[0001] The invention relates to a device and method for performing well interventions offshore.
[0002] Offshore oil and gas platforms are designed for decades of use. Oil and gas wells
are becoming depleted, which creates a need on the one hand to extend the lifespan
of these wells and on the other to deactivate and dismantle the wells (well plug and
abandonment). These operations can be performed by means of well interventions.
[0003] Well interventions are currently performed by relatively large jack-up platforms
supported by three lattice legs with diameters of 6-8 m and more. These were originally
designed for the purpose of drilling to oil and gas wells but are increasingly also
being applied to perform well interventions. The existing platforms are not easily
displaceable and often lack a design suitable for well interventions.
[0004] The above stated trend has created a need to be able to perform well interventions
in an efficient and flexible manner. Well interventions can for instance comprise
of closing a well, wherein a well is cleaned and filled with a suitable material such
as cement, after which the borehole casing is sawn off. Other well interventions comprise
maintenance to a borehole, such as taking samples from the wall of the borehole, surveying
and logging in order to be able to determine the residual capacity of the well, arranging
small explosive charges in order to allow new oil to flow to the borehole, and the
like.
[0005] The invention provides for this purpose a device comprising a jack-up platform which
comprises a height-adjustable horizontal work deck which is supported by vertical
legs supporting on an underwater bottom; and further a frame of frame parts connected
rigidly to each other which is configured to support well intervention equipment and
comprises for this purpose at least two horizontal frame floors of mutually connected
frame floor parts; wherein the frame is connected with a work deck part to the work
deck for movement in horizontal directions over the work deck, and the frame protrudes
with an operative part beyond a side edge of the work deck.
[0006] The device according to the invention allows, among other actions, a safe assembly
of well intervention equipment at a position which can be far removed from the well
in which intervention is to take place. Making use of a relatively light jack-up platform
which can be transported quickly and is preferably provided with four or more legs
with a diameter of a maximum of 4 m further makes it possible to perform a well intervention
in rapid and efficient manner. A stable support surface for the frame is obtained
by providing the platform with at least four legs. Well intervention equipment can
moreover be placed precisely above a well in which intervention is to take place by
making use of a frame which is connected with a work deck part to the work deck for
movement in horizontal directions over the work deck and which protrudes with an operative
part beyond a side edge of the work deck.
[0007] Provided in an embodiment for the purpose of further increasing the positioning precision
and reducing the risk of damage to for instance the oil well itself is a device wherein
the jack-up platform comprises a Dynamic Positioning platform configured to position
itself independently by means of rotatable thruster bodies.
[0008] In an embodiment of the invention a device is provided wherein the work deck of the
jack-up platform comprises a lifting means configured to lift a load of between 200
and 1000 tons at a distance ranging between 5 and 50 m, preferably to lift a load
of between 500 and 900 tons at a distance ranging between 10 and 40 m, and most preferably
to lift a load of between 600 and 800 tons at a distance ranging between 20 and 30
m. Not only can components of well intervention means be taken up and placed in the
frame using such a lifting means, components of a borehole of great length can also
be pulled to a position above the water surface. A suitable lifting means comprises
a crane connected to the work deck for pivoting around a vertical axis. This crane
can comprise an upward oriented support arm to which a main boom is pivotally connected.
The main boom is provided at the free outer end thereof with a hoisting tackle and
can be luffed in and luffed out by means of traction cables.
[0009] In an embodiment of the invention a device is provided wherein the work deck has
a thickness and the protruding part of the frame extends vertically along the work
deck in the thickness direction thereof. In this embodiment a horizontal frame floor
of the protruding part is situated at a level below the upper surface of the work
deck, this for instance increasing the accessibility of the well to divers.
[0010] This accessibility is further increased by an embodiment of the device wherein the
protruding part of the frame has more horizontal frame floors of mutually connected
frame floor parts than the work deck part, and by another embodiment wherein the frame
has a width and the protruding part of the frame comprises a horizontal frame floor
extending beyond the width.
