[0001] The present disclosure relates to the building sector and more in particular to an
innovative method, and the corresponding means, for coating the steel bars used in
the building sector with a layer of bituminous material in order to guarantee conservation
thereof over time.
[0002] Right from the very first forms, up to the present day, reinforced-concrete structures
have been subject to limited duration because the steel bars are inevitably attacked
by rust (iron oxide), which jeopardizes the strength and integrity of the structures
and which in the majority of cases leads to the need for demolition thereof.
[0003] A large number of scientific researchers (engineers, architects, scientists, experts
on building materials, etc.) throughout the world have devoted their energy over the
years to seeking a solution for improving the strength and conservation over time
of steel bars for reinforced-concrete structures, above all in the United States of
America, where there is a prevalence of skyscrapers, and for which huge amounts of
capital have been invested but without any altogether satisfactory results since steel
bars resist only for a limited time, with the result that after approximately 60-100
years such buildings undergo corrosion of the steel and have to be demolished.
[0004] The limit of researchers has been to concentrate their attention and experiments
exclusively on cold-dipping of the bars in one and only one first tank, thus making
just one first pass for treatment of the bars.
[0005] In the Italian patent No.
1403867 filed in the name of the present applicant, a process has been described for anti-oxidizing
treatment with protective baths of bituminous material of the steel bars that are
used in the building sector both in load-bearing structures made of steel structural
work and as skeletons resistant to bending and shear stresses of reinforced concrete.
[0006] The above process envisages a series of production steps, respectively of impregnation,
where the individual bar, at ambient temperature, first comes into contact with a
bath of bituminous solution at a temperature of between 6°C and 10°C, then passes
to a step of first drying in air at ambient temperature, followed by a second dipping
in a second tank containing a hot bituminous emulsion kept at a temperature of between
350°C and 450°C for a certain time, and eventually passes to a final drying step,
where it is left to cool at ambient temperature for a time interval that varies as
a function of the ambient temperature in order to obtain a metal bar that cannot be
attacked by corrosion.
[0007] A task of the present invention is to rationalize the above method, rendering the
process of treatment of the bars no longer dependent upon the environmental conditions
and hence upon the geographical area, the season, the natural temperature gradients,
etc.
[0008] Another task of the invention is to guarantee industrial reproducibility of the method,
enabling control of the temperatures throughout the treatment path from the point
where the steel bars are picked up to the point where they are loaded onto the conveying
trolley.
[0009] The above has been obtained, according to the invention, by resorting to a thermo-electromagnetic
plant, which is able to measure, adapt, and balance the various temperatures of the
steel bars that are to undergo treatment with the temperatures of the antioxidant
bituminous solutions contained in the dip tanks described in the aforementioned Italian
patent filed in the name of the present applicant, in addition to carrying out movement
of the bars through the various operating stations.
[0010] In greater detail, with the present invention:
- the first step of the treatment has been improved in so far as it has been found that
it is of fundamental importance to dip the bars in a tank, appropriately built, containing
a bituminous solution that is cold but at an adequate constant temperature; and
- a second step has been devised, tested, and developed, which consists in providing
a second tank immediately downstream of the first, without envisaging any intermediate
steps, for dipping the bars into a special hot bituminous emulsion at an adequate
constant temperature.
[0011] In the course of testing, the inventors have surprisingly found that the aforesaid
constant temperature is of fundamental importance, since a higher or lower temperature
would not prove suitable and would nullify the result thereof.
[0012] Consequently, forming a further object of the invention is a method that envisages:
measuring the temperature of the environment in which the steel bars are deposited,
the temperature of the bituminous liquid contained in the two tanks, and the temperature
of the loading environment;
adapting in succession the temperature of the environment where the steel bars are
located to the temperature of the bituminous liquid of the first tank, to the temperature
of the bituminous liquid of the second tank, and finally to the temperature of the
loading environment;
balancing the various temperatures of the steel bars and of the dipping liquid throughout
the treatment path; and
articulating the steps of treatment of the steel bars from the point where they are
picked up from the ground or from the furnace to the point where they are loaded onto
the trolley.
[0013] Yet a further object of the invention is to provide a plant equipped with a thermo-electromagnetic
device designed to carry out in succession the various treatment steps starting from
measurement of the temperature of the environment in which the steel bars are deposited.
