Technical field
[0001] The invention relates to a method of handling a unit in a marine vessel, which unit
is arranged in a vessel hull, which unit closes a vessel hull and which unit is adapted
to extend into the water below the vessel.
[0002] Further, the invention relates to an assembly in a marine vessel comprising a water
tight hoisting chamber opening into a hull of a vessel, and a unit closing an opening
of the hoisting chamber in a vessel hull, wherein the unit is adapted to extend into
the water below the vessel.
Background art
[0003] Document
WO 97/27102 describes a method and apparatus for removing a propeller assembly from an opening
of a floating vessel, wherein the propeller assembly is designed to close an opening
in the vessel hull when the propeller assemblyis in its mounted position. According
to this prior art, awatertight hoisting chamber is provided around thepropeller assembly
and inside that hoisting chamber a drive shaft is provided, which leads to a drive
motor positioned in the vessel and outside of the hoisting chamber. When the known
propeller assembly is to be removed, the drive shaftis removed first. Then its passage
through the hoistingchamber wall is closed in a watertight manner. After that the
propeller assembly is connected to hoisting means and then a flange of the propeller
assembly is loosened. Then, the propeller assembly can be lifted from the hoistingchamber.
The propeller assembly is also known as thruster. The method according to the prior
art requires assembly/disassembly work which has to be carried out under water.
[0004] Further, large vessels can have a draught which is up to 20 meters under water surface
level. In this case, considerable forces act to push the thruster upwards and inside
the vessel due to the difference in pressures between the water pressure outside and
the air pressure inside the vessel. With large thrusters, the forces pushing up the
thrusters which are not compensated by thruster weight may reach up to 2000kN. When
the fixing screws of the flange are removed, the propeller assembly or thruster is
lifted by these forces in uncontrolled manner. Having such a heavy mass which moves
in uncontrolled manner is dangerous. Further, loosening of the fixing of the flange
while under these forces is difficult.
[0005] Document
WO 2011/127987 A1 represents the closest prior art and describes an assembly according to the preamble
of claim 10 and a method of maintenance of a unit arranged in the watertight hoisting
chamber and closing an opening in a vessel hull, wherein the unit is adapted to extend
into the water below the floating vessel. The method comprises the steps of clamping
the unit in its mounted position by clamping means, releasing fixing means which fix
the unit into its mounted position while holding the unit clamped in its position
and at least partly flooding the hoisting chamber, then releasing the clamping of
the unit and hoisting the unit away from its mounted position. A clamping means is
used to clamp the unit in its mounted position before the fixing means, which are
normally used for mounting the unit intoits position, are removed. In this way, the
opening can be held closed and the unit is held in position, so that the work for
releasing the fixing means can be carried out while it is still dry in the hoisting
chamber. After the fixings are removed, the hoisting chamber is at leastpartly flooded
either by provision of an extra valve for flooding the chamber or by a controlled
release of the clamping of the unit. When the clamping is released, the water in the
at least partly flooded hoisting chamber puts some pressure on the unit from the vessel
inside, so that the pressure differences at the unit between inside and outside the
vessel are reduced. Therefore, the forces pushing up the unit can be reduced. Even
if the method is beneficial as such there has emerge some need to further develop
the method.
[0006] In view of the above prior art, it is the object of the invention to provide an improved
method and assembly for maintenance of a unit which passes through and closes an opening
in the vessel hull while the vessel is floating.
Disclosure of the Invention
[0007] With regard to the method, this object is met with a method of handling a unit in
a water tight hoisting chamber opening into a hull of a vessel, wherein the unit is
adapted to extend into the water below the vessel when installed at its mounted position,
the method comprising steps of: clamping the unit in its mounted position by clamping
means, releasing fixing means fixing the unit into its mounted position while holding
the unit clamped in position by clamping means, at least partly flooding the hoisting
chamber. The method being characterized by steps of detaching the unit by simultaneously
releasing the clamping means and lifting the unit from its mounted position by applying
lifting force to the unit by lifting devices, and hoisting the unit away from the
hoisting chamber.
[0008] According to an embodiment of the invention the method further comprises a step of
controlling the detachment of the unit by mutual operation of the clamping means and
the lifting devices.
[0009] According to an embodiment of the invention the method further comprises a step of
controlling alignment during the detachment of the unit by mutual operation of the
clamping means and the lifting devices.
[0010] According to an embodiment of the invention the flooding of the hoisting chamber
the method further comprises the step of gradually releasing the clamping means clamping
the unit into the mounted position in co-operation with the lifting devices until
water enters through the opening of the hull.
[0011] According to an embodiment of the invention the method further comprises a step of
clamping and lifting of the unit uses hydraulic forces.
[0012] According to an embodiment of the invention the method further comprises steps of
lowering the unit into its mounted position inside the hoisting chamber on lifting
devices, clamping the unit in its mounted position and closing the opening in the
vessel hull with co-operation of the clamping means and lifting devices, at least
partly removing the water from the hoisting chamber and applying fixing means thus
fixing the unit in its mounted position, releasing the clamping of the unit.
[0013] Objects of the invention are also met by a method of handling a unit in a water tight
hoisting chamber opening into a hull of a vessel, wherein the unit is adapted to extend
into the water below the vessel when installed at its mounted position, the method
comprising steps of: lowering the unit into its mounted position inside the hoisting
chamber on lifting devices, clamping the unit in its mounted position and closing
the opening in the vessel hull with co-operation of the clamping means and lifting
devices, at least partly removing the water from the hoisting chamber and applying
fixing means thus fixing the unit in its mounted position, releasing the clamping
of the unit.