[0011] A practical embodiment of the invention is characterized in that the work deck part
of the frame comprises two horizontal floors and the protruding part of the frame
comprises three horizontal floors.
[0012] The frame floors are configured to be able to support well intervention equipment.
An embodiment of the invention proposes a device wherein an upper horizontal floor
of the frame comprises a coiled tubing injector which is connected to frame parts.
Provided in another embodiment of the invention is a device wherein a middle floor
extends in the plane of the work deck of the platform and comprises a riser constructing
apparatus which is connected to frame parts. Provided according to a further embodiment
of the invention is a device wherein a lowest floor of the protruding part of the
frame comprises a riser ring tensioner which is connected to frame parts. With a ring
tensioner it becomes possible to hold pipe parts fixedly.
[0013] A frame comprising the above stated upper, middle and lower frame floors in combination
provides many practical advantages, wherein specific equipment is arranged for each
floor, this requiring specific operations. The operations can hereby be performed
in well-organized manner and with little risk of errors and the like.
[0014] Another embodiment of the invention relates to a device wherein a horizontal floor
of the frame can be opened. Such a floor allows equipment to be easily arranged in
the frame. It is also possible to provide horizontal floors with smaller hatches and
passages through which pipes and tubes can for instance be inserted and fixed.
[0015] The loads acting on the frame are preferably transmitted to the work deck via the
connection movable over the work deck. In an embodiment of the invention a device
is provided wherein the side edge of the work deck comprises a support rail. The support
rail provides an edge reinforcement of the work deck and preferably extends over substantially
the whole edge length.
[0016] In an alternative embodiment the work deck of the platform can be provided with a
(circular) opening or so-called moon pool which provides access to the water present
under the work deck 11. In such an embodiment the frame can also be arranged over
and in the moon pool, and the peripheral edge of the moon pool is provided with a
support rail in the form of a thick-walled plate.
[0017] The mobile connection to the work deck of the platform can be embodied in many ways.
In a suitable embodiment the work deck comprises a skidding beam which runs at a distance
from and substantially parallel to the support rail and to which the work deck part
of the frame is connected movably over the work deck in a direction running substantially
parallel to the side edge. The skidding beam is firmly connected to the work deck
so as to be able to absorb the relatively great forces. The mutually parallel support
rail and skidding beam are configured to absorb a moment of force of at least 800
tons/m, more preferably at least 1000 tons/m and most preferably at least 1200 tons/m.
[0018] In another embodiment of the invention a device is provided wherein the work deck
is provided with horizontal skidding beams which run substantially perpendicularly
of the support rail and to which the work deck part of the frame is connected movably
over the work deck in a direction running substantially perpendicularly of the side
edge.
[0019] In both above stated embodiments the frame can for instance be displaced relative
to the work deck by means of hydraulic cylinders disposed between the skidding beam(s)
and frame parts of the frame.
[0020] Provided for the purpose of enabling still better absorption of the considerable
forces is an embodiment wherein the jack-up platform comprises bulkheads under the
work deck which preferably run along the underside of the skidding beam(s). In an
embodiment the work deck is further provided with storage containers for liquids,
for instance liquids which are used during cleaning of a borehole and which are pumped
from the well to the work deck. The storage containers are preferably embodied as
internal cavities in the work deck.
[0021] In an embodiment of the invention a method is provided for performing well interventions
offshore making use of a device according to the invention.
[0022] Another embodiment of the invention relates to a method wherein the device is employed
to perform operations above an existing production platform, so-called workover. Existing
production platforms preferably comprise a plurality of boreholes which are brought
together on the platform. The device is advantageously employed to perform well interventions
above such an existing production platform. Owing to the provided option of moving
the frame in horizontal directions the different boreholes brought together on the
production platform can be readily accessed from one position of the jack-up platform.
