TECHNICAL FIELD
[0001] The present invention relates to a casting installation and a casting method using
the same, and more particularly, to a casting installation that may easily produce
a slab for an extremely thick steel material and enhance quality, yielding percentage,
and productivity of the slab and to a casting method using the same.
BACKGROUND ART
[0002] In general, an extremely thick steel material has a thickness of at least 100 mm,
and internal quality such as porosity and mechanical properties such as impact and
toughness of the extremely thick steel material are managed with a thickness reduction
ratio (slab thickness/product thickness) limited according to an intended use. For
example, as marine structural steel, there is required an extremely thick steel material
having the thickness reduction ratio of 4 or more and pressure steel and wind power
structural steel requires the thickness reduction ratio of 3 or more.
[0003] Currently, an extremely thick steel material may be produced through predetermined
post-processes such as forging and rolling of an ingot or slab produced by a continuous
casting process. When an extremely thick steel material is produced by the ingot process,
i.e., the former method, the ingot is produced into an extremely thick steel material
product by a forging process or is subject to an additional rolling process. In particular,
since the extremely thick steel material requiting a high thickness reduction ratio
regards the internal quality as an important factor, a slab mostly cast in an ingot
is subjected to a forging operation and then produced through a rolling process.
[0004] As such, producing an extremely thick steel material by using a slab cast in an ingot
may correspond to the production of an extremely thick steel material having a high
thickness reduction ratio and has an advantage for the production of a small-lot in
consideration of a demand characteristic of the extremely thick steel material. However,
the slab produced by using the ingot process requires cutting of an unsound region
for removing the unsound region generated around a riser and a main riser. Thus, deterioration
in yielding percentage of the slab is caused due to cutting of upper and lower regions
of the slab, so that production costs for producing the extremely thick steel material
is increased.
[0005] Meanwhile, when an extremely thick steel material is produced by the continuous casting
process, i.e., the latter method, in general, the extremely thick steel material is
produced by a method of rolling a slab subject to a continuous cast. Although the
latter method is excellent in yielding process and thus superior to the ingot process
in terms of production costs when compared to the ingot process, there is a problem
in that a thickness of the extremely thick steel material is also limited due to a
limited slab thickness when steel products requiring a high thickness reduction ratio
are produced.
[0006] Further, since the extremely thick steel material is relatively thick compared to
a normal slab, it takes a long time until the slab is completely solidified after
being cast. When a slab for an extremely thick steel material thicker than a general
slab produced by a general caster is produced by a conventional casting method in
which molten steel is continuous cast and cut, solidification is completed to an inside
of the slab and thus the installation of the caster becomes very long for a cutting
process, which leads to enlargement of the installation, resulting in consumption
of enormous initial cost in terms of production costs.
[0007] In addition, since possibility in which an internal defect of the slab occurs is
high compared to an ingot material, there is a high possibility in which an internal
defect in a continuous cast slab may remain in the extremely thick steel material.
In addition, since a continuous cast installation for producing a slab is optimized
for mass production, there is a disadvantageous problem in terms of production of
a small-lot.
[0008] Thus, development of new installation and process is urgently required for producing
a slab for extremely thick steel material having a high thickness reduction ratio,
the slab being not easy to be produced in a general casting installation. That is,
required is an installation and process which is capable of enhancing internal quality
and yielding percentage same as or better than an ingot slab in terms of steel quality,
is advantageous in producing various kinds of small-lot extremely thick steel materials
in terms of production, and is capable of enhancing productivity compared to the production
of the ingot slab.
DISCLOSURE OF THE INVENTION
TECHNICAL PROBLEM
[0009] The present invention provides a casting installation easily producing a slab for
an extremely thick steel material and to a casting method using the same.
[0010] The present invention also provides to a casting installation capable of enhancing
quality and yielding percentage of a slab and to a casting method using the same.
[0011] The present invention also provides to a casting installation capable of enhancing
productivity of a slab and efficiency of a process installation and to a casting method
using the same.
TECHNICAL SOLUTION
[0012] A casting installation according to an embodiment of the present invention includes:
a casting unit defining a passage through which molten steel passes and for casting
the molten steel into a slab; and a solidification unit including: a support unit
disposed spaced apart from the casting unit and receiving the slab from the casting
unit and disposed on at least any one place of sides of the slab to support the slab;
and a first quality controller provided on an outside of the slab to induce solidification
of the slab.
[0013] The first quality controller may include: a first stirrer disposed in proximity to
an outside of the slab and able to elevate in a longitudinal direction of the slab;
a second stirrer provided spaced apart below the first stirrer and able to elevate
in the longitudinal direction of the slab; and a first heater installed so as to be
able to move forward and backward in a region directly above the slab and configured
to heat an upper portion of the slab.
[0014] The first stirrer may have coils wound around the slab and disposed in the form of
a circle.
[0015] The casting unit may include: an accommodation unit having a space in which the molten
steel is accommodated; a drawing machine drawing the slab from the accommodation unit
to a lower portion; and a second quality controller provided on an outside of the
passage.
[0016] The accommodation unit may include a mold configured to form the passage through
which the molten steel supplied to a tundish passes, and the mold may be formed so
that the slab has a thickness of 800 mm or less and a width of 2000 mm or less.