[0014] According to an embodiment of the invention the method further comprises a step of
controlling the installation of the unit by mutual operation of the clamping means
and the lifting devices.
[0015] According to an embodiment of the invention the method further comprises a step of
controlling alignment during the installation of the unit by mutual operation of the
clamping means and the lifting devices.
[0016] Objects of the invention are also met by an assembly in a marine vessel comprising
a water tight hoisting chamber opening into a hull of a vessel, and a unit closing
an opening of the hoisting chamber in a vessel hull, wherein the unit is adapted to
extend into the water below the vessel, the assembly comprising: a fixing means fixing
the unit into its mounted position, a clamping means adapted to clamp the unit into
its mounted position, lifting devices arranged in co-operation with the unit and the
hoisting chamber in order to apply force to the unit, the lifting devices comprising
a plurality of hydraulic jacks arranged at inside the hoisting camber and around the
opening in the hull when the hoisting chamber is mounted.
[0017] According to an embodiment of the invention the lifting devices are fixed to the
hull.
[0018] According to an embodiment of the invention the lifting devices comprise removable
hydraulic jacks.
[0019] According to an embodiment of the invention the lifting devices comprise dedicated
force control systems.
Brief Description of Drawings
[0020] In the following, the invention will be described with reference to the accompanying
exemplary, schematic drawings, in which
- Figure 1 shows a section of a vessel with a hoisting chamber and a mounted unit;
- Figure 2 shows an enlarged schematic view of a portion of Fig. 1 where a part of the
hoisting chamber and a part of the unit is shown;
- Figure 3 shows a detail of a clamping means cooperating with the unit;
- Figure 4 shows the sequence of dismounting a thruster unit from the vessel hull;
- Figure 5 shows a detail of hoisting chamber and a flange connection;
- Figure 6 shows an embodiment of the flange;
- Figure 7 shows a further embodiment of the flange; and
- Figure 8 shows a still further embodiment of the flange.
Detailed Description of Drawings
[0021] Fig. 1 shows a vessel hull 100 which floats in water as is indicated with the broken
line in Fig. 1. Inside the vessel, there is provided a hoisting chamber 1 which is
afixed construction mounted to the vessel 100.Inside the hoisting chamber 1 there
is a unit 2 which extends through the vessel hull 100 to the outside. This is the
unit which requires maintenance. Here,the unit is a so-called thruster 2. The thruster
2 has a propeller 21, a gear housing 22, a flange 24 and an electric motor 23 for
driving the propeller 21. Anotherterm often used in practice for the flange 24 is
mounting can; hereinafterthe term flange is used for that part. Of thethruster 2,
the propeller 21 and the gear housing 22 are the elements immersed in water, while
the flange 24 closes the opening in the vessel hull 100 when the unit is mounted to
the vessel. The propeller 21 and the gear housing 22 may be rotated around an axis
substantially perpendicular to therotational axis of the propeller 21. This kind of
thruster is often used in connection with large vessels for position control and for
maneuver assistance. The flange 24 may also be developed and contain a gear box and
drive means for rotating thethruster around its substantially vertical axis.
[0022] Fig. 1 further shows that hoisting chamber 1 has guide rails 12 at its wall extending
along the chamber in its height direction; here two guide rails 12 are shown. Also,clamping
means 11 are shown which will be discussed in moredetail under reference being made
to other drawing figures.It is noted that only a pair of clamping means 11 is shown
in Fig. 1 although typically up to eight clamping means are provided which are arranged
on a circle at equal angularintervals around the flange 24.
[0023] Further, Fig. 1 shows a cover 4 of the hoisting chamber, which preferably watertightly
closes the hoisting chamber at its upper end. One of the functions of this cover is
ofcourse to avoid that someone may fall into this chamber (inthe shown example vessel's
draught i.e. the depth of the chamber is about 18 meters) and, on the other hand,
the cover is additional protection against immersion of water into the vessel if the
opening in the vessel bottom is not tightly closed for whateverreason.
[0024] Fig. 2 shows an enlarged view of a section II of the arrangement of the thruster
2 at a portion close to the flange 24 of the thruster. The flange 24 of the thruster
furthercomprises hoisting eyes 25 and a flange plate portion 26,which cooperates with
seals 13 for watertightly closing the opening in the vessel hull 100. Screws 14 form
the fixing means and a number of screws are provided along the flange plate portion
26 in a rim around the unit 2. Fig. 2 shows a part of the hoisting chamber wall, which
hoisting chamber wall carries two guide rails. It should be understood that the flange
and the bottom opening in the hoisting chamber may be formed suitably according to
the need. They may have for example circular, rectangular or polygon form, or a combination
thereof.
[0025] Although not shown, unit 2, in particular the flange 24 thereof, has guide means
which cooperate with the guide rails, when the unit is moved inside the hoisting chamber.
Although twoguide rails 12 are shown in Fig. 1, any suitable number ofguide rails
can be provided. Also, clamping means 11 are shown fixed to the hoisting chamber wall.
Functional cooperation of the clamping means 11 with the flange 24 of the unit 2 will
be described by referencebeing made to Fig. 3.
[0026] Further, Fig. 2 shows an electric motor 23 which is fixed to a gear box having a
coupling so as to be in drive connection with a propeller 21 of theunit 2. Of course,
other types of motors may be used as well.
