TEHCNICAL FIELD
[0001] The present invention relates to a heat pump hot water heater.
BACKGROUND ART
[0002] A hot water dispenser, a hot water heater and so forth, in which a heat pump system
is utilized, have been conventionally used. For example, Patent Literature 1 (
JP 2010-181104 A) discloses a hot water dispenser as a heat pump device equipped with a refrigerant
circuit and a water circuit. The refrigerant circuit is a type of circuit composed
of a compressor, an outdoor heat exchanger and an indoor heat exchanger, and makes
refrigerant circulate therethrough. The water circuit is a type of circuit sharing
the indoor heat exchanger with the refrigerant circuit, and makes water flow therethrough.
In the refrigerant circuit, the refrigerant, compressed to have high temperature in
the compressor, is heat-exchanged with the water and cooled down in the indoor heat
exchanger, and is reduced in pressure, and then is heat-exchanged with outdoor air
and heated in the outdoor heat exchanger. The water, flowing through the water circuit,
is heat-exchanged with the refrigerant and heated in the indoor heat exchanger.
[0003] In a heat pump device equipped with the outdoor heat exchanger in which the outdoor
air and the refrigerant are heat-exchanged as with the aforementioned hot water dispenser,
there is a possibility that when the temperature of the outdoor air is low, frost
is attached to the outdoor heat exchanger and this results in degradation in operating
efficiency. In this case, the heat pump device performs a defrosting operation for
melting the frost attached to the outdoor heat exchanger. For example, the heat pump
device performs a reverse cycle operation for causing the refrigerant to circulate
through the refrigerant circuit in a direction opposite to that in a normal operation.
Accordingly, the refrigerant, compressed to have high temperature in the compressor,
flows into the outdoor heat exchanger, and the outdoor heat exchanger is defrosted.
SUMMARY OF THE INVENTION
<Technical Problem>
[0004] However, there is a possibility that the water freezes in the water circuit when
the reverse cycle operation-based defrosting is performed for a long period of time
under the condition that the temperature of outdoor air is low. A type of heat pump
device has been known that is configured to defrost the outdoor heat exchanger by
utilizing the heat of hot water remaining in the water circuit in order to prevent
water freezing. For example, Patent Literature 1 discloses a heat pump device configured
to perform the reverse cycle operation-based defrosting after heat is accumulated
in the indoor heat exchanger by feeding hot water, stored in a hot water storage tank
connected to the water circuit, to the indoor heat exchanger. On the other hand, Patent
Literature 2 (
WO 2006/103815) discloses a heat pump device having a mode for performing the reverse cycle operation-based
defrosting by utilizing the heat of hot water remaining in the water circuit and a
mode for performing defrosting by causing the high-temperature refrigerant discharged
from the compressor in the refrigerant circuit to flow through the outdoor heat exchanger,
and subsequently, by causing the refrigerant having passed through the outdoor heat
exchanger to flow back to the compressor without changing the status quo of the refrigerant.
[0005] However, the aforementioned heat pump devices are required to change either the configuration
of the refrigerant circuit or that of the water circuit in order to defrost the outdoor
heat exchanger. Additionally, when the outdoor heat exchanger is defrosted by the
reverse cycle operation of the refrigerant circuit, there is still a possibility of
water freezing in the water circuit under the condition that the temperature of water
in the water circuit and the temperature of outdoor air are low.
[0006] It is an object of the present invention to provide a heat pump hot water heater
that is capable of preventing water freezing.
<Solution to Problem>
[0007] A heat pump hot water heater according to a first aspect of the present invention
includes a refrigerant circuit, a water circuit and a control unit. The refrigerant
circuit is a circuit through which refrigerant circulates. The refrigerant circuit
includes a first heat exchanger configured to cause heat exchange between air and
the refrigerant, a second heat exchanger configured to cause heat exchange between
the refrigerant and water, and a compressor configured to compress the refrigerant.
The water circuit is a circuit through which the water flows. The water circuit includes
the second heat exchanger and a water supply mechanism configured to supply the water
to the second heat exchanger. The control unit is configured to control the refrigerant
circuit and the water circuit so as to perform a defrosting operation of the first
heat exchanger. The refrigerant circuit is capable of switching between a forward
cycle operation and a reverse cycle operation. The forward cycle operation causes
the refrigerant to sequentially circulate through the compressor, the second heat
exchanger, the first heat exchanger and back to the compressor. The reverse cycle
operation causes the refrigerant to sequentially circulate through the compressor,
the first heat exchanger, the second heat exchanger and back to the compressor. At
least either in starting the defrosting operation or during performing the defrosting
operation, the control unit is configured to determine a possibility of freezing of
the water in the water circuit and select to perform either the forward cycle operation
or the reverse cycle operation so as to perform the defrosting operation.
[0008] The heat pump hot water heater is a heat pump device equipped with the refrigerant
circuit and the water circuit that share the second heat exchanger. The refrigerant
at high temperature, compressed by the compressor of the refrigerant circuit, is heat-exchanged
with the water flowing through the water circuit in the second heat exchanger. In
the second heat exchanger, heat is transferred from the refrigerant flowing through
the refrigerant circuit to the water flowing through the water circuit. Accordingly,
the water flowing through the water circuit is heated, and hot water is produced.
The control unit is capable of switching between the forward cycle operation and the
reverse cycle operation by controlling the refrigerant circuit. In the forward cycle
operation, the high-temperature refrigerant compressed by the compressor flows into
the second heat exchanger. In the reverse cycle operation, the high-temperature refrigerant
compressed by the compressor flows into the first heat exchanger. Chances are that
frost is attached to the first heat exchanger installed in an outdoor space under
conditions of low outdoor air temperature. The present heat pump hot water heater
is configured to perform the defrosting operation for eliminating the frost attached
to the first heat exchanger. The control unit is normally configured to perform the
defrosting operation based on the reverse cycle operation. However, the control unit
is configured to perform the defrosting operation based on the forward cycle operation
when determining that performing the reverse cycle operation-based defrosting operation
could result in freezing of the water flowing through the water circuit. The forward
cycle operation-based defrosting operation is performed by deactivating the water
supply mechanism of the water circuit and by increasing the opening degree of an expansion
mechanism of the refrigerant circuit. With the deactivation of the water supply mechanism,
heat exchange is inhibited in the second heat exchanger, and heat is accumulated in
the second heat exchanger. With the increase in opening degree of the expansion mechanism,
the heat of the compressor and the second heat exchanger is transferred to the first
heat exchanger via the expansion mechanism through the refrigerant. Accordingly, the
first heat exchanger is heated and the frost attached to the first heat exchanger
is eliminated.