[0017] The second quality controller may include: a stirring unit including at least one
stirrer disposed on an outside of the mold and configured to stir at least any one
of the molten steel and unsolidified molten steel inside the slab; a second heater
installed so as to be able to move forward and backward in a region directly below
the mold and configured to heat an upper portion of the slab.
[0018] The stirring unit may include: a third stirrer disposed in proximity to the mold
and able to elevate in a drawing direction of the slab; a fourth stirrers provided
spaced apart below the third stirrer and able to elevate in the drawing direction
of the slab.
[0019] The third stirrer may have coils wound around the mold or the slab and disposed in
the form of a circle.
[0020] A pusher for separating the slab from the drawing machine may be provided to the
casting unit and the pusher may be installed so as to be able to reciprocally move
forward and backward toward the solidification unit.
[0021] A transfer unit transferring the slab from the casting unit to the solidification
unit or from the solidification unit to an outside of the solidification unit may
be provided.
[0022] A casting method according to an embodiment of the present invention includes: providing
molten steel to prepare casting; casting the molten steel in a casting unit allowing
a passage through which the molten steel passes to be opened or closed; transferring
a slab produced through the casting to a solidification unit; and transferring the
slab to a post-process after solidification of the slab is completed.
[0023] The casting of the molten steel may be repeated in the casting unit after the slab
is transferred to the solidification unit.
[0024] When the casting of the molten steel is repeated, the transferring the slab to the
solidification unit may be performed while the molten steel is transferred to the
casting unit so that preparing the casting is performed.
[0025] When the casting of the molten steel is a single casting, that is one time casting,
the solidification of the slab may be completed in the casting unit or after the slab
is transferred to the solidification unit.
[0026] The molten steel may be cast at a casting rate 0.3m per minute or less.
ADVANTAGEOUS EFFECTS
[0027] According to a casting installation and a casting method using the same according
to embodiments of the present invention, it is possible to improve yielding percentage
of a slab produced by a continuous casting. That is, when a slab cast in a casting
unit is solidified in a casting unit or a solidification unit, the length of a pipe
generated at an upper portion of the slab is reduced to enhance yielding percentage
of the slab by delaying solidification of the upper portion of the slab by using a
second heater or a first heater.
[0028] In addition, molten steel remaining in a mold is stirred to enhance inner quality
during casting and unsolidified molten steel in slab is stirred after a casting is
completed, so that the equiaxed crystal ratio in the slab may be enhanced, segregation
and porosity may be reduced, and an internal defect such as a pipe occurring at an
edge end of the slab may be reduced.
[0029] In addition, according to the present invention, it is possible to continuously cast
another slab in a casting unit during a process in which solidification of a slab
is performed in a solidification unit. Thus, since a process required for solidification
of an extremely thick steel material may be completed in the solidification unit,
a casting of molten steel may not stop, thus capable of improving productivity of
a slab and efficiency of a process installation.
BRIEF DESCRIPTION OF THE DRAWINGS
[0030]
FIG. 1 illustrates a view of a casting installation according to an embodiment of
the present invention.
FIG. 2 illustrates a flow chart of a casting method according to an embodiment of
the present invention.
FIG. 3 illustrates a view of an operating state of a casting installation according
to a casting method in FIG. 2.
MODE FOR CARRYING OUT THE INVENTION
[0031] Hereinafter, specific embodiments will be described in detail with reference to the
accompanying drawings. The present invention may, however, be embodied in different
forms and should not be construed as limited to the embodiments set forth herein.
Rather, these embodiments are provided so that this disclosure will be thorough and
complete, and will fully convey the scope of the present invention to those skilled
in the art. Like reference numerals refer to like elements throughout.
[0032] FIG. 1 illustrates a view of a casting installation according to an embodiment of
the present invention. FIG. 2 illustrates a flow chart of a casting method according
to an embodiment of the present invention. FIG. 3 illustrates a view of an operating
state of a casting installation according to a casting method in FIG. 2. FIGS. 3A
to 3F illustrate changes in the casting installation working to produce slab.
[0033] Refereing to FIG. 1, a casting installation 1 as an installation to produce a slab
for an extremely thick steel material according to an embodiment of the present invention
includes a casting unit 1a defining a passage through which molten steel passes and
for casting the molten steel into a slab; and a solidification unit 1b including:
a support unit 500 disposed spaced apart from the casting unit 1a and receiving the
slab from the casting unit 1a and disposed on at least any one place of sides of the
slab to support the slab; and a first quality controller 600 provided on an outside
of the slab to induce solidification of the slab.
[0034] The casting unit 1a as a section in which continuous casting of refined molten steel
is carried out includes: an accommodation unit 100 accommodating the molten steel;
a drawing machine 200 drawing the slab from the accommodation unit 100 to a lower
portion; and a second quality controller 300 provided on an outside of the passage
through which the molten steel passes.
[0035] The accommodation unit 100 defines a space accommodating molten steel before the
casting of the molten steel and includes a ladle 120 accommodating molten steel, a
tundish 140 receiving the molten steel from the ladle 120, and a mold 160 disposed
spaced apart below the tundish 140.