[0027] Turning now to Fig. 3, a detail of a clamping means 11 as shown of the righthand
side of Fig. 2 is shown in more detail in Fig. 3. The clamping means 11 has a hydraulic
cylinder 111 which has a cylinder rod 112. By controlling flow of hydraulic fluid
to and from the cylinder 111, movement of the rod 112 can be controlled. At the end
of the rod 112 there is shown a clamp 114, which is adapted to cooperate with a clamping
pad 115 provided on the flange 24 of the unit 2. Also, Fig. 3 shows the fixing screws
14 serving as the fixing means and a seal 13 for watertightly sealing the connection
between the unit 2 and the vessel hull 100. It is noted that the clamping pad 115
here has the form of a shallow recess cut into the plate-shaped member 241 which is
fixed to the flange 24 and the flange plate portion 26.
[0028] Furthermore, Fig. 3 shows a guide surface 113 which is inclined outwardlywith increasing
height of the hoistingchamber. The guide surface 113 cooperates with the clamp114
of the clamping means 11. With the cylinder bolt 117the hydraulic cylinder 111 is
fixed to the hoisting chamber wall, so that the cylinder 111 can pivot around this
cylinder bolt 117. Further, an urging means 116 isprovided, which urges the cylinder
111 of the clampingmeans 11 towards the outside of the hoisting chamber so as to ensure
that the clamp 114 is always guided by the guide surface 113.
[0029] Now starting out from the position of the cylinder 111 shown in dotted lines in Fig.
3, in which the cylinder 111 extends almost parallel to the hoisting chamber wall
and the rod 112 is retracted into the cylinder, functions of the clamping means are
described. When the flange24 is to be clamped for holding it (and the unit 2) in itsmounted
position, the hydraulic cylinder 112 is controlled so as to extend the rod 112. The
clamp 114 moves guided by the guide surface 113 towards the clamping pad 115, which
guided movement is supported by a guide shoe 118 providedclose to the clamp 114 and
cooperating with the guide surface 113. Once the cylinder 111 has fully extended its
rod 112, the clamp 114 sits into the shallow recess 115 as the clamping pad provided
on the flange 24, i.e. on the plate-shaped member 241 thereof. The hydrauliccylinders
111 are strong enough to securely clamp the unit into its mounted position, so that
the position of the unit in regard to the opening in the vessel hull can be securely
held or maintained while the fixing means 14 are screwed off. In order to securely
avoid that any unintentionalrelease of the clamping of the flange 24 mayhappen, it
is suggested that the cylinders 111 are provided with locking valves which cut off
the fluid connection of the hydraulic cylinder to the hydraulic system in order tomaintain
the cylinder in its actual position.
[0030] Once the fixing means 14 have been removed and the hoisting means (such as hoisting
lines, not shown) is fixed to the lifting eyes 25, the clamping may be gradually released.
In particular,looking at Fig. 3, the cylinder 111 is controlled so as toslowly retract
the rod 112. Because the fixing means 14 have been removed, and due to the differential
pressure between inside the hoisting chamber 1 and the water pressure at the bottom
of the vessel 100, the flange 24 will move upward following the cylinder rods 112
movement while keeping the engagement between the shallow recess 115 and the clamp
114. Once the seal 13 lifts up from its counter surface, water may rapidly flow into
the hoisting chamber 1. After the hoisting chamber is flooded to a required level,
the cylinder 111 may be controlled tofurther retract the rod 112.
[0031] When the pressure differencesand forces have been leveled out, the unit 2 following
its own weight will again sit on the seal 13 with its flange plate portion 26.
[0032] According to an embodiment of the invention the unit further comprises a number of
lifting devices 500 arranged in co-operation with the flange 24 and the hoisting chamber
1 in order to apply controllably force to the flange in the upward direction of the
hoisting chamber. Such a lifting device is shown the figures2, 3, 5 and 6. The lifting
devices 500 comprise a number of lifting jacks, particularly hydraulic jacks, arranged
under the flange plate portion 26 around the unit 2. The lifting devices are preferably
arranged substantiallysymmetrically in respect of center of load to be lifted.The
lifting devices 500 are arranged to fit between an extension of the flange plate portion
26 and a lifting base arranged to the hoisting chamber in a retracted position while
the flange 24 sits on the seal 13 with its flange plate portion 26. The flange plate
portion 26 is provided with a local extension only at the location of the jack 500
against which the jack is supported during the lifting so that the flange portion
may pass the guide surface 113.
[0033] Each lifting device is provided with or is in connection with a force control system
510, which facilitates controlling of alignment of the flange while installed or removed.
The lifting devices may be used during assembly / disassembly of the unit, whether
it is a thruster or a closing cover or other kind of unit.
[0034] Next in the procedure the hydraulic jacks 500 are activated and the flange 24 is
liftedfrom theseat controllably by the hydraulic jacks. The flange is lifted so that
the cylinders 111 and their rods 112 adjustably control the lifting of the flange
and the flange 24 will move upward following the cylinder rods 112 and hydraulic jacks
500 movement while keeping the engagement between the shallow recess 115 and the clamp
114. This way the removal of the flange is performed controllably and movement may
be kept translational i.e. moving the flange aligned with the opening in the hosting
chamber. A low tension on the hoisting lines may also be is applied.
[0035] According to an embodiment of the invention the unit is lifted at a first level,the
hydraulic cylinders 111 are fully retracted in to their end position. Advantageously
the lift is about 150mm.Once the cylinders have been retracted, following the urging
force of the urging means 116, each cylinder 111 will again lie flat or substantially
flat against the hoisting chamber wall. The unit 2 may then be lifted to be taken
out of the hoisting chamber.A bottom closing cover 6 (shown figure 4 c)) may be installed
to the hoisting chamber to seal the opening. Also a safety hatch may be installed
on top of chamber and the chamber may be emptied i.e. water pumped away.