[0009] The present heat pump hot water heater is configured to select and perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation on the basis of the possibility of freezing of the water flowing
through the water circuit. In the reverse cycle operation-based defrosting operation,
the high-temperature refrigerant compressed by the compressor directly flows into
the first heat exchanger. Thus, the frost attached to the first heat exchanger is
efficiently eliminated. However, heat exchange is performed in the second heat exchanger
such that heat is transferred from the water flowing through the water circuit to
the refrigerant flowing through the refrigerant circuit. Thus, when the temperature
of the water in the water circuit is low or so forth, there is a possibility that
the water in the water circuit freezes and breaks the water circuit. On the other
hand, in the forward cycle operation-based defrosting operation, while heat exchange
is inhibited in the second heat exchanger, the frost attached to the first heat exchanger
is eliminated by the heat of the compressor and the second heat exchanger. Hence,
in the forward cycle operation-based defrosting operation, there is no possibility
of water freezing in the water circuit. Consequently, the present heat pump hot water
heater can prevent water freezing in the defrosting operation.
[0010] A heat pump hot water heater according to a second aspect of the present invention
relates to the heat pump hot water heater according to the first aspect, and wherein,
when the water flowing into the second heat exchanger has a temperature of lower than
or equal to a first temperature in starting the defrosting operation, the control
unit is configured to select to perform the forward cycle operation and deactivate
the water supply mechanism.
[0011] The present heat pump hot water heater is configured to select and perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation in starting the defrosting operation. When the temperature of
the water flowing into the second heat exchanger is lower than or equal to a predetermined
temperature, the control unit is configured to determine that performing the reverse
cycle operation-based defrosting operation could result in freezing of the water flowing
through the water circuit. In this case, the present heat pump hot water heater is
configured to start the forward cycle operation-based defrosting operation.
[0012] A heat pump hot water heater according to a third aspect of the present invention
relates to the heat pump hot water heater according to the first or second aspect,
and wherein, when the air to be heat-exchanged in the first heat exchanger has a temperature
of lower than or equal to a second temperature in starting the defrosting operation,
the control unit is configured to select to perform the forward cycle operation and
deactivate the water supply mechanism.
[0013] The present heat pump hot water heater is configured to select and perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation in starting the defrosting operation. When the temperature of
the air to be heat-exchanged in the first heat exchanger is lower than or equal to
a predetermined temperature, the control unit is configured to determine that performing
the reverse cycle operation-based defrosting operation could result in freezing of
the water flowing through the water circuit. In this case, the present heat pump hot
water heater is configured to start the forward cycle operation-based defrosting operation.
[0014] A heat pump hot water heater according to a fourth aspect of the present invention
relates to the heat pump hot water heater according to any of the first to third aspects,
and wherein, when the compressor has been deactivated for a first period of time or
greater before starting the defrosting operation in starting the defrosting operation,
the control unit is configured to select to perform the forward cycle operation and
deactivate the water supply mechanism.
[0015] The present heat pump hot water heater is configured to select and perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation in starting the defrosting operation. When the normal operation
for heating the water in the water circuit based on the forward cycle operation has
been deactivated for a predetermined period of time or greater in starting the defrosting
operation, the control unit is configured to determine that performing the reverse
cycle operation-based defrosting operation could result in freezing of the water flowing
through the water circuit. In this case, the present heat pump hot water heater is
configured to start the forward cycle operation-based defrosting operation.
[0016] A heat pump hot water heater according to a fifth aspect of the present invention
relates to the heat pump hot water heater according to any of the first to fourth
aspects, and wherein, when the defrosting operation has been previously performed
for a second period of time or less in starting the defrosting operation, the control
unit is configured to select to perform the forward cycle operation and deactivate
the water supply mechanism.
[0017] The present heat pump hot water heater is configured to select and perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation in starting the defrosting operation. When the defrosting operation
has been previously performed for a predetermined period of time or less, the control
unit is configured to determine that performing the reverse cycle operation-based
defrosting operation could result in freezing of the water flowing through the water
circuit. In this case, the present heat pump hot water heater is configured to start
the forward cycle operation-based defrosting operation.
[0018] A heat pump hot water heater according to a sixth aspect of the present invention
relates to the heat pump hot water heater according to any of the first to fifth aspects,
and wherein, when the water flowing into the second heat exchanger has a temperature
of lower than or equal to a third temperature during performing the defrosting operation
based on the reverse cycle operation, the control unit is configured to select to
perform the forward cycle operation and deactivate the water supply mechanism.
[0019] The present heat pump hot water heater is configured to select and perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation during performing the reverse cycle operation-based defrosting
operation. When the temperature of the water flowing into the second heat exchanger
is lower than or equal to a predetermined temperature during performing the reverse
cycle operation-based defrosting operation, the control unit is configured to determine
that continuing the reverse cycle operation-based defrosting operation could result
in freezing of the water flowing through the water circuit. In this case, the present
heat pump hot water heater is configured to terminate the reverse cycle operation-based
defrosting operation and start the forward cycle operation-based defrosting operation.
[0020] A heat pump hot water heater according to a seventh aspect of the present invention
relates to the heat pump hot water heater according to any of the first to fifth aspects,
and wherein, when the water flowing into the second heat exchanger has a temperature
of lower than or equal to a fourth temperature during performing the defrosting operation
based on the reverse cycle operation, the control unit is configured to select to
perform the forward cycle operation.
[0021] The present heat pump hot water heater is configured to select and perform either
the normal operation for heating the water in the water circuit based on the forward
cycle operation or the reverse cycle operation-based defrosting operation during performing
the reverse cycle operation-based defrosting operation. When the temperature of the
water flowing into the second heat exchanger is lower than or equal to a predetermined
temperature during performing the reverse cycle operation-based defrosting operation,
the control unit is configured to determine that continuing the reverse cycle operation-based
defrosting operation could result in freezing of the water flowing through the water
circuit. In this case, the present heat pump hot water heater is configured to terminate
the reverse cycle operation-based defrosting operation and start the forward cycle
operation-based normal operation.
<Advantageous Effects of Invention>
[0022] The heat pump hot water heater according to any of the first to seventh aspects of
the present invention can prevent water freezing.
BRIEF DESCRIPTION OF THE DRAWINGS
[0023]
FIG. 1 is a circuit configuration diagram of a heat pump hot water heater in a normal
operation.