[0036] The ladle 120 is a container for accommodating molten steel after refining is completed
and may be produced in various hollow shapes having an internal space capable of accommodating
the molten steel. In general, the ladle 120 may be provided in plurality to increase
the circulation rate of a continuous casting installation.
[0037] The tundish 140 is produced in the shape of a hollow container capable of accommodating
the molten steel supplied from the ladle 120. An outlet discharging molten steel is
formed in the bottom of the tundish 140, so that the molten steel accommodated in
the tundish 140 may be discharged to the outside through the outlet. The molten steel
accommodated in the tundish 140 stays inside the tundish 140 for a period of time,
thus being poured into the mold 160 after flotation of inclusion contained in the
molten steel.
[0038] The mold 160 is provided for shaping the molten steel poured from the tundish 140
in an appropriate size to produce a slab, thus defining width and thickness of a passage
through which the molten steel passes. The mold 160 of the present invention may be
formed such that a slab has a thickness of 800 mm or less and a width of 2000 mm or
less in order to cope with the size of a slab for an extremely thick steel material.
That is, use of the mold 160 having a greatly increased thickness compared to a mold
of a conventional casting installation allows a slab subjected to forging and rolling
processes to have a thickness used for the extremely thick steel material.
[0039] Meanwhile, there may be provided a guide roll 170 guiding a slab having an initial
shell to the outside of the mold 160 through the mold 160, a cooling nozzle (not shown)
cooling the slab guided from the guide roll 170, and a vibrator (not shown) transmitting
vibration to the mold 160 so that the slab inside the mold is easily drawn to the
outside of the mold 160. In the present invention, it is not necessary to particularly
limit the configuration of the guide roll 170, the cooling nozzle, and the vibrator,
but various configurations and operating methods thereof are already widely known
to those skilled in the art, so that a detailed description thereof will be omitted.
[0040] The drawing machine 200 as a machine for drawing a slab from the accommodation unit
100 to a lower portion, includes: a surface plate 220 which is initially disposed
inside the mold and receives molten steel to prevent the molten steel from spilling
downwards from the mold 160 and connects the primary solidified slab to an actuator
240, and the actuator 240 drawing the slab to the lower portion.
[0041] The surface plate 220 is provided for connecting a slab to the actuator 240, and
a plate having a specific-shaped surface is used for easy connection to the slab.
Although the present invention does not limit the shape and the material of the surface
plate 220, it is preferable that the surface plate 200 is made of such a material
that does not lead to deformation which may be caused by to a slab of a high temperature
when being in contact with the slab.
[0042] The actuator 240 is a device for lowering the surface plate 220, and a slab connected
to the surface plate 220 may be drawn downwards by lowering the surface plate 220
connected to the actuator 240. The actuator 240 may employ a device capable of descending
to a lower portion when the slab is drawn and ascending at an initial stage of casting
so that the surface plate 220 is positioned inside the mold 160. That is, a device
capable of descending and ascending may be used as the actuator 240.
[0043] The second quality controller 300 is provided for improving quality of a slab drawn
from the drawing machine 200 and includes: a stirring unit 320 including at least
one stirrer disposed on an outside of the mold 160 and configured to stir at least
any one of molten steel in the mold 160 and unsolidified molten steel inside the slab;
and a second heater 340 installed so as to be able to move forward and backward in
a region directly below the mold 160 and configured to heat an upper portion of the
slab.
[0044] The stirring unit 320 is a device having at least one stirrer on an outside of the
mold 160 to improve quality of a slab and includes: a third stirrer 322 disposed in
proximity to the mold 160 and able to elevate in a drawing direction of the slab;
and a fourth stirrer 324 provided spaced apart below the third stirrer 322 and able
to elevate in the drawing direction of the slab. That is, the stirring unit 320 stirs
at least any one of molten steel accommodated in a molten state in the mold 160 and
unsolidified molten steel in the produced slab to perform grain refinement on a slab,
thereby being capable of improving quality of the slab.
[0045] As illustrated in FIG. 1, the third stirrer 322 is disposed spaced apart at a predetermined
distance from a side of the mold 160, and stirs molten steel accommodated in the mold
160 during the casting. When the casting starts, the third stirrer 322 descends by
a predetermined distance along with a slab to stir unsolidified molten steel inside
the slab. That is, when molten steel is poured to the mold 160, the third stirrer
322 applies an electromagnetic field to the molten steel from a side of the mold 160
to stir the molten steel, and when pouring of the molten steel into the mold 160 is
completed, the third stirrer 322 may stir unsolidified molten steel inside a slab
while descending to a lower portion along with the slab. An electromagnetic stirrer
(EMS) may be used as the third stirrer 322. The electromagnetic stirrer being able
to be used as the third stirrer 322 typically has a low frequency (Hz) band corresponding
to a frequency enough to stir molten steel in a molten state.
[0046] The fourth stirrer 324 is provided spaced apart at a predetermined distance below
the third stirrer 322, and elevates in a drawing direction of a slab to stir unsolidified
molten steel in the slab. A final electromagnetic stirrer (FEMS) may be used as the
fourth stirrer 324. The fourth stirrer 324 is disposed in a relatively lower portion
compared to the third stirrer 322, and it is preferable to use a stirring device having
a higher frequency (Hz) than the third stirrer 322 in order to stir molten steel existing
inside a solidified region in a lower portion of a slab (a lower portion from the
center with respect to a longitudinal direction of a slab) in which solidification
has progressed to some extent.
