TECHICAL FIELD
[0001] The description generally concerns building structures as used within the building
industry etc. and in particular relates to a method of forming a building structure
where adjoining building elements are joined together and a joint is formed between
the building elements and where a uniting force is applied by tension elements to
the building elements that are joined at the joint. The description also concerns
a building structure formed of several building elements that are joined together
as well as a joint formed between such building elements.
BACKGROUND
[0002] In connection with construction and building work involving the establishment of
a concrete slab on the ground it is today only a matter of casting on-site, whether
it concerns small houses, holiday homes, garages or storage buildings in the form
of so called "Friggebodar" (small structures of no more than 15 square meters and
3 meters in height built without a special permit). The reason is mainly that it has
not been practically and economically possible to transport large prefabricated concrete
slabs or footings or similar structures from a plant to an installation site. Although
concrete slabs that are built on-site, when fabricated correctly, have very high strength
they are expensive to produce. They also cause problems and difficulties both for
the supplier/provider and for the customer. As an example, it is difficult for a customer/client
to coordinate delivery times with other house elements. In most situations it is also
difficult for the customer/client to get an overall cost specified by the supplier
since an external supplier in most cases shall provide the concrete slab that is cast
on-site. The delivery time for a cast on-site concrete slab is also normally rather
long and may, depending upon the time of the year and the weather, often vary between
2-12 months.
[0003] Until now, no solutions have been presented that effectively eliminate the above
discussed problems in connection with the establishment of predominantly concrete
slabs on the ground. Accordingly, there is a demand within this general technical
field for a building structure that has high strength and that at the same time is
advantageous both with regard to cost, transport and production planning.
SUMMARY
[0004] It is a general object to find a solution to the above discussed problems.
[0005] It is a particular object to suggest an improved method of forming a building structure
from separate building elements.
[0006] It is another particular object to suggest an improved building structure composed
of building elements being joined together.
[0007] A further object is to suggest an improved joint between building elements being
joined together and forming a composite building structure.
[0008] These and further objects are achieved by means of embodiments that are specified
in the attached claims.
[0009] In a first aspect this technology relates to a method of forming a building structure,
whereby a number of separate, adjoining building elements are brought together, a
joint is formed between them and a uniting force is applied by tension elements to
the building elements that are joined at the joint. A first building element is fitted
at least at a portion of its circumference with a first engagement formation that
is formed having alternating peaks and valleys and a second building element is fitted
at least at a portion of its circumference with a second engagement formation that
is likewise formed having alternating peaks and valleys. The first and second engagement
formations of the respective first and second building elements are formed having
a mutually fitting complementary shape and the first and second engagement formations
are brought together and are clamped together by the tension elements to form the
joint. In a basic configuration the method comprises providing at each adjoining building
element, in conjunction with the joint, a number of transverse force supports separated
in a general longitudinal direction of the joint and in the form of a pair of a groove
and a tongue for each peak and valley of the respective engagement formations that
are combined in a joined condition.
[0010] In another aspect the technology relates to a building structure that includes a
number of separate adjoining building elements that are brought together at a joint
and a number of tension elements that apply a uniting force to the respective adjoining
building elements, whereby a first building element at least at a portion of its circumference
is fitted with a first engagement formation that is formed having alternating peaks
and valleys and a second building element at least at a portion of its circumference
is fitted with a second engagement formation that is likewise formed having alternating
peaks and valleys and whereby the first and second engagement formations of the respective
first and second building elements are formed having mutually fitting complementary
shape. In a basic configuration each adjoining building element (1, 2) is in conjunction
with the joint fitted with a number of transverse force supports that are separated
in a general longitudinal direction of the joint and that are in the form of a pair
of a groove and a tongue for each peak and valley of the respective engagement formations
that are combined in a joined condition.
