1. FIELD OF THE INVENTION
[0001] The invention relates to shipbuilding and, more specifically, to seagoing bunkering
vessels intended for bunkering seagoing ships as well as to liquefied natural gas
transportation.
2. DESCRIPTION OF PRIOR ART
[0002] The prior art discloses tug/bunker barge combination (TBC) for ship bunkering comprised
of a specialized barge rigidly hitched to a tug. The barge is fitted with liquefied
natural gas (LNG) containers integrated by the cargo system into a single installation
for LNG storage and dispensing to the ship for bunkering - gas fueling of ship's power
plants (
WO 2012 074584) - prototype.
[0003] However, in case of long-term (up to several weeks) LNG storage the gas in containers
on board of the bunker barge awaiting a ship for bunkering will heat up leading to
gas boiling and evaporation in containers, and the gas vapors will have to be processed.
In this case the warmer is the gas delivered to the bunkered ship, the shorter is
the gas storage time on board the ship; moreover, in this case the transfer of such
"warm" LNG becomes much more complicated due to increased gas pressure in the containers
during bunkering.
[0004] Furthermore, for loading the bunker vessel with LNG from a shore-based bunkering
base or LNG terminal, or from an LNG carrier it is necessary to provide an area for
setting up a shore-based terminal or "mating" the bunker vessel with LNG carrier.
[0005] And finally, the LNG transfer is practically always associated with partial gas losses
growing with the number of loading operations performed.
3. SUMMARY OF THE INVENTION
[0006] The claimed invention is aimed to improve economic efficiency of the bunker barge
vessel by elimination of gas vaporing in the containers and its processing, shortening
the process of pressurized LNG transfer during ship bunkering, reducing gas losses
at LNG loading and delivery to the bunker vessel due to significant reduction of intermediate
cargo operations during LNG loading and delivery to the bunkered ship.
[0007] For this purpose the tug/bunker barge combination comprised of the specialized barge
articulated to the tug by means of coupling device is equipped with liquefied natural
gas containers located on the barge and the cargo system for integrating the said
containers into a single installation for LNG storage and dispensing for ship bunkering,
wherein
according to the invention the LNG containers are made in the form of tanks mounted on the wheeled chassis,
which are rolled onto a barge, and then sea fastened on the barge, and connected to
the barge cargo system, the barge being fitted with a facility for rolling on the
tanks.
[0008] Furthermore, the barge deck is adapted to allow traveling of wheeled vehicles. Moreover,
the facility for rolling the tanks onto the barge is made in the form of a ramp or
bridge located outside of the barge.
[0009] In this case the barge deck has thermal insulation coating aimed to prevent any damage
to the deck by accidental spills of liquefied natural gas.
[0010] Besides the thermal insulation coating has a covering, e.g. of perforated metal plates
or metal grillages.
[0011] Making the liquefied natural gas containers as tanks on wheeled chassis to be rolled
onto a barge and thereafter sea fastened and connected to the barge cargo system will
increase the economic efficiency of such bunker barge by elimination of gas vaporing
in the containers, shortening the process of LNG transfer during ship bunkering, reducing
gas losses at LNG loading and delivery to the bunker vessel due to significant reduction
of intermediate cargo operations during LNG loading and delivery to the bunkered ship.
4. BRIEF DESCRIPTION OF DRAWINGS
[0012] The substance of the invention is explained by figures, where Fig.1 shows the tug/bunker
barge combination carrying tanks on wheeled chassis, Fig.2 shows the integrated cargo
system of the tug/bunker barge combination with connected LNG tanks intended for subsequent
bunkering (top view in Fir.1).
5. PREFERRED EMBODIMENT
[0013] The tug/LNG bunker barge combination including the specialized barge 1articulated
to the tug 2 by means of coupling device (not shown in the figure), LNG containers
on the barge made in the form of tanks 3 which are positioned on wheeled chassis 4
and rolled onto the barge 1. The tug/LNG bunker barge combination has the cargo system
comprised of interconnected pipelines 5 with stop & connecting valves 6 intended for
integration of LNG tanks 3 into a single installation for LNG storage and dispensing
for ship bunkering. Tanks 3 are connectable to the cargo system.
[0014] Barge 1 is outfitted with the devices (not shown in the figure) for sea fastening
of the wheeled chassis 4 mounted with LNG tanks 3 to be rolled on the barge, and a
facility for rolling on the tanks 3 made as the ramp 7 located on the barge, or a
shore-based loading bridge located outside the barge 1 (not shown in the figure).
[0015] The deck of barge 1 is adapted to allow travelling of wheeled vehicles, it is applied
with a thermal insulation coating (not shown in the figure) intended to prevent any
damage to the deck by accidental spills of liquefied natural gas.
[0016] The thermal insulation coating has a covering, e.g. of perforated metal plates or
metal grillages (not shown in the figure).
6. INDUSTRIAL APPLICABILITYE
[0017] The process of ship bunkering by the claimed tug/bunker barge combination will be
as follows.
[0018] Pre-filled LNG tanks 3 are rolled on the deck of barge 1 using the wheeled chassis
over the ramp 7 or shore-based loading bridge (not shown in the figure), the said
tanks are then sea fastened on the deck and connected with the pipelines 5 via stop
& connecting valves 6 to the barge cargo systems to integrate the same into a single
liquefied natural gas storage system.
[0019] The tug/bunker barge combination with the LNG tanks 3 onboard sails to the ship to
be bunkered, and on approach to the same the integrated LNG system of the bunker barge
is connected to the fuel system of the ship to be bunkered. For this purpose the cargo
system of the bunker barge is mated with the LNG receiving system of the ship to be
bunkered, and the full scope of actions for LNG transfer is performed as specified
in the operational documentation of the LNG bunker barge and the bunkered gas-fuel
ship.
[0020] Upon completion of the bunkering the tug/bunker barge returns to the berth where
the cargo system is ventilated, thereafter the tanks 3 are disconnected from the integrated
cargo system of the barge 1, released from sea fastenings and rolled off to the shore.
[0021] The claimed tug/bunker barge combination provides higher economic efficiency being
an advantage as compared with its prototype.
1. The tug/bunker barge combination comprised of the specialized barge articulated to
the tug by means of coupling device, liquefied natural gas containers located on the
barge and the cargo system for integrating the said containers into a single installation
for LNG storage and dispensing for ship bunkering including pipelines with stop &
connecting valves, wherein the LNG containers are made in the form of tanks which
are mounted on the wheeled chassis, which are rolled onto a barge, and then sea fastened
on the barge, and connected to the barge cargo system, the barge being fitted with
a facility for rolling on the tanks.
2. The tug/bunker barge combination of Claim 1, wherein a facility for rolling on the
tanks is made as the ramp located on the barge, or a shore-based loading bridge located
outside the barge 1.
3. The tug/bunker barge combination of Claim 1, wherein the deck of barge is adapted
to allow travelling of wheeled vehicles.
4. The tug/bunker barge combination of Claim 1, wherein the barge deck is applied with
thermal insulation coating aimed to prevent any damage to the deck by accidental spills
of liquefied natural gas.
5. The tug/bunker barge combination of Claim 4, wherein the thermal insulation coating
has a covering, e.g. of perforated metal plates or metal grillages.