Field of the invention
[0001] The present invention relates to a downhole deployment system and a method for completing
a well downhole.
Background art
[0002] One way of completing a well for oil or gas production is to drill a first part of
the borehole, then arrange an intermediate casing in the first part, then drill a
second part of the borehole and subsequently run in a production casing by pushing
and rotating the production casing. At some point down the borehole, the pushing and
rotation force at the top of the well is inadequate to force the production casing
further into the borehole as the production casing is stuck and then the insertion
process of the production casing will have to be called off. This is due to the fact
that there are no known ways of moving on from this this point when inserting the
production casing. Hence, casing a well beyond this point is not a conceivable option.
Production zones are then isolated and the production initiating procedures are initiated
so that production can begin.
Summary of the invention
[0003] It is an object of the present invention to wholly or partly overcome the above disadvantages
and drawbacks of the prior art. More specifically, it is an object to provide an improved
downhole deployment system which makes it possible to complete wells having a longer
cased borehole than what is possible by means of known solutions.
[0004] The above objects, together with numerous other objects, advantages and features,
which will become evident from the below description, are accomplished by a solution
in accordance with the present invention by a downhole deployment system for completing
a well downhole, comprising
- a production casing to be inserted in an intermediate casing or borehole having a
substantially vertical part and a substantially horizontal part, the production casing
having a first open end furthest away from a top of the well, and
- a self-propelling driving unit being electrically and/or hydraulically driven and
comprising a driving section having a first end and a second end and propelling means,
the propelling means being movable between a retracted position and a projected position
in order to propel the driving unit forward in the well with the first end facing
forwards, and a pulling section connected to the second end,
wherein the pulling section is releasably connected to the first open end of the production
casing and the driving section is arranged in front of the production casing so that
the propelling means, when being in the projected position, have contact with the
intermediate casing or borehole for pulling the production casing forward in the intermediate
casing or borehole.
[0005] The self-propelling driving unit may have a wireline and thus be a wireline self-propelling
driving unit.
[0006] Also, the self-propelling driving unit may be connected with an elongated tubing
string for conducting fluid in the well, and the driving unit may further comprise
a turbine driven by the fluid for driving a generator driven by the turbine and generating
electricity for powering the driving section.
[0007] Further, the turbine may drive a hollow shaft for driving the generator and for providing
fluid to a pump in order to propel the driving section and the tubing string forward
in the well.
[0008] Moreover, the driving unit may further comprise an electrically driven driving section
comprising an electrical motor powered by the generator for propelling the driving
unit and the production casing forward in the well, the electrically driven driving
section being arranged in front of the driving unit forming the first end.
[0009] The production casing at the first open end may have a projection decreasing a first
inner diameter of the production casing to a second inner diameter.
[0010] Also, the production casing may have a first inner diameter in a main bore and an
inner diameter of an opening at the first open end, the first inner diameter being
larger than the inner diameter of the opening.
[0011] Moreover, the driving section may have an outer diameter which is smaller than the
second inner diameter when the propelling means is in the retracted position.
[0012] Further, the propelling means may be wheels arranged on projectable arms.
[0013] In addition, the propelling means may be caterpillar tracks.
[0014] The pulling section may have an outer diameter which is larger than the second inner
diameter and smaller than the first inner diameter.
[0015] Also, the pulling section may have projectable elements which are movable between
a projected position and a retracted position, said pulling section having, in the
projected position, an outer diameter which is larger than a second inner diameter,
so that the projectable elements abut the opening projection.
[0016] The projectable elements may be dogs, anchors, claws, keys or similar elements capable
of projecting radially from a body of the pulling section.
[0017] Furthermore, the downhole deployment system as described above may further comprise
a pulling device at the top of the well for pulling a wireline connected with the
driving unit and retracting the driving unit from the production casing.
[0018] Additionally, the driving unit may comprise a disconnecting means for disconnecting
the pulling section from the driving section, and the system may further comprise
a pulling device at the top of the well for pulling the wireline and retracting the
pulling device from the production casing.
[0019] Moreover, the driving section may be left downhole.
[0020] Furthermore, the production casing may comprise an annular barrier to be expanded
in an annulus between the production casing and the intermediate casing or borehole
for providing zone isolation between a first zone and a second zone of the borehole.
