Technical Field
[0001] The present invention relates to a heat pump water heater and a method for controlling
the same.
Background Art
[0002] Conventionally, as a heat pump water heater, a water heater disclosed by PTL 1 is
known. PTL 1 discloses that a consumed heat amount in the last few days is stored,
and when a current heat storage amount is smaller than the maximum consumed heat amount
in the last few days, it is determined that shortage of hot water is likely to occur
due to the large consumed heat amount, and thus, a remaining hot water amount at a
time of starting heating is increased to start a heating operation early so as to
prevent hot water shortage.
Citation List
Patent Literature
[0003]
{PTL 1}
Japanese Unexamined Patent Application, Publication No. 2004-60948
Summary of Invention
Technical Problem
[0004] In a case of a heat pump water heater, in general, a heat pump is operated to store
hot water in a hot water storage tank during an off-peak period as inexpensive as
possible, such as a night rate period (for example, from 0:00 to 8:00). In this case,
it is preferable that electric power in the night rate period is used as efficiently
as possible to avoid heating operation in a daytime rate period in which electric
power rate is relatively expensive.
[0005] The present invention has been made in view of these circumstances, and an object
of the present invention is to provide a heat pump water heater which sets an appropriate
heat storage amount based on a past use result and uses as much electric power in
a time period in which an electric power rate is relatively inexpensive as possible
to perform heating, thereby allowing energy saving to be achieved, and a method for
controlling a heat pump water heater. Solution to Problem
[0006] A first aspect of the present invention is a heat pump water heater performing heating
so as to make hot water in a hot water storage tank have a preset stored hot water
temperature target value and a preset stored hot water amount target value by using
as much electric power in a time period in which an electric power rate is relatively
inexpensive as possible, including: acquisition means acquiring a minimum heat storage
amount per day from past use result data including a heat storage amount or a remaining
hot water amount and a hot water supply load; target value change means changing at
least one of the stored hot water temperature target value and the stored hot water
amount target value when the minimum heat storage amount is higher than a predetermined
proper range; and trial calculation means performing trial calculation of a minimum
heat storage amount of a day by using the stored hot water temperature target value
and the stored hot water amount target value after change and a hot water supply load
of a day in the past use result data, and wherein, if the minimum heat storage amount
is higher than an upper limit value of the proper range, the target value change means
decreases the stored hot water temperature target value with priority until the minimum
heat storage amount obtained by trial calculation by the trial calculation means falls
within the proper range, and if the stored hot water temperature target value reaches
a predetermined lower limit value, the target value change means decreases the stored
hot water amount target value, while if the minimum heat storage amount is lower than
a lower limit value of the proper range, the target value change means increases the
stored hot water amount target value with priority until the minimum heat storage
amount obtained by trial calculation by the trial calculation means falls within the
proper range, and if the stored hot water amount target value reaches a predetermined
upper limit value, the target value change means increases the stored hot water temperature
target value.
[0007] Alternatively, a minimum remaining hot water amount may be used instead of the minimum
heat storage amount.
[0008] According to the aforementioned heat pump water heater, in a case where the stored
hot water temperature target value and the stored hot water amount target value for
a next day and afterwards are changed depending on the use result data, if it is determined
that the minimum heat storage amount is excessive from the use result data, the stored
hot water temperature target value is decreased with priority, and if the stored hot
water temperature target value reaches the lower limit value, the stored hot water
amount target value is decreased. If it is determined that the minimum heat storage
amount is insufficient from the use result data, the stored hot water amount target
value is increased with priority, and if the stored hot water amount target value
reaches the upper limit value, the stored hot water temperature target value is increased.
[0009] In this way, if a stored hot water temperature is set to be as low as possible and
a hot water amount is set to be as large as possible, it is possible to operate a
heat pump in an efficient operation range, and thus, energy saving can be achieved.
Furthermore, by setting the stored hot water temperature to be as low as possible,
it is possible to decrease precipitation of scale.
[0010] Since the stored hot water temperature target value and the stored hot water amount
target value are updated by referring to the use result data periodically, the heat
storage amount is made appropriate so that energy saving can be achieved.