[0036] As depicted in figure 6 according to an embodiment of the invention, the closing
cover 6 is arranged of at least two parts, a first part 601 and a second part 602.
The parts are here called as top part and lower part, because the first part forms
a top (inner) portion of the closing cover and the lower part form the lower (outer)
portion of the cover. The lower part has a form such that it can be fitted into the
opening in the bottom of the hoisting chamber through the hull. The form may be circular
or a polygonal.It is, however, important that particularly the sealing system may
properly function at possible corner areas, which are therefore advantageously suitably
rounded. The upper part has a flange plate portion 26by means of which it may be attached
to the chamber.In the figure 6 the cover 6 is in a position supported by the jacks
500 just before mounting.There is also shown how the upper part 601 may at a removed
position by dotted line.The second part 602 comprises a periphery wall 622 and a water
tight inner section 620 bordered by the periphery wall. The first part comprising
a flange 24 is extending over the periphery wall of the second part, to be outside
the area of the lower part 602. The first part and the second part are removably attached
to each other. Advantageously the periphery wall outer surface of the second part
602 and the flange plate portion lower surface of the first part are perpendicular
to each other. The upper part extends wider than the lower part. The first and the
second part are provided with counter surfaces which are joined together when the
first and the second part are attached with each other. The surfaces are preferably
provided with planar counter surfaces.
[0037] In figure 7 there is shown a closing cover according to an embodiment of the invention.The
lower part is provided with a sealing system 604 at its outer periphery wallsurface
622. The sealing system is controllable so that it may be in active state or in passive
state. When it is in active state it seals the gap between lower part and the wall
of the hoisting chamber. Preferably there are arranged at least two successive sealing
units 606, 608 in the longitudinal direction of the hoisting chamber. The seal units
may be inflatable seals so that they may be pressurized by a working fluid when activated
and depressurized when deactivated. The seals are provided with or are in connectable
with a controllable working fluid supply system 618, such as pressurized air / pneumatic
system. The sealing system 604 is arranged in a connection path 630 from outside of
the vessel to inside of the vessel along interconnecting surfaces of the closing cover
and the hull of the vessel.
[0038] The lower part 602 is also provided with attaching means to attach the second part
602 to the vessel hull at least when the upper part 601 is removed. The attaching
means comprises a number of holding means 610. The holding means are in this embodiment
pins, which may move partially from outer periphery wall surface 622 of the lower
part and co-operate with the hoisting chamber, in which a mating recess 614 has been
arranged thus, when activated or pushed out, locking the lower part 602 to its locking
position in the hoisting chamber. The hoisting chamber is provided with a counterpart
614 for each of the holding pin, such as a recess, or a slot, so that the holding
pins, when protruding from the wall of the lower part into the pin recess, locks the
movement of the lower part. The locking pins are arranged to the lower part longitudinally
at one side of the sealing system, the part being at inner side i.e. dry side when
installed.
[0039] When servicing the closing cover while the vessel is floating, the closing cover
is attached through its periphery wall 622 to the surrounding opening and the sealing
system 604 is activated by inflating the sealing units at the outer cylindrical surface.
Now the first part may be removed from the second part by e.g. removing respective
screws 624,and any serviceable object revealed by the removing of the first part may
be serviced. Thus, the top part 601 may be removed from the lower part 602 after the
sealunits 606, 608 are activated and the holding pins 610 are inserted in to recesses
614 in the counter surface of the hoisting chamber.
[0040] In this way there will be free access to the main seal mating surface under the top
part for inspection and/or repair while sealing and locking of the lower part is activated.
[0041] The first part is extending radially from inner side of the periphery wall of the
second part to outer side of the periphery wall.
[0042] In figure 8 there is shown a closing cover according to another embodiment of the
invention. The lower part is also provided with a sealing system 604' at its upper
part, on lower surface of a plate 626 on which the upper part 601 is attached. The
sealing system comprises two successive O-rings 606', 608' in the radial direction
of the hoisting chamber. The sealing system is arranged in a connection path 630 from
outside the vessel to inside of the vessel along interconnecting surfaces of the closing
cover and the hull of the vessel.
[0043] The lower part is also in this embodiment provided with a number of holding means
610. The holding means are pins in this embodiment, which pins may move partially
from outer periphery wall surface 622 of the lower part and co-operate with the hoisting
chamber. The hoisting chamber is provided with a counterpart 614 for each of the holding
pin, such as a recess, or a slot, so that the holding pins, when protruding from the
wall of the lower part into the recess, locks the movement of and tightens the sealing
system 604' the lower part. The locking pins are arranged to the lower part longitudinally
at one side of the sealing system, the part being at inner side i.e. dry side when
installed.
[0044] When servicing the closing cover while the vessel is floating, the lower part of
closing cover is attached through its periphery wall 622 to the surrounding opening
tightening the O-rings 606', 608'. Now, the first part may be removed from the second
part by e.g. removing respective screws 624, and any serviceable object revealed by
the removing of the first part may be serviced. Thus, the top part 601 may be removed
from the lower part 602 after the holding pins 610 are securely inserted in to recesses
614 in the counter surface of the hoisting chamber.
[0045] In this way there will be free access to the main seal mating surface under the top
part for inspection and/or repair while sealing and locking of the lower part is activated.
[0046] The first part may be is a flange plate extending radially from inner side of the
periphery wall of the second part to over the periphery wall.