[0021] Also, the annular barrier may comprise a casing part, an expandable sleeve surrounding
the casing part and having an inner sleeve face facing the casing part and an outer
sleeve face facing the borehole, each end of the expandable sleeve being connected
with the casing part in two connections, and an annular space between the inner sleeve
face of the expandable sleeve and the casing part.
[0022] In addition, the disconnecting means may have a timer for activating the disconnecting
means when the driving unit has been unpowered for a predetermined time period.
[0023] The pulling section may comprise a fishing neck for pulling the driving unit.
[0024] Moreover, the propelling means of the driving section may be wheels, and each wheel
may comprise a hydraulic motor.
[0025] Further, the propelling means of the driving section may be wheels, and each wheel
may comprise an electrical motor.
[0026] Additionally, the driving unit may comprise an electrical motor driving a pump providing
hydraulic power for projecting the propelling means.
[0027] The production casing may comprise an inflow control section for letting well fluid
in and/or may comprise a fracturing port for ejecting fluid out from the production
casing for fracturing the formation.
[0028] Furthermore, a rotation equipment may be arranged at the top of the well for rotating
the production casing.
[0029] The driving unit may comprise a swivel connection between the driving section and
the pulling section so that the driving section remains unrotated, while the production
casing is rotated.
[0030] Also, the driving unit may comprise a plurality of driving sections.
[0031] Moreover, the propelling means may have at least a first projected position and a
second projected position, the propelling means being capable, in the first projected
position, of abutting the first inner diameter of the production casing, and the propelling
means being capable, in the second projected position, of abutting an inner diameter
of the intermediate casing or the borehole.
[0032] The present invention also relates to a method for completing a well downhole by
means of the downhole deployment system as described above, comprising the steps of:
- inserting a production casing in an intermediate casing or borehole having a substantially
vertical part and a substantially horizontal part, the production casing having a
first open end furthest away from a top of the well,
- positioning a self-propelling driving unit in connection with the first open end of
the production casing, so that the pulling section is arranged inside the production
casing and the driving section is arranged in front of the production casing, and
- projecting the propelling means of the driving section so that they are in contact
with the intermediate casing or borehole for pulling the production casing forward
in the intermediate casing or borehole.
[0033] Said method for completing a well downhole by means of the downhole deployment system
as described above may also comprise the steps of:
- positioning a self-propelling driving unit in connection with a first open end of
the production casing so that the pulling section is arranged inside the production
casing, and the driving section is arranged in front of the production casing,
- inserting a production casing with the self-propelling unit in an intermediate casing
or borehole having a substantially vertical part and a substantially horizontal part,
the production casing having the first open end furthest away from a top of the well,
and
- projecting the propelling means of the driving section so that they are in contact
with the intermediate casing or borehole for pulling the production casing forward
in the intermediate casing or borehole.
[0034] Also, the method as described above may comprise the step of:
- releasing the driving unit or the pulling section of the driving unit from the open
first end of the production casing by either
- retracting the propelling means and pulling the driving section into the production
casing and further up to the top of the well by pulling a wireline connected with
the driving unit, or
- releasing the pulling section from the driving section and pulling the pulling section
up to the top of the well by pulling a wireline connected with the driving unit.
[0035] Further, the method as described above may comprise the step of conducting acid stimulation
via the first open end after removal from the production casing of the driving unit
or the pulling section of the driving unit.
[0036] Finally, the method as described above may further comprise the step of dropping
a ball for closing the first open end of the production casing.
Brief description of the drawings
[0037] The invention and its many advantages will be described in more detail below with
reference to the accompanying schematic drawings, which for the purpose of illustration
show some non-limiting embodiments and in which
Fig. 1 shows a downhole deployment system,
Fig. 2 shows a driving unit in a production casing,
Fig. 3 shows a driving unit pulling a production casing,
Fig. 4 shows another driving unit pulling a production casing,
Fig. 5 shows a driving unit having another pulling section pulling a production casing,
Fig. 6 shows a driving unit pulling a production casing and having substantially the
same diameter as the casing,
Fig. 7 shows a driving unit having two driving sections propelling themselves forward
in a production casing, and
Fig. 8 shows a driving unit having two driving sections driven by pressurised fluid
through coiled tubing.
[0038] All the figures are highly schematic and not necessarily to scale, and they show
only those parts which are necessary in order to elucidate the invention, other parts
being omitted or merely suggested.
