(19)
(11) EP 3 063 893 B8

(12) CORRECTED EUROPEAN PATENT SPECIFICATION
Note: Bibliography reflects the latest situation

(15) Correction information:
Corrected version no 1 (W1 B1)

(48) Corrigendum issued on:
28.09.2022 Bulletin 2022/39

(45) Mention of the grant of the patent:
24.08.2022 Bulletin 2022/34

(21) Application number: 14857968.3

(22) Date of filing: 31.10.2014
(51) International Patent Classification (IPC): 
H04L 1/00(2006.01)
H04W 36/00(2009.01)
H04L 1/18(2006.01)
H04W 76/19(2018.01)
(52) Cooperative Patent Classification (CPC):
H04L 1/1829; H04L 1/1867; H04L 1/1893; H04L 2001/0092; H04L 2001/0096; H04W 36/0069; H04W 76/19
(86) International application number:
PCT/KR2014/010334
(87) International publication number:
WO 2015/065080 (07.05.2015 Gazette 2015/18)

(54)

METHOD AND APPARATUS FOR RECONFIGURING A BEARER

VERFAHREN UND VORRICHTUNG ZUR REKONFIGURATION EINES TRÄGERS

PROCÉDÉ ET APPAREIL POUR RECONFIGURER UN SUPPORT


(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

(30) Priority: 01.11.2013 GB 201319312
07.05.2014 GB 201408072
05.08.2014 GB 201413854

(43) Date of publication of application:
07.09.2016 Bulletin 2016/36

(73) Proprietor: Samsung Electronics Co., Ltd.
Suwon-si, Gyeonggi-do 443-742 (KR)

(72) Inventors:
  • VAN LIESHOUT, Gert Jan
    7314 CG Apeldoorn (NL)
  • KIM, Soenghun
    Suwon-si Gyeonggi-do 443-851 (KR)
  • VAN DER VELDE,Himke
    NL-8014 ZT Zwolle (NL)
  • KIM, Wooseong
    Gwacheon-si Gyeonggi-do 427-734 (KR)

(74) Representative: Gulde & Partner 
Patent- und Rechtsanwaltskanzlei mbB Wallstraße 58/59
10179 Berlin
10179 Berlin (DE)


(56) References cited: : 
US-A1- 2010 118 781
US-A1- 2013 088 960
US-A1- 2013 088 960
   
  • NTT DOCOMO ET AL: "UP bearer split comparison (3C vs. 3D)", 3GPP DRAFT; R2-133275_UP BEARER SPLIT COMPARISON (3CVS3D), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG2, no. Ljubljana, Slovenia; 20131007 - 20131011 28 September 2013 (2013-09-28), XP050719130, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/tsg_ran/WG2_RL 2/TSGR2_83bis/Docs/ [retrieved on 2013-09-28]
  • HUAWEI ET AL: "Analysis of Latency Related Issues for UP Protocol Alternatives", 3GPP DRAFT; R2-131786, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG2, no. Fukuoka, Japan; 20130520 - 20130524 11 May 2013 (2013-05-11), XP050700051, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/tsg_ran/WG2_RL 2/TSGR2_82/Docs/ [retrieved on 2013-05-11]
  • SAMSUNG: "Report on [87#23][LTE/DC] PDCP issues(Samsung)", 3GPP DRAFT; R2-144319 [87#23] SUMMARY REPORT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG2, no. Dresden, Germany; 20140818 - 20140822 2 October 2014 (2014-10-02), XP050870605, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/tsg_ran/WG2_RL 2/TSGR2_87bis/Docs/ [retrieved on 2014-10-02]
  • CATT: 'Signaling Impact over Sl/Xn' R3-131711, 3GPP TSG RAN WG3 #81BBI S 28 September 2013, VENICE, ITALY, XP050719985
  • INTEL CORPORATION: 'Challenges in the uplink to support dual connectivity' R2-132860, 3GPP TSG RAN WG2 MEETING #83 10 August 2013, BARCELONA, SPAIN, XP050718568
  • ERICSSON: 'Overall procedures for offloading over Xn' R2-133419, 3GPP TSG RAN WG2 MEETING #83BIS 28 September 2013, LJUBLJANA, SLOVENIA, XP050719179
   
Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).