[0047] Thus, the stirring unit 320 stirs solidified molten steel in the mold and unsolidified
molten steel in the slab, thereby being capable of enhancing the equiaxed crystal
ratio in slab and reducing segregation and porosity. Meanwhile, the present invention
does not limit a stirring region of a slab stirred by the third and fourth stirrers
322 and 324 and an elevating width of the stirrers, and various moving ranges may
be applicable according to casting conditions.
[0048] The second heater 340 is a device disposed outside of the mold 160 and installed
so as to be able to move forward and backward in a region directly below the mold
(a path in a drawing direction of a slab) to heat an upper portion of the cast slab
(tail portion). In this embodiment, a method according to induction heating (electromagnetic
heater, EMH) was employed. The second heater 340 indirectly heats the upper side of
a slab by using an electromagnetic field generated in an induction heating coil by
power supply, and is wound so as to surround the slab while being spaced apart at
a predetermined interval from four directional sides of the slab. Thus, the second
heater 340 preferably uses an induction coil having a shape corresponding to a cross-section
of the slab, but not limited thereto, may be wound in various forms.
[0049] Meanwhile, a pusher 400 may be provided to the casting unit 1a so as to transfer
a slab to the solidification unit 1b after casting of molten steel is completed.
[0050] The pusher 400 is a device disposed in a position facing the solidification unit
1b of sides of the casting unit 1a and pushing a side of a slab and separating the
slab from the drawing machine 200 to deliver the slab towards the solidification unit
1b. A device capable of reciprocally moving a predetermined distance may be used for
the pusher 400, and for example, a stepping motor, an actuator, a solenoid, or the
like may be used. As an example, when an actuator is used as the pusher 400, a piston
reciprocally moves while being inserted and ejected into/from a cylinder, thus being
able to push the slab toward the solidification unit 1b and then return back to an
original position. A device delivering the slab of the casting unit 1a to the solidification
unit 1b is not limited to the pusher 400 and may be a variety of devices.
[0051] The solidification unit 1b is a section receiving a slab so as to solidify the slab
cast from the above described casting unit 1a and includes: a support unit 500 disposed
on at least any one side of the slab to support the slab; and a first quality controller
600 provided on an outside of the slab to induce solidification of the slab. The solidification
unit 1b receives the slab from a section spaced apart at a predetermined distance
from the casting unit 1a, completes solidification of the slab, and then transfers
the slab to a post-process (for example, forging or rolling).
[0052] The support unit 500 is provided so that the slab is stably positioned in the solidification
unit 1b and includes: a support block 520 disposed in contact with the bottom of the
slab; and a support frame 540 disposed surrounding a portion of a side of the slab.
However, the configuration of the support unit 500 is not limited thereto, but the
slab may be supported by a variety of devices and methods within the extent not interfering
with the movement of the first quality controller 600.
[0053] The supporting block 520 uses a block in a shape similar to the surface plate 220
of the casting unit 1a. The support block 520 plays a role of supporting a lower portion
of the slab disposed in the solidification unit 1b in a drawing direction, i.e. a
longitudinal direction.
[0054] The support frame 540 may be disposed spaced apart at a predetermined distance from
a side of the slab and surrounding a portion of a side of the slab so as to suppress
and prevent the slab disposed in the longitudinal direction from falling, as illustrated
in an enlarged view in FIG. 1.
[0055] The first quality controller 600 as a device provided on an outside of a slab and
to ensure slab quality includes: a first stirrer 620 disposed in proximity to an outside
of the slab and able to elevate in a longitudinal direction of the slab; a second
stirrer 640 provided spaced apart below the first stirrer 620 and able to elevate
in the longitudinal direction of the slab; and a first heater 660 configured to heat
an upper portion of the slab. That is, since solidification of the slab which is naturally
cooled is not completed, the first quality controller 600 may be provided with a device
the same as or similar to the casting unit 1a to continue a treatment process for
improving slab quality.
[0056] The first stirrer 620 as a device for stirring unsolidified molten steel in a slab
delivered to the solidification unit 1b is disposed spaced apart at a predetermined
distance from the slab. The first stirrer 620 may be installed so as to be able to
elevate in such a way that the first stirrer 620 descends to be disposed on a side
of the slab when the slab is delivered to the solidification unit 1b with the first
stirrer 620 being disposed at the same height as or a similar height to the third
stirrer 322. The first stirrer 620 is disposed in an upper portion outside of the
slab. That is, the first stirrer 620 is disposed above the center of the slab with
respect to a longitudinal direction of the slab. An unsolidified region in an upper
portion of the slab, which is stirred by the first stirrer 620, is subjected to relatively
less progressed solidification than a lower portion of the slab, so that a large amount
of unsolidified molten steel is included in the slab compared to the lower portion
of the slab. Thus, an electromagnetic stirrer (EMS) similar to the third stirrer 322
may be used.