[0011] The heat pump water heater may have a configuration in which, the stored hot water
temperature target value and the stored hot water amount target value are set for
each day, the acquisition means acquires the minimum heat storage amount for each
day, and the target value change means changes at least one of the stored hot water
temperature target value and the stored hot water amount target value of a day in
which the minimum heat storage amount is outside the proper range.
[0012] The heat pump water heater may have a configuration in which, the stored hot water
temperature target value and the stored hot water amount target value are set for
weekdays and for holidays, separately, the acquisition means acquires the minimum
heat storage amount of weekdays and the minimum heat storage amount of holidays, separately,
and the target value change means changes at least one of the stored hot water temperature
target value and the stored hot water amount target value for weekdays if the heat
storage amount of weekdays is outside the proper range, while changes at least one
of the stored hot water temperature target value and the stored hot water amount target
value for holidays if the minimum heat storage amount of holidays is outside the proper
range.
[0013] The heat pump water heater may have a configuration in which, the acquisition means
acquires the minimum heat storage amount from use result data of a previous day, and
the target value change means changes at least one of the stored hot water temperature
target value and the stored hot water amount target value if the minimum heat storage
amount is higher than the predetermined proper range, and sets the stored hot water
temperature target value and the stored hot water amount target value for a next day.
[0014] A second aspect of the present invention is a method for controlling a heat pump
water heater performing heating so as to make hot water in a hot water storage tank
have a preset stored hot water temperature target value and a preset stored hot water
amount target value by using as much electric power of a time period in which an electric
power rate is relatively as inexpensive as possible, the method including: an acquisition
step of acquiring a minimum heat storage amount per day from past use result data
including a heat storage amount, a remaining hot water amount and a hot water supply
load; a target value change step of changing at least one of the stored hot water
temperature target value and the stored hot water amount target value if the minimum
heat storage amount is higher than a predetermined proper range; and a trial calculation
step of performing trial calculation of a minimum heat storage amount of a day by
using the stored hot water temperature target value and the stored hot water amount
target value after change and a hot water supply load of a day in the past use result
data, and wherein, in the target value change step, if the minimum heat storage amount
is higher than an upper limit value of the proper range, the stored hot water temperature
target value is decreased with priority until the minimum heat storage amount obtained
by trial calculation by the trial calculation means falls within the proper range,
and if the stored hot water temperature target value reaches a predetermined lower
limit value, the stored hot water amount target value is decreased, while if the minimum
heat storage amount is lower than a lower limit value of the proper range, the stored
hot water amount target value is increased with priority until the minimum heat storage
amount obtained by trial calculation by the trial calculation means falls within the
proper range, and if the stored hot water amount target value reaches a predetermined
upper limit value, the stored hot water temperature target value is increased. Advantageous
Effects of Invention
[0015] The present invention provides an effect that energy saving can be achieved.
Brief Description of Drawings
[0016]
{Fig. 1}
Fig. 1 illustrates a schematic configuration of a heat pump water heater according
to an embodiment of the present invention.
{Fig. 2}
Fig. 2 is a function block diagram of a hot water supply control unit illustrated
in Fig. 1.
{Fig. 3}
Fig. 3 illustrates an example of minimum heat storage amounts for each day which are
acquired by an acquisition unit illustrated in Fig. 2.
{Fig. 4}
Fig. 4 illustrates a general relationship between a performance coefficient and a
stored hot water temperature of a heat source machine.
{Fig. 5}
Fig. 5 is a flowchart illustrating procedures of processing executed by a schedule
updating unit.
{Fig. 6}
Fig. 6 is a flowchart illustrating procedures of processing executed by the schedule
updating unit.
{Fig. 7}
Fig. 7 is a flowchart illustrating procedures of processing executed by the schedule
updating unit.
{Fig. 8}
Fig. 8 is a flowchart illustrating procedures of processing executed by the schedule
updating unit.
{Fig. 9}
Fig. 9 illustrates an example of a balance sheet of hot water supply load created
based on use result data for a certain day stored in a use result data storage unit.
