[0001] The present invention relates to a method for coupling and mounting of the flexible
light-bearing tunnel in the tunnel skylight, consisting of elements in supply condition.
[0002] Typical design of tunnel skylights essentially consist of three main components:
an outer element, a light-bearing tunnel and an inner element. The outer element is
mounted in the outer partition of the building. The roof slope is it in the most solutions,
and in such solution the outer element is referred to as a roof element. There are
also solutions in which the outer element is mounted in the outer wall of the building.
The inner element is mounted in one of the inner partitions, i.e. in the ceiling or
the inner wall of the illuminated room and is used for the direct emission of the
conducted light into the room.
[0003] It is connected with the outer element via light-bearing tunnel, which preferably
has the shape of an expediently circular tube coated inside with a layer of an excellent
light reflecting material. There are other cross-sectional shapes of the light-bearing
tunnel, but the simplest and cheapest solution is a round tube: rigid, flexible or
corrugated.
[0004] Basically, the mounting method of the tunnel skylights consists of two stages. The
assembly of the outer element in the outer partition and the assembly of the inner
element in the inner partition is the first stage. The mounting of the light-bearing
tunnel and linking with the outer and the inner element is the second stage being
the subject of the invention.
[0005] It is a known state of the art, wherein the skylight is equipped with a flexible
light-bearing tunnel of the length specified by the manufacturer. There are solutions
also known from the market in which the flexible tube of the skylight is terminated
with a rigid tube serving as a connecting element to the body of the outer element
of the skylight.
[0006] The required length of the light-bearing tunnel varies due to a freedom of arrangement
of the outer element of the skylight mounted in the outer partition relative to the
inner element mounted in the inner partition. In the case of an excessed length of
the light-bearing tunnel it is shortened by cutting away the superfluous part during
final assembly of the building. In most cases the edge of the light-bearing tunnel
after trimming should be in one plane, eg. to create a circle perpendicular to the
axis. Such a method of preparation of the light-bearing tunnel increases the risk
of damage during installation and requires special care when cutting, which in practice
forces the execution of the operation by a trained person with high manual dexterity.
As is apparent from the description, this assembly method is laborious. Furthermore,
in case of a bad evaluation of the required length the repetition of cutting too long
light-bearing tunnel is necessary.
[0007] In the case of trimming of the light-bearing tunnel too short the exchange for new
and repeat of the operation may even be required. Preparation of the length of the
light-bearing tunnel for the specific solution in consultation with the supplier or
the manufacturer may be a special solution and making installation easier. However,
this requires the prior effort to determine the exact dimensions and negotiations
with the supplier. The requirement for precise adjustment of the length of the light-bearing
tunnel stems from the condition of maximum flow of light through the tunnel skylight,
which is satisfied by properly tensioned flexible light-bearing tunnel without unnecessary
bends and undulations of the inner surface. Methods of mounting a flexible skylight
tunnel between a skylight and a ceiling are known from
JP H108658 A,
EP 0313461 A1,
WO 02/25032 A2 and especially
US 4339900 A1. The goal of the proposed invention is a mounting method of a light-bearing tunnel
skylight, eliminating the need for its trimming and such a preparation of the kit
that it could be in this range of activities installed quickly and without tools.
[0008] A solution to the implementation of the present purpose is the subject of the invention
as defined by claim 1 : the method of the mounting of the light-bearing tunnel on
the inner element, usually embedded in the ceiling of the illuminated room or on the
outer element embedded usually in the roof of the building. The light-bearing tunnel
consists essentially of two parts: the rigid tube and the flexible tube. The flexible
tube is the easily deformable element made essentially from a thin shell, to which
the resilient wire shaped in the form of a spiral coil is attached on the outer surface.
The stroke of the winding of the spiral and the number of coils are dependent on the
projected maximal extension of the light-bearing tunnel. Such prepared flexible tube
is slid over on the part of the rigid tube.
[0009] The remaining part of rigid tube is used as the mounting part, for connecting the
light-bearing tunnel to the outer element, the inner element or the other flexible
tube. During the operations of sliding on the rigid tube the spiral reduces its stroke,
preferably to a value slightly larger than the diameter of the wire of the spiral
and the elastic tube is assembled between the spiral and the outer surface of the
rigid tube.