[0057] Meanwhile, although the first stirrer 620 uses a device similar to the third stirrer
322, the first and third stirrers 620 and 322 may be different in the size of a frequency
generated thereby or the operating time thereof from each other. That is, the third
stirrer 322 stirs molten steel in the mold 160 or molten steel in an initial slab
subjected to solidification, and thus uses a frequency less than about 1 Hz. The third
stirrer 322 operates during the following processes: pouring of molten steel into
the mold 160, casting the molten steel into a slab, and transferring of the slab to
the solidification unit 1b. In the case of the first stirrer 620, due to a characteristic
of the slab transferred to the solidification unit 1b, the slab is not provided with
the mold and forms a thicker solidified shell compared to the slab cast in the casting
unit. Therefore, the first stirrer 620 uses a frequency of up to 5 Hz and operates
until the casting of the slab is completed so that the magnetic field of the first
stirrer 620 passes through the thickened solidified shell to stir unsolidified molten
steel in the slab. However, solidification of a slab occurs in a wide variety of forms
according to casting situations and casting conditions, so that the third and first
stirrers 322 and 620 may use a frequency in a range of 0 to 5 Hz according to various
operation patterns. In addition, the first stirrer 620 disposed in the solidification
unit 1b in FIG. 3D stirs unsolidified molten steel in the slab to equalize temperatures
of unsolidified molten steel in the slab during solidification of the slab in the
solidification unit 1a, thus being able to operate very efficiently in reducing pipe
defects inside the slab in such a way that the first heater 660 heats an upper side
of the slab to prevent an upper portion of the slab from being pre-solidified. Similarly,
the third stirrer 322 disposed in the casting unit 1a in FIG. 3F stirs unsolidified
molten steel in the slab to equalize temperatures of unsolidified molten steel in
the slab during solidification of the slab in the casting unit 1a, thus being able
to operate very efficiently in reducing pipe defects inside the slab in such a way
that the second heater heats an upper side of the slab to prevent an upper portion
of the slab from being pre-solidified.
[0058] The second stirrer 640 is provided spaced apart at a predetermined distance below
the first stirrer 620 and installed so as to elevate in a longitudinal direction of
a slab to stir unsolidified molten steel in the slab. That is, the second stirrer
640 is disposed below the center of the slab with respect to a longitudinal direction
of the slab. Although the second stirrer 640 may use a final electromagnetic stirrer
(FEMS) similar to the fourth stirrer 324 so as to stir unsolidified molten steel in
a lower region outside of the slab, the second and fourth stirrers 640 and 324 may
be different in the size of a frequency generated thereby or the operating time thereof
from each other. That is, the fourth stirrer 322 uses a frequency of up to about 3
Hz so as to stir unsolidified molten steel in the slab which is being solidified in
the casting unit 1a. The fourth stirrer 324 operates before the slab cast in the casting
unit 1a is transferred to the solidification unit 1b. In the case of the second stirrer
640, due to a characteristic of the slab transferred to the solidification unit 1b,
the slab forms a thicker solidified shell compared to the slab cast in the casting
unit. Therefore, the second stirrer 640 uses a frequency of up to 6 Hz and operates
until the casting of the slab is completed. However, solidification of a slab occurs
in a wide variety of forms according to casting situations and casting conditions,
so that the fourth and second stirrers 324 and 640 may use a frequency in a range
of 0 to 6 Hz according to various operation patterns.
[0059] Meanwhile, in the embodiment, although the first and second stirrers 620 and 640
are provided in plurality to respectively stir unsolidified molten steel in different
regions of the slab, an apparatus and a method for stirring unsolidified molten steel
in the slab in the solidification unit 1b are not limited thereto. That is, the embodiment
may be modified to various methods and apparatus shapes in such a way that a single
stirrer is provided and a whole region from an upper portion to a lower portion of
the slab may be stirred while the frequency of the stirrer is being changed.
[0060] Thus, the first and second stirrers 620 and 640 stir molten steel until solidification
of the slab transferred to the solidification unit 1b is completed, thus being able
to enhance the equiaxed crystal ratio in the slab and improve slab quality by reducing
segregation and porosity as in the stirring unit 320 of the casting unit 1a.
[0061] Meanwhile, in the case of the third and first stirrers 322 and 620 applied to the
present invention, in order to ensure a uniform stirring force in molten steel in
the slab according to significantly increased sizes compared to molds applied to existing
continuous casting machines, coils wound around the mold 160 or the slab were disposed
in the form of a circle to perform rotation-type stirring on unsolidified molten steel
in the mold or the slab.
[0062] The first heater 660 is a device installed so as to be able to move forward and backward
in a direct upper region of slab for heating an upper portion of the slab in an outside
of the slab and configured to heat an upper portion (tail portion) of the slab transferred
to the solidification unit 1b. Since the first heater 660 has similar configuration
and effect as in the second heater 340, a detailed description thereof will not be
repeated.
[0063] The above described casting installation 1 may include a transfer unit which transfers
the slab from the casting unit 1a to the solidification unit 1b and/or from the solidification
unit 1b to the outside of the solidification unit 1b, i.e. a post-process.
[0064] The transfer unit 700 is a device disposed on one side of the solidification unit
1b and formed so as to be able to move forward and backward toward the casting unit
or the solidification unit to transfer the slab. The transfer unit 700 includes: a
tilting unit 720 for tilting the slab in contact with the slab in the casting unit
1a or transferring the slab from the casting unit 1a to the solidification unit 1b;
and a driving unit 740 controlling operation of the tilting unit 720.