[0011] In yet another aspect this technology relates generally to a joint between separate
adjoining building elements in a building structure, having a first engagement formation
with alternating peaks and valleys at a portion of a circumference of a first building
element, a second engagement formation with alternating peaks and valleys at a portion
of a circumference of a second building element, whereby the respective first and
second engagement formations of the first and second building elements have a mutually
fitting complementary shape. In a basic configuration each adjoining building element
is in conjunction with the joint fitted with a number of transverse force supports
that are separated in a general longitudinal direction of the joint and that are in
the form of a pair of a groove and a tongue for each peak and valley of the engagement
formations that are combined in a joined condition.
[0012] Preferred further developments of the basic idea behind this technology as well as
embodiments thereof are specified in the dependent subclaims.
[0013] Advantages offered in addition to those described will become apparent when reading
the below detailed description of embodiments.
BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The technology in question and its further features and advantages will be explained
in the following description and with reference to the attached drawings, where:
- Fig. 1
- is a schematic plan view of a building structure formed in accordance with this technology;
- Fig. 2
- is a plan view of a first building element included in the building structure of Fig.
1;
- Fig. 3
- is a cross-section along line A-A through the first building element of Fig. 2;
- Fig. 4
- is a cross-section along line B-B through the first building element of Fig. 2;
- Fig. 5
- is a plan view of a second building element included in the building structure of
Fig. 1;
- Fig. 6
- is a cross-section along line C-C in Fig. 1 through a joint formed in the building
structure;
- Fig. 7
- is a schematical illustration of the course of forces in a building structure according
to Fig. 1, formed by building elements tensioned together at a staggered joint; and
- Fig. 8
- is a schematical illustration of the course of forces in a building structure formed
by building elements tensioned together at a straight joint.
DETAILED DESCRIPTION
[0015] The principles of the present technology will now be explained with reference to
exemplifying configurations thereof, which are illustrated in the attached drawing
figures 1-7. The basic embodiment illustrated in the drawings is an example of an
application of the principles of the present technology at a widely used slab of preferably
concrete. The slab that is not specified in detail, is intended for forming a base
or footing in a building. It shall be emphasized though, that the purpose of the shown
embodiment is only to illustrate a presently preferred configuration of this technology
and is not intended to limit the technology to the details shown in the drawings.
It shall also be stressed that the technology is not restricted only to the building
industry or to concrete as material of the structure. The technology may with the
corresponding advantages be applied to other fields in order to form strong foundations
or for structures consisting of other materials having similar properties of material.
Such applications may however require some adaption to the use of the structures in
question and/or to properties of material.
[0016] As mentioned, no solutions have been presented in the general technical field, which
have managed to eliminate the problems relating to building structures that were discussed
in the introduction. The new technology aims at finding an effective and reliable
solution to these problems and not least to the problems of providing a building structure
involving an essentially shorter delivery time than the on-site built structures of
today and still having comparable strength. These objects are achieved with the new
technology by applying a completely new way of thinking that basically involves forming
a building structure by stably joining a number of prefabricated transportable building
elements.
[0017] This technology will now be described in more detail below with reference to a partly
schematical exemplifying embodiment of a building structure. In Figs. 1-7 is illustrated
an embodiment of a building structure that is configured in accordance with the now
suggested technology and in Fig. 1 is especially shown a very schematical view of
an exemplifying building structure 20 in a design especially intended for use in forming
any type of appropriate foundation, footing or corresponding structure within the
building industry. The building structure shown here is specifically intended to be
prefabricated by concrete casting.
[0018] According to the technology described herein, the building structure 20 comprises
a number of adjoining building elements 1, 2 joined together at a joint 8 and a number
of tension elements 18 that apply a uniting force F1 to the respective adjoining building
elements. In this embodiment is shown two adjoining and joined together building elements
1, 2 but it shall be obvious that the number of used building elements may be adapted
to the area of the foundation or footing to be formed.
[0019] The building structure 20 is thus formed of a first building element 1 that at least
at a portion 3 of its outer circumference O1 is fitted with a first engagement formation
4 formed having alternating peaks 4A and valleys 4B and a second building elements
2 that at least at a portion 7 of its outer circumference 02 likewise is fitted with
a second engagement formation 9 that in a corresponding manner is formed having alternating
peaks 9A and valleys 9B. It is essential that the first and second engagement formations
4 and 9 of the respective first and second building elements 1, 2 are formed having
mutually fitting complementary shape to form a joint 8 having appropriate strength
in the manner described below.