[0023] The invention will now be further elucidated with reference to the description of
the accompanying figures, without however been limited thereto. In the figures:
Figure 1 is a schematic front view of a device in accordance with an embodiment according
to the invention;
Figure 2 is a schematic side view of an embodiment of the device according to the
invention;
Figure 3 is a schematic perspective view of the frame of the device in accordance
with an embodiment according to the invention shown in figure 1;
Figure 4 is a schematic side view of the embodiment of the frame according to the
invention shown in figure 3;
Figure 5 is a schematic front view of the frame according to the invention shown in
figures 3 and 4; and
Figure 6 is a schematic side view of another embodiment of the device according to
the invention which can be applied for workover operations.
[0024] An embodiment of a device 20 according to the invention is shown with reference to
figures 1 and 2. Device 20 comprises a jack-up platform 1 to which a protruding frame
3 is connected. Jack-up platform 1 comprises substantially a horizontal work deck
21 which is supported by four vertical legs 22 (only two of which are visible) supporting
on or in an underwater bottom 15. Because it must be possible to displace jack-up
platform 1 in simple manner, legs 22 take a relatively light form as hollow tubes
with a diameter of a maximum of 4 m. This becomes possible because frame 3 is not
provided with a drilling tower, as is usual in more permanent drilling platforms.
Such drilling platforms are generally provided with three legs in the form of lattices
with a diameter of 8 m and more.
[0025] Work deck 21 is height-adjustable in a height direction 16 by means of four rack
and pinion jacks 23 located at the corner points of work deck 11 and each operating
a corresponding leg 22. In an embodiment (not shown) work deck 21 of platform 1 can
likewise be provided with a (circular) opening or so-called moon pool which provides
access to the water 17 present under work deck 11. In such an embodiment frame 3 can
also be arranged over and in the moon pool.
[0026] Work deck 21 has a thickness 24 in order to give it the required bending stiffness,
for which purpose an internal (not visible) support structure of support beams and
partitions extends over the thickness. As shown in figure 1, a side edge of work deck
21 is reinforced with a support rail 2. In an embodiment in which frame 3 is arranged
over and in the moon pool the peripheral edge of the moon pool comprises a support
rail.
[0027] Jack-up platform 1 is further provided with a Dynamic Positioning (DP) system. Such
a DP system is configured to enable independent positioning of platform 1 and comprises
a number of thruster bodies (or thrusters) 25, provided under work deck 21, of propeller
blades rotating around a horizontal axle. In the shown embodiment four thruster bodies
25 are arranged along a lower edge of work deck 21. Using thruster bodies 25 a work
deck 21 floating in the water 17 can be precisely positioned relative to for instance
an oil well, particularly in that they are likewise rotatable around a vertical axis
26. The use of thruster bodies 25 has the advantage that it is not necessary to apply
anchor cables during positioning of platform 1. The risk of for instance oil wells
being damaged is hereby reduced.
[0028] Work deck 21 is further provided with a lifting means in the form of a crane 27.
The crane is connected for pivoting around a vertical axis 270 to work deck 21 by
means of base 271. It further comprises an upward oriented support arm 272 to which
a main boom 273 is pivotally connected. Main boom 273 is provided at the free outer
end thereof with a hosting tackle 274 with which the components used to perform well
interventions can be taken up and displaced. Main boom 273 can be luffed in and luffed
out by means of traction cables 275. Smaller auxiliary cranes are also present on
work deck 21 if desired.
[0029] According to the invention, frame 3 is connected with a work deck part 31 to work
deck 21 for movement in horizontal directions (18, 19) over work deck 21. Referring
to figures 3 and 4, the work deck part 31 of the frame comprises the part which extends
over work deck 21 and does not therefore protrude. Frame 3 protrudes with an operative
part 32 beyond a side edge 28 of work deck 21. Frame 3 is constructed from frame parts
(33, 34) connected rigidly to each other. Frame parts 33 extend in a longitudinal
direction 35 of frame 3, while frame parts 34 extend in a transverse direction 36
of frame 3. The longitudinal direction 35 of frame 3 extends parallel to the horizontal
direction 18 of work deck 21, whereas the transverse direction 36 of frame 3 extends
parallel to the horizontal direction 19 of work deck 21. As shown in figures 1 and
2, the protruding part 32 of frame 3 extends in vertical direction 16 along work deck
21 in the thickness direction thereof over a length which can vary.