{Fig. 10}
Fig. 10 illustrates an example of the balance sheet of hot water supply load created
from the use result data.
{Fig. 11}
Fig. 11 illustrates an example of the balance sheet of hot water supply load illustrated
in Fig. 10, in which a stored hot water temperature target value and a stored hot
water amount target value are changed such that a minimum heat storage amount obtained
by trial calculation falls within a proper range.
{Fig. 12}
Fig. 12 illustrates an example of the balance sheet of hot water supply load created
from the use result data.
{Fig. 13}
Fig. 13 illustrates an example of the balance sheet of hot water supply load illustrated
in Fig. 12, in which a stored hot water temperature target value and a stored hot
water amount target value are changed such that a minimum heat storage amount obtained
by trial calculation falls within a proper range.
{Fig. 14}
Fig. 14 illustrates an example of the balance sheet of hot water supply load illustrated
in Fig. 12, in which a stored hot water temperature target value and a stored hot
water amount target value are changed such that a minimum heat storage amount obtained
by trial calculation falls within a proper range.
Description of Embodiments
[0017] Hereinafter, description will be given of an embodiment of a heat pump type hot water
heater and a method for controlling the same according to the present invention, with
reference to the drawings.
[0018] Fig. 1 illustrates a schematic configuration of a heat pump water heater according
to an embodiment of the present invention. As illustrated in Fig. 1, a heat pump water
heater 1 includes a heat source machine 2 heating low-temperature water with a heat
pump, and a hot water storage tank 3 which stores high-temperature water heated by
the heat source machine 2.
[0019] In the heat pump water heater 1, low-temperature water is supplied to the hot water
storage tank 3 by a water supply pump 5, via a water supply pipe 4. Low-temperature
water supplied to the hot water storage tank 3 is fed to a circulation pipe 6, a flow
rate of the low-temperature water is adjusted by a circulation pump (not illustrated)
of the heat source machine 2 disposed in the circulation pipe 6, and the low-temperature
water exchanges heat with a refrigerant having a high temperature in a heat exchanger
for water (not illustrated) so that the low-temperature water is heated. High-temperature
water after heating is fed back to the hot water storage tank 3 through the upper
part of the hot water storage tank 3 via the circulation pipe 6. The high-temperature
water stored in the hot water storage tank 3 is supplied to a non-illustrated hot
water supply faucet such as a bathtub faucet via a hot water supply pipe 7.
[0020] In the hot water storage tank 3, a hot water amount sensor (not illustrated) for
measuring a remaining hot water amount and a temperature sensor (not illustrated)
for measuring a stored hot water temperature are disposed. In the water supply pipe
4, a flow rate sensor (not illustrated) for measuring a water supply amount is disposed.
In the hot water supply pipe 7, a flow rate sensor (not illustrated) for measuring
a hot water supply amount is disposed. A value measured by the aforementioned sensors
is transmitted to a hot water supply control unit 10, which will be described below,
and is stored in the hot water supply control unit 10 as use result data, and also
is used for controlling the heat source machine and the like.
[0021] Heating control of low-temperature water in the heat pump water heater 1 is performed
by the hot water supply control unit 10. The hot-water supply control unit 10 holds
a schedule in which a stored hot water temperature target value and a stored hot water
amount target value are set for each day. According to the schedule, the heat source
machine 2 and the water supply pump 5 are operated so that a heat storage amount (stored
hot water temperature x stored hot water amount) corresponding to the schedule is
stored in the hot water storage tank 3. Here, heating operation of low-temperature
water by the heat source machine 2 is performed by using as much electric power of
a time period in which an electric power rate is relatively as inexpensive (for example,
the night power rate, etc.) as possible.
[0022] Fig. 2 is a function block diagram of the hot water supply control unit 10. As illustrated
in Fig. 2, the hot water supply control unit 10 includes a schedule storage unit 11,
a use result data storage unit 12 that stores past use result data and a schedule
updating unit 13 that updates a schedule stored in the schedule storage unit 11 based
on the past usage result data. The hot water supply control unit 10 includes a non-illustrated
water supply pump control unit that provides the water supply pump 5 with an operation
command, a non-illustrated heating control unit that provides the heat source machine
2 with a command value of hot water target temperature, etc., and the like. For the
flow rate control of the water supply pump 5 and the operation control of the heat
source machine 2 which are performed based on the stored hot water temperature target
value and the stored hot water amount target value, a known technique may be applied
as appropriate, and thus, detailed description thereof is omitted.
