TECHNICAL FIELD
[0001] The present disclosure relates to compensation of variations in movement and/or force
of a load, in particular of a load suspended from a movable or moving hoisting system,
such as in floating vessels.
BACKGROUND
[0002] Heave compensation systems for hoisting systems that are moving, e.g. being located
on a moving object are well known and they may be divided in two general types: passive
heave compensation relying on spring devices, which may provide energy dissipation,
and active heave compensation relying on measurements, active feedback and operating
units.
[0003] In some cases, passive and active heave compensation are combined. Such combinations
may be divided in three general types.
[0004] A first type causes or affects movement of (part of) the hoisting device, e.g. see
EP 228050 and
WO 2012/039623. This, however complicates construction of the hoisting system and it can transform
heave motion in vertical direction into motion in a lateral direction.
[0005] A second type combines passive and active actuation of hydraulic systems, e.g. see
US 3912227,
US 4121806,
US 4215851,
WO 2004/067435,
DE 102005058952,
WO 2007/145503,
EP 2029423,
WO 2012/161565,
CN 202429940 U,
CN 102556875. Such systems tend to be complex and require strong hydraulic pumps and/or bulky
conduits and reservoirs for the hydraulic fluid. Further, the effective achievable
stroke of such systems is determined by the length of the hydraulic cylinders.
[0006] A third type comprises systems wherein the effective length of the hoisting cable
is adjusted by reeling in and/or paying out the hoisting cable, e.g. see
WO 83/03815,
US 6595494,
US 2005/0179021,
WO 2008/022125,
US 7798471,
WO 2009/120062,
US 2009/0232625,
WO 2009/036456,
US 8297597,
WO 2011/034422,
CN 101948002,
CN 102398856,
WO 2012/112039,
CN 202499677 U,
CN 202643158 U,
CN 202829415 U. This accelerates wear of the hoisting cable and it requires strong engines to manipulate
the cable, in particular cables under full load, thus being bulky and consuming significant
power.
[0007] Improvements in heave compensation are therefore desired.
SUMMARY
[0008] Herewith, a method and an apparatus according to the appended claims are provided.
[0009] In an aspect a method for compensation movements and/or force variations of a load
is provided, in particular of a load suspended from a movable or moving structure,
more in particular a load suspended from a floating vessel, comprising the steps of:
connecting a first hoisting cable and a second hoisting cable with the load in parallel;
suspending the load from the first and second hoisting cables, wherein the first hoisting
cable exerts a first lifting force on the load including a spring force, and wherein
the second hoisting cable exerts a second lifting force on the load;
wherein the method comprises the step of controlling a position and/or movement of
the load by compensating, in particular reducing, at least part of the spring force
by adjusting the second lifting force and/or a length of the second hoisting cable.
[0010] Thus, the spring excursion amplitude, and therewith the position of the load with
respect to the first hoisting cable, in particular with respect to the movable or
moving structure, is adjustable by adjustment of the second cable providing adjustment
of the second lifting force and/or length of the second hoisting cable, in particular
by adjustment thereof with respect to the first lifting force. This increases control
over the position and/or movement of the suspended load and reaction forces on the
lifting cables and associated apparel caused by such movement. By connecting a first
hoisting cable and a second hoisting cable with the load in parallel, active heave
compensation and passive heave compensation systems are provided in parallel rather
than in series as in common systems and a more accurate and/or faster control over
the position and/or movement of the load can be effected.
[0011] By performing passive heave compensation and active heave compensation in parallel
and with different cables, the active heave compensation needs to accommodate only
part of the load weight, with the passive heave compensation accounting for another
portion of the load weight; in order to compensate part of the spring force, or rather
to compensate motion of the first lifting cable such as by movement of the structure
from which the load is suspended, the second lifting force may be only a small fraction
of the first lifting force. As an example, for lifting the suspended load from a stationary
position in which the load is in an equilibrium position with respect to the first
hoisting cable, wherein the spring force counteracts gravity on the load, the second
lifting force need not (be sufficient to) carry the full weight of the load for raising
the load from the stationary position; the bulk being supported by the first hoisting
cable with the associated spring force. Thus the second lifting force need only be
a small fraction of the first lifting force to provide still a significant deviation
from the equilibrium position and affect the position of the load with respect to
the structure from which the load is suspended by the first and second lifting cables.