[0010] In the supply condition the flexible tube is compressed and sliding on the rigid
tube. Mutual relation of the flexible tube and the rigid tube diameters must be selected
so that the flexible tube with the spiral provide elastic pressure to the outer surface
of the rigid tube and guarantee protection against self slipping off the flexible
tube under the influence for example of the force of gravity. There are a number of
alternative ways for tunnel skylight mounting depending on the prefabrication supply
condition, where prefabrication consisting of an outer element, an inner element and
the light-bearing tunnel, which consists of a rigid tube and pulled over it the flexible
tube.
[0011] The following options of light-bearing tunnel preparation as being part of the skylight
prefabrication may take place in prefabrication supply condition:
A - the light-bearing tunnel is removably attached to the outer element of the skylight,
B - the light-bearing tunnel is removably attached to the inner element of the skylight,
C - the light-bearing tunnel is permanently joined with the outer element of the skylight,
D - the light-bearing tunnel is permanently joined with the inner element of the skylight,
E - the light-bearing tunnel is a separate element combined during the assembly with
the outer or inner element or with the other light-bearing tunnel of the skylight;
during the assembly, the flexible tube is stretched to the desired length and coupled
with the inner element or outer element of the skylight,
[0012] The length of the rigid tube in the part with the pushed flexible tube is preferably
similar to the length of the flexible tube compressed and fastened to the rigid tube.
However, in this state, substantially the flexible tube does not extend beyond the
rigid tube.
[0013] The assembly of the inner element of the skylight in the inner partition limiting
the room, to which the light have to be supplied, is the first step of the method
of installation. In parallel, the outer element must be installed in the outer partition,
usually in the roof.
[0014] The next step of assembling is
operation I, where a combination of the rigid tube of the light-bearing tunnel with the outer
or inner element takes place. This operation occurs in the case where in the prefabrication
supply condition the light-bearing tunnel is not connected with said elements.
[0015] The next
operation II, is stretching of the light-bearing tunnel to the desired length. This action involves
pulling of the flexible tube by its free end, this leads to the sequential coil after
coil, automatic stretching of the flexible tube and slippage of subsequential coils
of the flexible tube from the rigid tube. During this operation, the self-resilient
formation of the flexible tube of the light-bearing tunnel occurs by sliding of the
subsequential coils from the rigid tube, increasing the stroke between subsequential
coils, and thus, the development of the complex surface of the flexible tube. In this
way, such a portion of the light-bearing tunnel is developed that is required for
maximum shortest connection of the inner element of the skylight with its outer element.
The axially compressed light-bearing tunnel is slightly tight mounted on the rigid
tube, which protects it from accidental slipping and ensures that the development
of the coil after coil from the side provided to connect to the inner element of the
skylight. Easily jerky strip, eg. paper in the form of a strip, sticked parallel to
the axis on the outer side of the collapsed light-bearing tunnel in the supply condition
may be an additional protection. The sections of the strip break off in the sequence
of developed coils of the light-bearing tunnel.
[0016] In the case where the length of one light-bearing tunnel is inadequate for various
reasons, its extension may be used by combining two or more. Connecting of the light-bearing
tunnels one with other is the
operation III. It involves the application of the developed part of the flexible tube of the one
light-bearing tube on the rigid tube of the another tunnel. If the length of the light-bearing
tunnel is sufficient, the operation III is ignored.
[0017] The connection of the flexible tube of the light-bearing tunnel with the unconnected
element of the skylight, which may be, depending on the options previously described,
the inner or outer element is the next stage of the assembly. These are the steps
as one of the operations IVa, IVb. The connection of the light-bearing tunnel and
the inner or outer element must be secured against accidental disconnection, using
e.g. the adhesive tape.
[0018] The
operation IVa involves the connection of the light-bearing tunnel with the inner element. This
case occurs when the rigid tube at the beginning of assembly operation I is connected
to the outer element of the skylight.
[0019] The
operation IVb involves the connection of the light-bearing tunnel with the outer element, in the
case where the rigid tube in the supply condition is connected to the inner element
or the connection was made during the previous operation.
[0020] The protection against self-development of the remaining undeveloped coils of the
light-bearing tunnel e.g. with adhesive tape is the ending stage of the assembly.