[0047] When installing the unit again in its mounted position, in case the lifting devices
500 or the jacks have been removed, the jacks are remounted at their positions explained
above. Next the chamber is flooded e.g.with a water pump up to a proper level corresponding
the ship's draft. Next the bottom closing cover is demounted in a similar manner explained
above in connection with the flange 24.
[0048] The unit will be lowered into the flooded hoisting channel until it lands and rests
on the actuated i.e. extended jacks, which are positioned at the bottom of the channel.
Then, the cylinders 111 are controlled to extend their rods 112 and, guided by the
guide surface 113, each clamp 114 will move into engagement with the shallow recesses
115 on the flange 24. Now the working pressure on each hydraulic jack can be released
in a controlled manner and the jacks will be retracted down with appropriately low
actuating pressure on the cylinders111. This takes place while the hoisting chamber
is filled with water.When the clamping means have clamped the unit 2 into the mounted
position, water can be pumped out of the hoisting chamber so as to dry the working
space there. It is noted that the cylinders of clamping means are also maintained
ina locked state, for safety reasons.
[0049] Once the water has been pumped off, persons for re-applying the fixing means 14 may
climb down the hoisting chamber to set the screws. After the screws have been set
and fixed,the clamping means can be retracted by retracting the rod 112 into the cylinder
111. This is recommended, because the cylinder rod 112 is then protected against corrosion
whenit is located in the cylinder 111.
[0050] Returning back to figure 5, in which a still another embodiment of the invention
is described. As is depicted also in figure 5 by the dotted line the assembly comprises
a connection path 630 which runs through a potential route to the water underneath
the vessel from outside the vessel to inside of the vessel along interconnecting surfaces
of the unit 2 or the flange thereof and the hull of the vessel 100. There is a sealing
system 604 which divides the connection path 630 to outside connection path portion
630' and inside connection path portion 630". The outer side connection pathportion
630' opens into the surroundings i.e. water when the vessel is floating. According
to an embodiment of the invention the unit 2 is provided with a gas inlet system 640,
640'arranged to open into the outside connection path portion 630'.
[0051] The gas inlet system 640, 640' comprises a conduit 642, 642' extending through the
unit or though the hull and is connectable to a source of gas 644 arranged in the
vessel. The source of gas is advantageously a pressurized air system of the vessel.
The source of gas may also comprise an air-nitrogen converter 645, in which case the
gas which is fed to the space is advantageously nitrogen. Thus, the gas inlet system
is arranged to inject dry nitrogen into the space, so that a pressure above the water
hydrostatic pressure at prevailing draft is controllably maintained in the outside
connection path portion. This prevents any sea growth in the space and also prevents
sea water to enter into the space. Advantageously only service air is needed to feed
this system. There is also a control system 646, 646' for maintaining a predetermined
supply of gas to the inlet gas system. The control system may comprise e.g. a pressure
sensor. The control system may comprise e.g. a valve 646, 646' and or an orifice plate
647.Naturally only one inlet system is needed and the separated conduits in figure
5 are for purpose of example.
[0052] Finally, Fig. 4 shows a sequence of steps a), b), c) inwhich a unit in the form of
a thruster 2 is dismounted froma vessel hull 100. On the left in Fig. 4, a step a)
is shown in which the electric drive motor 23 is removed from the thruster 2. After
removal of the electric motor 23, cover 61 or covers are mounted to the thruster 2
toclose all openings against the immersion of water when the hoisting chamber 1 is
to be flooded. The drive connection of the thruster 2 usually consists of a flexible
coupling; it may however also or additionally include a gear box. Also, a hoist means
7 is already fixed to the flange 24 of the thruster 2 as is indicated at the right
lifting eye in step a) of Fig. 4. Further, the clamping means are activated so as
to clamp the flange 24 against its seat in the vessel hull 100. Once the clamping
is set, the fixing means (screws) can be removed and thepersons leave the hoisting
chamber.
[0053] Then, the clamping means is gradually released so as to let water flow into the hoisting
chamber. Once the hoisting chamber is filled to the required water level, the clampingmeans
can be released and the lifting devices activated, that is, as described under reference
to Fig. 3, the rods of the cylinders are retracted.Then, continuing to step b) in
the middle of Fig. 4, it isshown that the hoist means 7 of a crane 5 are used to pull
up the thruster 2 by lifting it at the lifting eyes. During lifting, the thruster
2 is guided in the hoisting chamberby means of the guide rails which are indicated
withseveral parallel lines on the chamber walls in step b) ofFig. 4.When the thruster
2 is completely withdrawn from the hoisting chamber 1, the status of step c) in Fig.
4 will be established in that a provisional cover 6 isinserted into the hoist chamber
so as to close the openingin the vessel hull using the flange seat at the bottom of
the chamber. It is noted that clamping with the clamping means is possible because
the cover 6 has the same clamping pads as are provided with the flange 24 of thethruster
2. Depending on how long the hoisting chamber has to stay closed, the cover may be
additionally fixed with fixing means after the water has been removed from the chamber.
Basically, however, it should be sufficient to press the cover down by a clamping
means. Also, an additionalcover 4 is put on the top of the hoisting chamber for safety
reasons as discussed above.
[0054] In Fig. 4, dismounting the thruster and putting it on deck of the vessel has been
described. Mounting of the thrusterafter maintenance or for replacement is done in
the opposite order of steps. That is: removing cover 4,clamping cover 6, fixing hoist
means 7 to cover 6, removing any fixing means (if any), and gradually releasing the
clamping force so as to flood the hoisting chamber 1. Once the required water level
is reached in hoisting chamber 1, coveris lifted after clamping has been released.
