[0001] The present invention refers to a foundation base made in concrete for use in offshore
wind farms.
STATE OF THE ART
[0002] The installation of wind farms at sea is known and forecasts of great growth in the
application of this technology in the coming years have been confirmed. Wind farms
built at sea are certainly more expensive, logically depending on the depth of the
water in which they are located, but the quality of the wind is better, more constant,
its speed higher and turbulence lower and, consequently, the number of hours of production
is higher and this, added to the higher air density at sea level, generates higher
income than wind farms on land, compensating for the extra initial investment cost.
[0003] The trend for using higher power, larger wind turbines in order to reduce the unit
cost of the installed power has been a constant factor in wind turbine development
and is, if anything, even more marked in the case of offshore wind farms adapted to
the particularly demanding marine conditions. This in turn means a significant increase
in the stresses and requirements placed on the foundation/shaft substructure supporting
the wind turbines, which, added to their use in sites of variable depth, demands the
development of a foundation/shaft substructure adapted to a wide range of depths and
for wind turbines of higher power and larger size, while avoiding increasing the complexity
and cost of this foundation/shaft substructure.
[0004] In some marine wind farms located in areas where the width or thickness of the sheet
of water is limited gravity-based structures (GBSs) are used, comprising structural
concrete footings, often with pedestals, that use dry construction, i.e. on dry land.
Once constructed, they are transported and anchored using barges and/or marine cranes
at installation point for this substructure.
[0005] The mode of construction of this type of gravity-based structure uses formwork and
falsework in a dry port or dock, involving the use of a large amount of labour, as
well as having large spaces available in the port, as well as cranes with heavy lifting
capacity. Additionally, it is necessary to flood the dry dock to float the foundation
and drain it again subsequently and, in addition, the method for installing this foundation
on the underwater bed limits the depth at which the foundation can be laid, the power
and size of the wind turbine that can be installed on this foundation and, therefore,
the costs of the foundation system, shaft and wind turbine soar, making the installation
of wind turbine farms non-viable on underwater beds where the width of the sheet of
water tends to be medium or high.
[0006] The construction method for the foundation base enables the construction of the aforementioned
base to be automated, reducing the personnel and time required to execute the construction
method.
SUMMARY
[0007] The present invention seeks to resolve one or more of the disadvantages stated previously
by means of a foundation base constructed on a floating structure as claimed in the
claims.
[0008] One purpose of the embodiment is to provide a foundation base used as a gravity-based
structure made in reinforced concrete, using a submersible structure equipped with
sliding formwork for the purpose to confine the concrete and enable it to be given
an essentially quasi-pyramidal caisson form, the cross-section of which decreases
with increasing height of the foundation base which, in turn, includes internal cells
or holes to increase the buoyancy of the foundation base.
[0009] Another aspect of the embodiment is to provide a foundation base that includes a
transition component on which to locate the shaft for a wind turbine tower, at least
one connector for transmitting forces between the transition component and the foundation
base, with this transition component embedded in the foundation base.
[0010] A further aspect of the embodiment is to provide a hollow section, essentially frustoconical
transition component made in steel.
[0011] Yet another aspect of the embodiment is to provide a method for transporting the
foundation base to the anchoring point by towing once the foundation base has been
extracted from the floating structure by means of partial sinking of the latter.
[0012] Still another aspect of the embodiment is to supply a shaft alignment piece for a
tower and a set of bolts for load transmission.
[0013] The construction of foundation bases for offshore wind turbines by means of a floating
structure reduces the space needed in port for these and also reduces the need for
cranes to move the foundation bases as they are carried on the floating structure.
[0014] The floating structure is partially sunk to facilitate extraction of the foundation
base by towing once construction of the foundation base is complete.
[0015] Consequently, the construction of a foundation base by means of the use of a floating
structure minimises the necessary resources of space, labour and lifting systems for
the gravity-based foundation base.
[0016] The foundation base provides an assembly with the buoyancy and stability required
to be transported by floating it on the surface of the water before sinking it.
[0017] The foundation base provides stability to the wind turbine support tower in its installed
position, thanks to its own weight and the weight of the ballast, and ensures appropriate
transmission of loads to the underwater bed.
[0018] The gravity-based foundation base on an underwater bed to support a wind turbine
in the installed position comprises a foundation caisson having a geometry in the
form of a quasi-pyramidal caisson, the section of which decreases as the height of
the foundation base increases, and which includes internal buoyancy cells and a transition
component of tapered frustoconical form on top of the foundation caisson.
[0019] The foundation base is manufactured by means of a floating- or semi-floating structure
of the floating dock, vessel with submersible platform, submersible pontoons guided
from fixed structures, etc. type.
[0020] The stepped foundation caisson includes a set of hollow, sealed cells that can be
connected together and are configured to be ballasted with sand and/or water.
[0021] Yet another aspect is to use a floating- or semi-floating-type structure for manufacturing
reinforced concrete caissons to manufacture foundation caissons having a geometry
in the form of a quasi-pyramidal caisson, the section of which decreases as the height
of the foundation base increases, and which includes internal buoyancy cells.
BRIEF DESCRIPTION OF THE FIGURES
[0022] A more detailed explanation of the invention is given in the following description
based on the attached figures:

Figure 1 shows a perspective view of a foundation base;

Figure 2 shows a perspective view of a transition component;

Figure 3 shows a transverse cross section of the foundation base;

Figure 4 shows a perspective view of the gravity-based foundation base on an underwater
bed to support a wind turbine in the installed position;

Figure 5 shows an elevation view of a structure for manufacturing reinforced concrete
of the floating type; and

Figures 6a to 6c show the steps in manufacturing a floating reinforced concrete caisson
as per the state of the art.
DESCRIPTION OF AN EMBODIMENT
[0023] In relation to Figures 1 to 5, an embodiment is shown of a gravity-based foundation
base 11 for an offshore wind turbine that comprises a foundation caisson 12 itself
having a geometry essentially in the form of a quasi-pyramidal caisson, including,
in turn, internal cells or holes 31 to increase the buoyancy of the foundation base
11 and a transition component 13 essentially of frustoconical form tapered upwards
in the installed position.
[0024] The transition component 13 enables the connection to be made between the foundation
base 11 and a wind turbine support tower shaft 41 which is also tapered in the upward
direction in the installed position; at least one tower shaft 41 alignment flange
22 which makes it possible to prevent undesired inclinations once the foundation base
11 has been anchored to the underwater bed at the installation point; and at least
one connecting bolt 21 for transmission of loads between the transition component
13 and the foundation base 11.
[0025] The foundation caisson 12 is arranged in an essentially quasi-pyramidal form in an
ascending direction in the installed position, the section of which decreases as the
height of the foundation base 11 increases. The stepped foundation caisson 12 includes
a set of hollow, sealed cells 31, with the cells 31 connected to each other and floodable.
[0026] The geometry in plan and elevation view of the foundation caisson 12 can vary depending
on conditions such as the type of underwater bed, the dynamic conditions of the water
and the atmosphere, the power and size of the wind turbine, etc.
[0027] The transition component 13 is inserted by one of its ends through the top part of
the foundation caisson 12, with the opposite end of the transition component 13 remaining
free. Arranged at the end of the transition component 13 in contact with the foundation
base 11 is a set of connecting bolts 21 responsible for transmitting loads to the
foundation base 11 and guaranteeing adherence between the transition component 13
itself and the foundation base 11.
[0028] At the opposite, free, end of the transition component 13 is a wind turbine tower
shaft 41 alignment piece or flange 22.
[0029] With respect, now, to Figure 5, this shows a structure 51 for manufacturing floating
reinforced concrete caissons of the caisson vessel type where the foundation caisson
12 is manufactured compartmented into cells 31 capable of being ballasted or flooded
and unballasted, being manufactured sheltered from the waves.
[0030] The structure 51 can also be of the semi-floating structure, floating dock, vessel
with submersible platform, submersible pontoons guided from fixed structures, etc.
type.
[0031] The caisson vessel 51 comprises a pontoon with four towers so as to always have the
necessary buoyancy and to control the combination of caisson vessel/foundation base
at all times. The foundation caisson 12 is constructed in reinforced concrete in the
caisson vessel 51, without interfering with the traffic in the port where it is moored.
[0032] The lateral towers are capable of being ballasted and unballasted to guarantee the
naval stability of the combination of caisson vessel/foundation base. Metal structures
are arranged on each of the towers, in a truss structure to support the superstructure
and the sliding formwork by means of a set of winches. A support pontoon is the working
platform enabling dry manufacture on its deck of the foundation caisson 12 and the
first few metres of the transition component 13. This pontoon is then progressively
sunk as the erection of the foundation base 11 progresses.
[0033] With respect, now, to Figures 6a to 6c, the process of manufacturing the caisson
12 includes the placement of a reinforcement mesh for the base slab on the support
pontoon, concreting the base slab, descending sliding of the formwork and the start
of concreting of the foundation caisson shaft and concreting of the shaft until completion.
Curing of the concrete is performed directly by submerging the caisson 12 in the water.
This procedure does not impair the characteristics or durability of the concrete.
[0034] Launching of the caisson 12 is achieved by immersing the support pontoon. On occasions,
launching is a critical operation for the naval stability of the floating structure
51 and of the caisson 12. Once the caisson has been launched, the caisson 12 is towed
