TECHNICAL FIELD
[0001] The present invention relates to a traffic control system, and particularly relates
to a train traffic control system configured to make train schedule adjustment based
on predictions of train operations.
BACKGROUND ART
[0002] In a railway train traffic operation, it is necessary to operate trains while restricting
normal train operations in view of the safety during bad weather. In such a case,
for a certain period of time, speed restrictions according to the weather conditions
are imposed on the normal running speeds of trains. Such restriction is called temporary
speed restriction (also referred to as TSR). If the temporary speed restrictions are
imposed, the trains run at lower speeds, and a train diagram planned in advance is
disturbed. For this reason, a train dispatcher has a need to predict the temporary
speed restrictions and make a plan for train schedule adjustment before the train
diagram is disturbed.
[0003] The train traffic control system monitors weather conditions in train operation areas
by using measuring devices such as anemometers, rain gauges, seismometers, and snow
gauges which are installed around railroad lines. There has been known a conventional
technique (Patent Literature 1) of predicting train operation restrictions in consideration
of weather by using the measurement values of measuring devices.
[0004] For example, Patent Literature 1 discloses the technique of: obtaining predicted
measurement values of the measuring devices based on weather forecast; predicting
an inter-station area where a speed restriction will be imposed, if any of the predicted
values exceeds a preset measurement value threshold; and presenting the prediction
result to a train dispatcher.
CITATION LIST
PATENT LITERATURE
[0005]
[Patent Literature 1] Japanese Patent Application Publication No. 2013-203078
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0006] According to Patent Literature 1, the measurement values of the installed measuring
devices can be predicted based on the weather forecast, and a disturbance in train
operations at a certain time point in the future can be predicted as described above.
In this way, the technique described in Patent Literature 1 is capable of identifying
time points and areas in which the speed restrictions are required according to a
change in weather. However, this technique is incapable of predicting train operations
in consideration of a train diagram changed due to speed restrictions.
[0007] The present invention aims to provide a train traffic control system that predicts
measurement values of each of measuring devices based on weather forecast, and makes
a train operation prediction while presenting a change from a planned diagram to a
predicted diagram according to speed restrictions.
[0008] The present invention has an objective to provide a train traffic control system
capable of predicting train operations with high accuracy.
SOLUTION TO PROBLEM
[0009] According to an aspect of the present invention, a traffic control system includes:
a storage unit configured to store information acquired from outside, the information
including district information and a weather forecast value in each of districts,
and to store a first table in which each of the districts and a measuring device located
within the district are associated with each other based on the acquired district
information, and a second table in which a measurement value threshold for the measuring
device is associated with a speed limit to which a normal speed of a train is limited;
and
an arithmetic unit configured to perform processing of
obtaining a predicted measurement value of the measuring device from the weather forecast
value in the associated district by using the first table,
if the predicted measurement value is found to reach or exceed the measurement value
threshold based on the second table, selecting the measuring device indicating the
predicted measurement value thus found, and predicting the speed limit in an area
along a railroad line around which the selected measuring device is installed, and
displaying a diagram indicating a future train operation prediction which is made
based on the predicted speed limit.
ADVANTAGEOUS EFFECTS OF INVENTION
[0010] According to an aspect of the present invention, it is possible to provide a train
traffic control system capable of predicting train operations with high accuracy.
BRIEF DESCRIPTION OF DRAWINGS
[0011]
Fig. 1 which is made up of Figs. 1A and 1B is a functional configuration diagram of
a traffic control system according to an embodiment.
Fig. 2 is an example of a wind velocity forecast information file.
Fig. 3 is an example of a wind velocity information conversion constant table.
Fig. 4 is an example of an anemometer prediction information storage table.
Fig. 5 is an example of a rainfall forecast information file.
Fig. 6 is an example of a rainfall information conversion constant table.
Fig. 7 is an example of a rain-gauge prediction information storage table.
Fig. 8 is a diagram illustrating a correlation between a management range of the train
traffic control system and a management range of a weather forecast system.
Fig. 9 is a flowchart of anemometer-induced TSR information creation processing.