Hence, the method facilitates accurate and detailed control over the position of a
heavy load with comparatively small adjustment forces. Adjustment of the position
of the load by adjustment of the first lifting force is possible, in which case both
lifting forces may be adjusted together.
[0012] In the method, the tension force in the second hoisting cable is varied by varying
the length of the second hoisting cable, which therefore automatically transfers load
to/from the first hoisting cable from/to the second hoisting cable. Typically, the
second lifting force may be less than about 25% of the first lifting force, in particular
less than about 15% such as less than about 10%, e.g. about 5% of the first lifting
force.
[0013] The present method obviates active heave compensation methods acting on a single
hoisting cable (main hoisting cable) which generally is heavy, relatively stiff and
moreover, bears all the weight of the load. Compared to such single cable systems,
the present method allows active heave compensation with a comparatively much smaller
and lighter-weight system, and the first cable can be adjusted under less than full
load. It therefore suffers less wear than an actively adjusted hoisting cable. Further,
the first cable may have a smaller cable diameter reducing wear when travelling over
sheaves with a reasonable diameter.
[0014] Advantageously, the step of controlling a position and/or movement of the load by
compensating at least part of the spring force by adjusting the second lifting force
and/or a length of the second hoisting cable comprises adjusting a hoisting length
of the second hoisting cable as a function of a variation in a hoisting length of
the first cable, e.g. by taking in or paying out cable length together in different
rates. In the present context, a hoisting length refers to the effective distance
along the cable that an object can be displaced with the cable, e.g. a (free) hanging
section of a crane cable. In case part of the cable would run forth and back plural
times between the load and the object as in a sheaving system, the hoisting length
is accordingly less than the actual length of cable involved.
[0015] The sum of both the first and second lifting forces may be kept substantially constant
so as not to accelerate the load and maintain a predetermined position of the load.
Note that the first and second lifting forces may be controlled based on monitoring
tension forces in the respective cables, e.g. via one or more force feedback systems
in a winch, and/or based on monitoring (variations in) the actual position and/or
movement of the load.
[0016] Within this text, the word "cable" refers to any form of a suitable flexible thin
elongated component that can carry sufficient load for carrying out the required respective
part of the method such as a rope, wire, cord, wire bundle, fibre rope, ribbon, chain,
tether (e.g. steel rod tether) and/or combinations thereof. The spring force may be
provided by one or more of a pneumatic system, a pneumohydraulic system, a hydraulic
system, a constant tension winch, a mechanical spring system e.g. having a reversibly
deformable portion, and the like, which may at least partly be configured to provide
a generally relatively low spring stiffness. The spring force may also be derived
from elastic deformation of (at least part of) the first hoisting cable itself. A
constant tension winch as referred to above can control the tension in a line run
off the winch; it is used to achieve a constant line-pull set by an operator, e.g.
a pneumatically and/or hydraulically controlled tension winch. The line-pull can be
measured by a sensor, e.g. a load cell, and monitored by a control system. If the
actual value of the line-pull differs from a pre-set value the winch will pay in or
pay out the line to maintain the pre-set value. Adjustment of the cable tension may
be possible by changing the tension set point value, e.g. by setting a constant reference
pressure in the pneumatic and/or hydraulic system.
[0017] In an embodiment, the step of controlling a position and/or movement of the load
comprises varying the second lifting force and/or a length of the second hoisting
cable as a function of at least one of a position and a movement of the suspended
load with respect to a reference, in particular as a function of a deviation from
the reference.
[0018] Thus, the second lifting force allows active control of the position, force and/or
movement of the load with respect to the reference, e.g. for active heave compensation
against motion of a support and maintaining the load stationary with respect to the
earth or a moving vessel. Note that (the spring force of) the first lifting force
provides passive compensation of the force and/or movement of the load, e.g. for passive
heave compensation. In the present method, active and passive heave compensation are
arranged in parallel, rather than in series. The system is readily adjustable by direct
control over the second cable within the maximum amplitude of the spring excursion
without the need to adjust the first cable.
[0019] In an embodiment, the reference comprises at least one of a stationary point on the
earth, a position of the load, a movement of the load, a tension force of the first
hoisting cable, a spring force of the first hoisting cable, a spring excursion, the
first lifting force of the first hoisting cable, the second lifting force and/or a
tension force of the second hoisting cable. The reference position and/or movement
of the load may (also) comprise one or more intended positions and/or movements of
the load. The position and/or movement of the load may be predetermined with respect
to at least part of a remote stationary or moving object, e.g. a target position on
a quay or aboard a floating vessel or a part of the hoisting system itself in particular
a point on a (vessel's) crane such as the crane tip.