The cover 6 is removed from hoisting chamber 6.Then, proceeding back to step b), the
thruster 2 fixed to the hoist means 7 will be led down the hoisting chamber 1 while
being guided by the guide rails 12. Once the thruster2 is set in its mounting position,
clamping means 111, 112,114, 115 are activated to press the flange 24 of the thruster
2 against its seat to seal the bottom of the hoisting chamber 1. The hoisting chamber
1 is thenpumped empty and in the dry space fixing means like screws are set and fixed.
After that, clamping may be released. Hoist means 7 are separated from the lifting
eyes of the thruster and covers 61 are removed. Thereafter, theelectric motor 23 can
be lowered into position and fixed for operation. After connection work has been done,
the thruster 2 is ready for use again.
[0055] While the invention has been described herein by way of examples in connection with
what are, at present, considered to be the most preferred embodiments, it is to be
understood that the invention is not limited to the disclosed embodiments, but is
intended to cover various combinations or modifications of its features, and several
other applications included within the scope of the invention, as defined in the appended
claims. In the above example, the invention has been describedusing a thruster as
the unit which passes through the vessel hull. However, it may be any, in particular
large, unit of any vessel or ship for the maintenance of which the invention may be
applied. In particular, these units can be oil or gas well connectors, drilling equipment,
pumpingequipment, etc. Due to the clamping provided to hold the unit in sealing contact
with its sealing seat, and having an automatic engagement of the clamping means provided,
it can be achieved that no person has to enter a water-filled hoisting chamber, that
is, all steps can be carried out indry environment without diving work. Of course,
modifications can be seen in using divers for setting the clamping means or other
work.The details mentioned in connection with any embodiment above may be used in
connection with another embodiment when such a combination is technically feasible.
1. A method of handling a unit in a watertight hoisting chamber opening into a hull of
a vessel, wherein the unit is adapted to extend into the water below the vessel when
installed at its mounted position, the method being
characterized by the steps of:
clamping the unit (2) in its mounted position by clamping means (11),
releasing fixing means (14) fixing the unit (2) into its mounted position while holding
the unit (2) clamped in position by clamping means (11),
at least partly flooding the hoisting chamber (1),
detaching the unit (2) by simultaneously releasing the clamping means (11) and lifting
the unit (2) from its mounted position by applying lifting force to the unit (2) by
lifting devices (500), and
hoisting the unit (2) away from the hoisting chamber (1).
2. A method according to claim 1, characterized by further step of controlling the detachment of the unit (2) by mutual operation of
the clamping means (11) and the lifting devices (500).
3. A method according to claim1 or 2, characterized by further step of controlling alignment during the detachment of the unit (2) by mutual
operation of the clamping means (11) and the lifting devices (500).
4. A method according to claim 1, characterized in that the flooding of the hoisting chamber (1) comprises the step of gradually releasing
the clamping means (11) clamping the unit (2) into the mounted position in co-operation
with the lifting devices (500) until water enters through the opening of the hull
(100).
5. A method according to claim 1, characterized in that clamping and lifting of the unit (2) uses hydraulic forces.
6. A method according to claim 1,
characterized in by further steps of:
lowering the unit (2) into its mounted position inside the hoisting chamber (1) on
lifting devices (500),
clamping the unit (2) in its mounted position and closing the opening in the vessel
hull (100) with co-operation of the clamping means (11) and lifting devices (500),
at least partly removing the water from the hoisting chamber (1) and applying fixing
means (14) thus fixing the unit (2) in its mounted position,
releasing the clamping of the unit (2).
7. A method of handling a unit in a water tight hoisting chamber opening into a hull
of a vessel, wherein the unit (2) is adapted to extend into the water below the vessel
when installed at its mounted position, the method being
characterized by the steps of:
lowering the unit (2) into its mounted position inside the hoisting chamber (1) on
lifting devices (500),
clamping the unit (2) in its mounted position and closing the opening in the vessel
hull (100) with co-operation of the clamping means (11) and lifting devices (500),
at least partly removing the water from the hoisting chamber (1) and applying fixing
means (14) thus fixing the unit (2) in its mounted position,
releasing the clamping of the unit (2).
8. A method according to claim 6 or 7, characterized by further step of controlling the installation of the unit (2) by mutual operation
of the clamping means (11) and the lifting devices (500).
9. A method according to claim 7, characterized by further step of controlling alignment during the installation of the unit (2) by
mutual operation of the clamping means (11) and the lifting devices (500).
10. An assembly in a marine vessel comprising a water tight hoisting chamber opening into
a hull of a vessel, and a unit closing an opening of the hoisting chamber in a vessel
hull, wherein the unit is adapted to extend into the water below the vessel, the assembly
comprising:
a clamping means (11) adapted to clamp the unit (2) into its mounted position, and
lifting devices (500) arranged in co-operation with the unit (2) and the hoisting
chamber (1) in order to apply force to the unit (2), characterized in that the assembly further comprises a fixing means (14) fixing the unit (2) into its mounted
position, and in that the lifting devices (500) comprise a plurality of hydraulic jacks arranged at inside
the hoisting camber (1) and around the opening in the hull (100) when the hoisting
chamber (1) is mounted.
11. An assembly according to claim 10, wherein the lifting devices (500) are fixed to the hull (100).
12. An assembly according to claim 10, wherein the lifting devices (500) comprise removable hydraulic jacks.
13. An assembly according to any one of the preceding claims 10 - 12, wherein the lifting devices (500) comprise dedicated force control systems (510).