FIG. 2 is a circuit configuration diagram of the heat pump hot water heater in a reverse
cycle operation-based defrosting operation.
FIG. 3 is a circuit configuration diagram of the heat pump hot water heater in a forward
cycle operation-based defrosting operation.
FIG. 4 is a flowchart showing a routine for determining a possibility of water freezing
in a water circuit when the defrosting operation is started after terminating the
normal operation.
FIG. 5 is a flowchart showing a routine for determining the possibility of water freezing
in the water circuit when the reverse cycle operation-based defrosting operation is
performed.
DESCRIPTION OF EMBODIMENTS
[0024] A heat pump hot water heater according to an embodiment of the present invention
will be explained with reference to drawings. The heat pump hot water heater according
to the present embodiment is a type of heater that is configured to heat water with
use of a heat pump system and to heat air in an indoor space with use of the heat
of the produced hot water.
(1) Construction of Heat Pump Hot Water Heater
[0025] A heat pump hot water heater 10 according to the present embodiment is mainly composed
of a refrigerant circuit 20, a water circuit 30 and a control unit 40. The refrigerant
circuit 20 is a circuit that refrigerant circulates therethrough. The water circuit
30 is a circuit that water circulates therethrough. The refrigerant circuit 20 functions
as a heat pump.
(1-1) Refrigerant Circuit
[0026] The refrigerant circuit 20 is a type of refrigerant circuit in which a first heat
exchanger 21, a compressor 22, an expansion valve 23, a four-way switch valve 24 and
a second heat exchanger 25 are mainly connected to each other. The refrigerant circuit
20 includes a first temperature sensor 26. The refrigerant circulating through the
refrigerant circuit 20 is, for instance, R134a.
[0027] The refrigerant circuit 20 is configured to perform either a forward cycle operation
or a reverse cycle operation in accordance with the circulation direction of the refrigerant.
[0028] FIGS. 1 and 3 are circuit configuration diagrams of the heat pump hot water heater
10 in the forward cycle operation of the refrigerant circuit 20. FIG. 2 is a circuit
configuration diagram of the heat pump hot water heater 10 in the reverse cycle operation
of the refrigerant circuit 20. In FIGS. 1 to 3, the flow direction of the refrigerant
circulating through the refrigerant circuit 20 is indicated by arrows. The forward
cycle operation of the refrigerant circuit 20 is configured to be performed when the
heat pump hot water heater 10 performs either a normal operation or a defrosting operation.
The reverse cycle operation of the refrigerant circuit 20 is performed when the heat
pump hot water heater 10 performs the defrosting operation. The normal operation of
the heat pump hot water heater 10 is a type of operation for heating water circulating
through the water circuit 30 and utilizing the produced hot water for heating. The
defrosting operation of the heat pump hot water heater 10 is a type of operation for
eliminating frost attached to the first heat exchanger 21. The refrigerant circuit
20 is capable of switching between the forward cycle operation and the reverse cycle
operation.
[0029] The first heat exchanger 21 is a refrigerant-air heat exchanger. In the first heat
exchanger 21, heat exchange is performed between the refrigerant circulating through
the refrigerant circuit 20 and a heat source. The heat source is, for instance, outdoor
air and geothermal heat. In the present embodiment, the heat source is outdoor air.
The first heat exchanger 21 is, for instance, a plate fin coil heat exchanger. A fan
21 a is installed in the vicinity of the first heat exchanger 21. The fan 21 a is
configured to feed outdoor air to the first heat exchanger 21 and discharge the outdoor
air that is heat-exchanged with the refrigerant in the first heat exchanger 21. The
first heat exchanger 21 is an outdoor heat exchanger designed to be installed in an
outdoor space.
[0030] The compressor 22 is a type of compressor that is configured to suck and compress
the refrigerant at low pressure that flows in the refrigerant circuit 20 and discharge
the refrigerant at high temperature and high pressure. The compressor 22 is, for instance,
a rotary compressor.
[0031] The expansion valve 23 is an electric valve for regulating the flow rate and the
pressure of the refrigerant circulating through the refrigerant circuit 20.
[0032] The four-way switch valve 24 is a type of switch valve configured to switch between
the forward cycle operation and the reverse cycle operation so as to reverse the direction
of the refrigerant circulating through the refrigerant circuit 20. The four-way switch
valve 24 has a first port 24a, a second port 24b, a third port 24c and a fourth port
24d. The four-way switch valve 24 is set in either a first communication state or
a second communication state. As shown in FIGS. 1 and 3, in the first communication
state, the first port 24a and the second port 24b communicate with each other, and
simultaneously, the third port 24c and the fourth port 24d communicate with each other.
As shown in FIG. 2, in the second communication state, the first port 24a and the
third port 24c communicate with each other, and simultaneously, the second port 24b
and the fourth port 24d communicate with each other. When the refrigerant circuit
20 performs the forward cycle operation, the four-way switch valve 24 is set in the
first communication state. When the refrigerant circuit 20 performs the reverse cycle
operation, the four-way switch valve 24 is set in the second communication state.
[0033] The second heat exchanger 25 is a water-refrigerant heat exchanger. In the second
heat exchanger 25, heat exchange is performed between the refrigerant circulating
through the refrigerant circuit 20 and the water circulating through the water circuit
30. The refrigerant circuit 20 and the water circuit 30 share the second heat exchanger
25. The second heat exchanger 25 has a refrigerant heat exchange part 25a that the
refrigerant circulating through the refrigerant circuit 20 passes therethrough and
a water heat exchange part 25b that the water circulating through the water circuit
30 passes therethrough. For example, the second heat exchanger 25 is a tornado heat
exchanger having a construction that a refrigerant pipe as the refrigerant heat exchange
part 25a is helically wound about the outer periphery of a water pipe as the water
heat exchange part 25b, and additionally, the water pipe has grooves in the inside
thereof. The second heat exchanger 25 is an indoor heat exchanger designed to be installed
in a space as a heating target.
[0034] The first temperature sensor 26 is a type of sensor configured to measure the temperature
of the outdoor air to be heat-exchanged in the first heat exchanger 21. The first
temperature sensor 26 is configured to measure the temperature of the outdoor air
to be fed to the first heat exchanger 21 by the fan 21 a or the temperature of the
air in the outdoor space that the first heat exchanger 21 is installed. The first
temperature sensor 26 is attached to the first heat exchanger 21.