Fig. 10 is a flowchart of rain gauge-induced TSR information creation processing.
Fig. 11 is an example of an anemometer-induced TSR termination table.
Fig. 12 is an example of a rain gauge-induced TSR termination table.
Fig. 13 is an example of a TSR prediction information table.
Fig. 14 is an example of a TSR table.
Fig. 15 is an example of temporary speed restrictions changing over time according
to a wind velocity.
Fig. 16 is an example of a change in a predicted wind velocity over time and a transition
of temporary speed restriction settings.
Fig. 17 is an example of a planned diagram and a predicted diagram.
Fig. 18 is a flowchart of processing of creating proposal information for preventing
a train stop between stations.
Fig. 19 is a hardware configuration diagram of the traffic control system.
DESCRIPTION OF EMBODIMENTS
[0012] Hereinafter, embodiments are described by using the drawings.
[Embodiment 1]
[0013] Fig. 19 is a hardware configuration diagram of a train traffic control system 100S
which is an embodiment of the present invention. The traffic control system 100S includes
a storage apparatus 100T, an arithmetic processing apparatus 100R, and an input/output
apparatus 100D. The storage apparatus 100T stores various programs and files. The
arithmetic processing apparatus 100R performs reading/writing of the files stored
in the storage apparatus 100T, execution of the programs, calculation, and control
of the other apparatuses included in the traffic control system 100S. The input/output
apparatus 100D includes an input device 102D configured to receive input from outside,
and a display device 101D configured to output information to outside.
[0014] Fig. 1 which is made up of Figs. 1A and 1B is a functional configuration diagram
of the train traffic control system 100S according to the present invention. The train
traffic control system 100S is connected via a network to a weather forecast system
101S installed in the meteorological agency or the like and configured to provide
a weather forecast, and controls train operations based on a train diagram formed
in advance.
[0015] In the train traffic control system 100S, an electric data reception processing function
111R acquires a wind velocity forecast information file 101T and a rainfall forecast
information file 101J created by the weather forecast system 101S (Step 1). The wind
velocity forecast information file 101T and the rainfall forecast information file
101J indicate forecast values of the wind velocity and rainfall per unit time within
each of districts managed by the weather forecast system. Detailed description is
provided for the wind velocity forecast information file 101T by using Fig. 2 and
for the rainfall forecast information file 101J by using Fig. 5.
[0016] A measuring device prediction function 112R creates an anemometer prediction information
storage table 112T and a rain-gauge prediction information storage table 114T (Step
2) from information in the wind velocity forecast information file 101T and the rainfall
forecast information file 101J received by the electric data reception processing
function 111R, by using a wind velocity information conversion constant table 111T
and a rainfall information conversion constant table 113T, respectively.
[0017] The wind velocity information conversion constant table 111T and the rainfall information
conversion constant table 113T are conversion tables in which the districts managed
by the weather forecast system and measuring devices such as anemometers and rain
gauges installed around railroad lines are associated with each other. The anemometer
prediction information storage table 112T and the rain-gauge prediction information
storage table 114T indicate predicted measurement values per unit time of the measuring
devices such as the anemometers and the rain gauges installed around the railroad
lines. Detailed description is provided for the wind velocity information conversion
constant table 111T by using Fig. 3, for the anemometer prediction information storage
table 112T by using Fig. 4, for the rainfall information conversion constant table
113T by using Fig. 6, and for the rain-gauge prediction information storage table
114T by using Fig. 7.
[0018] The measuring device prediction function 112R obtains predicted values of future
measurement values of the measuring devices. The measuring device prediction function
112R performs an anemometer measurement value prediction 1121R of obtaining a temporal
change in a wind velocity value of each anemometer from the anemometer prediction
information storage table 112T, and performs a rain gauge measurement value prediction
1122R of obtaining a temporal change in a rainfall value of each rain gauge from the
rain-gauge prediction information storage table 114T.
[0019] After the creation of the measuring device prediction information storage tables
112T and 114T, a TSR prediction information creation function 113R is activated (Step
3).
[0020] After the measuring device prediction function 112R predicts the temporal changes
in the measurement values of the measuring devices, the TSR prediction information
creation function 113R calculates a TSR enforcement time point and a TSR termination
time point. This calculation is made using the measuring device prediction information