Detailed description of the invention
[0039] Fig. 1 shows a downhole deployment system 100 for completing a well 2 in a borehole
4 downhole. The downhole deployment system 100 comprises a production casing 1 which
is inserted through an intermediate casing 3 and then the borehole 4 having a substantially
vertical part 5 and a substantially horizontal part 6. In the end furthest away from
the top 31 of the well, the production casing has a first open end 7 from which a
self-propelling driving unit 10 extends for pulling the production casing forward
in the borehole while forcing the production casing down from the top of the well.
By having the self-propelling driving unit, it is possible to pull the production
casing beyond the point P (shown in Fig. 2) at which the production casing, without
the self-propelling driving unit, would be stuck, and the rest of the borehole would
remain uncased.
[0040] The self-propelling driving unit 10 of Fig. 2 comprises a driving section 11 having
propelling means 12. The self-propelling driving unit 10 has a first end 41 facing
forwards and a second end 42 facing backwards and being nearer the top of the well
as the driving unit propels itself forward in the well. The propelling means is movable
between a retracted position and a projected position, and a pulling section 15 is
connected with the driving section and is arranged connecting a wireline 14 with the
driving section. The pulling section is releasably connected to the first open end
of the production casing and the driving section is arranged in front of the production
casing, so that the projected propelling means have contact with first the intermediate
casing and then the borehole for pulling the production casing forward in the intermediate
casing and the borehole.
[0041] As can be seen in Figs. 2 and 3, the production casing is stuck at the point P, and
the self-propelling driving unit 10 has therefore been inserted into the production
casing 1 and propels itself forward in the production casing. The propelling means
are wheels arranged on projectable arms 17, and the propelling means is in a first
projected position at which the projectable arms 17 are somewhat projected. In the
first projected position, the propelling means is capable of abutting an inner face
24 of the production casing. The production casing at the first open end has a projection
16 decreasing a first inner diameter D1 of the production casing to a second inner
diameter D2. In order to pull the production casing beyond the point P, the self-propelling
driving unit 10 enters an open hole part 26 of the well borehole through the open
end 7 of the production casing 1. The propelling means 12 first retracts to be able
to pass the open end and then the propelling means projects into a second projected
position when the wheels abut an inner face 27 of the borehole as shown in Fig. 3.
In the second projected position shown in Fig. 3, the wheels engage the borehole wall
and lift the production casing 1 free of the borehole projection, hence preventing
the production casing from moving forward in the borehole, and as the self-propelling
driving unit 10 starts propelling, the production casing is pulled as well. This is
due to the fact that the pulling section 15 has a larger outer diameter than the second
inner diameter D2 of the open end, and the pulling section is thus releasably connected
to the first open end of the production casing, and the driving section is arranged
in front of the production casing so that the propelling means have contact with the
borehole and pulls the production casing forward in the borehole. Thus, the driving
section has an outer diameter D
od which is smaller than the second inner diameter D2 when the propelling means is in
the retracted position, and the pulling section has an outer diameter D
op which is larger than the second inner diameter and smaller than the first inner diameter.
[0042] As shown in Figs. 4, the projection at the open end of the production casing 1 may
have an inclined surface 28 functioning as a ball seat in a subsequent production
initiating procedure. When the projection is a ball seat, the pulling section has
a corresponding shape so as to match the ball seat and increase the contact between
the pulling section 15 and the production casing 1.
[0043] In Fig. 5, the pulling section 15 has projectable elements 18 which are movable between
a projected position and a retracted position. In the retracted position, the pulling
section has approximately the same outer diameter as the driving section 11, and in
the projected position the pulling section has an outer diameter D
po which is larger than second inner diameter, so that the projectable elements 18 abuts
the projection of the production casing 1. The projectable elements 18 may be dogs,
anchors, claws, keys or similar elements capable of projecting radially from a body
29 of the pulling section 15.
[0044] As shown in Fig. 6, the driving section 11 may also have an outer diameter D
od which is substantially equal to the outer diameter D
oc of the production casing, when the propelling means are in their retracted position.
Then the driving unit comprises a disconnecting means 20 for disconnecting the pulling
section from the driving section when the self-propelling driving unit 10 has performed
its job and has pulled the production casing beyond the point and further into the
borehole. As shown in Fig. 1, the downhole deployment system 100 further comprises
a pulling device 19 at the top of the well for pulling the wireline and retracting
the pulling device from the production casing, when the disconnecting means 20 of
Fig. 6 has been activated and disconnects the pulling section 15 from the driving
section 11. In this way, the driving section is left downhole and the wireline and
the pulling section 15 are drawn up from the production casing. The disconnecting
means may have a timer 36 for activating the disconnecting means when the driving
unit has been unpowered for a predetermined time period. By having a timer, the disconnecting
means is not activated if the power is temporarily lost but only if the power is intentionally
disconnected.