[0020] Depending on the reference, this facilitates correcting the position and/or movement
of the load for manoeuvring the load and/or placing a load in a desired position,
reducing force variations on the first and/or the second hoisting cable and/or associated
equipment. An important purpose of the active heave compensation is to minimise relative
motions between a hoisted object and a platform (foundation, moving vessel) the object
is to land on, with as a final objective to reduce acceleration and impact on both
the hoisted object and the platform. Note that plural references may be used either
selectively, in succession and/or together, e.g. to define a bounded multidimensional
parameter space in which the position and/or movement of the load is, should be and/or
can be controlled.
[0021] The step of compensating at least part of the spring force by adjusting the second
lifting force and/or a length of the second hoisting cable may be automated, e.g.
comprising use of a sensor for sensing a position and/or movement of the load with
respect to a reference, e.g. a suspending structure or a platform onto which the load
is to be placed, and using a controller controlling at least one of a position and
a movement of the suspended load based on one or more signals of the sensor. This
allows executing the method generally faster and more reliably than with a human operator
adjusting the second lifting force.
[0022] The method may comprise adjusting the first and second hoisting cables substantially
simultaneously, e.g. paying out and/or taking in the respective cables. This facilitates
controlled movement of the load. The adjustment of the first and second hoisting cables
need not be at an equal rate or speed, so as to adjust the first and second lifting
forces with respect to each other.
[0023] In an embodiment the spring force and/or the spring stiffness may be adjustable,
e.g. in dependence of the lifting capacity of the second hoisting cable. Thus, the
spring force and the second lifting force may be adjusted to the weight and/or other
aspects of the load, e.g. size and shape of the load, deformability of (parts of)
the load, drag on the load by air and/or water, etc.
[0024] In an embodiment, at least part of the load may be submerged in water, in particular
sea water. Where applicable, the reference may comprise (part of) a sea bed and/or
a structure on a sea bed. A (partly) submerged load experiences significant hydrodynamic
forces such as drag and/or fluid inertia, commonly known as "added mass". Providing
a spring force to the first hoisting cable provides passive heave compensation and
can sometimes - depending on the shape etc. of the structure - effectively compensate
for most wave motion, e.g. created, for instance, by roll, pitch, heave etc. of a
vessel; the active heave compensation system as presently provided by the second hoisting
cable allows to control (residual) movements and/or forces of the load with respect
to moving water and/or or a moving support structure, in particular a vessel on the
water and conversely with respect to the (stationary) environment such as (structures
on) the sea bed. The present method is particularly effective in air, where the effect
of drag on the load and/or added mass inertia, and hence activation of the passive
heave compensator in the first hoisting wire, is minimal.
[0025] In an embodiment, the method comprises using two cables from one hoisting device,
e.g. a crane or winch assembly, as first and second hoisting cables, respectively.
Thus, one crane may carry most of the weight of the load with a first cable, e.g.
the main hoisting cable, and compensate at least part of the spring force provided
by (the heave compensation of) the main hoisting cable by employing an auxiliary cable
of the same crane and adjusting the second lifting force provided by that auxiliary
cable. This increases ease and/or reliability of manipulation of the first and second
hoisting cables with respect to each other. Similarly, an assembly of two or more
winches or a combination of one or more cranes and winches may be suitably employed,
wherein the cranes and/or winches may be positioned on a single or on different hoisting
structures. Note that commonly in cranes free portions of all hoisting cables generally
hang from substantially equal positions, but this is not required. Further, both first
and second hoisting cables may readily extend generally parallel to each other and
engage the load close to each other, so that forces applied with one of the hoisting
cables can relatively directly affect forces in the other one of the hoisting cables.
[0026] An embodiment comprises lifting the load with two or more hoisting systems, each
hoisting system comprising at least a first and a second hoisting cable, respectively,
and the method comprising connecting each of the respective first and a second hoisting
cables to the load, and performing the method according to any one of the preceding
claims with each of the hoisting systems connected to the load, wherein in particular
at least one of the respective hoisting systems is operated in a slave mode to the
another one of the respective hoisting systems. Thus, a large load may be hoisted
with two or more cranes, each of which employing the method described herein. This
facilitates manipulation of the load.