storage tables 112T and 114T and a TSR setting table 116T. In the TSR setting table
116T, train limited speeds are set corresponding to measurement value thresholds for
the anemometer and the rain gauge. In other words, a temporary speed restriction to
be imposed if a predicted measurement value exceeds its corresponding threshold is
set. Figs. 11 and 12 illustrate details of the TSR setting table 116T. By using this
table, the TSR prediction information creation function 113R can obtain the TSR enforcement
time point and the TSR termination time point if any predicted measurement value exceeds
its threshold.
[0021] The TSR prediction information creation function 113R performs anemometer-induced
TSR information creation processing 1131R by calculating the enforcement and termination
time points for a temporary speed restriction induced by each anemometer from the
anemometer prediction information storage table 112T, and registering the calculation
results in a TSR prediction information table 115T. The TSR prediction information
creation function 113R performs rain gauge-induced TSR information creation processing
1132R by calculating the enforcement and termination time point for a temporary speed
restriction induced by each rain gauge from the rain-gauge prediction information
storage table 114T, and registering the calculation results in the TSR prediction
information table 115T (Step 4).
[0022] A diagram control function 115R performs diagram prediction creation processing 116R
by creating information on a predicted diagram in consideration of predictions of
future temporary speed restrictions with reference to the TSR prediction information
table 115T, and by registering the created predicted diagram information in a diagram
prediction information file 117T (Step 5).
[0023] The display device 101D in the input/output apparatus 100D displays a predicted diagram
based on the diagram prediction information file 117T (Step 6).
[0024] Fig. 2 illustrates a structure of a wind velocity forecast information file 200.
The wind velocity forecast information file 200 includes a district 201, a time 202,
and wind velocity forecast information 203 which are managed by the weather forecast
system. The wind velocity forecast information 203 indicates a forecast value of a
wind velocity in the district 201 at the time 202. This information is fetched to
the train traffic control system 100S from the weather forecast system. District division
in the district 201 is independent of control areas of the train traffic control system
100S. For this reason, the district 201 may be set such that the wind velocity forecast
information can be extracted mainly for areas where the railroad lines are located.
This may reduce unnecessary information and thereby lighten the load on a memory.
[0025] Fig. 3 illustrates information stored in a wind velocity information conversion constant
table 300.
[0026] The wind velocity information conversion constant table 300 includes an anemometer
301 and an installation district 302. The anemometer 301 indicates a facility administration
number in the traffic control system 100S representing a facility installed around
a railroad line. The installation district 302 indicates a district in the wind velocity
forecast information file 200 corresponding to an installation location of the anemometer
301.
[0027] Fig. 4 illustrates information stored in an anemometer prediction information storage
table 400.
[0028] The anemometer prediction information storage table 400 includes an anemometer 401,
a time 402, and wind velocity prediction information 403. The anemometer 401 indicates
the facility administration number in the traffic control system 100S corresponding
to the anemometer 301 in the wind velocity information conversion constant table 300.
The time 402 indicates time points whose intervals may be determined based on minimum
time intervals in the wind velocity forecast information file 200 acquired from the
weather forecast system. The wind velocity prediction information 403 indicates a
predicted measurement value of a wind velocity that will be indicated by the anemometer
401 at the time 402.
[0029] The measuring device prediction function 112R creates the anemometer prediction information
storage table 400 in Fig. 4 by using the wind velocity forecast information file 200
in Fig. 2, and the wind velocity information conversion constant table 300 in Fig.
3. The measuring devices can be identified which are installed around the railroad
lines located in specific districts managed by the weather forecast system. Then,
the predicted measurement values that will be indicated by the identified measuring
devices can be obtained from the weather forecast values in the specific districts.
In this way, the predicted measurement values of the measuring devices (anemometers)
in the traffic control system 100S can be obtained.
[0030] Fig. 5 illustrates a structure of a rainfall forecast information file 500.
[0031] The rainfall forecast information file 500 includes a district 501, a time 502, and
rainfall forecast information 503 which are managed by the weather forecast system.
The rainfall forecast information 503 indicates a forecast value of a rainfall per
