open the coal seams (17). The pressure coefficient of coal seams is required to
be greater than 0.9 to ensure the economical implementation of the development scheme.
[0014] Referring to Fig. 1, a directional drilling process according to an embodiment of
the present invention is utilized, the prepared fluid (12) with certain performance
transmits hydraulic power to the coal seams for tunneling by a ground mud pump (3)
via a specific double-layer tubular column (i.e., an inner tubular column (14) and
an outer tubular column (15)), and the coal deeply buried in the ground is washed
and cut by using a specific hydraulic cutting drill (13). The coal mixture is brought
out of the ground through fluid with a certain flow velocity and then enters a ground
processing system.
[0015] Referring to Fig. 1, the parameters of the mud pump (3) in an embodiment of the present
invention mainly include pressure and displacement. The pressure is required to be
a high pressure, generally greater than 10 MPa.
[0016] Referring to Fig. 1, for the specific double-layer tubular columns in an embodiment
of the present invention, i.e., the inner tubular column (14) and an outer tubular
column (15), the tubular columns (14, 15) of different diameters are utilized according
to production capacity. The performance of the fluid (12) in an embodiment of the
present invention is configured according to the pressure coefficient and density
of coal seams, and the main performance indexes include density, viscosity and cutting
force.
[0017] Referring to Fig. 1,for a specific hydraulic cutting drill (13) in an embodiment
of the present invention, hydraulic cutting drills (13) of different parameters are
customized according to thicknesses and dip angles of the coal seams (17), and the
main parameters include rotation speed, the diameter of nozzles, and the jet angle
of nozzles.
[0018] Referring to Fig. 1, the fluid (12) (also called coal alkali liquor) in an embodiment
of the present invention is mainly prepared from water, bentonite, caustic soda (sodium
hydroxide), coal powder and gangue powder.
[0019] Referring to Fig. 2, a planar graph of flow of the process is shown, including an
electricity transformer and distributor (1), a pump (2), a mud circulating pool (3)
and a wellhead (4). The coal mixture in an embodiment of the present invention enters
a three-phase separation system (5) first so that the mud (10), coal (11) and gas
(7) of three phases are separated, respectively.
[0020] Referring to Fig. 2, the coal gas (CH4) in an embodiment of the present invention
enters a gas processing station (6), is then compressed and transmitted to users.
[0021] Referring to Fig. 2, coal briquettes (11) in an embodiment of the present invention
enter a coal washing workshop (12) and are then processed into cleaned coal, and the
cleaned coal is transferred a cleaned coal warehouse (13) for marketing.
[0022] Referring to Fig. 2, the mud (10) in an embodiment of the present invention flows
into a sedimentation tank (8) after separation, powdered coal and fine sand particles
are settled by a sediment processing device (9), the sediment is transferred to the
coal washing workshop (12) for processing, and the mud is recycled to a circulation
pool (3) for recycling.
1. A novel process for hydraulic mining and fluid carrying of deep-seam coal, wherein:
(1) the novel process is a coal development technology for realizing the integration
of synchronous mining of gas and solid of coal fields and is especially suitable for
the coal seams which can not be mined with a conventional method or are uneconomically
mined;
(2) meanwhile, the novel process is suitable for the establishment of gasification
tunnels of underground gasification of coal;
(3) by a directional drilling process, a hydraulic cutting drill and double-layer
tubular columns are utilized, fluid with a certain performance is prepared and used
as a carrier, and mixture of underground deep-seam coal is brought out of the ground
through the fluid with a flow velocity;
(4) mud, coal and gas in the mixture are simultaneously separated by a three-phase
separator system; and
(5) coal gas (CH4) is fed into a gas processing station, is then compressed and transmitted
to users; coal briquettes enter a coal washing workshop and are processed into cleaned
coal, which is then transferred to a cleaned coal warehouse for subsequent sale; and
the mud is recycled to a circulation pool for recycling.
2. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 1, wherein an overall development scheme is drawn up according to the amount
of resources from coal resource exploration and the actual situation of the geological
formation, and the simultaneous development of a same layer of a single well or multiple
wells is implemented according to the overall scheme.
3. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 1, wherein the novel process is also applicable to the establishment of gasification
tunnels of underground gasification of coal.
4. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 1 or 2, wherein, the development of several sets of coal seams is required
to follow a principle of development from a deep-seam coal seam to a shallow coal
seam, and the pressure coefficient of coal seams is greater than 0.9, to ensure the
economical implementation of the development scheme.
5. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 1, wherein the well drilling process is utilized to establish a production
well; after drilling to the top of the deepest coal seam by the well drilling process,
a casing is put down for well cementation, and then a cement plug is drilled to open
the coal seams.
6. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 3 or 4, wherein the directional drilling process is utilized, a specific
hydraulic cutting drill and specific double-layer tubular columns are utilized, fluid
with a certain performance is prepared, and finally production is performed by a ground
surface mud pump.
7. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 5, wherein the directional drilling process is utilized, and a downhole television
set, a position finder and a direction instrument are used to ensure the quality of
tunneling.
8. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 6, wherein, hydraulic cutting drills of different parameters are customized
according to thicknesses and dip angles of the coal seams, and the parameters include
rotation speed, the diameter of nozzles, and the jet angle of nozzles. The novel process
for hydraulic mining and fluid carrying of deep-seam coal according to claim 6, wherein,
the double-layer tubular columns of different diameters are utilized according to
production capacity, the performance of the fluid is configured according to the pressure
coefficient and density of coal seams, and indexes of the performance include density,
viscosity and cutting force; the fluid (also called coal alkali liquor) is prepared
from water, bentonite, caustic soda (sodium hydroxide), coal powder and gangue powder;
and parameters of the mud pump include pressure (generally high pressure) and displacement.
9. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 1, wherein the mixture of coal briquettes and coal gas (CH4) is brought out
of the ground through fluid with a certain flow velocity and then enters a processing
system on the ground.
10. The novel process for hydraulic mining and fluid carrying of deep-seam coal according
to claim 10, wherein the mixture of the fluid enters a three-phase separation system
first so that the mud, coal and gas are separated simultaneously; the coal gas (CH4)
enters a gas processing station, is then compressed and transmitted to users; the
coal briquettes enter a coal washing workshop and are then processed into cleaned
coal, and the cleaned coal is transferred a cleaned coal warehouse for subsequent
sale; ash and gangue from the coal washing workshop enter a gangue grinding plant
and are then processed into materials below 200 meshes for preparing mud; waste water
from the coal washing workshop is transferred to a mud preparation plant and used
for preparing mud; the mud flows into a sedimentation tank from the three-phase separator
for settling powdered coal and fine sand particles; and the sediment is transferred
to the coal washing workshop for processing, and the mud is recycled to a circulation
pool for recycling.