to its installation position.
[0035] Once the foundation is out of the caisson vessel 51 and moored in the port, the transition
component 13 is placed, having previously arranged the tower shaft 41 alignment flange
22 and the connecting bolts 21.
[0036] If necessary, the foundation base/tower shaft assembly would be ballasted to achieve
the appropriate freeboard for transfer by towing to its final installation position,
where the underwater bed area 14 has previously been prepared for seating the foundation
base 11, as shown in Figure 1.
[0037] Once the corresponding underwater bed area 14 has been prepared, that is the seating
bed on which the foundation base 11 is located by simply allowing it to fall under
gravity by means of controlled ballasting to the installation point, such that the
preparation of the underwater bed and the seating bed for the foundation base 11 are
performed in immediately consecutive operations, without allowing time for the prepared
seating bed to undergo alterations due to movements of the water, ensuring perfect
seating of the foundation base 11.
[0038] The foundation base 11 determines a structural assembly with a weight and a base
that enable seating by gravity on an underwater bed to support a wind turbine arranged
on a tower placed on the foundation base.
[0039] However, for an application scenario with seating on a soft underwater bed, a means
of anchoring is arranged on the foundation base 11, essentially in the form of piles,
for example, to ensure seating under gravity of the foundation base 11.
[0040] The construction procedure for the gravity-based foundation base 11 on a floating
structure 51 comprises the following steps:
[0041] Manufacture of the lower or base slab of the foundation base 11 on the floating structure
or caisson vessel, construction of the stepped quasi-pyramidal foundation caisson
12 using the sliding formwork installed on the caisson vessel 51. Simultaneous sinking
of the lower platform of the floating structure of the caisson vessel 51 on which
the foundation base 11 is supported. Once the foundation caisson 12 has been completed,
it is extracted from the floating structure of the caisson vessel 51 by towing by
floating.
[0042] Once the foundation base is complete, the transition component, the connecting bolts
and the wind turbine support tower alignment piece are assembled successively.
[0043] Similarly, works are carried out to prepare the foundation seating bed on the underwater
bed at the installation position and the foundation base is towed by floating to the
anchoring point. Finally, the gravity-based foundation base is submerged by controlled
flooding, totally or partially filling the foundation caisson 12 cells with sand ballast
and/or water.
[0044] In transport by floating of the foundation base/transition component, auxiliary floating
structures can be used to improve the buoyancy and stability of the assembly. These
auxiliary floating structures are temporarily abutted against and connected to this
assembly with appropriate means of anchoring.
1. A gravity-based foundation base on an underwater bed to support a wind turbine in the installation position; characterised in that the foundation base (11) comprises a foundation caisson (12) having a geometry in
the form of a quasi-pyramidal caisson, the section of which decreases as the height
of the foundation base (11) increases, and which includes internal buoyancy cells
(31) and a transition component (13) of tapered frustoconical form on top of the foundation
caisson (12).
2. A Base according to claim 1; characterised in that the base (11) is manufactured by means of a floating- or semi-floating structure
(51) of the floating dock, vessel with submersible platform, submersible pontoons
guided from fixed structures, etc. type.
3. A base according to claim 1; characterised in that the stepped foundation caisson (12) includes a set of hollow, sealed cells (31) that
can be connected together and are configured to be ballasted.
4. A base according to claim 1; characterised in that the transition component (13) is adapted to join the foundation base (11) and a wind
turbine support tower shaft (41) which is also tapered in the upward direction in
the installed position; at least one tower shaft (41) alignment flange (22) cooperates
with the transition component (13) in the vertical alignment of the foundation base
(11) and the tower shaft (41).
5. A use of a structure for manufacturing reinforced concrete caissons of the floating- or semi-floating-type;
characterised in that the structure (51) is configured to manufacture a gravity-based foundation base (11)
on an underwater bed to support a wind turbine in the installation position.
6. Use of a structure according to claim 5; characterised in that the foundation base (11) comprises a foundation caisson (12) having a geometry in
the form of a quasi-pyramidal caisson, the section of which decreases as the height
of the foundation base (11) increases.