unit time in the district 501 at the time 502. This information is fetched to the
train traffic control system 100S from the weather forecast system. District division
in the district 501 is independent of the control areas of the train traffic control
system 100S. In addition, the district 501 may have no correspondence with the district
201 in the wind velocity forecast information file 200.
[0032] Fig. 6 illustrates information stored in a rainfall information conversion constant
table 600.
[0033] The rainfall information conversion constant table 600 includes a rain gauge 601
and an installation district 602. The rain gauge 601 indicates a facility administration
number in the traffic control system 100S representing a facility installed around
a railroad line. The installation district 602 indicates a district in the rainfall
forecast information file 500 corresponding to an installation location of the rain
gauge 601.
[0034] Fig. 7 illustrates information stored in a rain-gauge prediction information storage
table 700.
[0035] The rain-gauge prediction information storage table 700 includes a rain gauge 701,
a time 702, rainfall prediction information 703, and rainfall sum prediction information
704. The rain gauge 701 indicates the facility administration number in the traffic
control system 100S corresponding to the rain gauge 601 in the rainfall information
conversion constant table 600. The time 702 indicates time points whose intervals
may be determined based on minimum time intervals in the rainfall forecast information
file 500 acquired from the weather forecast system. The rainfall prediction information
703 indicates a predicted value of a rainfall per unit time that will be indicated
by the rain gauge 701 at the time 702. The rainfall sum prediction information 704
indicates a predicted value of a rainfall sum from a certain past time point to the
time 702. Since both the rainfall per unit time and the rainfall sum are obtained,
speed limits can be set with respect to these two types of rainfall values, respectively.
Thus, more detailed predictions can be made.
[0036] As is the case with the wind velocity, the rainfall forecast information file 500
in Fig. 5 is converted to the rain-gauge prediction information storage table 700
in Fig. 7 by using the rainfall information conversion constant table 600 in Fig.
6. The rainfall forecast information in the specific districts acquired from the weather
forecast system can be related to the measuring devices in the traffic control system
100S. Thus, the predicted values of the rain gauges in the traffic control system
100S can be obtained.
[0037] Fig. 8 illustrates an example of a correlation between the control areas of the train
traffic control system 100S and the information collection districts of the weather
forecast system. A management range of the weather forecast system includes wind velocity
forecast districts and rainfall forecast districts independently, and reference anemometers
and reference rain gauges in a management range of the train traffic control system
100S are located in these districts. TSR control areas 801, 802, ... indicate minimum
areas for TSR control in the train traffic control system 100S. Here, instead of the
minimum area, an arbitrary area may be set as the TSR control area in the train traffic
control system 100S. For each TSR control area, the corresponding anemometer and rain
gauge are referred to in the process of determining whether or not to enforce a temporary
speed restriction.
[0038] Fig. 9 illustrates a flowchart of the anemometer-induced TSR information creation
processing 1131R. The anemometer-induced TSR information creation processing 1131R
includes: receiving information on time-series predicted values of the wind velocity
of each anemometer obtained as a result of the anemometer measurement value prediction
(900); determining whether or not there is a time slot when the predicted value of
the wind velocity exceeds a TSR enforcement reference wind velocity by using the received
information (910); and, for the time slot thus found, calculating a TSR enforcement
time point (911) and a TSR termination time point (912) based on the prediction results
of the preceding and following time slots.
[0039] As the TSR enforcement reference wind velocity, reference wind velocities corresponding
to respective temporary speed restrictions are set in advance in the TSR setting table
116T. For example, as presented in Fig. 15A, speed limits with respect to the wind
velocity are to be set with a TSR of 0 km, i.e., a suspension of train operations
if the wind velocity is 30 m/s or above, and with a TSR of 70 km if the wind velocity
is 25 m/s or above. These speed limit conditions differ depending on the locations
of the measuring devices.
[0040] Next, description is provided for a method of calculating a TSR enforcement time
point according to a wind velocity and expressions for calculating a TSR enforcement
time point according to a wind velocity.
T
n: Time point (H)
F
n: Predicted value of wind velocity (m/s) at a time point T
n
α
n: Change in wind velocity per unit time (m/s per hour) between two given time points
(T
n to T
n+1)
V
max: TSR enforcement reference wind velocity (m/s)
X: Elapsed period (H) from T
n
[0041] When F
n < V
max < F
n+1,