[0045] In Fig. 8, the downhole deployment system 100 comprises a self-propelling driving
unit having two driving sections 11, a first driving section 11a and a second driving
section 11b. The self-propelling driving unit is connected with an elongated tubing
string 45" such as coiled tubing, drill pipe, etc., for conducting fluid to a turbine
44 driven by the fluid for driving a generator 43 driven by the turbine and generating
electricity for powering at least one of the driving sections 11, 11a, 11b.
[0046] In the event that the first driving section 11a is a fluid-driven driving section,
the fluid in the tubing string is used for driving the pump 39 driving a closed hydraulic
system in the first driving section. The pump 39 thus drives hydraulic motors 37 in
the wheels 12 of the driving section and projects the arms 17. The first driving section
may also be electrically driven where the electricity from the generator powers a
motor driving the pump 39 and thus the wheels and arms, or the motor drives the pump
to drive the arms, and electrical motors 37 in the wheels are powered by the electricity
from the generator.
[0047] The second driving section 11b is, in Fig. 8, an electrically driven driving section
and is powered by the electricity from the generator to drive a pump driving the arms.
The motors in the wheels may either be hydraulically driven by the pump or electrically
driven by the electricity from the generator. The second or electrically driven driving
section is arranged in front of the driving unit forming the first end 41, where the
pulling section is connected with the second end 42 of the first driving section 11a.
[0048] Both the first and the second driving sections 11, 11a, 11b have a control section
(not shown) for controlling the operation of the driving section. In order to provide
fluid to the first driving section, the turbine drives a hollow shaft for driving
the generator and for providing fluid to the pump 39 in order to propel the driving
section 11, 11a and the production casing forward in the well when the pulling section
engages the production casing. When the driving unit arrives at the end of the production
casing, the projectable elements 18 are projected to engage the production casing,
and the driving sections are arranged outside the production casing so the wheels
can engage the borehole wall and propel the driving unit and the production casing
forward in the well. The driving unit may also be installed so the projectable elements
18 engage the end of the production casing when the production casing is lowered into
the borehole.
[0049] As shown, the driving section has wheels and a motor 37, such as a hydraulic motor
or electrical motor, may be arranged in each wheel. The driving unit comprises an
electrical motor 38 powered through the wireline and driving a pump 39 providing hydraulic
power for projecting the propelling means. A spring is compressed upon projection
of the propelling means, and the inherent force in the compressed spring provides
a retraction force when the hydraulic pressure is released for retracting the propelling
means. The driving unit 10 comprises a swivel connection 25 between the driving section
11 and the pulling section 15 so that the driving section 11 remains unrotated while
the production casing is rotated during insertion of the production casing 1.
[0050] Dependent on the distance along which the production casing needs to be pulled, the
driving unit may comprise a plurality of driving sections 11 as shown in Fig. 7. Furthermore,
the driving sections 11 may be arranged at a circumferential angle in relation to
each other as shown, so that the propelling means is also capable of centralising
the production casing in the transverse direction perpendicular to the longitudinal
extension of the borehole.
[0051] Even though not shown, the pulling section may comprise a fishing neck for pulling
the driving unit if the outer diameter of the driving section is smaller than the
inner diameter of the open end of the production casing. Furthermore, the driving
unit is illustrated having propelling means in the form of wheels but may in another
embodiment have caterpillar tracks.
[0052] In Fig. 1, the downhole deployment system further comprises a pulling device 19 at
the top 31 of the well for pulling the wireline and retracting the driving unit from
the production casing. The production casing comprises an annular barrier 21 to be
expanded in an annulus between the production casing and the borehole 4 for providing
zone isolation between a first zone and a second zone of the borehole. The annular
barrier comprises a casing part 32 forming part of the production casing, an expandable
sleeve 33 surrounding the casing part and each end of the expandable sleeve being
connected with the casing part in two connections 34 defining an annular space (not
shown) between the expandable sleeve and the casing part. Production zones are isolated
by expanding the sleeve of the annular barrier so that the sleeve abuts the wall of
the borehole 4. The annular barrier may be expanded by pressurising the production
casing from within after closing the open end of the production casing.