[0027] The method provided herewith may also facilitate supporting relatively heavy loads
with relatively small or light-weight hoisting devices.
[0028] In accordance with the preceding, herewith an apparatus for performing the described
method is provided. The apparatus, comprises a first hoisting cable and a second hoisting
cable. The first hoisting cable is connectable to a load and the second hoisting cable
is connectable to the load. The first hoisting cable is configured to provide, at
least when connected with the load, a lifting force including a spring force, e.g.
the first hoisting cable being elastic and/or operably connected with a spring device.
The second hoisting cable, in particular the hoisting length and/or lifting force
thereof, is adjustable relative to the first hoisting cable, at least when connected
with the load for compensating at least part of the spring force by adjusting the
second lifting force. The apparatus comprises a sensor configured to detect at least
one of the position and/or movement of the load with respect to a reference and wherein
the second cable is operably connected with a controller which in turn is connected
with the sensor and is configured to adjust the second hoisting cable in response
to one or more signals from the sensor.
[0029] In particular, the first hoisting cable is connectable to the load in a first connection,
and the second hoisting cable is connectable to the load in the first connection and/or
a second connection near the first connection. Thus, the first and second cables engage
the load close to each other and forces applied with one of the hoisting cables can
relatively directly affect forces in the other one of the hoisting cables.
[0030] In particular, the reference may comprise at least one of the group comprising a
predetermined position of the load, a movement of the load, a tension force of the
first hoisting cable, a spring force of the first hoisting cable, the first lifting
force of the first hoisting cable, the second lifting force and/or a tension force
of the second hoisting cable and wherein in particular the position and/or movement
of the load are predetermined with respect to at least part of a remote stationary
or moving object, e.g. a target position on a floating vessel for placement of the
load.
[0031] The apparatus may comprise one hoisting device, e.g. a crane, providing both the
first and second hoisting cables. In particular the first cable may be a main hoisting
cable and the second cable may be an auxiliary cable.
[0032] In an embodiment, the apparatus is configured for being itself at least partly suspended
from a hoisting system, e.g. a crane, and in turn suspending the load with respect
to a base, e.g. at least one of the first and second hoisting cables extending between
the base and the load. In particular the apparatus and the load may be movably attached
together to form an integrated assembly, wherein the apparatus may comprise a power
source and/or a connection to an external power source such as a remote operated vehicle.
Such apparatus can be used suspended from a hoisting cable and thus employed, which
allows reaching great depths with the load while benefiting from the present concepts.
A benefit from suspending the apparatus from a hoisting system instead of the other
way around is that a more direct control over the position and/or movement of the
load may be achieved if no cable is positioned between the compensation apparatus
and the load.
[0033] The system may, e.g., be realised with (i) a main hoisting wire from above sea level
to a first depth, say, 1,600 m deep. (ii) a beam complete with hoisting system at
the first depth. (iii) the load being suspended beneath the beam with (iv) a main
lift wire complete with passive heave compensation (forming the first hoisting cable)
and (v) an additional lifting wire of which the length can be controlled (forming
the second hoisting cable). Hence the beam is at the first depth and the load at a
second depth, below the first depth, say, 1,620 m. Note that the first cable running
between the beam and the load can be a, possibly passively heave compensated, fixed
pennant or hoisting wire with high stiffness.
[0034] In a further aspect, a vessel is provided comprising at least one apparatus as described
herein. Such vessel exhibits improved heave compensation with respect to simplicity,
costs and/or weight.
[0035] In a particular embodiment, the vessel comprises one or more, e.g. two, hoisting
systems with first and second hoisting cables, e.g. cranes and wherein the vessel
is configured to lift the load with two or more of the hoisting systems each performing
the method as described herein.
BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The above-described aspects will hereafter be more explained with further details
and benefits with reference to the drawings showing an embodiment by way of example.
Fig. 1 indicates an embodiment of an apparatus as provided herewith;
Figs. 2-5 indicate further embodiments.
DETAILED DESCRIPTION OF EMBODIMENTS
[0037] It is noted that the drawings are schematic, not necessarily to scale and that details
that are not required for understanding the present invention may have been omitted.