1. Verfahren zur Handhabung einer Einheit in einer wasserdichten Förderkammer, die in
einem Rumpf eines Schiffs mündet, wobei die Einheit dazu eingerichtet ist, sich in
das Wasser unter dem Schiff zu erstrecken, wenn sie in ihrer montierten Position installiert
ist, wobei das Verfahren durch die folgenden Schritte gekennzeichnet ist:
Klemmen der Einheit (2) in ihrer montierten Position durch ein Klemmmittel (11),
Lösen von Befestigungsmitteln (14), die die Einheit (2) in ihrer montierten Position
befestigen, während die Einheit (2) durch das Klemmmittel (11) in Position geklemmt
wird,
zumindest partielles Fluten der Förderkammer (1),
Abziehen der Einheit (2) durch gleichzeitiges Lösen des Klemmmittels (11) und Anheben
der Einheit (2) aus ihrer montierten Position durch Anwenden von Hebekraft auf die
Einheit (2) durch Hebevorrichtungen (500) und
Hieven der Einheit (2) von der Förderkammer (1) weg.
2. Verfahren nach Anspruch 1, gekennzeichnet durch einen weiteren Schritt des Steuerns des Abziehens der Einheit (2) durch gemeinsame Betätigung des Klemmmittels (11) und der Hebevorrichtungen (500).
3. Verfahren nach Anspruch 1 oder 2, gekennzeichnet durch einen weiteren Schritt des Steuerns einer Ausrichtung während des Abziehens der Einheit
(2) durch gemeinsame Betätigung des Klemmmittels (11) und der Hebevorrichtungen (500).
4. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das Fluten der Förderkammer (1) einen Schritt des allmählichen Lösens des Klemmmittels
(11), die die Einheit (2) in die montierte Position klemmen, in Zusammenwirkung mit
den Hebevorrichtungen (500) umfasst, bis Wasser durch die Öffnung des Rumpfs (100)
eintritt.
5. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das Klemmen und das Anheben der Einheit (2) Hydraulikkräfte verwenden.
6. Verfahren nach Anspruch 1,
gekennzeichnet durch die weiteren folgenden Schritte:
Absenken der Einheit (2) in ihre montierte Position im Inneren der Förderkammer (1)
auf den Hebevorrichtungen (500),
Klemmen der Einheit (2) in ihrer montierten Position und Schließen der Öffnung in
dem Schiffsrumpf (100) mit Zusammenwirkung des Klemmmittels (11) und der Hebevorrichtungen
(500),
zumindest partielles Entfernen des Wassers aus der Förderkammer (1) und Anwenden von
Befestigungsmitteln (14), wodurch die Einheit (2) in ihrer montierten Position befestigt
wird,
Lösen des Klemmens der Einheit (2).
7. Verfahren zur Handhabung einer Einheit in einer wasserdichten Förderkammer, die in
einem Rumpf eines Schiffs mündet, wobei die Einheit (2) dazu eingerichtet ist, sich
in das Wasser unter dem Schiff zu erstrecken, wenn sie in ihrer montierten Position
installiert ist, wobei das Verfahren durch die folgenden Schritte gekennzeichnet ist:
Absenken der Einheit (2) in ihre montierte Position im Inneren der Förderkammer (1)
auf Hebevorrichtungen (500),
Klemmen der Einheit (2) in ihrer montierten Position und Schließen der Öffnung in
dem Schiffsrumpf (100) mit Zusammenwirkung des Klemmmittels (11) und der Hebevorrichtungen
(500),
zumindest partielles Entfernen des Wassers aus der Förderkammer (1) und Anwenden von
Befestigungsmitteln (14), wodurch die Einheit (2) in ihrer montierten Position befestigt
wird,
Lösen des Klemmens der Einheit (2).
8. Verfahren nach Anspruch 6 oder 7, gekennzeichnet durch einen weiteren Schritt des Steuerns der Installation der Einheit (2) durch gemeinsame Betätigung des Klemmmittels (11) und der Hebevorrichtungen (500).
9. Verfahren nach Anspruch 7, gekennzeichnet durch einen weiteren Schritt des Steuerns einer Ausrichtung während der Installation der
Einheit (2) durch gemeinsame Betätigung des Klemmmittels (11) und der Hebevorrichtungen (500).
10. Baugruppe in einem Seeschiff, das eine wasserdichte Förderkammer, die in einem Rumpf
eines Schiffs mündet, und eine Einheit, die eine Öffnung der Förderkammer in einem
Schiffsrumpf schließt, umfasst, wobei die Einheit dazu eingerichtet ist, sich in das
Wasser unter dem Schiff zu erstrecken, wobei die Baugruppe Folgendes umfasst:
ein Klemmmittel (11), das dazu eingerichtet ist, die Einheit (2) in ihrer montierten
Position zu klemmen, und Hebevorrichtungen (500), die in Zusammenwirkung mit der Einheit
(2) und der Förderkammer (1) angeordnet sind, um eine Kraft auf die Einheit (2) anzuwenden,
dadurch gekennzeichnet, dass die Baugruppe weiterhin ein Befestigungsmittel (14) umfasst, das die Einheit (2)
in ihrer montierten Position befestigt, und dass die Hebevorrichtungen (500) mehrere
hydraulische Winden umfassen, die im Inneren der Förderkammer (1) und um die Öffnung
in dem Rumpf (100) angeordnet sind, wenn die Förderkammer (1) montiert ist.