[0020] With reference to Fig. 1 and especially to Figs. 2 and 5 the peaks 4A, 9A and valleys
4B, 9B of the engagement formations 4, 9 do in this building structure 20 have a height
A that is important to the strength of the joined together building structure 20 and
also to the compressive forces that arise in the building elements 1, 2 when they
are pulled towards each other. Expressed otherwise, outer 12, 14 and inner 13, 15
end surfaces of the alternating peaks 4A, 9A and valleys 4B, 9B of the respective
first and second engagement formations 4, 9 are provided at a mutual distance A. The
importance of the size of this distance A will be discussed below, with specific reference
to Figs. 7 and 8. However, in a practical example this distance may generally be said
to lie between approximately 5 and 80 % of the length LE of the respective building
element in a direction transversal to the joint 8, preferably between approximately
ca 20 and 50 % of this length. On the other hand, the measure A is normally chosen
so as to not be larger than for the joint 8 to become equally strong with the building
elements 1, 2 in themselves.
[0021] Furthermore, in the shown embodiment the first and second engagement formations 4
and 9, respectively, of the building structure 20 have peaks 4A, 9A and valleys 4B,
9B that have outwardly generally converging and diverging, respectively, side surfaces
5, 10. As an alternative it is also possible to design these peaks and valleys, respectively,
having fundamentally straight side surfaces, with a certain allowance to facilitate
the joining together thereof, or even to design the peaks and valleys, respectively,
having curved and wavy, respectively, profiles (not illustrated).
[0022] In the basic embodiment with joined together building elements 1, 2 of concrete,
a number of tension elements 18 are used in the building structure 20. Preferably,
the tension elements 18 each consist of an at least partially threaded tension bar
18. The tension bars 18 are received with clearance through aligned holes 19 in adjoining
building elements 1, 2. Preferably, nuts 18A are used to clamp the separate, adjoining
building elements 1, 2 against each other by means of the tension bars 18 and with
a tensioning force F1. The number of tension bars 18 used for the clamping may vary
depending upon the circumstances at the specific application but is preferably chosen
equal to or smaller than the number of peaks 4A, 9A and valleys 4B, 9B, respectively,
in the engagement formations 4, 9 of the building elements 1, 2.
[0023] As is illustrated in the drawings and most clearly in Fig. 6, each of the separate,
adjoining building elements 1, 2 of the building structure 20 are in conjunction with
the joint 8 provided with a number of transverse force supports 16, 17 that are separated
in a general longitudinal direction LS of the joint 8. The transverse force supports
16, 17 are here made having the form of a groove 17 in the valleys 4B and 9B, respectively,
of the first and second building elements 1, 2 and in the form of a protruding tongue
16 in the peaks 4A and 9A, respectively, of the first and second building elements
1, 2. The number of transverse force supports 16, 17 that are employed at the building
elements 1, 2 may also be varied in dependence upon the circumstances by the specific
application, but basically one pair of a groove/tongue is provided for each peak and
valley of the engagement formations that are combined in a joined condition. In the
illustrated embodiment a tongue 16 and a groove 17 are only provided in the surfaces
that lie perpendicular to the bending moment MB (Fig. 7) but for specific applications
with special circumstances it is also possible to provide them also in other surfaces
of the joint 8.
[0024] Generally, it may be seen that when the distance A increases the compressive forces
F2 (see Fig. 7) are reduced in the building element material, i.e. usually in the
concrete. Should the measure A be doubled the compressive forces in the material/concrete
would as an example be reduced to half. Concrete only takes up compressive forces
whereas tensioning forces are taken up by the material, preferably steel, of the tension
rods 18 or the like. With specific reference to Figure 7 it is realized that the staggered
or irregular joint 8 of a divided building structure 20, as suggested in accordance
with the new technology, provides considerable advantages with regard to the ability
of a building structure formed of separate building elements 1, 2 to take up bending
moment MB. Among other things it is clear that the material fundamentally is subjected
only to pure compressive forces F2 that may be said to act oppositely directed at
the transverse force supports 16, 17 that are displaced with the measure A. In cases
with thin building structures 20 the thickness T in practice loses its importance.