[0035] The configuration of the refrigerant circuit 20 in the forward cycle operation will
be explained. The discharge side of the compressor 22 is connected to the first port
24a of the four-way switch valve 24. The second port 24b of the four-way switch valve
24 is connected to the refrigerant heat exchange part 25a of the second heat exchanger
25. The refrigerant heat exchange part 25a of the second heat exchanger 25 is connected
to the expansion valve 23. The expansion valve 23 is connected to the first heat exchanger
21. The first heat exchanger 21 is connected to the third port 24c of the four-way
switch valve 24. The fourth port 24d of the four-way switch valve 24 is connected
to the intake side of the compressor 22.
[0036] An action of the refrigerant circuit 20 in the forward cycle operation will be explained.
The forward cycle operation is configured to be performed when the heat pump hot water
heater 10 performs the normal operation. The refrigerant in a gaseous state at low
pressure is sucked into the compressor 22 and is compressed therein. The compressed
refrigerant is discharged from the compressor 22 in a gaseous state at high temperature
and high pressure, and is fed to the second heat exchanger 25 via the first and second
ports 24a and 24b of the four-way switch valve 24. In the second heat exchanger 25,
the refrigerant passes through the refrigerant heat exchange part 25a, whereas the
water passes through the water heat exchange part 25b. In the second heat exchanger
25, heat is transferred from the refrigerant at high temperature to the water at low
temperature, and thus, heat exchange is performed between the refrigerant and the
water. Accordingly, in the second heat exchanger 25, the refrigerant in a gaseous
state at high temperature and high pressure is condensed and changed into a liquid
state at high pressure. Then, the refrigerant is reduced in pressure when passing
through the expansion valve 23, and is changed into a gas-liquid two phase state at
low pressure. The refrigerant in the gas-liquid two phase state at low pressure evaporates
in the first heat exchanger 21 as a result of heat exchange with the outdoor air,
and is changed into a gaseous state at low pressure. Then, the refrigerant passes
through the third and fourth ports 24c and 24d of the four-way switch valve 24 and
is fed to the compressor 22. The refrigerant circuit 20, performing the forward cycle
operation, is configured to supply the heat of the outdoor air through the refrigerant
to the water circulating through the water circuit 30 by repeating the aforementioned
processing steps.
[0037] It should be noted that the refrigerant circuit 20 is configured to perform either
the forward cycle operation or the reverse cycle operation when the heat pump hot
water heater 10 performs the defrosting operation. An action of the refrigerant circuit
20 in the reverse cycle operation will be described below.
(1-2) Water Circuit
[0038] The water circuit 30 is a type of circuit in which the second heat exchanger 25,
a water supply pump 31, a hot water storage tank 32 and a heating unit 33 are mainly
connected to each other. The water circuit 30 includes a second temperature sensor
34. Water circulates the water circuit 30. In the water circuit 30, the water circulates
through the water supply pump 31, the second heat exchanger 25, the hot water storage
tank 32, the heating unit 33 and back to the water supply pump 31 in this order. In
FIGS. 1 and 2, the direction of the water circulating through the water circuit 30
is indicated by arrows.
[0039] The water supply pump 31 is a type of pump configured to feed the water circulating
through the water circuit 30 to the water heat exchange part 25b of the second heat
exchanger 25.
[0040] The second heat exchanger 25 is a water-refrigerant heat exchanger. As described
above, in the second heat exchanger 25, heat exchange is performed between the refrigerant
circulating through the refrigerant circuit 20 and the water circulating through the
water circuit 30. The water passes through the water heat exchange part 25b so as
to be heat-exchanged in the second heat exchanger 25. The inlet of the water heat
exchange part 25b is connected to the water supply pump 31 through a pipe. The outlet
of the water heat exchange part 25b is connected to the hot water storage tank 32
through a pipe.
[0041] The hot water storage tank 32 is a type of tank for storing the water heated in the
second heat exchanger 25. The hot water stored in the hot water storage tank 32 is
fed to the heating unit 33. The hot water storage tank 32 may be provided with a keep-warm
heater for keeping the warmth of the hot water stored therein.
[0042] The heating unit 33 is installed in a space to be heated by the normal operation
of the heat pump hot water heater 10. For example, the heating unit 33 is a floor
heating panel to be mounted to the floor surface of a room. The heating unit 33 has
a heating pipe 33a that the hot water heated in the second heat exchanger 25 flows
therethrough.
[0043] The second temperature sensor 34 is a type of sensor configured to measure the temperature
of the water flowing into the water heat exchange part 25b of the second heat exchanger
25. For example, the second temperature sensor 34 is attached to the pipe in the vicinity
of the inlet of the water heat exchange part 25b.
[0044] An action of the water circuit 30 will be explained. The water is fed to the second
heat exchanger 25 by the water supply pump 31. In the second heat exchanger 25, heat
exchange is performed between the refrigerant and the water by thermal transference
from the refrigerant at high temperature to the water at low temperature. Accordingly,
the water is heated in the second heat exchanger 25. The water heated in the second
heat exchanger 25 is fed to the hot water storage tank 32 as hot water. The hot water
stored in the hot water storage tank 32 is supplied to the heating unit 33. In the
heating unit 33, the hot water, flowing through the inside of the heating pipe 33a,
heats the air in the space in which the heating unit 33 is installed. The water, reduced
in temperature after passing through the heating pipe 33a, is fed to the water supply
pump 31.
(1-3) Control Unit
[0045] The control unit 40 is a computer for controlling the respective constituent elements
of the heat pump hot water heater 10. The control unit 40 is connected to the compressor
22, the expansion valve 23, the four-way switch valve 24, the first temperature sensor
26, the water supply pump 31, the heating unit 33 and the second temperature sensor
34. For example, the control unit 40 is installed in an electric component unit (not
shown in the drawings) disposed inside the heat pump hot water heater 10.
[0046] The control unit 40 is capable of activating and deactivating the compressor 22 by
regulating the operating frequency of the compressor 22. The control unit 40 is capable
of controlling the flow rate of the refrigerant passing through the expansion valve
23 by regulating the opening degree of the expansion valve 23. The control unit 40
is capable of activating and deactivating the water supply pump 31 by controlling
the rotational speed of the water supply pump 31. The control unit 40 is capable of
regulating the temperature of the space in which the heating unit 33 is installed
by regulating the flow rate of the hot water to be fed to the heating unit 33.
[0047] The control unit 40 is capable of switching between the first communication state
and the second communication state by controlling the four-way switch valve 24. Put
differently, the control unit 40 is capable of switching between the forward cycle
operation and the reverse cycle operation by controlling the four-way switch valve
24.