The method of the mounting being the subject of the invention provides a development
of only a required length of the light-bearing tunnel without having to shorten it
in the event of excess length. The mentioned excess remains undeveloped on the rigid
tube, which has a significant impact on the maintenance of a high transmittance of
the light beam. This is a result of the restrictions to the minimum amount of bends
and curves and smooth stretched inner surface of the light-bearing tunnel. Simplicity,
the fast installation time and the maximum efficiency of the skylight are thus assured.
[0021] The ability to re-overlap of the free turns of the flexible tube on the rigid tube,
which gives full freedom during assembly and allows the strong straining of the light-bearing
tunnel after its connection with the outer element and the inner element is an additional
advantage of the proposed invention.
[0022] Subsequential steps of the assembly of the light-bearing tunnel according to the
invention are shown in the simplified drawings from Fig. 1 to Fig. 4b,
The Fig. 1 shows the light-bearing tunnel consist of the circular rigid tube and slipped
on it axially compressed flexible tube. The drawing contains a side view and a fragment
of the longitudinal section through the wall of the light-bearing tunnel.
The Fig. 2a in the side view shows the state of the tunnel skylight assembly after
operation I for option A and C, after which the light-bearing tunnel is connected
to the outer element of the skylight.
The Fig. 2b in the side view shows the state of the tunnel skylight assembly after
operation I for option B and D, after which the light-bearing tunnel is connected
to the inner element of the skylight.
The Fig. 3 in the side view shows the state of the skylight tunnel assembly after
the operation III which is the optional case E, which consists in applying of the
developed part of the flexible tube of one light-bearing tunnel on the rigid tube
of the another light-bearing tunnel.
The Fig. 4a in the side view shows the state of the tunnel skylight assembly after
operation IVa for options A, C, E, after which the light-bearing tunnel, stretched
from the side of the outer element is connected to the inner element of the skylight.
The Fig. 4B shows the state of the tunnel skylight assembly after operation IVb for
options B, D, E , after which the light-bearing tunnel, stretched from the side of
the inner element is connected to the outer element of the skylight.
[0023] Methods of assembling in examples of the execution depend on the particular options
given in the description as cases from A to E, being the description of the preparation
of the prefabrication to the assembly.
[0024] In the first example of the execution, the light-bearing tunnel 1 is in skylight prefabrication supply condition in the
configuration of the option
A, i.e. is removably attached to the outer element 2 of the skylight. The light-bearing
tunnel 1 consists of the rigid tube 11 and the flexible tube 12, by means of which
it is removably connected to the outer element 2. The shell 121 and the spiral 122
are components of the flexible tube 12.
[0025] In the
option C similar to the option A, the rigid tube 11 is permanently joined with the outer element
2 of the skylight. The light-bearing tunnel 1 in prefabrication supply condition according
to the option A or C is shown in the simplified Fig. 2a. In this case of the execution,
the method of the assembly comprises sequentially operations II and IVa.
[0026] In the operation IVa the flexible tube 12 is applied to the circular mounting flange
31 of the inner element 3. Condition of the system after the above operations is shown
in Fig. 4a.
[0027] In a second example of the execution, the light-bearing tunnel 1 in skylight prefabrication supply condition is in the
configuration of the
option B, i.e. it is in a removable manner attached to the inner element 3 of the skylight
or in configuration of the
option D similar to the option B, in which the rigid tube 11 is permanently joined with inner
element 3 of the skylight. The light-bearing tunnel 1 in the prefabrication supply
condition according to the option B or D is shown in the simplified Fig. 2b. In this
case of the execution, the method of the assembly comprises sequentially operations
II and IVb. In the operation IVb the flexible tube 12 is applied to the circular mounting
flange 21 of the outer element 2. Condition of the system after the above operations
is shown in Fig. 4b.
[0028] In the third example of the execution, the light-bearing tunnel 1 in skylight prefabrication
supply condition is in the configuration of the option E, i.e. it is a separate part
combined during the assembly with the outer element 2 and inner element 3 and, if
necessary, an additional light-bearing tunnel 1 ' of the skylight. The light-bearing
tunnel 1 in the supply condition according to the option E is shown in the Fig. 1.