[0042] Then, the elapsed period X from the time point T
n until the wind velocity reaches the TSR enforcement reference wind velocity is expressed
as:

[0043] Thus, the time point T at which the wind velocity will reach the TSR enforcement
reference wind velocity is calculated as follows:

[0044] The temporary speed restriction is set to be enforced when the predicted measurement
value of the anemometer reaches or exceeds a predetermined value. Provided that this
wind velocity as the reference is denoted by the TSR enforcement reference wind velocity
V
max, the TSR enforcement time point T is calculated in accordance with the above expressions.
[0045] Next, description is provided for a method of calculating a TSR termination time
point according to a wind velocity.
T
n: Time point (H)
F
n: Predicted measurement value of wind velocity (m/s) at a time point T
n
α
n: Change in wind velocity per unit time (m/s per hour) between two given time points
(T
n to T
n+1)
V
min: TSR termination reference wind velocity (m/s)
X: Elapsed period (H) after T
n (< N)
L: Termination monitoring period (H)
[0046] When F
n+1 < V
min < F
n,

[0047] Thus, the time point T
s at which the wind velocity will reach the TSR termination reference wind velocity
is calculated as:

[0048] An expected TSR termination time point T
e is calculated as:

[0049] The temporary speed restriction is set to terminate if the wind velocity remain at
or below a certain value for a predetermined monitoring period after the predicted
measurement value of the anemometer falls to the certain value or below. Provided
that this wind velocity as the reference is denoted by the TSR termination reference
wind velocity V
min, the time point T
s at which the predicted measurement value of the anemometer will reach V
min, and the TSR termination time point T
e are calculated in accordance with the above expressions.
[0050] Fig. 10 is a flowchart of the rain gauge-induced TSR information creation processing
1132R. The rain gauge-induced TSR information creation processing 1132R includes:
receiving information on time-series predicted values of the rainfall of each rain
gauge obtained as a result of the rain gauge measurement value prediction (1200) ;
calculating a rainfall per unit time at each concerned time point or a rainfall sum
within a certain period until the concerned time point based on the received information
(1210); determining whether or not the rainfall per unit time or the rainfall sum
exceeds a TSR enforcement reference rainfall based on the calculated result (1212);
and, for a time slot when the above condition is met, calculating a TSR enforcement
time point (1213) and a TSR termination time point (1214) based on the prediction
results of the preceding and following time slots.
[0051] Here, the TSR enforcement reference rainfalls are set in advance in a program. As
for rainfalls, the TSR enforcement reference rainfalls are set for both the rainfall
per unit time and the rainfall sum. Thus, highly accurate predictions can be made.
[0052] Next, description is provided for a method of calculating a TSR enforcement time
point according to a rainfall per unit time.
T
n: Time point (H)
R
n: Rainfall (mm) per unit time at a time point T
n
α
n: Change in rainfall per unit time (mm/H) between two given time points (T
n to T
n+1)
R
max: TSR enforcement reference rainfall (mm)
X: Elapsed period (H) from T
n
[0053] When R
n < R
max ≤ R
n+1,

[0054] Then, the elapsed period X from the time point T
n until the rainfall per unit time reaches the TSR enforcement reference rainfall is
expressed as:

[0055] Thus, the time point T at which the rainfall per unit time will reach the TSR enforcement
reference rainfall is calculated as:

[0056] The temporary speed restriction is set to be enforced when the predicted measurement
value of the rain gauge reaches or exceeds a predetermined value. Provided that this
rainfall as the reference is denoted by the TSR enforcement reference rainfall R
max, the TSR enforcement time point T is calculated in accordance with the above expressions.
[0057] Next, description is provided for a method of calculating a TSR enforcement time
point according to a rainfall sum.
T
n: Time point (H)
R
n: Rainfall (mm) per unit time at a time point T
n
L: Time interval (H) for rainfall information summation
S
n: Rainfall sum (mm) for a period L until the time point T
n β
n: Start time point (H) for calculation of a rainfall sum at the time point T
n
β
n = T
n - L
S
max: TSR enforcement reference rainfall sum (mm)

[0058] When S
n < S
max < S
n+1,

[0059] Thus, the time point T at which the rainfall sum will reach the TSR enforcement reference
rainfall is calculated as:

[0060] The rainfall sum S
n for a predetermined period L until a given time point T
n is calculated based on the received information. The temporary speed restriction
is set to be enforced when S
n reaches or exceeds a predetermined value. Provided that this rainfall sum as the
reference is denoted by the TSR enforcement reference rainfall sum S
max, the TSR enforcement time point T is calculated in accordance with the above expressions.
[0061] Next, description is provided for a method of calculating a TSR termination time
point according to a rainfall per unit time.
T
n: Time point (H)
R
n: Rainfall (mm) per unit time at a time point T
n
α
n: Change in rainfall per unit time (mm/H) between two given time points (T
n to T
n+1)
R
min: TSR termination reference rainfall (mm)
L: Termination monitoring period (H)
[0062] When R
n+1 < R
min < R
n,

[0063] Thus, the time point T
s at which the rainfall per unit time will reach the TSR termination reference rainfall
is calculated as:

[0064] A TSR termination time point T
e is calculated as:

[0065] The temporary speed restriction is set to terminate if the rainfall per unit time
remains at or below a certain value for a predetermined monitoring period after the
predicted measurement value of the rain gauge falls to the certain value or below.
Provided that this rainfall per unit time as the reference is denoted by the TSR termination
reference rainfall R
min, the time point T
s at which the predicted measurement value of the rain gauge will reach R
min and the TSR termination time point T
e are calculated in accordance with the above expressions.
[0066] Next, description is provided for a method of calculating a TSR termination time
point according to a rainfall sum.
T
n: Time point (H)
R
n: Rainfall (mm) per unit time at a time point T
n
L: Time interval (H) for rainfall information summation
S
n: Rainfall sum (mm) for a period L until the time point T
n β
n: Start time point (H) for calculation of a rainfall sum at the time point T
n
β
n = T
n - L
S
min: TSR termination reference rainfall sum (mm)

[0067] When S
n+1 < S
min < S
n,

[0068] Thus, the time point T
s at which the rainfall sum will reach the TSR termination reference rainfall sum is
calculated as:

[0069] The rainfall sum S
n for a predetermined period L until a given time point T
n is calculated based on the received information. The temporary speed restriction
is set to terminate when S
n falls to a predetermined value or below. Provided that this rainfall sum as the reference
is denoted by the TSR termination reference rainfall S
min, the TSR termination time point T is calculated in accordance with the above expressions.
[0070] Hereinafter, description is provided for creation of a predicted diagram with TSR
enforcements and terminations taken into account. The following description explains
a TSR termination table 118T used for TSR terminations in addition to the TSR setting
table 116T used for TSR enforcements. By use of the TSR termination table 118T, the
predicted diagram can be formed with the TSR enforcements and terminations taken into
account.
[0071] Fig. 11 is the TSR termination table 118T for the anemometers Fc1, Fc2, and so on.
[0072] An enforcement reference wind velocity 1701 differs among anemometers 1700. In this
table, the enforcement reference wind velocity 1701, a TSR termination monitoring
wind velocity 1702, and a TSR termination monitoring period 1703 are set for each
of the measuring devices. For example, as for the anemometer Fc1, it is assumed that
the temporary speed restriction is enforced when the predicted value of the wind velocity
exceeds an enforcement reference wind velocity of 20 (m/s). In this case, if the anemometer
Fc1 remains at or below a TSR termination monitoring wind velocity of 15 (m/s) for
a TSR termination monitoring period of 20 minutes, the temporary speed restriction
is terminated. Instead, the termination monitoring period may be set to 0 minutes,
and the temporary speed restriction may be terminated immediately after the predicted
value of the measuring device falls to the TSR termination monitoring wind velocity
or below. However, there is a case where the predicted value of the measuring device
repeatedly varies up and down around the TSR enforcement reference value, i.e., repeatedly
switches over between a state requiring a TSR enforcement and a state requiring no
TSR enforcement at short intervals. Even in that case, if the TSR termination monitoring
wind velocity and the TSR termination monitoring period are provided, predictions
can be performed while avoiding frequent TSR enforcements and terminations.
[0073] Fig. 12 illustrates a TSR termination table 118T for the rain gauges Rc1, Rc2, and
so on.
[0074] An enforcement reference rainfall 1801 differs among rain gauges 1800. In this table,
the enforcement reference rainfall 1801, a TSR termination monitoring rainfall 1802,
and a TSR termination monitoring period 1803 are set for each of the measuring devices.
For example, as for the rain gauge Rc1, it is assumed that a temporary speed restriction
is enforced when the predicted value of the rainfall exceeds an enforcement reference
rainfall of 15 (mm). In this case, if the rain gauge Rc1 remains at or below a TSR
termination monitoring rainfall of 10 (mm) for a TSR termination monitoring period
of 20 minutes, the temporary speed restriction is terminated. Instead, the termination
monitoring period may be set to 0 minutes, and the temporary speed restriction may
be terminated immediately after the predicted value of the measuring device falls
to the TSR termination monitoring rainfall or below. However, there is a case where
the predicted value of the measuring device repeatedly varies up and down around the
TSR enforcement reference value, i.e., repeatedly switches over between a state requiring
a TSR enforcement and a state requiring no TSR enforcement at short intervals. Even
in that case, if the TSR termination monitoring rainfall and the TSR termination monitoring
period are provided, predictions can be performed while avoiding frequent TSR enforcements
and terminations. In addition, although the example herein uses the rainfall per unit
time, the same applies to the case of the rainfall sum.
[0075] The TSR prediction information table 115T illustrated in Fig. 13 is formed based
on the TSR termination table 118T and the TSR enforcement reference wind velocity