The terms "upward", "downward", "below", "above", and the like relate to the embodiments
as oriented in the drawings, unless otherwise specified. Further, elements that are
at least substantially identical or that perform an at least substantially identical
function are denoted by the same number.
[0038] Fig. 1 indicates as an exemplary embodiment an offshore vessel 1 floating on a body
of water W and being provided with a crane 3 having a mast 5 and a boom 7. A load
9 is suspended from (the boom 7 of) the crane 3 via a first hoisting cable 11 and
a second hoisting cable 13. The load 9 may be placed on a target position on a fixed
object 15 such as a platform fixed to the seabed. Note that in other cases the target
position may be on a movable object, e.g. a floating vessel, and/or may be submerged.
[0039] In the shown configuration, the first hoisting cable 11, or main wire, has a connector
12 determining a first hoisting length L11 from the crane down. The first hoisting
cable 11 is connected with the load 9 through a spring element 17 suspended from the
main wire 11, and, here, a sling 19, together spanning a length LS. Thus, the load
9 is suspended from the crane boom 7 by a suspension length L9 (L9 = L11 + LS). The
first hoisting length L11 is adjustable, e.g. by reeling in and/or paying out the
cable 11 from a first winch 21.
[0040] The second hoisting cable 13, or auxiliary wire, is connected to the load 9 without
intervening spring element and determines a second hoisting length L13 from the crane
down. The second hoisting length L13 is adjustable, e.g. reeling in and/or paying
out the cable 13 from a controllable second winch 23.
[0041] The second hoisting cable 13 may be connected with the load 9 at the same point(s)
as the first hoisting cable 11 and any intervening structure (spring device, sling,
etc.) or at one or more different connection points. The first and second hoisting
cables 11, 13 may hang from the crane boom 7 at equal or different heights, e.g. using
sheaves running on a common or on different axles. Thus, the suspension length L9
and the second hoisting length L13 may be equal or different.
[0042] The stiffness of the spring element, e.g. a spring constant, should be selected such
that the load 9 is suspended within the dynamic range of the spring and the length
LS is variable. Thus, the first hoisting cable 11 exerts a first lifting force on
the load including a spring force due to the spring element 17 and the total suspension
length L9 is variable while the first hoisting length L11 is constant. As a consequence,
in absence of the second hoisting cable 13 or at least in absence of influence of
the second hoisting cable 13, the load 9 may move up and down with respect to (the
boom 7 of) the crane 3 without adjustment of the first hoisting cable 11. This provides
passive heave compensation to the load 9 for movements of the vessel 1, in particular
when the load 9 is submerged in the water W and subject to significant drag and "added
mass". The spring stiffness determines the spring force on the load 9 and excursions
of the load 9 from an initial position, i.e. the length LS and variations thereof.
The possible length variation of LS (and hence L9) is determined by a maximum excursion
amplitude allowed by the spring element 17.
[0043] As indicated, the spring element 17 typically may take the form of one or more hydraulic
cylinder-piston assemblies coupled with an at least partly gas-filled volume 25. By
adjusting the gas pressure in the volume 25, the pressure in the hydraulic assembly
may be adjusted and an equilibrium piston position may be determined, and thus an
equilibrium position of the load 9 with respect to the connector 12, such that equal
up-and downward spring excursions SE and corresponding variations in LS are possible.
[0044] In case the first hoisting cable 11 would be directly connected to the load, the
suspension length L9 and the first hoisting length L11 would be equal, e.g. in case
the spring force would be derived from elasticity of the cable itself, from a constant
tension winch and/or from a movable crane element.
[0045] According to the presently provided concepts, the second hoisting cable 13 is provided
and connected with the load 9 in parallel to the first hoisting cable 11. By adjustment
of (the hoisting length L13 of) the second hoisting cable 13, in particular pulling
in the second hoisting cable 13, the second hoisting cable 13 may exert a lifting
force on the load 9, taking over part of the weight of the load 9 from the first lifting
cable 11 and the spring element 17, (partly) relaxing the spring element 17 and reducing
the spring force and reducing the length LS. Thus, the spring force of the spring
element 17, or rather the spring force component of the first lifting force is at
least partly compensated. By increasing or reducing the length L13, i.e. extending
or retracting the second hoisting cable 13, the lengths L9 and LS may be varied separate
from variations of the length L11. Since gravity and other forces acting on the load
9, e.g. accelerations due to wave motion, are supported primarily by the first hoisting
cable 11 and the spring element 17, such variations of the length LS can be realised
with a relatively small second hoisting force by the second hoisting cable 13, depending
on the stiffness of the spring element 17.