[0029] In case of the option E, the method of the assembly consists of sequentially operations
I, II, IVa, IVb. In the option E, there are two possible configurations. First, wherein
the rigid tube 11 is connected to the outer element 2 and the flexible tube 12 is
applied to the mounting flange 31 of the inner element 3 and the second wherein the
rigid tube 11 is joined to the inner element 3 and the flexible tube 12 is applied
to the mounting flange 21 of the outer element 2. In case of necessary of the extension
of the light-bearing tunnel, it is possible to supplement of the assembly process
with the operation III of the assembly of the light-bearing tunnel 1' of the skylight,
after operation II. The operation III in one of possible variants consists of the
putting of the end of a flexible tube 12 of the light-bearing tunnel 1 on the rigid
tube 11' of the additional light-bearing tunnel 1', and following operation IVb consists
of the putting of the end of a flexible tube 12' on the mounting flange 31 of the
inner element 3. Condition of the system after the above operations is shown in Fig.
3.
[0030] In each of the above showed examples of the execution the connection of the imposed
flexible tube 12 with the rigid tube 11 with the mounting flanges 21 and 31 must also
be secured, e.g. by means of adhesive tape. Additionally undeveloped coils of the
flexible tube 12 remaining on the rigid tube 11 shall be secured against accidental
unwanted spreading, e.g. by gluing them with adhesive tape.
1. The method of assembling of a flexible tunnel skylight for conducting the sunlight
into a room inside a building, said skylight in prefabrication supply condition consists
of an outer element (2), an inner element (3) and a light-bearing tunnel (1), wherein
said inner element (3) is mounted substantially within the inner partition of the
building, said light-bearing tunnel (1) has the length matched during the assembly
and said outer element (2) is mounted in the opening of the outer partition of the
building, wherein the light-bearing tunnel (1) comprises a rigid tube (11) and a flexible
tube (12) integrated with an elastic flexible spiral coil (122), wherein said flexible
tube (12) in prefabrication supply condition is compressed axially and is slid over
the rigid tube (11), and said light-bearing tunnel (1) is engaged with the inner or
the outer element in the assembly process at the building wherein increasing the length
of the light-bearing tunnel (1) in assembly operations is carried out in the operation
(II) of stretching, and subsequential sliding coil after coil of the flexible tube
(12) from the rigid tube (11) by pulling of the flexible tube by its free end, characterized in that the flexible tube (12) integrated with the coil (122) in the prefabrication supply
condition is slipped substantially wholly on the rigid tube (11) and a resilient pressure
of the flexible tube (12) using a spiral (122) to the outer surface of the rigid tube
(11) provides protection against the flexible tube (12) accidentally slipping.
2. The method according to claim 1, characterized in that the light-bearing tunnel (1) is protected against streching in the form of the easily
breaked off tape connecting spiral coils (122) of the flexible tube (12).
3. The method according to claim 1 or 2, characterized in that the light-bearing tunnel (1) in skylight prefabrication supply condition is attached
to the outer element (2) of the skylight in operation (I) where a combination of the
rigid tube of the light-bearing tunnel with the outer or inner element takes place.
4. The method according to claim 1 or 2, characterized in that the light-bearing tunnel (1) in skylight prefabrication supply condition is attached
to the inner element (3) of the skylight in operation (I) where a combination of the
rigid tube of the light-bearing tunnel with the outer or inner element takes place.
5. The method according to claim 1 or 2, characterized in that the rigid tube (11) of the light-bearing tunnel (1) in skylight prefabrication supply
condition is permanently joined with the outer element (2) of the skylight.
6. The method according to claim 1 or 2, characterized in that the rigid tube (11) of the light-bearing tunnel (1) in skylight prefabrication supply
condition is permanently joined with the inner element (3) of the skylight.
7. The method according to claim 1 or 2, characterized in that the light-bearing tunnel (1) in skylight prefabrication supply condition is a separate
element combined with the outer element (2) or the inner element (3) or with the rigid
tube (11') of an additional light-bearing tunnel (1') of the skylight during assembly
in operation (III) where the light-bearing tunnels are connected one with the other.
8. The method according to claim 1, or 2, or 3, or 5, or 6 characterized in that it comprises the operation (IVa) of connecting the flexible tube (12) of the light-bearing
tunnel (1) with the mounting flange (31) of the inner element (3).