[0014] According to the invention, the above plant basically comprises a metal cage or tunnel
that develops longitudinally over the entire path from outlet of the steel bars from
the furnace or from where they are stored up to the final station, covering two dip
tanks, contained in which is bituminous solution at different temperatures. Provided
inside said cage or tunnel is a thermo-electromagnetic device constituted by a bell,
closed at the bottom by an electromagnetic plate, which is slidingly guided in a suspended
way along a fixed horizontal guide, via a vertical load-bearing arm. In a preferred
embodiment, said electromagnetic plate defines within the bell a closed top compartment,
which is used as chamber for containing equipment, and a compartment open at the bottom,
which serves as chamber for heating the bars since it is able to contain the steel
bars, which that, once they have been attracted by the electromagnetic plate, are
carried by the bell to the various operating stations.
[0015] The temperature of the steel bars, picked up from the environment where they are
deposited, must first be adapted to that of the dipping liquid of the first tank,
which consists of a cold bituminous solution (6°-10°C).
[0016] Once the steel bars have come out of the first tank, their temperature must be adapted
to that of the dipping liquid of the second tank, which consists of a hot bituminous
emulsion (390°-410°C).
[0017] Finally, the temperature of the bars that have come out of the second tank must be
adapted to that of the loading environment so that they can be loaded onto the conveying
trolley.
[0018] The bell has an electromagnetic field that has the basic function of binding the
two elements, namely bitumen and iron (steel bars for reinforced-concrete structures),
into just one element, which becomes a single body that is compact and resistant to
corrosion over time.
[0019] Further characteristics and advantages of the invention will emerge clearly from
the ensuing description, with reference to the attached plates of drawings, which
illustrate, purely by way of nonlimiting example, a preferred embodiment thereof.
[0020] In the plates of drawings:
Figure 1 is a top plan view of the plant;
Figure 2 is a vertical cross-sectional view according to the plane of trace A-A of
Figure 1, which shows the thermo-electromagnetic bell set in a position corresponding
to the first tank containing the cold bituminous solution;
Figure 3 is a vertical cross-sectional view according to the plane of trace B-B of
Figure 1 of the bell in the position of Figure 2;
Figure 4 is a vertical cross-sectional view according to the plane of trace A-A of
Figure 2, at a larger scale, of just the bell; and
Figure 5 is a schematic perspective view of the longitudinal cage and of the thermo-electromagnetic
bell.
[0021] With reference to the figures, the plant that is described is constituted by an electromagnetic
bell 12 designed to slide within a metal cage 14, which extends throughout the path
for treatment of the bars 15 from the point of exit of said bars from the furnace
or the point where they are picked up from the ground where they have been accumulated
up to the point where they are loaded onto the trolley that conveys the treated bars,
covering also two dip tanks 16, 18 that contain the bituminous solution, which are
kept at a differentiated temperature by two mutually independent combustion chambers
20 and 21, respectively, set underneath said tanks.
[0022] The electromagnetic bell 12 is guided so as to slide in the cage along a horizontal
load-bearing shaft or beam 24 fixed on the roof of the cage itself thanks to a vertical
supporting arm 26, the bottom end of which is anchored to a magnetic plate 28, which
slides downwards along two guides 30 welded to the iron pillars distributed throughout
the length of the cage.
[0023] The above magnetic plate 28 separates the inside of the bell 12 into two chambers:
a top chamber 32, contained in which is the equipment 34 that has the function of
gradually heating the steel bars (which are located in the underlying heating chamber)
to the temperature established both for the first tank and for the second tank; and
a bottom or heating chamber 36, which receives the heat from the equipment of the
overlying chamber and located underneath which is the magnetic plate 28, which magnetically
attracts the steel bars.
[0024] The magnetic plate 28 is, in fact, subject to magnetization and demagnetization for
attraction and repulsion, respectively, of the steel bars 15.
[0025] The two metal tanks 16, 18, each measuring 2.00 m x 1.00 m, are located at the base
of the cage. The first contains the cold bituminous solution and the second contains
the hot bituminous solution in which the steel bars are to be dipped.
[0026] The two combustion chambers 42, 44 are equipped, respectively, with means 42 for
heating the cold bituminous solution to the temperature of 6°-10°C, and with means
44 for heating the hot bituminous emulsion to the temperature of 390°-410°C.
[0027] The plant just described enables the operations outlined in what follows to be carried
out.