[0048] The control unit 40 is capable of receiving the temperature measured by the first
temperature sensor 26 of the refrigerant circuit 20, i.e., the temperature of the
air to be heat-exchanged in the first heat exchanger 21. The control unit 40 is capable
of receiving the temperature measured by the second temperature sensor 34 of the water
circuit 30, i.e., the temperature of the water flowing into the water heat exchange
part 25b of the second heat exchanger 25.
[0049] Additionally, the control unit 40 stores information regarding the operation of the
heat pump hot water heater 10. For example, the control unit 40 is configured to monitor
and store activation timing of the compressor 22 and deactivation timing of the compressor
22. Accordingly, the control unit 40 is capable of calculating, for instance, duration
of deactivation of the compressor 22, duration of the normal operation performed by
the heat pump hot water heater 10, and duration of the defrosting operation performed
by the heat pump hot water heater 10.
(2) Action of Heat Pump Hot Water Heater
(2-1) Explanation of Normal Operation and Defrosting Operation
[0050] The action of the heat pump hot water heater 10 will be explained. The heat pump
hot water heater 10 is configured to perform either the normal operation or the defrosting
operation. FIG. 1 is a circuit configuration diagram of the heat pump hot water heater
10 performing the normal operation. In the normal operation of the heat pump hot water
heater 10, the refrigerant circuit 20 is configured to perform the forward cycle operation.
As shown in FIG. 1, the four-way switch valve 24 of the refrigerant circuit 20 is
herein set in the first communication state. In the water circuit 30, the water is
fed to the second heat exchanger 25 by the water supply pump 31 and is heated in the
second heat exchanger 25. Then, hot water is fed to the hot water storage tank 32
and the heating unit 33.
[0051] In the normal operation of the heat pump hot water heater 10, heat exchange, which
is thermal transference from the outdoor air to the refrigerant, is performed in the
first heat exchanger 21 of the refrigerant circuit 20. Put differently, the heat of
the outdoor air to be blown by the fan 21 a is deprived in the first heat exchanger
21. Due to this, chances are that frost is attached to the first heat exchanger 21
under some conditions of low outdoor air temperature such as cold weather places and
the winter season. When frost is attached to the first heat exchanger 21, in comparison
with a condition that frost is not attached to the first heat exchanger 21, heat exchange
efficiency is degraded in the first heat exchanger 21 and then operating efficiency
is degraded in the heat pump hot water heater 10. Therefore, for the purpose of inhibiting
degradation in operating efficiency under the conditions of low outdoor air temperature,
the heat pump hot water heater 10 is required to regularly perform the defrosting
operation of eliminating the frost attached to the first heat exchanger 21. The defrosting
operation of the heat pump hot water heater 10 is performed by melting the frost attached
to the first heat exchanger 21 with heat.
[0052] In performing the defrosting operation, the heat pump hot water heater 10 is configured
to perform it either in the reverse cycle operation of the refrigerant circuit 20
or in the forward cycle operation of the refrigerant circuit 20. FIG. 2 is a circuit
configuration diagram of the heat pump hot water heater 10 performing the reverse
cycle operation-based defrosting operation. FIG. 3 is a circuit configuration diagram
of the heat pump hot water heater 10 performing the forward cycle operation-based
defrosting operation.
[0053] The direction of the refrigerant circulating through the refrigerant circuit 20 in
the reverse cycle operation is opposite to that of the refrigerant circulating through
the refrigerant circuit 20 in the forward cycle operation. Specifically, in the reverse
cycle operation, the refrigerant in the refrigerant circuit 20 passes and circulates
through the compressor 22, the four-way switch valve 24 (the first port 24a and the
third port 24c), the first heat exchanger 21, the expansion valve 23, the second heat
exchanger 25, the four-way switch valve 24 (the second port 24b and the fourth port
24d) and back to the compressor 22 in this order.
[0054] Next, explanation will be provided for an action to be performed when the heat pump
hot water heater 10 terminates the normal operation and starts the reverse cycle operation-based
defrosting operation. First, the control unit 40 deactivates the compressor 22 by
zeroing the rotational speed of the compressor 22. The normal operation is terminated
by the deactivation of the compressor 22. Next, the control unit 40 switches the four-way
switch valve 24 from the first communication state into the second communication state.
Subsequently, the control unit 40 starts an operation of the compressor 22 by increasing
the rotational speed of the compressor 22 from zero. The defrosting operation of the
heat pump hot water heater 10 is started by the activation of the compressor 22. In
the defrosting operation, the refrigerant at high temperature, discharged from the
compressor 22, flows into the first heat exchanger 21. Additionally, in the defrosting
operation, the heat accumulated in the second heat exchanger 25 in the normal operation
is supplied to the first heat exchanger 21 through the refrigerant circulating through
the refrigerant circuit 20. Accordingly, frost attached to the first heat exchanger
21 melts, and thus, the first heat exchanger 21 is defrosted. It should be noted that
the water supply pump 31 of the water circuit 30 is being operated in the reverse
cycle operation-based defrosting operation.
[0055] Next, explanation will be provided for an action to be performed when the heat pump
hot water heater 10 terminates the normal operation and starts the forward cycle operation-based
defrosting operation. First, the control unit 40 deactivates the water supply pump
31 by zeroing the rotational speed of the water supply pump 31. Water supply to the
second heat exchanger 25 is stopped by the deactivation of the water supply pump 31.
Next, the control unit 40 increases the opening degree of the expansion valve 23.
Additionally, the control unit 40 maintains the four-way switch valve 24 in the first
communication state. Put differently, similarly to the normal operation, the refrigerant
at high temperature, discharged from the compressor 22, is supplied to the second
heat exchanger 25 in the forward cycle operation-based defrosting operation. In the
second heat exchanger 25, the water is not passing through the water heat exchange
part 25b, and thus, heat exchange between the refrigerant and the water is inhibited
in the second heat exchanger 25. Due to this, the heat of the refrigerant at high
temperature supplied from the compressor 22 is accumulated in the second heat exchanger
25. As a result, the temperature of the second heat exchanger 25 is increased. Additionally,
the temperature of the compressor 22 is also increased by the operation of the compressor
22. The heat accumulated in the compressor 22 and the second heat exchanger 25 is
supplied to the first heat exchanger 21 via the expansion valve 23 through the refrigerant
circulating through the refrigerant circuit 20. Accordingly, frost attached to the
first heat exchanger 21 melts, and thus, the first heat exchanger 21 is defrosted.