In comparison it is schematically illustrated in Fig. 8 how a straight joint 108,
i.e. having the measure A=0, should have capacity to transfer a bending moment MB'.
In this case is shown how the compressive load F2' has an unfavorable effect on a
building structure 120 at the straight joint 108. In such a case the thickness T'
of the building structure/concrete slab 120 is on the contrary quite decisive of the
ability to securely take up the compressive forces.
[0025] A joint 8 formed between adjoining building elements 1, 2 in a building structure
20 according to the new technology is thus characterized by a first engagement formation
4 with alternating peaks 4A and valleys 4B at a portion 3 of an outer circumference
O1 of a first building element 1 and a second engagement formation 9 with alternating
peaks 9A and valleys 9B at a portion 7 of an outer circumference 02 of a second building
element 2. The respective first and second engagement formations of the first and
second building elements thereby have a mutually fitting complementary shape. In conjunction
with the joint each of the adjoining building elements 1, 2 are preferably fitted
with a number of transverse force supports 16, 17 that are separated in a general
longitudinal direction LS of the joint 8 and that stabilize the joint 8 and take up
transversal forces between the building elements.
[0026] The described technology finally includes also a method of forming a building structure
20 as specified above, whereby a number of adjoining building elements 1, 2 are joined
together so that a joint 8 is formed between the building elements. A uniting force
F1 is applied by tension elements 18 to the building elements that are joined together
at the joint. A first building element 1 is at least at a portion 3 of its outer circumference
O1 made/fitted with a first engagement formation 4 that is formed having alternating
peaks 4A and valleys 4B. Furthermore, a second building element 2 is at least at a
portion 7 of its outer circumference 02 made/fitted with a second engagement formation
9 that is likewise formed having alternating peaks 9A and valleys 9B. The respective
first and second engagement formations of the first and second building elements are
thereby formed having mutually fitting complementary shape and the first and second
engagement formations are brought together and are tensioned together by the tension
elements 18 to form the joint 8.
[0027] The first and second engagement formations 4, 9 are each formed with outer 12, 14
and inner 13 15, respectively, end surfaces at their peaks 4A, 9A and valleys 4B,
9B that are provided at a mutual distance A of between approximately 5 and 80 %, preferably
between approximately 20 and 50 %, of the length LE of the respective building element
in a direction transversal to the joint 8. These peaks 4A, 9A and valleys 4B, 9B of
the first and second engagement formations 4 and 9, respectively, are formed having
straight or alternatively outwardly generally converging or diverging side surfaces
5 and 10, respectively.
[0028] At least one partially threaded tension bar 18 is extended with clearance through
holes 19 formed in adjoining building elements 1, 2 and is tensioned with tensioning
force F1 against each of these building elements. In conjunction with the joint 8
there are provided, at each of the adjoining building elements 1, 2, a number of transverse
force supports 16, 17 that are separated in a general longitudinal direction LS of
the joint 8.
[0029] These described, basic configurations bring about advantages in the form of:
- a very stable and above all moment resisting, composite building structure having
a strength comparable to that of a concrete slab cast in one piece;
- an improved flexibility by the forming of building structures having for example different
shape; and
- a cost effective solution with regard to both fabrication, transport and installation.
[0030] Compared to the present technique consisting of concrete slabs cast on-site a divided
concrete slab according to this new technology may in particular be prefabricated
and may very quickly and economically be transported to and installed at a building
site. The building structure according to this technology may also be dismounted and
reinstalled again in another place. It is also possible to easily implement it as
a divided slab with cast-in drains, water pipes, and floor heating, which is an important
and large market. The delivery time from storage may probably be reduced to a week.