9. The method according to claim 1, or 2, or 4, or 5, or 7 characterized in that it comprises the operation (IVb) of connecting the flexible tube (12) of the light-bearing
tunnel (1) with the mounting flange (21) of the outer element (2).
1. Verfahren zur Montage eines elastischen Tageslicht-Spots zum Leiten von Sonnenlicht
in einen Raum innerhalb des Gebäudes, der während der Montage oder im Lieferzustand
aus einem äußeren Element (2) sowie einem inneren Element (3) und einem lichtleitenden
Tunnel (1) besteht, wobei das innere Element (3) grundsätzlich in der Öffnung der
inneren Trennwand des Gebäudes montiert wird, und der lichtleitende Tunnel (1) eine
während der Montage angepasste Länge hat und das äußere Element (2) in der Öffnung
der äußeren Trennwand des Gebäudes montiert wird, wobei der lichtleitende Tunnel (1)
aus einem starren Rohr (11) und einem elastischen Rohr (12) besteht, das mit einer
federnden Schraubenspirale (122) integriert ist, wobei das elastische Rohr (12) im
Lieferzustand oder während der Montage im Gebäude axial gepresst und auf das starre
Rohr (11) geschoben wird, und der lichtleitende Tunnel (1) ist während der Montage
mit dem inneren oder äußeren Element verbunden, wobei die Erhöhung der Länge des lichtleitenden
Tunnels (1) während der Montage in der Operation II des Ausdehnens und Schiebens für
die Windung auf der Windung des elastischen Rohres (12) vom starren Rohr (11) durch
das Ziehen am freien Ende des elastischen Rohres realisiert wird, dadurch gekennzeichnet ist, dass das elastische Rohr (12), integriert mit der Spirale (122), im Lieferzustand grundsätzlich
im Ganzen auf das starre Rohr (11) geschoben wird, und der Federdruck des elastischen
Rohres (12) mit Hilfe der Spirale (122) auf die Außenfläche des starren Rohres (11)
einen Schutz vor dem selbsttätigen Herunterrutschen des elastischen Rohres (12) darstellt.
2. Das Verfahren zur Montage nach Anspruch 1, dadurch gekennzeichnet, dass der lichtleitende Tunnel (1) einen Schutz vor dem Ausdehnen hat, und zwar in Form
eines leicht abreißbaren Bands, das die Windungen der Spirale (122) des elastischen
Rohres (12) verbindet.
3. Das Verfahren zur Montage nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass der lichtleitende Tunnel (1) im Lieferzustand an das äußere Element (2) in der Operation
(I) befestigt wird, in der die Verbindung des starren Rohres des lichtleitenden Tunnels
mit dem inneren oder äußeren Element erfolgt.
4. Das Verfahren zur Montage nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass der lichtleitende Tunnel (1) im Lieferzustand an das innere Element (3) in der Operation
(I) befestigt wird, in der die Verbindung des starren Rohres des lichtleitenden Tunnels
mit dem inneren oder äußeren Element erfolgt.
5. Das Verfahren zur Montage nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das starre Rohr (11) des lichtleitenden Tunnels (1) im Lieferzustand ein integraler
Bestandteil des äußeren Elements (2) ist.
6. Das Verfahren zur Montage nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das starre Rohr (11) des lichtleitenden Tunnels (1) im Lieferzustand ein integraler
Bestandteil des inneren Elements (3) des Spots ist.
7. Das Verfahren zur Montage nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass der lichtleitende Tunnel (1) im Lieferzustand ein gesondertes Element ist, verbunden
mit dem äußeren Element (2) oder dem inneren Element (3) oder mit dem starren Rohr
(11') eines zusätzlichen lichtleitenden Tunnels (1') des Tageslicht-Spots während
der Montage in der Operation (III), in der die lichtleitenden Tunnels miteinander
verbunden sind.
8. Das Verfahren zur Montage nach Anspruch 1 oder 2, oder 3, oder 5, oder 6, dadurch gekennzeichnet, dass es die Operation (IVa) der Verbindung des elastischen Rohres (12) des lichtleitenden
Tunnels (1) mit dem Montageflansch (31) des inneren Elements (3) enthält.
