(19)
(11) EP 3 116 084 A8

(12) CORRECTED EUROPEAN PATENT APPLICATION
Note: Bibliography reflects the latest situation

(15) Correction information:
Corrected version no 1 (W1 A1)

(48) Corrigendum issued on:
30.08.2017 Bulletin 2017/35

(43) Date of publication:
11.01.2017 Bulletin 2017/02

(21) Application number: 16382322.2

(22) Date of filing: 07.07.2016
(51) International Patent Classification (IPC): 
H02J 3/32(2006.01)
H02J 13/00(2006.01)
H02J 3/38(2006.01)
(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA ME
Designated Validation States:
MA MD

(30) Priority: 07.07.2015 ES 201530975

(71) Applicant: Estabanell y Pahisa Energia, S.A.
08400 Granollers (Barcelona) (ES)

(72) Inventor:
  • GALLART FERNANDEZ, Ramon
    08510 RODA DE TER (ES)

(74) Representative: Durán-Corretjer, S.L.P. 
Còrsega, 329 (Paseo de Gracia/Diagonal)
08037 Barcelona
08037 Barcelona (ES)

   


(54) ELECTRICITY DISTRIBUTION NETWORK


(57) Electricity distribution network of tree typology, supplied from a transformation centre (2), said network having intermediate nodes and final nodes, characterised in that it comprises in said intermediate and/or final nodes a control centre that has: a control device (5), a communication device, an electricity storage device, the electricity storage device being configured to store power from the network or alternatively to dump power into the network.