As mentioned, this is a quite significantly shorter delivery time than for a concrete
slab cast on-site. An installation time of approximately an hour may be calculated
with, which all in all gives a very advantageous total time.
[0031] Such a divided concrete slab is also very moment resisting and the strength may be
maintained comparable to that of a concrete slab that is cast in one piece. Whereas
it is very expensive, if at all possible, to transport a complete concrete slab the
moment resisting, divided concrete slab makes normal economical transports possible.
Further advantages are that the divided concrete slab according to the new technology
may be prefabricated, which leads to lower price and more uniform quality, and that
it may even be transported together with a building kit or the like.
[0032] In alternative, but not specifically shown embodiments of this technology variants
or modifications of different illustrated parts of the building structure formed by
the building elements and of the joint, respectively, between these building elements
may be used without departing from its scope. Above all, the technology is not limited
to the illustrated and described, schematical configuration where the complementary
engagement formations have the illustrated general trapezoidal shape of its peaks
and valleys. It also comprises variants and modifications providing the same basic
functions as described above, but having engagement formations with other designs
of details. The same applies to embodiments where building elements have engagement
formations at more than one portion of their circumference, for forming larger connected
structures. Although the technology is presently estimated to have its principal application
by cast concrete structures it may also come to use for materials having similar properties
of material and for other purposes. The basic principles of the described technology
may thus be applied to other types of building elements and in applicable cases to
other types of applications than just foundations and footings.
[0033] The technology has been described in connection with what is presently regarded as
a most practical and preferred embodiment, but it shall be realized that the technology
is not limited to the illustrated and described configurations. The present technology
shall thus cover different modifications and equivalent arrangements that fall within
the basic idea and protective scope of the attached claims.
1. A method of forming a building structure (20), whereby a number of separate, adjoining
building elements (1, 2) are brought together, a joint (8) is formed between them
and a uniting force (F1) is applied by tension elements (18) to the building elements
that are joined at the joint, whereby a first building element (1) at least at a portion
(3) of its outer circumference (O1) is fitted with a first engagement formation (4)
that is formed having alternating peaks (4A) and valleys (4B) and a second building
element (2) at least at a portion (7) of its outer circumference (02) is fitted with
a second engagement formation (9) that is likewise formed having alternating peaks
(9A) and valleys (9B) and whereby the first and second engagement formations of the
respective first and second building elements are formed having mutually fitting complementary
shape and the first and second engagement formations are brought together and are
clamped together by the tension elements to form the joint, characterized by providing at each of the adjoining building elements (1, 2), in conjunction with
the joint (8), a number of transverse force supports (16, 17) separated in a general
longitudinal direction (LS) of the joint (8) and provided in the form of a pair of
a groove and a tongue (17, 16) for each peak (4A and 9A, respectively) and valley
(4B and 9B, respectively) of the engagement formations that are combined in a joined
condition.
2. A method according to claim 1, characterized by providing transverse force supports (16, 17) in the form of a groove (17) in the
valleys (4B and 9B, respectively) of the first and second building elements and in
the form of a protruding tongue (16) in the peaks (4A and 9A, respectively) of the
first and second building elements and in that the number of transverse force supports
(16, 17) that are provided at the building elements (1, 2) is varied depending upon
the circumstances at the specific application.
3. A method according to claim 1 or 2, characterized by forming each of the first and second engagement formations (4, 9) having outer (12,
14) and inner (13, 15) end surfaces, respectively, of their peaks (4A, 9A) and valleys
(4B, 9B) provided at a mutual distance (A) between approximately 5 and 80 %, preferably
between approximately 20 and 50 %, of the length (LE) of the building elements (1,
2) in a direction transversal to the joint (8).
4. A method according to any of claims 1-3, characterized by forming the peaks (4A, 9A) and valleys (4B, 9B) of the first and second engagement
formations (4, 9) having straight or alternatively outwardly generally converging
and diverging, respectively side surfaces (5, 10).