9. Das Verfahren zur Montage nach Anspruch 1 oder 2, oder 4, oder 5, oder 7, dadurch gekennzeichnet, dass es die Operation (IVb) der Verbindung des elastischen Rohres (12) des lichtleitenden
Tunnels (1) mit dem Montageflansch (21) des äußeren Elements (2) enthält.
1. Le procédé de montage d'un conduit de lumière flexible pour apporter de la lumière
naturelle à l'intérieur du bâtiment qui pendant le montage ou à la livraison, est
constitué d'un élément extérieur (2) et d'un élément intérieur (3) et d'un tunnel
apportant de la lumière (1) où l'élément intérieur (3) est en principe monté dans
le trou d'une cloison interne du bâtiment et le tunnel apportant de la lumière (1)
a une longueur qui est ajustée pendant le montage, et l'élément extérieur (2) est
monté dans un trou d'une cloison externe du bâtiment, compte tenu du fait que le tunnel
apportant de la lumière (1) est composé d'un tube rigide (11) est d'un tube flexible
(12) intégré avec une spirale hélicoïdale élastique (122) où le tube flexible (12)
à la livraison ou pendant le montage dans le bâtiment est comprimé axialement et est
glissé sur le tube rigide (11), et le tunnel apportant de la lumière (1) est relié
avec l'élément intérieur ou extérieur pendant le montage, et l'augmentation de la
longueur du tunnel apportant de la lumière (1) pendant le montage est effectuée dans
l'opération II de l'extension et du glissement d'une spire après l'autre du tube flexible
(12) du tube rigide (11) en tirant l'extrémité libre du tube flexible, caractérisé en ce que le tube flexible (12) qui à la livraison est intégré avec la spirale (122) en principe
est glissé entièrement sur le tube rigide (11) et le resserrement élastique du tube
flexible (12) à l'aide d'une spirale (122) sur la surface extérieure du tube rigide
(11) constitue la protection contre le glissement automatique du tube flexible (12).
2. Le procédé de montage selon al revendication 1, caractérisé en ce que le tunnel apportant de la lumière (1) possède une protection contre l'extension sous
forme d'un ruban facile à couper, qui lie les spires de la spirale (122) du tube flexible
(12).
3. Le procédé de montage selon la revendication 1 ou 2, caractérisé en ce que le tunnel apportant de la lumière (1) à la livraison est fixé à l'élément extérieur
(2) dans l'opération (I) pendant laquelle la liaison du tube rigide du tunnel apportant
de la lumière avec l'élément intérieur ou extérieur est effectuée.
4. Le procédé de montage selon la revendication 1 ou 2, caractérisé en ce que le tunnel apportant de la lumière (1) à la livraison est fixé à l'élément intérieur
(3) dans l'opération (I) pendant laquelle la liaison du tube rigide du tunnel apportant
de la lumière avec l'élément intérieur ou extérieur est effectuée.
5. Le procédé de montage selon la revendication 1 ou 2, caractérisé en ce que le tube rigide (11) du tunnel apportant de la lumière (1) à la livraison constitue
la partie intégrale de l'élément extérieur (2).
6. Le procédé de montage selon la revendication 1 ou 2, caractérisé en ce que le tube rigide (11) du tunnel apportant de la lumière (1) à la livraison constitue
la partie intégrale de l'élément intérieur (3) du conduit de lumière.
7. Le procédé de montage selon la revendication 1 ou 2, caractérisé en ce que le tunnel apportant de la lumière (1) à la livraison est un élément séparé, lié avec
l'élément extérieur (2) ou l'élément intérieur (3) ou avec le tube rigide (11') d'un
tunnel apportant de la lumière supplémentaire (1') du conduit de lumière pendant le
montage dans l'opération (III) pendant laquelle les tunnels apportant de la lumière
sont connectés entre eux.
8. Le procédé de montage selon la revendication 1 ou 2, ou 3, ou 5, ou 6 caractérisé en ce qu'il comprend une opération (IVa) de la connexion du tube flexible (12) du tunnel apportant
de la lumière (1) avec le bride de montage (31) de l'élément intérieur (3).
9. Le procédé de montage selon la revendication 1 ou 2, ou 4, ou 5, ou 7 caractérisé en ce qu'il comprend une opération (IVb) de la connexion du tube flexible (12) du tunnel apportant
de la lumière (1) avec le bride de montage (31) de l'élément extérieur (2).