[0046] Note that the second cable 13 may hang loose and inoperative if not required, therewith
not affecting the passive heave compensation. Note further that the active heave compensation
system provided by the second hoisting cable 13 in principle does not add mass to
the total load suspended from the first hoisting cable 11.
[0047] A number of optional motion and/or position sensors 27, 29, 31, 33 are provided and
(here: wirelessly) connected with a controller 35. Thus, the position and/or movement
of (the hull of) the vessel 1, the (tip of the) crane boom 7, the load 9 and the platform
15 may be determined with respect to each other, and/or with respect to one or more
particular sensors and thus may define one or more reference positions for positioning
and/or moving the load 9. In particular, a separation S of the load 9 from (a target
position on the object 15) may be determined and used for controlling a position and/or
movement of the load 9, e.g. through comparison of the (relative) positions of the
sensors 29 and 31, e.g. for smoothly placing or lifting the load 9 onto/from the platform
15. More, less and/or differently arranged and/or differently arranged and/or connected
sensors may be provided, e.g. a sensor monitoring piston movements in a cylinder of
a hydraulic spring element.
[0048] In this example, the controller 35 is connected to the second winch 23 and optionally
to the first winch 21 so that, in response to one or more signals from one or more
sensors 27-33 the position and/or movement of the load 9 may be automatically controlled
by adjustment of the first and/or second winches 21, 23. E.g., placing the load 9
onto the (stationary) platform 15 with a moving floating vessel 1 may comprise lowering
the load 9 by concurrent extension of the first and second hoisting cables 11, 13
but at different velocities, such that the second hoisting cable 13 exerts an increasing
lifting force and compensates reducing variation in length LS. Thus, the effect of
the extension of the first hoisting cable 11 is reduced by adjustment of the second
hoisting cable 13 and the load 9 nears the platform 15 at lower velocity than by lowering
the load 9 with the first hoisting cable 11 alone. The separation of the load 9 and
the platform 15 may then be controlled to accurate degree by relative adjustment of
the first and second hoisting cables 11, 13 by the controller 35 in dependence of
signals from the sensors 29 and 31, e.g. providing separation data, and possibly from
the sensor 27 providing data on movement of the hoisting structure3. Upon contact
of the load 9 with the platform 15 the second hoisting cable 13 may quickly be extended
relative to the first hoisting cable 11 and further wave motion of the vessel 1 and/or
any deformation of the crane 5 may be compensated by the spring element 17 until the
first hoisting cable 11 is also extended and the load 9 is securely placed.
[0049] Figs. 2-5 show further embodiments.
[0050] Fig. 2 shows an embodiment which may be understood as an inverse of the embodiment
shown in Fig. 1: here, a crane 5 is arranged on a stationary object 15 such as a platform
and provides the first and second hoisting cables 11, 13, for together hoisting a
load 9 in accordance with the aforegoing. The first hoisting cable 11 is provided
with a spring element 17 and the second hoisting cable 13 is adjustable for compensating
the spring force of the spring element 17. As indicated, the crane 5 can transfer
the 9 load onto (or from) a vessel 1 floating on a body of water W, wherein adjustment
of the first and second cables 11, 13 may be used to control the position and/or movement
of the load 9 so as to compensate wave-induced motion of the vessel 1 according to
the explanations supra. For a particularly smooth and shock-free transfer of the load
9, the vessel 1 and load 9 are provided with sensors 33, 29, respectively, connected
with a controller 35 for controlling operation of the crane and adjustment of the
first and second hoisting cables 11, 13, so that position and/or movement of the load
9 may be controlled with respect to the position and/or movement of (the sensor 33
of) the vessel 1, taking the latter as a reference rather than the stationary crane
5.
[0051] Fig. 3 indicates a vessel 1 with a first crane 5A and a second crane 5B. The first
hoisting cable 11 connects the first crane 5A with the load 9 (which here is submerged
in the body of water W) and the second hoisting cable 11 connects the second crane
5B with the load 9. Thus, the first and second hoisting cables 11, 13 may be adjusted
independently. Such system may be preferred in case the first hoisting cable 11 is
provided with a passive heave compensation system realised by deformation of at least
part of the first crane 5A and / or cable 11. Further, such system facilitates modifying
and/or retrofitting of an existing hoisting system with passive heave compensation.