Measurement of temperatures
[0028] With an appropriate distribution of temperature sensors, the temperature of the environment
in which the steel bars are deposited is first measured. Then, the temperature of
the bituminous dipping liquid in the first tank is measured. This is followed by measurement
of the temperature of the bars after first dipping in the first tank and then measurement
of the temperature of the bituminous dipping liquid in the second tank. Finally, the
temperature of the loading environment is measured.
[0029] The temperature of the liquid both in the first tank and in the second tank (which
is practically standard for each of the tanks) is fixed at the start of each treatment
cycle (within the limits established).
Adaptation of the temperatures
a) Adaptation of the ambient temperature of the steel bars to that of the (antioxidizing)
bituminous liquid in the first tank
[0030] The temperature of the environment in which the steel bars are deposited may vary
considerably in so far as it depends upon the geographical area (in northern areas,
it is approximately 15°C below zero; in southern areas, it is approximately 40°C above
zero), the season, the place, the natural temperature gradients, etc. Hence, before
the steel bars are dipped into the cold bituminous solution of the first tank, they
must be adapted to the temperature thereof, which should be 6°-10°C.
[0031] A difference of a few degrees centigrade (more or less, for at most 2°C) is insignificant
in so far as the temperature of the bars will be regulated by the temperature of the
bituminous dipping liquid.
b) Adaptation of the temperature of the bars after dipping in the liquid of the first
tank (6°-10°C) to that of the (antioxidizing) bituminous liquid of the second tank
(390°-410°C)
[0032] After the steel bars have been dipped in the bituminous liquid of the first tank,
they have a mean temperature of 8°C, and this temperature will have to be adapted
to the mean temperature of 400°C of the liquid, i.e., the hot bituminous emulsion,
of the second tank.
[0033] A difference of several degrees centigrade (more or less, for at most 10°C) is insignificant
in so far as the temperature of the bars will be regulated by the temperature of the
bituminous dipping liquid in the second tank.
[0034] Adaptation of the temperatures as described above is obtained via appropriate heating
devices located within the so-called "equipment chamber", which gradually bring the
temperature of the bars to higher values to enable dipping in the bituminous liquid
of the two tanks.
[0035] When the bars are to be dipped in the bituminous liquid of the second tank, they
will never have a mean temperature of 400°C but will gradually adapt to the temperature
of the dipping liquid, given that iron is a conductor that immediately absorbs heat,
reaching high temperatures.
[0036] Careful control of the temperatures and consequent adaptation both of the steel bars
and of the bituminous dipping liquid enables the bars to blend with the hot bituminous
liquid in an optimal way as compared to a simple or normal dipping.
[0037] Considering the dimensions of a tank with a width of 1.00 m and a length of 2.00
m, this will be able to contain twenty-four steel bars with a total weight of 120
kg.
Balancing of the temperature variations
[0038] The electromagnetic field produced by the bell has the function of:
- a) balancing the variations of temperature throughout the treatment path from the
point where the steel bars are picked up from the ground or from the furnace to the
point where they are loaded onto the trolley so that they will not undergo alterations
such as scaling, air bubbles, or pitting in which a gap is created that does not enable
the bituminous liquid to adhere, and consequently the bars will be subject to deterioration
and hence be unusable;
- b) binding the hot bituminous emulsion at the mean temperature of 400°C to the steel
bars at the same temperature at the moment of dipping using the magnetic plate in
such a way that the two elements, namely, bitumen and iron (steel bars), combine to
form just one element, thus constituting a single body that is compact and resistant
to corrosion over time; the electromagnetic field of the bell does not act on the
hot bituminous liquid, but acts directly and specifically on the steel bars in so
far as it causes an increase in the attractive energy of the steel bars so as to get
the bitumen to penetrate therein or, rather, to get the element iron to bind with
the element bitumen, it being at the same time important to bear in mind that bitumen
does not penetrate in depth or, rather, into the central care of the steel bar; and
- c) magnetizing and demagnetizing the magnetic plate to enable attraction and repulsion,
respectively, of the steel bars and passage thereof through the four process steps.
[0039] In conclusion, the electromagnetic bell hence has the function of measuring, adapting,
and balancing the variations of the temperatures of the steel bars throughout the
processing cycle and of the bituminous liquid of the two tanks, which constitutes
the basic premise for creating a protection for the bars such as to render them corrosion-resistant;
i.e., they cannot be attacked by rust and are indestructible over time.
[0040] The bell, with all its articulated passes, is basically the device that enables blending
of the two elements, bitumen and iron, into just one.