[0030] In order to enable displacement of frame 3 relative to work deck 21 a skidding beam
11 is arranged on work deck 21. Skidding beam 11 runs at a distance 111 from and substantially
parallel to support rail 2. The distance 111 can be freely chosen subject to the moment
and forces to be transmitted to support rail 2 and skidding beam 11. Running between
skidding beam 11 and an attachment to a frame part 34 are hydraulic cylinders 110
with which frame 3 can be displaced in the longitudinal direction 35 thereof relative
to skidding beam 11. The distance between protruding part 32 of frame 3 and side edge
28 can hereby be increased or decreased so that protruding part 32 can be placed precisely
above an oil well. Frame 3 can in the same way be displaced in the transverse direction
36 thereof relative to skidding beam 11. The relative position of protruding part
32 of frame 3 and platform 1 can hereby be adjusted in horizontal direction 19 so
that protruding part 32 can be placed precisely above an oil well.
[0031] In order to be able to absorb the great forces on skidding beam 11 it is advantageous
to provide work deck 21 with partition walls or bulkheads running in thickness direction
16 and preferably running along the underside of skidding beam(s) 11.
[0032] In the shown embodiment the frame parts 34 extending in transverse direction 36 form
the frame floor parts of three horizontal frame floors (12, 13, 14) of protruding
part 32 of frame 3. The work deck part 31 of frame 3 has two frame floors (12, 13).
Specific equipment required to perform well intervention operations is present on
each frame floor (12, 13, 14), as will be further elucidated hereinbelow.
[0033] In order to be able to understand the equipment it will be useful to briefly illustrate
the construction of a borehole. Reference is made here to figures 1 and 2. A borehole
is obtained by driving drill strings vertically into the ground and placing casings
which close off the borehole from the surrounding rock using a drilling tower. Once
the target to be drilled, usually a formation or "reservoir" containing hydrocarbon,
has been reached the tower can be removed. Situated on the underside of the drill
string is a well head to which the drill string is attached. A so-called christmas
tree (or simply tree) 9 is placed over the well head. Tree 9 comprises a number of
valves with which the flow rate of the product flowing out of the well (gas, oil and
so on) can be regulated. Tree 9 can also fulfil other functions such as for instance
providing injection points for chemicals, providing means for performing well intervention
operations, and providing pressure valves, measuring equipment and so on.
[0034] When well intervention operations are being performed the tree 9 which is present
is used as connecting member for a riser 6. Such a riser 6 connects jack-up platform
1, and more particularly the well intervention equipment present in frame 3, to christmas
tree 9 or to a well head. Riser 6 is constructed from work deck 21 of platform 1 from
a number of mutually connecting steel pipe parts with a diameter in the order of magnitude
of for instance 15-20 cm. In order to enable connection of riser 6 to tree 9, tree
9 is provided with a tree running tool (TRT) 8 which forms the interface between christmas
tree 9 and well intervention operators. The settings of tree 9 can for instance be
determined using the TRT 8 in order to guarantee the safety of the well intervention
operations. Riser 6 is provided on the upper side with a flowhead 4 which regulates,
among other things, the flow rate of well intervention liquids.
[0035] Equipment which can be employed for well plug and abandonment comprises for instance:
- pumps and storage tanks for filling a borehole with concrete/grout/CO2. These can
be placed on the deck of the jack-up platform or are located on a horizontal floor
12 or 13 of frame 3;
- a crane 27 for lifting the borehole components;
- clamps for holding the borehole casings. These clamps are generally located on a horizontal
floor 12 or 13 of frame 3;
- a cutting tool for cutting through the borehole casings. This tool is preferably placed
just above the clamps.
[0036] Suitable equipment for lifespan extension comprises for instance:
- at least one wire line and slick line reel and guides for guiding these wires in a
riser; and
- a coiled tubing reel and injector.