Instead of the first and/or second cranes 5A, 5B, one or more winches and/or capstans
may be used.
[0052] Fig. 4 indicates a vessel 100 comprising two cranes 5M and 5S respectively, for dual
crane operation wherein both cranes together hoist a load. Here, the load is suspended
from each crane by respective first and second hoisting cables 11, 13. Thus, on each
side of the load 9 engaged by the respective cranes 5M, 5S, passive and active heave
compensation can be performed in parallel as explained hereinbefore by appropriately
adjusting the respective first and/or second hoisting cables 11, 13 with respect to
each other. For manipulating the load 9, one of the cranes, e.g. 5S, may be operated
in slave-mode to the other crane 5M. This may entail master-slave operation of the
respective first hoisting cables 11 and controlled adjustment of the respective second
cables 13 relative to the respective first cables 11 for heave compensation of the
respective suspension lengths.
[0053] Fig. 5 indicates an embodiment of an apparatus 110 which is itself suspended from
a crane 5 by a hoisting cable 111. The apparatus 110 comprises a base 50 and the load
9 is suspended from the base 50 by first and second hoisting cables 11, 13 extending
from (a respective winch 21, 23 on) the base 50 to the load 9. Here, the first cable
11 is connected to a constant tension winch 21 with adjustable offset tension by an
adjustable spring element 117. The second hoisting cable 13 is connected to a winch
23 which may be controlled to reel in or pay out the second hoisting cable 13 by a
controller 135 on the basis of one or more signals from one or more sensors (not shown)
on the load 9, the vessel 1, the base 50, the spring element 117 and/or a portion
of the sea bed.
[0054] The invention is not restricted to the above described embodiments which can be varied
in a number of ways within the scope of the claims. For instance it is also possible
to have the load hanging from two cranes, each of which providing a respective "first
hoisting cable" and to have one second hoisting cable to the load, in particular engaging
the load at or near a position above the centre of gravity of the load, e.g. between
the cranes. The second hoisting cable may run from one of the cranes or from another
hoisting support e.g. a winch. This enables active heave compensation of the load
in a dual crane operation with a simplified setup compared to Fig. 4.
[0055] The second lifting force may include a second spring force, e.g. with the method
comprising providing the second hoisting cable with a second spring force, in particular
being higher than (e.g. due to a stiffer spring) or at least distinct from the first
spring force. Thus, the second hoisting cable may also be subject to passive compensation
of forces and/or movements such as passive heave compensation. Such second spring
force and/or its spring stiffness may be adjustable, e.g. in dependence of the lifting
capacity of the second hoisting cable.
[0056] Existing hoisting systems may comprise plural hoisting cables; the present method
can increase their operational flexibility for which (controllers of) such hoisting
systems may be modified to provide an apparatus as provided herewith.
[0057] Various aspects of the presently provided method may be implemented as a program
product for use with a computer system, in particular a computer system for controlling
adjustment of the first and/or second cable(s) of an apparatus as described herein,
where the program(s) of the program product define functions of the embodiments (including
the methods described herein). In one embodiment, the program(s) can be contained
on a variety of non-transitory computer-readable storage media, where, as used herein,
the expression "non-transitory computer readable storage media" comprises all computer-readable
media, with the sole exception being a transitory, propagating signal. In another
embodiment, the program(s) can be contained on a variety of transitory computer-readable
storage media. Illustrative computer-readable storage media include, but are not limited
to: (i) non-writable storage media (e.g., read-only memory devices within a computer
such as CD-ROM disks readable by a CD-ROM drive, ROM chips or any type of solid-state
nonvolatile semiconductor memory) on which information is permanently stored; and
(ii) writable storage media (e.g., flash memory, floppy disks within a diskette drive
or hard-disk drive or any type of solid-state random-access semiconductor memory)
on which alterable information is stored.
[0058] Elements and aspects discussed for or in relation with a particular embodiment may
be suitably combined with elements and aspects of other embodiments, unless explicitly
stated otherwise.