Steps of treatment of the steel bars
[0041] Control of the temperatures must be carried out throughout the treatment path from
the point where the steel bars are picked up from the ground or from the furnace to
the point where they are loaded onto the trolley and follows the four steps below.
Step I
[0042] Once the steel bars have been raised from the level of the furnace or the ground
to the level of the first tank, they undergo adaptation in temperature from the value
of ambient temperature to the value of the mean temperature of the dipping liquid,
which is 8°C.
Step II
[0043] The steel bars are lowered right down to the bottom of the first tank so as to be
entirely dipped in the cold bituminous solution (6°-10°C).
[0044] They are then raised from the bottom of the first tank to the level of the second
tank.
Step III
[0045] The steel bars are lowered right down to the bottom of the second tank. As they are
lowered, they gradually undergo adaptation to the temperature of the hot bituminous
emulsion (390°-410°C).
Step IV
[0046] As the steel bars are raised from the bottom of the second tank, they gradually undergo
adaptation to the ambient temperature of the loading environment, and are pushed out
so as to be loaded onto the trolley and conveyed into the various workplaces, now
ready to confront any temperature.
[0047] Once a first cycle of treatment of the steel bars has been completed, a subsequent
new cycle automatically starts, and so forth.
[0048] The thermo-electromagnetometer may be installed in a structure additional with respect
to the steel-production complex or in another place prepared for treatment of steel
bars.
[0049] With the present invention, the major drawback of iron (namely, rust, i.e., iron
oxide) is overcome, so that large structures, such as large public buildings, skyscrapers,
bridges, viaducts, and so forth, that will be built with these new criteria will no
longer have to undergo demolition within a short stretch of time (60-100 years, as
occurs today) but will even last for centuries.
[0050] Rusting, in fact, in addition to jeopardizing the compressive strength of steel,
causes increase in the volume thereof, which can thus cause cracking of the concrete
that coats it.
[0051] It should be emphasized that, without adaptation of the temperatures of the steel
bars to those of the liquid of the two tanks, the steel would undergo alterations,
namely, scaling, such as to render it unusable and inefficient.
Control of the structure of steel and concrete
[0052] It is indispensible for the heating and dipping steps to be carried out as accurately
as possible, since they are determining factors in so far as they affect the structure
of iron (steel bars).
[0053] Of primary importance is adaptation of the temperatures, both during the first pass
and during the second pass, so that it is necessary to:
check the structure of the steel bars to verify that that they are homogeneous and
are impregnated uniformly, thus preventing any sharp jumps in temperature from start
to end of the treatment process;
observe the rules regarding reinforced concrete (right dosage, water-to-cement ratio,
perfect packaging and compaction of the mixture); and
ensure perfect adherence of the concrete to the steel bars.
[0054] In this connection, it is to be emphasized that in a preferred embodiment the operating
rules outlined below are to be followed.
[0055] The steel bars with improved adherence that come out of the furnace are made to cool
naturally down to the ambient temperature Ta.
[0056] Only when the bars have reached said temperature is treatment started, i.e., dipping
of the bars in the first tank, which contains the cold bituminous solution at a temperature
of from 6°C to 10°C (preferably a mean temperature of 8°C) for a maximum duration
of 2 minutes.
[0057] Once the temperature of the bituminous liquid to be maintained has been established,
e.g. 8°C, this must remain constant throughout the treament cycle of dipping of the
bars in order for them to be homogeneous.
[0058] Constant temperature is of fundamental importance from the structural standpoint
of iron (steel bars) since a temperature different from the one established at the
start and different during the course of treatment produces bars with different degrees
of absorption, and hence not homogeneous.
[0059] Of considerable importance are also the modalities of impregnation of the bars in
the liquid. Impregnation must take place in a uniform manner over all the bars: a
small variation of temperature and impregnation are sufficient for there to be produced
bars that are not homogeneous and uniform.
[0060] It is important to guarantee that the constancy in temperature and the uniformity
of impregnation are maintained during dipping of the bars also in the second tank,
which contains the hot bituminous emulsion at the temperature of 390-410°C (preferably
the intermediate temperature of 400°C).
[0061] Once the temperature to be maintained for the liquid has been set (e.g. 400°C), this
must remain constant during dipping of the bars for a maximum duration of 2 minutes,
to prevent bars with different degrees of absorption from being obtained, as has already
been said as regards the first tank.
[0062] Likewise, as in the first pass within the first tank, also in the second pass within
the tank at 400°C, impregnation must take place in a uniform way.