|
(11) | EP 2 864 572 A2 |
| (12) |
|
|
|
|
|||||||||||||||||||||||
| (54) | SYSTEM AN METHOD FOR DETERMINING INCREMENTAL PROGRESSION BETWEEN SURVEY POINTS WHILE DRILLING |