[0023] In the schedule storage unit 11, a stored hot water temperature target value and
a stored hot water amount target value for each day are set.
[0024] In the use result data storage unit 12, for example, a minimum heat storage amount,
a remaining hot water amount, a hot water supply load, a heat source machine's heat
capacity of a previous week and the like are stored as past use result data, while
associating the data with a date and a day. Thereby, it is possible to create, for
example, a balance sheet of water supply load as illustrated in Fig. 9, based on certain
use result data stored in the use result data storage unit 12, allowing a grasp of
changes in heat storage amount of the hot water storage tank, hot water supply load,
and heat source machine's heat capacity of a day.
[0025] The schedule updating unit 13 includes an acquisition unit 21, a target value change
unit 22, and a trial calculation unit 23.
[0026] The acquisition unit 21 acquires a minimum heat storage amount for each day from
the past use result data stored in the use result data storage unit 12. For example,
the acquisition unit 21 reads out the use result data of the previous week from the
use result data storage unit 12, and acquires the minimum heat storage amount for
each day of the previous week, as illustrated in Fig. 3.
[0027] The target value change unit 22 determines whether a day in which the minimum heat
storage amount is outside a preset predetermined proper range exists or not among
the minimum heat storage amounts for each day acquired by the acquisition unit 21.
If a day in which the minimum heat storage amount is outside the proper range exists,
the target value change unit 22 changes the stored hot water temperature target value
and the stored hot water amount target value of the day. For example, if heat storage
amounts for each day acquired by the acquisition unit 22 result in ones illustrated
in Fig. 3, the stored hot water temperature target values and the stored hot water
amount target values for Mondays and Wednesdays are changed.
[0028] Specifically, if the minimum heat storage amount is higher than the upper limit value
of the proper range, the target value change unit 22 decreases the stored hot water
temperature target value with priority until the minimum heat storage amount obtained
by trial calculation by the trial calculation unit 23, which will be described later,
falls within the proper range. If the stored hot water temperature target value reaches
a predetermined lower limit value, the target value change unit 23 decreases the stored
hot water amount target value.
[0029] If the minimum heat storage amount is lower than the lower limit value of the proper
range, the target value change unit 22 increases the stored hot water amount target
value with priority until the minimum heat storage amount obtained by trial calculation
by the trial calculation unit 23, which will be described later, falls within the
proper range. If the stored hot water amount target value reaches a predetermined
upper limit value, the target value change unit 22 increases the stored hot water
temperature target value.
[0030] As illustrated in Fig. 4, in a heat source machine including a heat pump, generally,
as a stored hot water temperature increases, a coefficient of performance (COP) decreases.
The coefficient of performance is a value obtained by dividing a heat capacity (kW)
by a consumed power (kW), and the higher coefficient of performance means higher efficiency.
For this reason, in the present embodiment, when the stored hot water temperature
target value and the stored hot water amount target amount are changed, the stored
hot water temperature is set to be as low as possible so that the heat source machine
2 is operated in an efficient operation range. Thereby, reduction in power consumption
is achieved.
[0031] Every time the stored hot water temperature target value or the stored hot water
amount target amount is changed by the target value change unit 22, the trial calculation
unit 23 refers to the past use result (supply hot water load, more specifically) of
the day to perform trial calculation of a minimum heat storage amount for the changed
stored hot water temperature target value or the changed stored hot water amount target
amount. Specifically, the trial calculation unit 23 calculates a storage heat amount
for each time period by multiplying the stored hot water temperature target value
by the stored hot water amount target value in the changed operation pattern (operation
time), and also operates change of the hot water storage tank in a day, from the supply
hot water load for each time period of the past use result of the day, so that the
minimum heat storage amount of the day is calculated.