[0037] By way of example an upper horizontal floor 12 of frame 3 comprises a coiled tubing
injector unit 5 which is fixed to frame parts 34. Situated on the upper floor 12 of
the work deck part 31 is a coiled tubing reel 10 from which can be unrolled a flexible,
generally metal tube 50 (coiled tubing) which is shot via a support structure 51 with
the coiled tubing injector unit 5 into a riser 6 to depths of 4000-5000 m and more.
The upper floor can further be provided with pump means (not shown) with which liquids
can be pumped via tube 50 to a well. Pumping for instance scale-reducing liquids and
methanol prevents scale forming in the borehole casing. Saline liquids (brine) or
steam can also be injected for maintenance of a borehole. A flexible tube 50 can also
be used as production tube in almost depleted wells.
[0038] Coiled tubing 50 is generally provided on the underside with a bottom hole assembly
(BHA) (not shown). Suitable BHA for instance comprise a nozzle for pumping chemicals
or cement through tube 50 but, depending on the purpose, can also comprise a number
of logging instruments placed in series. Coiled tubing can also be used as a cheaper
alternative to workover operations. A BHA can also be used to break open an oil well,
wherein a liquid is pumped under high pressure into tube 50 in order to break the
bedrock and to allow product (oil or gas) to flow.
[0039] Means for supporting wires or wire lines (wire line tools) can also be attached to
the upper frame floor 12. Diverse (measuring) equipment can be lowered from frame
3 into the well using wire lines. Wire lines comprise electrical cabling with which
diverse data relating to the state of the well can be transmitted, for instance for
the purpose of logging the well. Other equipment, intended for instance to remove
well plugs, can also be lowered from frame 3 using slick lines (not shown). The wire
(and slick) lines are connected via winches to frame 3 and can be lengthened or shortened
using the winches. Guide wires 7 can be provided to guide equipment to the underwater
bottom therewith.
[0040] The upper frame floor 12 preferably further supports a Blow Out Preventer (BOP) (not
shown). A BOP comprises a valve which reacts to excessive pressures and flow in a
drill string during drilling into a well resemoir. A BOP hereby prevents drill string
components, and also well intervention liquids for instance, being blown out of the
drill shaft with great force.
[0041] A middle floor 13 extends substantially in the plane of work deck 21 of platform
1 and comprises a riser constructing apparatus which is connected to frame parts 34.
The riser constructing apparatus comprises for instance flowhead 4. A diver can if
desired be launched at the height of the middle floor, for instance using a launching
frame (not shown). Such a launching frame comprises for instance an A-frame which
is pivotally connected to a floor and which is provided with a top tackle to which
a cage for a diver can be attached and lowered. A remote-controlled robot or Remote
Operated Vehicle (ROV) can for instance also be attached to and lowered from the top
tackle.
[0042] A lowest floor 14 of protruding part 32 of frame 3 preferably comprises a riser ring
tensioner 60 which is connected to frame parts 34. Ring tensioner 60 ensures that
riser 6 is tensioned at the position of work deck 21. Movements of riser 6 resulting
from wind load and wave movements are hereby largely prevented.
[0043] Frame 3 according to the invention has the great advantage that it provides a plurality
of floors (12, 13, 14) and, owing to the construction by means of frame parts (33,
34), is still readily accessible for an apparatus to be arranged in the (protruding
part 32 of) frame 3. An embodiment wherein a horizontal floor (12, 13, 14) of frame
3 can be opened has further advantages in this respect. This is possible for instance
by embodying a relevant floor pivotally to the rest of frame 3 so that it can be folded
aside.
[0044] A method for performing well interventions offshore can be performed in efficient
manner with the device according to the invention.
[0045] Jack-up platform 1 of the device is for this purpose positioned in the immediate
vicinity of a well in which intervention is to take place and frame 3 is moved in
a horizontal plane relative to the work deck until operative part 32 of frame 3 is
aligned with the borehole. A diver can then be launched from frame 3 in order to make
connections between frame 3 and a Christmas tree 9 of the borehole. Equipment required
for the well intervention can be carried downward here via guide wires 7. From frame
3 diverse liquids suitable for the intervention can then be injected or (conversely)
brought up through the coiled tubing 50 shot downward into the constructed riser 6.