[0053] As shown in Fig. 1, the production casing 1 comprises an inflow control section 22
for letting well fluid in and a fracturing port 23 for ejecting fluid out from the
production casing for fracturing the formation. When the annular barriers are expanded
by means of pressurised fluid, the inflow control section 22 and the fracturing port
23 are closed from within the production casing 1, e.g. by means of a sliding sleeve
(not shown).
[0054] As earlier mentioned, the production casing may be rotated while being inserted into
the borehole and a rotation equipment 35 is arranged at the top 31 of the well for
rotating the production casing 1. Even though not explicitly shown, the self-propelling
driving unit may be used for pulling a production casing forward merely in an intermediate
casing so that the well is made as a double cased well.
[0055] When completing a well downhole by means of the downhole deployment system, a production
casing is inserted in an intermediate casing or borehole having a substantially vertical
part and a substantially horizontal part. The production casing has a first open end
furthest away from a top of the well, which end constitutes the front of the production
casing as it is inserted into the well. A self-propelling driving unit is positioned
in connection with the first open end of the production casing so that the pulling
section is arranged inside the production casing and the driving section is arranged
in front of the production casing. In order to pull the production casing, the propelling
means of the driving section is projected so that they are in contact with the intermediate
casing or borehole in order to pull the production casing forward in the intermediate
casing or borehole. In this method, the driving unit is inserted subsequent to the
production casing being entered into the intermediate casing or borehole.
[0056] Another way of pulling the production casing is to position the self-propelling driving
unit in connection with a first open end of the production casing before inserting
a production casing with the self-propelling unit in an intermediate casing or borehole.
The propelling means of the driving section may be projected at any point along the
longitudinal extension of the intermediate casing or borehole, so that they are in
contact with the intermediate casing or borehole in order to pull the production casing
forward in the intermediate casing or borehole.
[0057] Subsequent to a completed pulling operation, the pulling section is released from
the open first end of the production casing by either retracting the propelling means
and pulling the driving section into the production casing and further up to the top
of the well by pulling the wireline, or releasing the pulling section from the driving
section and pulling the pulling section up to the top of the well by pulling the wireline.
[0058] After the release operation, acid stimulation via the first open end can be initiated.
[0059] Before release of the pulling section, the open end of the production casing is closed
and the annular barrier may be expanded by pressurising the casing from within. If
the pulling section and the driving unit have been released, the expansion of the
annular barriers can be performed by dropping a ball for closing the first open end
of the production casing.
[0060] A stroking tool is a tool providing an axial force. The stroking tool comprises an
electrical motor for driving a pump. The pump pumps fluid into a piston housing to
move a piston acting therein. The piston is arranged on the stroker shaft. The pump
may pump fluid into the piston housing on one side and simultaneously suck fluid out
on the other side of the piston.
[0061] By fluid or well fluid is meant any kind of fluid that may be present in oil or gas
wells downhole, such as natural gas, oil, oil mud, crude oil, water, etc. By gas is
meant any kind of gas composition present in a well, completion, or open hole, and
by oil is meant any kind of oil composition, such as crude oil, an oil-containing
fluid, etc. Gas, oil, and water fluids may thus all comprise other elements or substances
than gas, oil, and/or water, respectively.
[0062] By a casing is meant any kind of pipe, tubing, tubular, liner, string etc. used downhole
in relation to oil or natural gas production.
[0063] In the event that the tool is not submergible all the way into the casing, a downhole
tractor can be used to push the tool all the way into position in the well. The downhole
tractor may have projectable arms having wheels, wherein the wheels contact the inner
surface of the casing for propelling the tractor and the tool forward in the casing.
A downhole tractor is any kind of driving tool capable of pushing or pulling tools
in a well downhole, such as a Well Tractor®.
[0064] Although the invention has been described in the above in connection with preferred
embodiments of the invention, it will be evident for a person skilled in the art that
several modifications are conceivable without departing from the invention as defined
by the following claims.