[0032] Next, the procedures of processing executed by the aforementioned schedule updating
unit 13 of the hot water supply control unit 10 are described, with reference to Fig.
5 to Fig. 8. The schedule updating unit 13 of the hot water supply control unit 10
executes the following processing to update the schedule, for example, once a week.
[0033] First, use result data of a previous week is read out from the use result data storage
unit 12 (step SA1 in Fig. 5), and a minimum heat storage amount of each day is acquired
(step SA2).
[0034] Then, it is determined whether a day in which a minimum heat storage amount is outside
the predetermined proper range exists or not (step SA3), and if a day in which a heat
storage amount is outside the predetermined proper range does not exist, it is determined
that the schedule is not required to be updated and the processing is ended ("NO"
in step SA3). In contrast, if a day in which a heat storage amount is outside the
predetermined proper range exists, the day is extracted (step SA4) and target value
change processing is respectively executed on each extracted day (step SA5).
[0035] In the target value change processing, first, it is determined whether the minimum
heat storage amount of the extracted day is lower than the lower limit value of the
proper range or not (step SB1 in Fig. 6), and if the minimum heat storage amount is
not lower than the lower limit value of the proper range ("NO" in step SB1), it is
determined that the minimum heat storage amount is higher than the upper limit value
of the proper range to execute target value change processing for the purpose of reducing
the heat storage amount (step SB2). If the minimum heat storage amount is lower than
the lower limit value of the proper range ("YES" in step SB1), target value change
processing is executed for the purpose of increasing the heat storage amount (step
SB3).
[0036] In the target value change processing for the purpose of reducing the heat storage
amount, first, it is determined whether the current stored hot water temperature target
value is a preset lower limit value of a stored hot water temperature or not (step
SC1 in Fig. 7), and if the stored hot water temperature target value is not the lower
limit value
[0037] ("NO" in step SC1), the stored hot water temperature target value is changed to the
lower limit value (step SC2). Thereafter, trial calculation of a minimum heat storage
amount is performed with use of the changed target value (step SC3), and it is determined
whether the minimum heat storage value obtained by trial calculation is within the
proper range (step SC4). As a result of the determination, if not within the proper
range ("NO" in step SC4), it is determined whether the minimum heat storage amount
obtained by trial calculation in step SC3 is higher than the upper limit value of
the proper range or not (step SC5).
[0038] As a result of the determination, if the minimum heat storage amount obtained by
trial calculation is higher than the upper limit value of the proper range ("YES"
in step SC5), the heat storage amount is required to be further decreased, and thus,
the stored hot water amount target value is changed to a value decreased by a predetermined
amount α (step SC6), and the processing returns to step SC3. In contrast, if the minimum
heat storage amount obtained by trial calculation is equal to or lower than the upper
limit value of the proper range in step SC5 ("NO" in step SC5), it is determined the
minimum heat storage amount is lower than the lower limit value of the proper range.
That is, in this case, due to change of the stored hot water temperature target value
to the lower limit value in step SC2, the heat storage amount becomes too low, and
the heat storage amount is required to be increased. Thus, the stored hot water temperature
target value is increased by a predetermined value β (step SC7), and the processing
returns to step SC3. Accordingly, trial calculation of the minimum heat storage amount
is performed again with use of the updated target value (step SC3). Then, a loop from
step SC3 to step SC7 is repeated until the minimum heat storage amount falls within
the proper range in step SC4. If the minimum heat storage amount falls within the
proper range ("YES" in step SC4), the schedule stored in the schedule storage unit
11 is updated to a target value as of that time (step SC8), and the processing is
ended.
[0039] In the present processing, the stored hot water temperature target value is increased
in step SC7. However, in a case where the stored hot amount is still insufficient
even if the stored hot water amount is increased to the upper limit value by increasing
the stored hot water to increase the heat storage amount, the stored hot water temperature
target value may be increased. In such processing, the stored hot water temperature
target value can be set to be as low as possible, and thus, the heat source machine
2 can be operated in an efficient temperature range.