or rainfall. The TSR enforcement reference wind velocity includes multiple levels
of TSR enforcement (termination) reference wind velocities (m/s) presented in Fig.
15A, and set TSR values are specified for the respective predicted values of the wind
velocity. The same applies to the rainfalls (not illustrated).
[0076] Fig. 13 illustrates information stored in a TSR prediction information table 1900.
[0077] The TSR prediction information table 1900 includes a TSR control area 1901, and TSR
control information 1902, 1903, and 1904.
[0078] The TSR control area 1901 indicates minimum areas for TSR control in the train traffic
control system 100S. The TSR control areas in the TSR control area 1901 correspond
to 801 to 814 or 801, ... in Fig. 8.
[0079] The TSR control information 1902, 1903, and 1904 indicates information on temporary
speed restrictions predicted in an area specified in the TSR control area 1901. The
TSR control information indicates a temporary speed restriction set for the predicted
value of the wind velocity or rainfall, based on the anemometer prediction information
storage table in Fig. 4 or the rain-gauge prediction information storage table in
Fig. 7, the TSR termination table 118T in Fig. 11 or 12, and the TSR setting table
116T specified depending on the wind velocity value or rainfall value as in Fig. 15A.
The temporary speed restriction is set to vary depending on the wind velocity value
as in Fig. 15A. Since the temporary speed restriction setting is classified into multiple
TSR levels depending on an indication value of the measuring device, there is a possibility
that two or more TSR enforcement conditions may be satisfied simultaneously for a
particular time period in a particular area. In a time slot at which two or more conditions
are satisfied simultaneously, the temporary speed restriction under the most severe
condition is selected as a control target. For example, in the TSR control area 801,
two levels of TSR control in the control information 1 and the control information
2 are established simultaneously for an hour from 15:00 to 16:00. In this case, the
TSR of 0 km under the severer condition is selected as the control target for the
hour from 15:00 to 16:00.
[0080] Fig. 14 presents time-series TSR settings in a TSR control area. An example presented
herein is a TSR table 2000 in which a TSR 2001, a start time point 2002 and an end
time point 2003 are set for the TSR control area 801. As in the TSR prediction information
table 115T in Fig. 13, the TSR table 2000 is made only in consideration of the TSR
settings according to the wind velocity without consideration of the TSR settings
according to the rainfall. However, in consideration of the TSR prediction information
tables 115T for both the rainfall and the wind velocity, the TSR table 2000 may be
made by selecting the temporary speed restriction under the most severe conditions
along a temporal axis.
[0081] As an example of calculating a TSR enforcement time point according to a wind velocity,
Figs. 15A-15C present a calculation example of a change in TSR settings in association
with a particular anemometer. Fig. 15A presents wind velocities used as TSR enforcement
and termination conditions and various constants, Fig. 15B presents forecast results
received from the weather forecast system, and Fig. 15C presents TSR enforcement time
points and termination time points calculated in the anemometer-induced TSR information
creation processing 1131R.
[0082] Fig. 16 illustrates an example of a forecast of a wind velocity change over time
and a transition of TSR settings in an implementation example under the conditions
specified in Figs. 15A-15C. In Fig. 16, the horizontal axis indicates a time and the
vertical axis indicates a wind velocity value. Fig. 16 illustrates TSR enforcement
start, TSR termination monitoring start, and TSR termination based on the predicted
values of the wind velocity. Here, the temporary speed restrictions are enforced such
that a TSR of 230 km is enforced from 12:40 to 12:50, and a TSR of 120 km is enforced
from 12:50 to 13:00, while the temporary speed restrictions are terminated such that
the termination monitoring for the enforcement of the TSR of 0 km is started from
13:40, the TSR of 0 km is terminated at 14:00, the termination monitoring for the
enforcement of the TSR of 70 km is started from 13:50, and the TSR of 70 km is terminated
at 14:10.
[0083] Fig. 17 presents a planned diagram and predicted diagrams. The horizontal axis indicates
a time (a, b, c, d), the vertical axis indicates a distance (A, B), and sections surrounded
by dotted lines indicate areas under bad weather, which are areas each requiring a
temporary speed restriction. Here, a train is assumed to run from a B spot to an A
spot. A string 1 represents a planned diagram, a string 2 represents a predicted diagram
with short-term weather considered, a string 3 represents a predicted diagram with
weather change over time considered, and each of dotted diagram strings represents
a diagram string under the enforcement of a temporary speed restriction. If the train
departs at the time point a from the B spot to the A spot, the arrival time point
at the A spot is the time point b in the planned diagram, the time point c in the
predicted diagram with short-term weather considered, and the time point d in the
predicted diagram with weather change over time considered. Thus, an accurate train