[0065] The tilting unit 720 is disposed on one side of the slab and transfers the slab while
being tilted or moved forward and backward by the driving unit, and the support block
520 of the solidification unit 1b is connected to transfer the slab. That is, the
slab may be transferred from the casting unit 1a to the solidification unit 1b in
such a way that one side of the tilting unit 720 is connected to the support block
520 supporting the slab and the slab is disposed on the support block 520. When the
slab is transferred from the solidification unit 1b to the outside of the solidification
unit, the tilting unit 720 is tilted with the slab being in contact with one side
of the tilting unit 720 and the slab may be seated on the tilting unit disposed in
the transferring direction. On a side in which the tilting unit 720 contacts the slab,
a roller 725 may be mounted to easily transfer the slab.
[0066] The driving unit 740 controls operation of the tilting unit 720, and may allow the
tilting unit 720 to move forward and backward so that the tilting unit 720 approaches
or recedes from the casting unit 1a. In addition, the driving unit 740 allows the
tilting unit 720 to be tilted and communicate with a roller table 800 guiding the
tilting unit 720 and the slab to a post-process. A device such as the pusher 400 of
the casting unit 1a capable of reciprocally moving a predetermined distance may be
used for the driving unit 740, and for example, when an actuator is used, the tilting
unit 720 may be connected to an end of a piston so as to enable angle adjustment.
[0067] In this way, in this embodiment, although the method and device as described above
are used for the transfer unit 700 transferring the slab, the device and operating
method used for the transfer unit 700 are not limited thereto, and various devices
and methods capable of easily transferring the slab may be used when the slab is transferred
from the casting unit 1a to the solidification unit 1b or from the solidification
unit 1b to a post-process.
[0068] Hereinafter, a casting method using the above-described casting installation will
be described.
[0069] Referring to FIG. 2, a casting method according to an embodiment of the present invention
includes: providing molten steel to prepare casting; casting the molten steel in a
casting unit allowing a passage through which the molten steel passes to be opened
or closed; and transferring a slab produced through the casting to a solidification
unit.
[0070] First, molten steel after refining is completed is accommodated in a ladle 120 and
then transferred to the casting unit so as to start casting. The molten steel transferred
to the casting unit is supplied to the tundish 140 from the ladle 120, flotation of
inclusion is then performed in the tundish 140 for a period of time, and the molten
steel is then poured to the mold, thereby performing the process in the casting unit
1a (S100). As illustrated in FIG. 3, preparation of the casting is competed in a condition
in which the surface plate 220 is positioned in a mold to prevent molten steel poured
to the mold 160 from being discharged to the outside (S120).
[0071] After the preparation of the cast is completed, as illustrated in FIG. 3B, as the
drawing machine 200 operates to lower the surface plate 220 down and a slab S1 connected
to the surface plate 220 is drawn downwards to start the casting, slab is produced
(S140). Before the casting starts, the third stirrer 322 is operated to stir molten
steel in the mold. The slab is produced in a size of a maximum thickness of 800 mm,
a maximum width of 2000 mm, and cast at a casting rate of 0.3m per minute or less.
By a characteristic of an extremely thick steel material, the mold 160 in which a
slab has an increased thickness needs to be used so as to obtain a final product having
an increased thickness. A reason why the slab is cast at a low casting rate of 0.3
m per minute is that suppressing occurrence of segregation to secure internal quality
by casting at a slow casting rate and seeming a sufficient thickness of the solidified
shell during casting are required as a solidification rate of a slab for the extremely
thick steel material is slow unlike a general slab.
[0072] While the casting is in progress, the third stirrer 322 continually stirs molten
steel in the mold and the fourth stirrer 324 continually stirs unsolidified molten
steel inside the slab so that solidification proceeds by characteristic of thick slab.
Thus, the third and fourth stirrers 322 and 324 may refine a structure of slab by
continuously stirring molten steel to enhance quality and equiaxed crystal ratio of
slab.
[0073] When the casting is complete on the casting unit 1a (S160), the slab S1 located in
the casting unit 1a is separated from the surface plate by the pusher 400 and supported
by the transfer unit 700 to move to the solidification unit (S200). When a pushing
force is delivered to the slab S1 by the pusher 400, the slab S1 may be transferred
to the solidification unit 1b in a state solidification of a surface is advanced to
a degree of no deformation. Meanwhile, the stirring unit 329 moving upper and lower
portions in the casting and solidifying slab returns to its original position so as
not to interfere with transfer of the slab S 1.
[0074] After the slab is transferred to the solidification unit 1b, a process of finally
completing solidification of the slab S1 proceeds in the solidification unit 1b (S300).
That is, since the slab S1 is solidified in the solidification unit 1b, a casting
process may be performed in the casting unit 1a. When solidification of the slab S1
starts, the first quality controller 600 provided in the solidification unit 1b descends
or ascends to be disposed spaced apart from an outside of slab. That is, as illustrated
in FIG. 3, the first and second stirrers 620 and 640 are disposed outside of the slab
for stirring unsolidified molten steel inside the slab S1 to operate until solidification
of the slab S1 is completed.