Following the intervention, platform 1 can be easily uncoupled from the borehole and
navigated to another borehole.
[0046] As shown in figure 6, the device according to the invention is also advantageously
applied in a method for performing well interventions offshore above an existing production
platform. The existing production platform comprises a jacket foundation 61 which
extends partially under water and on which is placed a processing platform 60 which
lies above water level 17. Borehole casings 62 extend from a well under ground surface
15 to a position above processing platform 60 and can be easily reached with frame
3 by displacing this frame 3 in a horizontal plane.
[0047] The invention is not limited to the above described embodiments, and modifications
could be made thereto to the extent these derive in self-evident manner from the appended
claims.
1. Device for performing well interventions offshore, comprising a jack-up platform which
comprises a height-adjustable horizontal work deck which is supported by vertical
legs supporting on an underwater bottom; a frame of frame parts connected rigidly
to each other which is configured to support well intervention equipment and comprises
for this purpose at least two horizontal frame floors of mutually connected frame
floor parts; wherein the frame is connected with a work deck part to the work deck
for movement in horizontal directions over the work deck, and wherein the frame protrudes
with an operative part beyond a side edge of the work deck.
2. Device as claimed in claim 1, wherein the work deck has a thickness and the protruding
part of the frame extends vertically along the work deck in the thickness direction
thereof.
3. Device as claimed in claim 1 or 2, wherein the protruding part of the frame has more
horizontal frame floors of mutually connected frame floor parts than the work deck
part.
4. Device as claimed in any of the foregoing claims, wherein the frame has a width and
the protruding part of the frame comprises a horizontal frame floor extending beyond
the width.
5. Device as claimed in any of the foregoing claims, wherein the work deck part of the
frame comprises two horizontal floors and the protruding part of the frame comprises
three horizontal floors.
6. Device as claimed in any of the foregoing claims, wherein an upper horizontal floor
of the frame comprises a coiled tubing injector which is connected to frame parts.
7. Device as claimed in any of the foregoing claims, wherein a middle floor extends in
the plane of the work deck of the platform and comprises a riser constructing apparatus
which is connected to frame parts.
8. Device as claimed in any of the foregoing claims, wherein a lowest floor of the protruding
part of the frame comprises a riser ring tensioner which is connected to frame parts.
9. Device as claimed in any of the foregoing claims, wherein a horizontal floor of the
frame can be opened.
10. Device as claimed in any of the foregoing claims, wherein the side edge of the work
deck comprises a support rail.
11. Device as claimed in any of the foregoing claims, wherein the work deck comprises
a skidding beam which lies at a distance from and substantially parallel to the support
rail and to which the work deck part of the frame is connected movably over the work
deck in a direction running substantially parallel to the side edge.
12. Device as claimed in any of the foregoing claims, wherein the work deck comprises
horizontal skidding beams which run substantially perpendicularly of the support rail
and to which the work deck part of the frame is connected movably over the work deck
in a direction running substantially perpendicularly of the side edge.
13. Device as claimed in any of the foregoing claims, wherein the jack-up platform comprises
bulkheads under the work deck which preferably run along the underside of the skidding
beams.
14. Device as claimed in any of the foregoing claims, wherein the jack-up platform comprises
four or more legs with a diameter of a maximum of 4 m.
15. Method for performing well interventions offshore making use of a device as claimed
in any of the foregoing claims.
16. Method as claimed in claim 15, wherein the jack-up platform is positioned in the immediate
vicinity of a well in which intervention is to take place and the frame is moved relative
to the work deck until the operative part of the frame is aligned with the borehole.
17. Method as claimed in claim 15 or 16, wherein the jack-up platform is positioned in
the immediate vicinity of a plurality of wells of an existing production platform
in which intervention is to take place and the frame is moved relative to the work
deck until the operative part of the frame is aligned with one of the boreholes.