1. A method for compensation of variations of movements and/or forces of a suspended
load, in particular a load suspended from a movable or moving structure, more in particular
a load suspended from a floating vessel, comprising the steps of:
connecting a first hoisting cable and a second hoisting cable with the load in parallel;
suspending the load from the first and second hoisting cables, wherein the first hoisting
cable exerts a first lifting force on the load including a spring force and wherein
the second hoisting cable exerts a second lifting force on the load;
wherein the method comprises the step of controlling a position and/or movement of
the load by compensating, in particular reducing, at least part of the spring force
by adjusting the second lifting force and/or a length of the second hoisting cable.
2. The method of claim 1, wherein the step of controlling a position and/or movement
of the load comprises varying the second lifting force and/or a length of the second
hoisting cable as a function of at least one of a position and a movement of the suspended
load with respect to a reference, in particular as a function of a deviation from
the reference.
3. The method of claim 2, wherein the reference comprises at least one of the group comprising
a stationary point on the earth, a position of the load, a movement of the load, a
tension force of the first hoisting cable, a spring force of the first hoisting cable,
a spring excursion, the first lifting force of the first hoisting cable, the second
lifting force and/or a tension force of the second hoisting cable, and wherein in
particular the position and/or movement of the load are determined with respect to
at least part of a remote stationary or moving object, e.g. a target position on a
floating vessel for placement of the load.
4. The method of any preceding claim, comprising adjusting the first and second hoisting
cables substantially simultaneously, e.g. paying out and/or taking in the first and
second cables together.
5. The method of any preceding claim, wherein the sum of the first and second lifting
forces is substantially constant.
6. The method of any preceding claim, wherein the spring force and/or spring stiffness
is adjustable, in particular in dependence of a lifting capacity of the second hoisting
cable.
7. The method of any preceding claim, wherein at least part of the load is submerged
in water, in particular sea water, and wherein in case of a method of at least claim
2 or 3 the reference may comprise part of a sea bed and/or a structure on a sea bed.
8. The method of any preceding claim, wherein the method comprises using two cables from
one hoisting device, e.g. a crane or a winch assembly, as first and second hoisting
cables, respectively.
9. The method of any preceding claim, comprising lifting the load with two or more hoisting
systems, each hoisting system comprising at least a first and a second hoisting cable,
respectively, and the method comprising connecting each of the respective first and
a second hoisting cables to the load, and performing the method according to any one
of the preceding claims with each of the hoisting systems connected to the load,
wherein in particular at least one of the respective hoisting systems is operated
in a slave mode to another one of the respective hoisting systems.
10. An apparatus for performing the method of any preceding claim, comprising a first
hoisting cable and a second hoisting cable, the first hoisting cable being connectable
to a load and the second hoisting cable being connectable to the load
wherein the first hoisting cable is configured to provide, at least when connected
with the load, a lifting force including a spring force, e.g. the first hoisting cable
being elastic and/or operably connected with a spring device, and wherein the second
hoisting cable, at least when connected with the load, is adjustable relative to the
first hoisting cable, and
wherein the apparatus comprises a sensor configured to detect at least one of the
position and/or movement of the load with respect to a reference and wherein the second
cable is operably connected with a controller which in turn is connected with the
sensor and is configured to adjust the second hoisting cable in response to one or
more signals from the sensor.
11. The apparatus of claim 10, wherein the reference comprises at least one of the group
comprising a predetermined position of the load, a movement of the load, a tension
force of the first hoisting cable, a spring force of the first hoisting cable, the
first lifting force of the first hoisting cable, and a tension force of the second
hoisting cable.
12. The apparatus according to any one of claims 10-11, comprising one hoisting device,
e.g. a crane or a winch assembly, providing both the first and second hoisting cables,
wherein in particular the first cable is a main hoisting cable and the second cable
is an auxiliary cable.
13. The apparatus according to any one of claims 10-13, the apparatus being configured
for being at least partly suspended from a hoisting system and in turn suspending
the load with respect to a base, wherein in particular at least one of the first and
second hoisting cables extends between the base and the load, and
wherein in particular the apparatus and the load are movably attached together to
form an integrated assembly, and wherein optionally the apparatus comprises a power
source and/or a connection to an external power source such as a remote operated vehicle.
14. A vessel comprising at least one apparatus according to any one of claims 10-13.
15. The vessel according to claim 14, comprising plural apparatus according to claim 12,
in particular two such apparatus, and being configured to perform the method according
to claim 9.