[0040] In the target value change processing for the purpose of increasing the heat storage
amount in step SB3 in Fig. 6, first, it is determined whether a current stored hot
water amount target value is the upper limit value of the preset stored hot water
amount (step SD1 in Fig. 8). If the current stored hot water amount target value is
not the upper limit value ("NO" in step SD1), the stored hot water amount target value
is changed to a value increased by a predetermined value α (step SD2). At that time,
the stored hot water amount target value is increased with the upper limit value of
the stored hot water amount as an upper limit. Thereafter, trial calculation of a
minimum heat storage amount is performed by using the changed target value (step SD3),
and it is determined whether the minimum heat storage amount obtained by trial calculation
is within the proper range (step SD4). As a result of the determination, if the minimum
heat storage amount is not within the proper range ("NO" in step SD4), the processing
returns to step SD1.
[0041] Accordingly, until the minimum heat storage amount obtained by trial calculation
falls within the proper range or the stored hot water amount target value reaches
the upper limit value, the processing from steps SD1 to SD4 is repeatedly executed
so that the stored hot water amount target value is stepwise increased. If the stored
hot water amount reaches the upper limit value before the minimum heat storage amount
obtained by trial calculation in step SD3 falls within the proper range ("YES" in
step SD1), it is determined whether the stored hot water temperature target value
is the upper limit value or not (step SD5). As a result of the determination, if the
stored hot water temperature target value is not the upper limit value ("NO" in step
SD5), the stored hot water temperature target value is changed to a value increased
by the predetermined value β (step SD6). Here, the stored hot water temperature target
value is increased with the upper limit value of the stored hot water temperature
as an upper limit. Then, the changed target value is used to perform trial calculation
of the minimum heat storage amount (step SD7), and it is determined whether the minimum
heat storage amount obtained by trial calculation is within the proper range (step
SD8).
[0042] As a result of the determination, if the minimum heat storage amount obtained by
trial calculation is within the proper range ("YES" in step SD8), the target value
as of that time is written into the schedule to update the schedule (step SD9). In
contrast, if the minimum heat storage amount is not within the proper range in step
SD8, the processing returns to step SD5. Accordingly, until the minimum heat storage
amount obtained by trial calculation falls within the proper range or the stored hot
water temperature target value reaches the upper limit, the processing of increasing
the stored hot water temperature target value is repeated. If the minimum heat storage
amount falls within the proper range before the stored hot water temperature target
value reaches the upper limit value ("YES" in step SD8), the target value as of that
time is written into the schedule to update the schedule, and the processing is ended.
[0043] In contrast, if the stored hot water temperature target value reaches the upper limit
value before the minimum heat storage amount falls within the proper range, the heat
storage amount cannot be increased any more. In this case, the schedule is updated,
for example, by writing the upper limit values of the stored hot water temperature
target value and the stored hot water amount target value into the schedule. In this
case, there is a high possibility that a heat amount stored in the hot water storage
tank 3 with night electric power is lower than a consumption amount. Therefore, there
is a need for a measure such as increasing a hot water amount to be stored in the
hot water storage tank by operating a heat pump during the daytime, for example. In
this case, for example, if the remaining hot water amount in the hot water storage
tank 3 is equal to or lower than a predetermined threshold, it is possible to take
a measure such as operating the heat source machine 2.
[0044] Fig. 9 to Fig. 14 illustrate an example of a balance sheet of hot water supply load
for a day. Fig. 9 illustrates a case where a minimum heat storage amount of the day
is within the proper range. Fig. 10, which illustrates an example of a balance sheet
of hot water supply load created from the use result data, illustrates a case where
the minimum heat storage amount of the day is higher than the upper limit value of
the proper range. In this case, the aforementioned processing of changing the target
value for the purpose of decreasing the heat storage amount illustrated in Fig. 7
is executed, and thus, the stored hot water temperature target value and the stored
hot water amount target value are changed such that the minimum heat storage amount
obtained by trial calculation is within the proper range, as illustrated in Fig. 11.