(2-2) Explanation of Determining Water Freezing Probability
[0056] In the heat pump hot water heater 10, the control unit 40 is configured to determine
a possibility of water freezing in the water circuit 30 and select to perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation. The control unit 40 is configured to perform the forward cycle
operation-based defrosting operation when determining that the water circuit 30 has
a possibility of water freezing. The control unit 40 is configured to perform the
reverse cycle operation-based defrosting operation when determining that the water
circuit 30 has no possibility of water freezing.
[0057] The control unit 40 determines the possibility of water freezing in the water circuit
30 at least either in the timing of terminating the normal operation and starting
the defrosting operation or during performing the reverse cycle operation-based defrosting
operation.
[0058] FIG. 4 is a flowchart showing a routine that the control unit 40 determines the possibility
of water freezing in the water circuit 30 in the timing of terminating the normal
operation and starting the defrosting operation. The routine is composed of Steps
S11 to S15. In Step S11, the control unit 40 terminates the normal operation. In Step
S12, the control unit 40 determines the possibility of water freezing in the water
circuit 30. When determining that the water circuit 30 has the possibility of water
freezing, the control unit 40 performs processing in Step S13. When determining that
the water circuit 30 has no possibility of water freezing, the control unit 40 performs
processing in Step S14. In Step S13, the control unit 40 starts the forward cycle
operation-based defrosting operation. In Step S14, the control unit 40 starts the
reverse cycle operation-based defrosting operation. In Step S15, the control unit
40 terminates the defrosting operation.
[0059] FIG. 5 is a flowchart showing a routine that the control unit 40 determines the possibility
of water freezing in the water circuit 30 during performing the reverse cycle operation-based
defrosting operation. The routine is composed of Steps S21 to S25. In Step S21, the
control unit 40 terminates the normal operation. In Step S22, the control unit 40
starts the reverse cycle operation-based defrosting operation. In Step S23, the control
unit 40 determines the possibility of water freezing in the water circuit 30. When
determining that the water circuit 30 has the possibility of water freezing, the control
unit 40 performs processing in Step S24. When determining that the water circuit 30
has no possibility of water freezing, the control unit 40 continues the reverse cycle
operation-based defrosting operation. In Step S24, the control unit 40 terminates
the reverse cycle operation-based defrosting operation and starts the forward cycle
operation-based defrosting operation. In Step S25, the control unit 40 terminates
the defrosting operation.
[0060] Specifically, the control unit 40 is configured to determine the possibility of water
freezing in the water circuit 30 on the basis of any one of six determination criteria
to be explained below. Next, the respective determination criteria will be explained.
(2-2-1) First Determination Criterion
[0061] In the first determination criterion, the control unit 40 determines the possibility
of water freezing in the water circuit 30 when terminating the normal operation and
starting the defrosting operation. The control unit 40 is configured to obtain the
temperature of the water flowing into the water heat exchange part 25b of the second
heat exchanger 25 from the second temperature sensor 34 of the water circuit 30. When
the temperature of the water flowing into the water heat exchange part 25b is lower
than or equal to a predetermined temperature, the control unit 40 is configured to
deactivate the water supply pump 31, maintain the four-way switch valve 24 in the
first communication state, and then, start the forward cycle operation-based defrosting
operation. When the temperature of the water flowing into the water heat exchange
part 25b is higher than the predetermined temperature, the control unit 40 is configured
to switch the four-way switch valve 24 from the first communication state into the
second communication state, and then, start the reverse cycle operation-based defrosting
operation.
(2-2-2) Second Determination Criterion
[0062] In the second determination criterion, the control unit 40 is configured to determine
the possibility of water freezing in the water circuit 30 when terminating the normal
operation and starting the defrosting operation. The control unit 40 is configured
to obtain the temperature of the air to be heat-exchanged in the first heat exchanger
21 from the first temperature sensor 26 of the refrigerant circuit 20. When the temperature
of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal
to a predetermined temperature, the control unit 40 is configured to deactivate the
water supply pump 31, maintain the four-way switch valve 24 in the first communication
state, and then start the forward cycle operation-based defrosting operation. When
the temperature of the air to be heat-exchanged in the first heat exchanger 21 is
higher than the predetermined temperature, the control unit 40 is configured to switch
the four-way switch valve 24 from the first communication state into the second communication
state, and then start the reverse cycle operation-based defrosting operation.
(2-2-3) Third Determination Criterion
[0063] In the third determination criterion, the control unit 40 is configured to determine
the possibility of water freezing in the water circuit 30 when terminating the normal
operation and starting the defrosting operation. The control unit 40 is configured
to obtain information regarding the operation of the compressor 22 of the refrigerant
circuit 20. When the compressor 22 has been successively deactivated for a predetermined
period of time or greater before starting the defrosting operation, the control unit
40 is configured to deactivate the water supply pump 31, maintain the four-way switch
valve 24 in the first communication state, and then start the forward cycle operation-based
defrosting operation. When the compressor 22 has been successively deactivated for
less than the predetermined period of time before starting the defrosting operation,
the control unit 40 is configured to switch the four-way switch valve 24 from the
first communication state into the second communication state, and then start the
reverse cycle operation-based defrosting operation.
(2-2-4) Fourth Determination Criterion
[0064] In the fourth determination criterion, the control unit 40 is configured to determine
the possibility of water freezing in the water circuit 30 when terminating the normal
operation and starting the defrosting operation. The control unit 40 is configured
to obtain information regarding the defrosting operation of the heat pump hot water
heater 10. When the defrosting operation has been previously performed for a predetermined
period of time or less, the control unit 40 is configured to deactivate the water
supply pump 31, maintain the four-way switch valve 24 in the first communication state,
and then start the forward cycle operation-based defrosting operation. When the defrosting
operation has been previously performed for more than the predetermined period of
time, the control unit 40 is configured to switch the four-way switch valve 24 from
the first communication state into the second communication state, and then start
the reverse cycle operation-based defrosting operation.
(2-2-5) Fifth Determination Criterion
[0065] In the fifth determination criterion, the control unit 40 is configured to determine
the possibility of water freezing in the water circuit 30 during performing the reverse
cycle operation-based defrosting operation after terminating the normal operation.