[0075] In a process of solidifying the slab, the first heater 660 indirectly heats an upper
portion of the slab inside each of regions to solidifying the upper portion of slab
while heat is suppressed from being released from a side of the upper portion of the
slab as much as possible. This may suppress or prevent unsolidified region of an upper
portion of the slab from being pre-solidified by indirectly heating a side of an upper
portion of the slab to minimize a solidification shrinkage defect such as a pipe.
Thus, yielding percentage of slab is enhanced to improve yielding percentage of a
final slab.
[0076] Thus, when solidification of the slab is completed in the solidified portion 1b,
S340, as illustrated in FIG. 3E, the slab is tilted by the tilting unit 720 of the
transfer unit 700 and the tilting unit 720 of the transfer unit 700 is connected to
the roller table 800 disposed in vicinity of the transfer unit 700 and the slab is
transferred to a post-process along the roller table 800.
[0077] Thus, the process of FIGS. 3A to 3F is not limited to a number of times and may be
repeated. As illustrated (b) in FIG. 2, after a process of the casting unit 1a is
completed, a process of the casting unit 1a is re-processed in the casting unit 1a
and produces another slab S2 to be able to be repeated until obtaining required quantity
while the slab S1 is transferred to the solidification unit to perform a process of
the casting unit (slab solidification process).
[0078] When the process of the casting unit 1a no longer proceeds after repeating the above
described process, that is, the last slab Se is produced in the casting unit 1a after
the slab S2 in FIG. 3E is transferred to the solidification unit 1b, the slab Se in
the casting unit 1a may finish solidification in the casting unit 1a without being
transferred to the solidification unit 1b. That is, the slab Se finishes solidification
by using the second quality controller 300 provided in the casting unit 1a and then
may be transferred to a post-process (S360). The second heater 340 of the casting
unit 1a indirectly heats an upper portion of the slab Se to perform a role of the
first heater 660 of the solidification unit 1b. However, the last produced slab Se
may be transferred to a post-process after being transferred to the solidification
unit 1b and then completing a solidification process as similarly as the previously
produced slabs S1 and S2. Thus, a position of the final slab Se is not limited.
[0079] Hereinafter, effects of the present invention will be described in more detail through
experimental examples.
[0080] Table 1 shows the results of changes in slab thickness and yielding percentage of
a finally produced slab in a variety of process conditions for producing the extremely
thick steel material.
[0081]
[Table 1]
| |
Slab thickness (mm) |
Yielding percentage (%) |
| |
Initial stage |
Middle stage |
Final stage |
| Comparative Example 1 |
1500 |
300 |
178 |
52 |
| Comparative Example 2 |
450 |
- |
150 |
95 |
| Example |
800 |
300 |
178 |
89 |
[0082] Herein, the slab thickness of the initial stage indicates the thickness of the slab
when an additional post-process is not performed on the slab of a completed cast.
In addition, the slab thickness of the middle stage indicates the thickness of the
slab after a forging process beating or pressing the slab and, the slab thickness
of the final stage indicates the thickness of the slab after a rolling process.
[0083] Each of the slabs (Comparative Example 1, Comparative Example 2, Example) shown in
Table 1 are slabs produced as a slab for the extremely thick steel material after
undergone a casting process and then at least any one of a forging or a rolling process,
and Table 1 may show following results as below.
[Comparative Example 1]
[0084] The slab in Comparative Example 1 is produced through an ingot process, thus being
able to be obtained by supplying molten steel to a mold and cooling the molten steel.
The slab produced as above has an initial thickness of about 1500 mm. Then, the slab
finally has a thickness of about 178 mm after undergone a forging and rolling process
so as to form a thickness for the extremely thick steel material. However, it may
be confirmed that a total yielding percentage has a low value of about 52%.
[Comparative Example 2]
[0085] The Slab in Comparative Example 2 is produced through a normal casting installation,
thus being able to be produced by continuously pouring and solidifying molten steel
supplied from a steelmaking plant to a mold.
[0086] The slab in Comparative Example 2 is produced through a normal casting installation,
thus being able to be produced by continuously pouring and solidifying molten steel
supplied from a steelmaking plant to a mold. The slab produced as above has very high
yielding percentage of about 95 %. However, in a generally used casting installation,
the slab is produced to have an initial thickness of about 450 mm, thus having a thickness
about 150 mm after a rolling process is completed. Thus, it may be confirmed that
the slab is limited to have a thickness of about 150 mm when used for the extremely
thick steel material.
[Example]
[0087] The slab in Example is produced through a casting installation according to an embodiment
of the present invention, thus being produced through the slab having a maximum thickness
of about 800 mm and a maximum width of about 2000 mm. Thus, the slab in Example produced
to have an initial thickness of about 800 mm and may be confirmed to finally have
a thickness of about 178 mm after undergone a forging and rolling process. In addition,
since the casting installation is separated into a casting unit and a solidification
unit and a process for preventing pre-solidification of an upper portion of the slab
is performed, the slab in Example is confirmed to have a yielding percentage of about
89 %.
[0088] As such, the slab in Example has a yielding percentage significantly enhanced by
about 40 % when compared to the slab of Comparative Example 1 and a thickness suitable
for the extremely thick steel material when compared to the slab in Comparative Example
2. That is, the slab produced by the installation in Example may solve problems of
a slab produced through an ingot casting and a conventional continuous casting.