[0045] Fig. 12, which illustrates an example of the balance sheet of hot water supply load
created from the use result data, illustrates a case where the minimum heat storage
amount of the day is lower than the lower limit value of the proper range. In this
case, the aforementioned processing of changing the target value for the purpose of
increasing the heat storage amount illustrated in Fig. 8 is executed, and thus, the
stored hot water temperature target value and the stored hot water amount target value
are changed such that the minimum heat storage amount obtained by trial calculation
is within the proper range, as illustrated in Fig. 13. In Fig. 13, for example, it
is found that, in the schedule, the operation time period of the heat source machine
2 is extended by an hour due to increase in stored hot water amount target value,
and the operation is stopped at nine o'clock. In this way, in a case where even if
the heat source machine 2 is operated during a night rate period, the stored hot water
temperature target value and the stored hot water amount target value which are set
in the schedule are not achieved, it is required to operate the heat source machine
2 also in a normal rate period. In Fig. 13, a predetermined heat storage amount is
secured by continuously extending the operation time period of the heat source machine
2, while in Fig. 14, a heat storage amount is increased by temporarily stopping the
operation of the heat source machine 2 at eight o'clock when the night power rate
period ends, and operating again the heat source machine 2 in the time period when
the hot water supply load increases (here, a time period from 18:00 to 19:00).
[0046] As described so far, according to the heat pump water heater 1 of the present embodiment,
in a case where the stored hot water temperature target value and the stored hot water
amount target value of a next day and afterwards are changed depending on use result
data, if it is determined that the heat storage amount is excessive from the use result
data, the stored hot water temperature target value is decreased with priority, and
if the stored hot water temperature target value reaches the lower limit value, the
stored hot water amount target value is decreased. If it is determined that the heat
storage amount is insufficient from the use result data, the stored hot water amount
target value is increased with priority, and if the stored hot water amount target
value reaches the upper limit value, the stored hot water temperature target value
is increased.
[0047] In this way, if the stored hot water temperature is set to be as low as possible
and the hot water amount is set to be as large as possible, it is possible to operate
the heat source machine 2 in an efficient operation range, and thus, energy saving
can be achieved. By setting the stored hot water temperature to be as low as possible,
it is possible to decrease precipitation of scale.
[0048] The schedule is updated by referring to the use result data periodically, and thus,
the heat storage amount is made appropriate so that efficient heating is possible.
Accordingly, energy saving can be achieved.
[0049] In the present embodiment, the stored hot water temperature target value and the
stored hot water amount target value are set for each day, but the present invention
is not limited to this. For example, the stored hot water temperature target value
and the stored hot water amount target value of a certain day may be set based on
use result data of a previous day, or the stored hot water temperature target value
and the stored hot water amount target value may be set for weekdays and for holidays,
separately. In this case, for a minimum heat storage amount for weekdays/holidays,
an average value may be used, or the lowest minimum heat storage amount of the minimum
heat storage amounts may be used.
[0050] In the present embodiment, the stored hot water temperature target value and the
stored hot water amount target value are changed with use of the minimum heat storage
amount, but such stored hot water temperature target value and stored hot water amount
target value may be changed with use of a minimum remaining hot water amount instead
of the minimum heat storage amount.
[0051] The present invention is not limited only to the aforementioned embodiment, and various
modifications can be performed within a scope of the present invention.