1. A downhole deployment system (100) for completing a well (2) downhole, comprising
- a production casing (1) to be inserted in an intermediate casing (3) or borehole
(4) having a substantially vertical part (5) and a substantially horizontal part (6),
the production casing having a first open end (7) furthest away from a top (8) of
the well, and
- a self-propelling driving unit (10) being electrically and/or hydraulically driven
and comprising a driving section (11) having a first end (41) and a second end (42)
and propelling means (12), the propelling means being movable between a retracted
position and a projected position in order to propel the driving unit forward in the
well with the first end facing forwards, and a pulling section (15) connected to the
second end,
wherein the pulling section is releasably connected to the first open end of the production
casing and the driving section is arranged in front of the production casing so that
the propelling means, when being in the projected position, have contact with the
intermediate casing or borehole for pulling the production casing forward in the intermediate
casing or borehole.
2. A downhole deployment system according to claim 1, wherein the production casing at
the first open end has a projection (16) decreasing a first inner diameter (D1) of
the production casing to a second inner diameter (D2).
3. A downhole deployment system according to claim 2, wherein the driving section has
an outer diameter (Ddo) which is smaller than the second inner diameter (D2) when the propelling means is
in the retracted position.
4. A downhole deployment system according to any of the preceding claims, wherein the
propelling means are wheels arranged on projectable arms (17).
5. A downhole deployment system according to claim 2, wherein the pulling section has
an outer diameter (Dpo) which is larger than the second inner diameter and smaller than the first inner
diameter.
6. A downhole deployment system according to claim 2, wherein the pulling section has
projectable elements (18) which are movable between a projected position and a retracted
position, said pulling section having, in the projected position, an outer diameter
(Dpo) which is larger than a second inner diameter, so that the projectable elements abut
the opening projection.
7. A downhole deployment system according to any of the preceding claims, further comprising
a pulling device (19) at the top of the well for pulling a wireline connected with
the driving unit and retracting the driving unit from the production casing.
8. A downhole deployment system according to any of the claims 1-7, wherein the driving
unit comprises a disconnecting means (20) for disconnecting the pulling section from
the driving section.
9. A downhole deployment system according to any of the preceding claims, wherein the
production casing comprises an annular barrier (21) to be expanded in an annulus (2)
between the production casing and the intermediate casing (3) or borehole (4) for
providing zone isolation between a first zone (101) and a second zone (102) of the
borehole.
10. A downhole deployment system according to any of the preceding claims, wherein the
production casing comprises an inflow control section (22) for letting well fluid
in and/or comprises a fracturing port (23) for ejecting fluid out from the production
casing for fracturing the formation.
11. A downhole deployment system according to claim 10, wherein the driving unit comprises
a swivel connection (25) between the driving section and the pulling section so that
the driving section remains unrotated, while the production casing is rotated.
12. A downhole deployment system according to any of the preceding claims, wherein the
propelling means has at least a first projected position and a second projected position,
the propelling means being capable, in the first projected position, of abutting the
first inner diameter of the production casing, and the propelling means being capable,
in the second projected position, of abutting an inner diameter of the intermediate
casing or the borehole.
13. A method for completing a well downhole by means of the downhole deployment system
according to any of the preceding claims, comprising the steps of:
- inserting a production casing in an intermediate casing or borehole having a substantially
vertical part and a substantially horizontal part, the production casing having a
first open end furthest away from a top of the well,
- positioning a self-propelling driving unit in connection with the first open end
of the production casing, so that the pulling section is arranged inside the production
casing and the driving section is arranged in front of the production casing, and
- projecting the propelling means of the driving section so that they are in contact
with the intermediate casing or borehole for pulling the production casing forward
in the intermediate casing or borehole.
14. A method for completing a well downhole by means of the downhole deployment system
according to any of the claims 1-12, comprising the steps of:
- positioning a self-propelling driving unit in connection with a first open end of
the production casing so that the pulling section is arranged inside the production
casing, and the driving section is arranged in front of the production casing,
- inserting a production casing with the self-propelling unit in an intermediate casing
or borehole having a substantially vertical part and a substantially horizontal part,
the production casing having the first open end furthest away from a top of the well,
and
- projecting the propelling means of the driving section so that they are in contact
with the intermediate casing or borehole for pulling the production casing forward
in the intermediate casing or borehole.
15. A method according to claim 13 or 14, comprising the step of:
- releasing the driving unit or the pulling section of the driving unit from the open
first end of the production casing by either
- retracting the propelling means and pulling the driving section into the production
casing and further up to the top of the well by pulling a wireline connected with
the driving unit, or
- releasing the pulling section from the driving section and pulling the pulling section
up to the top of the well by pulling a wireline connected with the driving unit.