[0089] In addition, the extremely thick steel material produced according to the embodiment
was not observed to have a surface defect (for example, a corner crack) identified
by a naked eye and segregation generated inside the slab as macro quality achieved
equiaxed crystal ratio of 100 % by applying a molten steel stirrer to the slab. Accordingly,
it may be confirmed that the extremely thick steel material produced according to
the embodiment of the present invention is improved.
[0090] As described above, according to the embodiment of the present invention, since a
continuous casting installation is separated into the casting unit and the solidification
unit and the slab in which casting is completed in the casting unit is transferred
to the solidification unit and the slab in which solidification is completed in the
solidification unit is transferred to a post-process, the extremely thick steel material
may be easily produced and quality and yielding percentage of the slab finally produced
may be improved.
[0091] More specifically, since the slab produced in a casting unit is transferred to the
solidification unit and then solidification of the slab is completed through the first
quality controller and pre-solidification of an upper portion of the slab is suppressed
or prevented to reduce formation of pipe, quality of the slab may be enhanced. Therefore,
since cutting unsound region that is a problem of an ingot casting is not performed
due to improved slab quality, yielding percentage of the slab may be enhanced.
[0092] In addition, since the next slab may be cast in the casting unit while the slab is
transferred to the solidification unit and then solidified in the solidification unit,
a problem of a batch process such as a conventional continuous casting may be solved.
Thus, as a result, productivity of the slab may be increased. Further, the slab produced
in a last casting process is not transferred to the solidification unit and solidification
of the slab may be completed through the second quality controller provided in the
casting unit. Thus, process efficiency may be improved.
[0093] The present invention will now be described more fully with reference to the accompanying
drawings, in which exemplary embodiments of the invention are shown. The present invention
is limited not thereto and but by Claims. Moreover, various changes and modifications
within the scope not departing from the basic principles of the present invention
are possible to those skilled in the art of the present invention.
1. A casting installation comprising:
a casting unit defining a passage through which molten steel passes and for casting
the molten steel into a slab; and
a solidification unit comprising:
a support unit disposed spaced apart from the casting unit and receiving the slab
from the casting unit and disposed on at least any one place of sides of the slab
to support the slab; and
a first quality controller provided on an outside of the slab to induce solidification
of the slab.
2. The casting installation of claim 1, wherein the first quality controller comprises:
a first stirrer disposed in proximity to an outside of the slab and able to elevate
in a longitudinal direction of the slab;
a second stirrer provided spaced apart below the first stirrer and able to elevate
in the longitudinal direction of the slab; and
a first heater installed so as to be able to move forward and backward in a region
directly above the slab and configured to heat an upper portion of the slab.
3. The casting installation of claim 2, wherein the first stirrer has coils wound around
the slab and disposed in the form of a circle.
4. The casting installation of claim 1, wherein the casting unit comprises:
an accommodation unit having a space in which the molten steel is accommodated;
a drawing machine drawing the slab from the accommodation unit to a lower portion;
and
a second quality controller provided on an outside of the passage.
5. The casting installation of claim 4, wherein the accommodation unit comprises a mold
configured to form the passage through which the molten steel supplied to a tundish
passes, and the mold is formed so that the slab has a thickness of 800 mm or less
and a width of 2000 mm or less.
6. The casting installation of claim 4, wherein the second quality controller comprises:
a stirring unit comprising at least one stirrer disposed on an outside of the mold
and configured to stir at least any one of the molten steel and unsolidified molten
steel inside the slab; and
a second heater installed so as to be able to move forward and backward in a region
directly below the mold and configured to heat an upper portion of the slab.
7. The casting installation of claim 6, wherein the stirring unit comprises:
a third stirrer disposed in proximity to the mold and able to elevate in a drawing
direction of the slab; and
a fourth stirrer provided spaced apart below the third stirrer and able to elevate
in the drawing direction of the slab.
8. The casting installation of claim 7, wherein the third stirrer has coils wound around
the mold or the slab and disposed in the form of a circle.
9. The casting installation of claim 1, wherein a pusher for separating the slab from
the drawing machine is provided to the casting unit and the pusher is installed so
as to be able to reciprocally move forward and backward toward the solidification
unit.
10. The casting installation of claim 1, wherein a transfer unit transferring the slab
from the casting unit to the solidification unit or from the solidification unit to
an outside of the solidification unit is provided.
11. A casting method comprising:
providing molten steel to prepare casting;
casting the molten steel in a casting unit allowing a passage through which the molten
steel passes to be opened or closed;
transferring a slab produced through the casting to a solidification unit; and
transferring the slab to a post-process after solidification of the slab is completed.
12. The casting method of claim 11, wherein the casting of the molten steel is repeated
in the casting unit after the slab is transferred to the solidification unit.
13. The casting method of claim 12, wherein, when the casting of the molten steel is repeated,
the transferring the slab to the solidification unit is performed while the molten
steel is transferred to the casting unit so that preparing the casting is performed.
14. The casting method of claim 11, wherein when the casting of the molten steel is a
single casting, that is one time casting, the solidification of the slab is completed
in the casting unit or after the slab is transferred to the solidification unit.
15. The casting method of claim 11, wherein the molten steel is cast at a casting rate
0.3m per minute or less.