5. A method according to any of claims 1-4, characterized by extending at least one partially threaded tension rod (18) with clearance through
holes (19) formed in adjoining building elements (1, 2) and tensioning it with tensioning
force (F1) against each of these building elements.
6. A building structure (20) including a number of separate, adjoining building elements
(1, 2) that are brought together at a joint (8) and a number of tension elements (18)
that apply a uniting force (F1) to the respective adjoining building elements, whereby
a first building element (1) at least at a portion (3) of its outer circumference
(O1) is fitted with a first engagement formation (4) that is formed having alternating
peaks (4A) and valleys (4B) and a second building element (2) at least at a portion
(7) of its outer circumference (02) is fitted with a second engagement formation (9)
that is likewise formed having alternating peaks (9A) and valleys (9B) and whereby
the first and second engagement formations of the respective first and second building
elements are formed having mutually fitting complementary shape, characterized in that in conjunction with the joint (8) each of the adjoining building elements (1, 2)
is fitted with a number of transverse force supports (16, 17) that are separated in
a general longitudinal direction (LS) of the joint (8) and that are in the form of
a pair of a groove and a tongue (17, 16) for each peak (4A and 9A, respectively) and
valley (4B and 9B, respectively) of the engagement formations that are combined in
a joined condition.
7. A building structure (20) according to claim 6, characterized in that the transverse force supports (16, 17) are in the form of a groove (17) in the valleys
(4B and 9B, respectively) of the first and second building elements and in the form
of a protruding tongue (16) in the peaks (4A and 9A, respectively) of the first and
second building elements and in that the transverse force supports (16, 17) are provided at the building elements (1,
2) in a number that varies depending upon the circumstances at the specific application.
8. A building structure (20) according to claims 6 or 7, characterized in that outer (12, 14) and inner (13, 15) end surfaces, respectively, of the alternating
peaks (4A, 9A) and valleys (4B, 9B) of the first and second engagement formations
(4, 9) are provided at a mutual distance (A) of between approximately 5 and 80 %,
preferably between approximately 20 and 50 %, of the length (LE) of the respective
building element in a direction transversal to the joint (8).
9. A building structure (20) according to any of claims 6 - 8, characterized in that the peaks (4A, 9A) and valleys (4B, 9B) of the first and second engagement formations
(4, 9) have straight or alternatively outwardly generally converging and diverging,
respectively, side surfaces (5, 10).
10. A building structure (20) according to any of claims 6 - 9, characterized in that the tension element/elements (18) consists/consist of a partially threaded tension
rod (18) that is received with clearance through holes (19) in adjoining building
elements (1, 2) and is tensioned with a tensioning force (F1) against each of these
building elements.
11. A joint (8) between separate adjoining building elements (1, 2) in a building structure
(20), including a first engagement formation (4) with alternating peaks (4A) and valleys
(4B) at a portion (3) of an outer circumference (O1) of a first building element (1)
and a second engagement formation (9) with alternating peaks (9A) and valleys (9B)
at a portion (7) of an outer circumference (02) of a second building element (2),
whereby the respective first and second engagement formations of the first and second
building elements have a mutually fitting complementary shape, characterized in that in conjunction with the joint (8) each of the adjoining building elements (1, 2)
is fitted with a number of transverse force supports (16, 17) that are separated in
a general longitudinal direction (LS) of the joint (8) and that are in the form of
a pair of a groove and a tongue (17, 16) for each peak (4A and 9A, respectively) and
valley (4B and 9B, respectively) of the engagement formations that are combined in
a joined condition.
12. A joint (8) between building elements according to claim 11, characterized in that the transverse force supports (16, 17) are in the shape of a groove (17) in the valleys
(4B and 9B, respectively) of the first and second building elements and in the form
of a protruding tongue (16) in the peaks (4A and 9A, respectively) of the first and
second building elements and in that the transverse force supports (16, 17) are provided at the building elements (1,
2) in a number that varies depending upon the circumstances at the specific application.