operation prediction can be achieved with weather change over time and temporary speed
restrictions considered.
[Embodiment 2]
[0084] In Embodiment 2, description is provided for a method of making a proposal for preventing
a train stop between stations on the basis of a prediction of the occurrence of a
train operation suspension due to a weather factor. Here, this method is performed
based on the diagram prediction information file 117T formed with the TSR prediction
information in Embodiment 1 considered.
[0085] Fig. 18 is a flowchart of processing of creating proposal information for preventing
a train stop between stations.
[0086] To begin with, whether there is a station in which the occurrence of an operation
suspension is predicted, and a start time point and a termination time point of the
predicted suspension, if any, are determined based on the diagram prediction information
file 117T (Step 1). If there is an area where the occurrence of the operation suspension
is predicted, trains scheduled to arrive at or pass through a suspension target station
during a period from the start of the operation suspension to the termination time
point thereof are extracted from the planned diagram (Step 2). Then, the following
processing is performed for each of the extracted trains in order of the arrival time.
[0087] First, a preceding station located before the suspension target station in a train
running direction is checked to find whether there is a platform at which the train
can be stopped (Step 3). If there is a platform at which the train can be stopped,
whether or not the platform is reserved for use is checked in a platform reservation
table (Step 4). If the target platform is not reserved for use, a train operation
plan using the platform is compared with the planned diagram. If the train is scheduled
to pass through the station, emergency stop control information is created (Step 5).
If the platform is different from the platform used in the planned diagram, platform
change control information is created (Step 6). After the comparison with the planned
diagram, the train is registered in the platform reservation table (Step 7), and departure
suspension information is created (Step 8). If there is no platform satisfying required
conditions, the check target station is changed to another preceding station, and
the determinations as described above are iterated. After the creation of the information
on all the target trains, a control proposal is presented to a train dispatcher by
outputting the change information thus created to a display screen (Step 9).
[0088] It should be noted that the embodiments described above are just illustrated for
the purpose of explaining the present invention, and there is no intention to limit
the scope of the present invention to these embodiments. A person skilled in the art
may be able to implement the present invention in various other ways without departing
from the scope of the present invention. In addition, any of the elements of the embodiments
may be modified by an addition of another element, a deletion, or a replacement with
another element.
[0089] In the description of the embodiments, the train traffic control system 100S has
been illustrated as the example.
[0090] However, the present invention is not limited to this, and may be implemented even
if the arithmetic processing apparatus 100R and the storage apparatus 100T are united
into a single unit. Moreover, the present invention is not only applicable to the
traffic control system 100S but can also be used in a similar manner in any simulator
environment for creating and checking a predicted diagram.
[0091] The foregoing elements, functions, processing units, processing means, and the like
may be partly or entirely implemented by hardware such as integrated circuits thus
designed, for example. Instead, the foregoing elements, functions, and the like may
be implemented by software in such a manner that a processor interprets and executes
programs which realize these functions. The programs, and the information of the tables,
files, and others for realizing these functions may be stored in a recording device
such as a memory, a hard disk, or a solid state drive (SSD) or a recording medium
such as an IC card, an SD card, or a DVD.
[0092] Furthermore, the control lines, information lines and numbers considered to be necessary
for the explanation are described above, which means that not all the control lines
and information lines are needed for a product. In practice, almost all the elements
may be considered to be connected to each other.
REFERENCE SIGNS LIST
[0093]
100S train traffic control system
101S weather forecast system
101T (200) wind velocity forecast information file
101J (500) rainfall forecast information file
111R electric data reception processing function
112R measuring device prediction function
113R TSR prediction information creation function
115R diagram control function
116R diagram prediction creation processing
111T (300) wind velocity information conversion constant table
112T (400) anemometer prediction information storage table
113T (600) rainfall information conversion constant table
114T (700) rain-gauge prediction information storage table 115T TSR prediction information
table
116T TSR setting table
117T diagram prediction information file
118T TSR termination table
2000 TSR table