The control unit 40 is configured to obtain the temperature of the water flowing into
the water heat exchange part 25b of the second heat exchanger 25 from the second temperature
sensor 34 of the water circuit 30. When the temperature of the water flowing into
the water heat exchange part 25b is lower than or equal to a predetermined temperature,
the control unit 40 is configured to deactivate the water supply pump 31 of the water
circuit 30, switch the four-way switch valve 24 from the second communication state
into the first communication state, and then start the forward cycle operation-based
defrosting operation. When the temperature of the water flowing into the water heat
exchange part 25b is higher than the predetermined temperature, the control unit 40
continues the reverse cycle operation-based defrosting operation.
(2-2-6) Sixth Determination Criterion
[0066] In the sixth determination criterion, the control unit 40 is configured to determine
the possibility of water freezing in the water circuit 30 during performing the reverse
cycle operation-based defrosting operation after terminating the normal operation.
The control unit 40 is configured to obtain the temperature of the water flowing into
the water heat exchange part 25b of the second heat exchanger 25 from the second temperature
sensor 34 of the water circuit 30. When the temperature of the water flowing into
the water heat exchange part 25b is lower than or equal to a predetermined temperature,
the control unit 40 is configured to switch the four-way switch valve 24 from the
second communication state into the first communication state in order to terminate
the defrosting operation, and then start a forward cycle operation-based normal operation.
When the temperature of the water flowing into the water heat exchange part 25b is
higher than the predetermined temperature, the control unit 40 continues the reverse
cycle operation-based defrosting operation.
(3) Features of Heat Pump Hot Water Heater
[0067] The present heat pump hot water heater 10 is a heat pump device equipped with the
refrigerant circuit 20 and the water circuit 30 that share the second heat exchanger
25. The refrigerant at high temperature, compressed by the compressor 22 of the refrigerant
circuit 20, is heat-exchanged with the water flowing through the water circuit 30
in the second heat exchanger 25. In the second heat exchanger 25, heat is transferred
from the refrigerant flowing through the refrigerant heat exchange part 25a to the
water flowing through the water heat exchange part 25b. Accordingly, the water flowing
through the water circuit 30 is heated, and hot water is produced. The hot water herein
produced is temporarily stored in the hot water storage tank 32, and is utilized for
heating of the indoor space by the heating unit 33.
[0068] The control unit 40 is capable of switching between the forward cycle operation and
the reverse cycle operation by controlling the four-way switch valve 24 of the refrigerant
circuit 20. Chances are that frost is attached to the first heat exchanger 21 under
conditions of low outdoor air temperature. The heat pump hot water heater 10 is capable
of performing the defrosting operation for eliminating the frost attached to the first
heat exchanger 21. The control unit 40 is normally configured to perform the reverse
cycle operation-based defrosting operation. However, the control unit 40 is configured
to perform the forward cycle operation-based defrosting operation when determining
that performing the reverse cycle operation-based defrosting operation could result
in freezing of the water flowing through the water circuit 30. The forward cycle operation-based
defrosting operation is performed by deactivating the water supply pump 31 of the
water circuit 30 and by increasing the opening degree of the expansion valve 23 of
the refrigerant circuit 20. With the deactivation of the water supply pump 31, heat
exchange is inhibited in the second heat exchanger 25, and heat is accumulated in
the second heat exchanger 25. With the increase in opening degree of the expansion
valve 23, the heat accumulated in the compressor 22 and the second heat exchanger
25 is transferred to the first heat exchanger 21 via the expansion valve 23 through
the refrigerant. Accordingly, the first heat exchanger 21 is heated and the frost
attached to the first heat exchanger 21 is eliminated.
[0069] The present heat pump hot water heater 10 is configured to select and perform either
the forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation on the basis of the possibility of freezing of the water flowing
through the water circuit 30.
[0070] In the reverse cycle operation-based defrosting operation, the refrigerant at high
temperature compressed by the compressor 22 directly flows into the first heat exchanger
21. Thus, the frost attached to the first heat exchanger 21 is efficiently eliminated.
However, in the reverse cycle operation-based defrosting operation, heat exchange
is performed in the second heat exchanger 25 such that heat is transferred from the
water flowing through the water circuit 30 to the refrigerant flowing through the
refrigerant circuit 20. Thus, when the temperature of the water flowing into the second
heat exchanger 25 is low, the temperature of the water to be heat-exchanged in the
second heat exchanger 25 falls and this could result in water freezing. When freezing,
water increases in volume. Hence, there is a possibility that when the water in the
water circuit 30 freezes in the pipe of the water circuit 30, the pipe is broken due
to increase in pressure inside the pipe. On the other hand, in the forward cycle operation-based
defrosting operation, heat exchange is inhibited in the second heat exchanger 25,
and the frost attached to the first heat exchanger 21 is eliminated by the heat accumulated
in the compressor 22 and the second heat exchanger 25. Hence, there is no possibility
of water freezing in the water circuit 30. Consequently, the heat pump hot water heater
10 can prevent water freezing in the defrosting operation.
[0071] The control unit 40 of the heat pump hot water heater 10 is configured to determine
the possibility of water freezing in the water circuit 30 on the basis of the first
to sixth determination criteria and is configured to select to perform either the
forward cycle operation-based defrosting operation or the reverse cycle operation-based
defrosting operation.
[0072] When the temperature of the water flowing into the second heat exchanger 25 is lower
than or equal to a predetermined temperature in starting the defrosting operation,
the control unit 40 is configured to determine that, based on the first determination
criterion, performing the reverse cycle operation-based defrosting operation could
result in water freezing in the water circuit 30. In the configuration, the heat pump
hot water heater 10 is capable of preventing water freezing in the water circuit 30
by terminating the normal operation and starting the forward cycle operation-based
defrosting operation.
[0073] On the other hand, when the temperature of the air to be heat-exchanged in the first
heat exchanger 21 is lower than or equal to a predetermined temperature in starting
the defrosting operation, the control unit 40 is configured to determine that, based
on the second determination criterion, performing the reverse cycle operation-based
defrosting operation could result in water freezing in the water circuit 30. In the
configuration, the heat pump hot water heater 10 is capable of preventing water freezing
in the water circuit 30 by terminating the normal operation and starting the forward
cycle operation-based defrosting operation.
[0074] But then, when the normal operation for heating the water in the water circuit 30
based on the forward cycle operation has been deactivated for a predetermined period
of time or greater in starting the defrosting operation, the control unit 40 is configured
to determine that, based on the third determination criterion, performing the reverse
cycle operation-based defrosting operation could result in water freezing in the water
circuit 30. In the configuration, the heat pump hot water heater 10 is capable of
preventing water freezing in the water circuit 30 by terminating the normal operation
and starting the forward cycle operation-based defrosting operation.