{Reference Signs List}
[0052]
- 1
- heat pump water heater
- 2
- heat source machine
- 3
- hot water storage tank
- 4
- water supply pipe
- 5
- water supply pump
- 6
- circulation pipe
- 7
- hot water supply pipe
- 10
- hot water supply control unit
- 11
- schedule storage unit
- 12
- use result data storage unit
- 13
- schedule updating unit
- 21
- acquisition unit
- 22
- target value change unit
- 23
- trial calculation unit
1. A heat pump water heater performing heating so as to make hot water in a hot water
storage tank (3) have a preset stored hot water temperature target value and a preset
stored hot water amount target value by using as much electric power in a time period
in which an electric power rate is relatively as inexpensive as possible,
characterized in that it comprises:
acquisition means (21) configured to acquire a minimum heat storage amount per day
from past use result data including a heat storage amount or a remaining hot water
amount and a hot water supply load;
target value change means (22) configured to change at least one of the stored hot
water temperature target value and the stored hot water amount target value when the
minimum heat storage amount is higher than a predetermined proper range; and
trial calculation means (23) configured to perform trial calculation of a minimum
heat storage amount of a day by using the stored hot water temperature target value
and the stored hot water amount target value after change and a hot water supply load
of a day in the past use result data, wherein,
if the minimum heat storage amount is higher than an upper limit value of the proper
range, the target value change means (22) decreases the stored hot water temperature
target value with priority until the minimum heat storage amount obtained by trial
calculation by the trial calculation means (23) falls within the proper range, and
if the stored hot water temperature target value reaches a predetermined lower limit
value, the target value change means (22) decreases the stored hot water amount target
value, and
if the minimum heat storage amount is lower than a lower limit value of the proper
range, the target value change means (22) increases the stored hot water amount target
value with priority until the minimum heat storage amount obtained by trial calculation
by the trial calculation means (23) falls within the proper range, and if the stored
hot water amount target value reaches a predetermined upper limit value, the target
value change means (22) increases the stored hot water temperature target value.
2. The heat pump water heater of Claim 1, wherein
the stored hot water temperature target value and the stored hot water amount target
value are set for each day,
the acquisition means (21) acquires the minimum heat storage amount for each day,
and
the target value change means (22) changes at least one of the stored hot water temperature
target value and the stored hot water amount target value for a day in which the minimum
heat storage amount is outside the proper range.
3. The heat pump water heater of Claim 1, wherein
the stored hot water temperature target value and the stored hot water amount target
value are set for weekdays and for holidays, separately,
the acquisition means (21) acquires the minimum heat storage amount for weekdays and
for holidays, separately, and
the target value change means (22) changes at least one of the stored hot water temperature
target value and the stored hot water amount target value for weekdays if the minimum
heat storage amount of weekdays is outside the proper range, and changes at least
one of the stored hot water temperature target value and the stored hot water amount
target value for holidays if the minimum heat storage amount of holidays is outside
the proper range.
4. The heat pump water heater of Claim 1, wherein
the acquisition means (21) acquires the minimum heat storage amount from use result
data of a previous day, and
the target value change means (22) changes at least one of the stored hot water temperature
target value and the stored hot water amount target value if the minimum heat storage
amount is higher than the predetermined proper range, and sets the stored hot water
temperature target value and the stored hot water amount target value for a next day.
5. The heat pump water heater of any one of Claims 1 to 4, wherein a minimum remaining
hot water amount is used instead of the minimum heat storage amount.
6. A method for controlling a heat pump water heater performing heating so as to make
hot water in a hot water storage tank (3) have a preset stored hot water temperature
target value and a preset stored hot water amount target value by using as much electric
power in a time period in which an electric power rate is relatively as inexpensive
as possible, the method being
characterized in that it comprises:
an acquisition step of acquiring a minimum heat storage amount per day from past use
result data including a heat storage amount or a remaining hot water amount and a
hot water supply load;
a target value change step of changing at least one of the stored hot water temperature
target value and the stored hot water amount target value if the minimum heat storage
amount is higher than a predetermined proper range; and
a trial calculation step of performing trial calculation of a minimum heat storage
amount of a day by using the stored hot water temperature target value and the stored
hot water amount target value after change and a hot water supply load of a day in
the past use result data, wherein,
in the target value change step,
if the minimum heat storage amount is higher than an upper limit value of the proper
range, the stored hot water temperature target value is decreased with priority until
the minimum heat storage amount obtained by trial calculation in the trial calculation
step falls within the proper range, and if the stored hot water temperature target
value reaches a predetermined lower limit value, the stored hot water amount target
value is decreased, and
if the minimum heat storage amount is lower than a lower limit value of the proper
range, the stored hot water amount target value is increased with priority until the
minimum heat storage amount obtained by trial calculation in the trial calculation
step falls within the proper range, and if the stored hot water amount target value
reaches a predetermined upper limit value, the stored hot water temperature target
value is increased.