11. Baugruppe nach Anspruch 10, wobei die Hebevorrichtungen (500) an dem Rumpf (100) befestigt
sind.
12. Baugruppe nach Anspruch 10, wobei die Hebevorrichtungen (500) entfernbare hydraulische
Winden umfassen.
13. Baugruppe nach einem der vorhergehenden Ansprüche 10-12, wobei die Hebevorrichtungen
(500) dedizierte Kraftsteuersysteme (510) umfassen.
1. Procédé de gestion d'une unité dans une chambre de hissage étanche à l'eau s'ouvrant
dans une coque d'un navire, dans lequel l'unité est adaptée pour s'étendre dans l'eau
au-dessous du navire lorsqu'elle est installée à sa position montée, le procédé étant
caractérisé par les étapes consistant à :
serrer l'unité (2) dans sa position montée par un moyen de serrage (11),
débloquer un moyen de fixation (14) fixant l'unité (2) dans sa position montée tout
en maintenant l'unité (2) serrée en position par le moyen de serrage (11),
au moins partiellement inonder la chambre de hissage (1),
détacher l'unité (2) en débloquant simultanément le moyen de serrage (11) et en levant
l'unité (2) de sa position montée en appliquant une force de levage à l'unité (2)
par des dispositifs de levage (500) et
hisser l'unité (2) hors de la chambre de hissage (1).
2. Procédé selon la revendication 1, caractérisé par l'étape supplémentaire consistant à commander le détachement de l'unité (2) par le
fonctionnement réciproque du moyen de serrage (11) et des dispositifs de levage (500).
3. Procédé selon la revendication 1 ou 2, caractérisé par l'étape supplémentaire consistant à commander l'alignement pendant le détachement
de l'unité (2) par le fonctionnement réciproque du moyen de serrage (11) et des dispositifs
de levage (500).
4. Procédé selon la revendication 1, caractérisé en ce que l'inondation de la chambre de hissage (1) comprend l'étape de déblocage graduel du
moyen de serrage (11) serrant l'unité (2) dans la position montée en coopération avec
les dispositifs de levage (500) jusqu'à ce que l'eau entre à travers l'ouverture de
la coque (100).
5. Procédé selon la revendication 1, caractérisé en ce que le serrage et le levage de l'unité (2) utilise les forces hydrauliques.
6. Procédé selon la revendication 1,
caractérisé par les étapes supplémentaires consistant à :
abaisser l'unité (2) en sa position montée à l'intérieur de la chambre de hissage
(1) sur des dispositifs de levage (500),
serre l'unité (2) en sa position montée et fermer l'ouverture dans la coque de navire
(100) avec la coopération du moyen de serrage (11) et des dispositifs de levage (500),
au moins partiellement éliminer l'eau de la chambre de hissage (1) et appliquer un
moyen de fixation (14) en fixant ainsi l'unité (2) dans sa position montée,
débloquer le serrage de l'unité (2).
7. Procédé de manipulation d'une unité dans une chambre de hissage étanche à l'eau s'ouvrant
dans une coque d'un navire, dans lequel l'unité (2) est adaptée pour s'étendre dans
l'eau au-dessous du navire lorsqu'elle est installée à sa position montée, le procédé
étant
caractérisé par les étapes consistant à :
abaisser l'unité (2) en sa position montée à l'intérieur de la chambre de hissage
(1) sur des dispositifs de levage (500),
serre l'unité (2) en sa position montée et fermer l'ouverture dans la coque de navire
(100) avec la coopération du moyen de serrage (11) et des dispositifs de levage (500),
au moins partiellement éliminer l'eau de la chambre de hissage (1) et appliquer un
moyen de fixation (14) en fixant ainsi l'unité (2) dans sa position montée,
débloquer le serrage de l'unité (2).
8. Procédé selon la revendication 6 ou 7, caractérisé par l'étape supplémentaire de commande de l'installation de l'unité (2) par le fonctionnement
réciproque du moyen de serrage (11) et des dispositifs de levage (500).
9. Procédé selon la revendication 7, caractérisé par l'étape supplémentaire de commande de l'alignement pendant l'installation de l'unité
(2) par le fonctionnement réciproque du moyen de serrage (11) et des dispositifs de
levage (500).
10. Ensemble dans un navire marin comprenant une chambre de hissage étanche à l'eau s'ouvrant
dans une coque d'un navire, et une unité fermant une ouverture de la chambre de hissage
dans une coque de navire, dans lequel l'unité est adaptée pur s'étendre dans l'eau
au-dessous du navire, l'ensemble comprenant :
un moyen de serrage (11) adapté pour serrer l'unité (2) dans sa position montée, et
des dispositifs de levage (500) disposés en coopération avec l'unité (2) et la chambre
de hissage (1) de manière à appliquer une force sur l'unité (2), caractérisé en ce que l'ensemble comprend en outre un moyen de fixation (14) fixant l'unité (2) dans sa
position montée et e ce que les dispositifs de levage (500) comprennent une pluralité
de vérins hydrauliques disposés à l'intérieur de la chambre de hissage (1) et autour
de l'ouverture dans la coque (100) lorsque la chambre de hissage (1) est montée.
11. Ensemble selon la revendication 10, dans lequel les dispositifs de levage (500) sont
fixés à la coque (100).
12. Ensemble selon la revendication 10, dans lequel les dispositifs de levage (500) comprennent
des vérins hydrauliques amovibles.
13. Ensemble selon une quelconque des revendications précédentes 10-12, dans lequel les
dispositifs de levage (500) comprennent des systèmes de commande de force dédiés (510).