[0075] Then again, when the defrosting operation has been previously performed for a predetermined
period of time or less in starting the defrosting operation, the control unit 40 is
configured to determine that, based on the fourth determination criterion, performing
the reverse cycle operation-based defrosting operation could result in water freezing
in the water circuit 30. In the configuration, the heat pump hot water heater 10 is
capable of preventing water freezing in the water circuit 30 by terminating the normal
operation and starting the forward cycle operation-based defrosting operation.
[0076] Then again, when the temperature of the water flowing into the second heat exchanger
25 is lower than or equal to a predetermined temperature during performing the reverse
cycle operation-based defrosting operation, the control unit 40 is configured to determine
that, based on the fifth determination criterion, continuing the reverse cycle operation-based
defrosting operation could result in freezing of the water flowing through the water
circuit 30. In the configuration, the heat pump hot water heater 10 is configured
to terminate the reverse cycle operation-based defrosting operation and start the
forward cycle operation-based defrosting operation.
[0077] Then again, when the temperature of the water flowing into the second heat exchanger
25 is lower than or equal to a predetermined temperature during performing the reverse
cycle operation-based defrosting operation, the control unit 40 is configured to determine
that, based on the sixth determination criterion, continuing the reverse cycle operation-based
defrosting operation could result in freezing of the water flowing through the water
circuit 30. In the configuration, the heat pump hot water heater 10 is configured
to terminate the reverse cycle operation-based defrosting operation and start the
forward cycle operation-based normal operation.
[0078] In the forward cycle operation-based defrosting operation, the temperature of the
water flowing into the second heat exchanger 25 does not fall. Hence, the possibility
of water freezing in the water circuit 30 is low. However, the temperature of the
first heat exchanger 21 does not easily rise until a sufficient amount of heat is
accumulated in the second heat exchanger 25. Hence, a longer time will be required
for defrosting the first heat exchanger 21. Due to the above, when performing only
the forward cycle operation-based defrosting operation, the heat pump hot water heater
10 degrades in average heating performance. On the other hand, when performing only
the reverse cycle operation-based defrosting operation, the heat pump hot water heater
10 has the possibility of water freezing in the water circuit 30. The heat pump hot
water heater 10 according to the present embodiment is configured to select to perform
either the reverse cycle operation-based defrosting operation or the forward cycle
operation-based defrosting operation in accordance with the possibility of water freezing
in the water circuit 30. Accordingly, the heat pump hot water heater 10 is capable
of preventing water freezing in the water circuit 30 and is also capable of reliably
achieving required average heating performance.
(4) Modifications
[0079] Specific configurations of the embodiment of the present invention can be changed
without departing from the scope of the present invention. Modifications applicable
to the embodiment of the present invention will be hereinafter explained.
(4-1) Modification A
[0080] In the present embodiment, the control unit 40 of the heat pump hot water heater
10 is configured to determine the possibility of water freezing in the water circuit
30 on the basis of any one of the first to sixth determination criteria. However,
the control unit 40 may be configured to select two or more of the first to sixth
determination criteria and determine the possibility of water freezing in the water
circuit 30 on the basis of combination of the selected determination criteria.
[0081] For example, in terminating the normal operation and starting the defrosting operation,
the heat pump hot water heater 10 may be configured to start the defrosting operation
on the basis of the first and second determination criteria. In this case, the control
unit 40 may be configured to start the forward cycle operation-based defrosting operation
when either of the following conditions is fulfilled: that the temperature of the
water flowing into the water heat exchange part 25b is lower than or equal to a predetermined
temperature; and that the temperature of the air to be heat-exchanged in the first
heat exchanger 21 is lower than or equal to another predetermined temperature. In
addition, in this case, the control unit 40 may be configured to start the forward
cycle operation-based defrosting operation when the both of the following conditions
are fulfilled: that the temperature of the water flowing into the water heat exchange
part 25b is lower than or equal to the predetermined temperature; and that the temperature
of the air to be heat-exchanged in the first heat exchanger 21 is lower than or equal
to the another predetermined temperature.
[0082] Alternatively, in terminating the normal operation and starting the defrosting operation,
the heat pump hot water heater 10 may be configured to start the defrosting operation
on the basis of the first determination criterion. Moreover, during performing the
reverse cycle operation-based defrosting operation, the heat pump hot water heater
10 may be configured to terminate the reverse cycle operation-based defrosting operation
and start the forward cycle operation-based defrosting operation on the basis of the
fifth determination criterion.
(4-2) Modification B
[0083] During performing the forward cycle operation-based defrosting operation, the heat
pump hot water heater 10 may be configured to terminate the forward cycle operation-based
defrosting operation and start the reverse cycle operation-based defrosting operation.
[0084] For example, the control unit 40 may be configured to start the reverse cycle operation-based
defrosting operation on the basis of the fifth determination criterion. Specifically,
when the temperature of the water flowing into the water heat exchange part 25b is
higher than a predetermined temperature during performing the forward cycle operation-based
defrosting operation, the control unit 40 may be configured to start the reverse cycle
operation-based defrosting operation by activating the water supply pump 31 of the
water circuit 30 and switching the four-way switch valve 24 from the first communication
state into the second communication state. When the temperature of the water flowing
into the water heat exchange part 25b is herein lower than or equal to the predetermined
temperature, the control unit 40 is configured to continue the forward cycle operation-based
defrosting operation.
[0085] Moreover, in the present modification, when the forward cycle operation-based defrosting
operation has been performed for more than a predetermined period of time, the control
unit 40 may be configured to determine that the possibility of water freezing in the
water circuit 30 becomes zero and to start the reverse cycle operation-based defrosting
operation by activating the water supply pump 31 of the water circuit 30 and switching
the four-way switch valve 24 from the first communication state into the second communication
state.
INDUSTRIAL APPLICABILITY
[0086] The heat pump hot water heater according to the present invention is capable of preventing
water freezing.
REFERENCE SIGNS LIST
[0087]
- 10
- Heat pump hot water heater
- 20
- Refrigerant Circuit
- 21
- First heat exchanger
- 22
- Compressor
- 25
- Second heat exchanger
- 30
- Water circuit
- 31
- Water supply pump (water supply mechanism)
- 40
- Control unit
CITATION LIST
PATENT LITERATURE
[0088]
PTL 1: Japan Laid-open Patent Application Publication No. 2010-181104
PTL 2: International Patent Application Publication No. WO2006/103815