BACKGROUND
1. Field.
[0001] The example embodiment in general relates to a construction method for fixing hollow
cylindrical columns for supporting an offshore marine platform thereon, which in turn
is adapted to support wind turbines, bridges and marine buildings thereon, to a seabed
in a marine environment, and more particularly to a method in which a steel tube is
driven into seabed until reaching the designated depth is employed as a temporary
casing during installation of a bottom closed hollow column inserted into the steel
tube after the marine deposit inside the steel tube is excavated down to the designated
level. After insertion of the bottom closed hollow column, the gap between the steel
tube and the hollow column is pressure filled with underwater concrete or cement grout
thereby when the concrete and cement hardened the steel tube and the hollow column
become an integral unit having the benefits of both friction resistance from the steel
tube surface against the soil pressure and end bearing resistance from the hollow
column base. It can be classified as a frictional end bearing pile or a deep founding
caisson, since most caissons are founded not far away from the seafloor. The operation
is carried out in a dry environment, thereby lowering construction costs and improving
safety.
2. Related Art.
[0002] Existing foundation types (excluding floating types) in marine environment can be
divided into gravity type and pile type. Large scale gravity types are further referred
to as caisson of bottom closed or opened type. Traditional caisson foundation requires
that the load bearing stratum close to the seafloor so that the top soft material
can be removed easily and replaced with sand fill as a regular layer for levelling
and for spreading the caisson loads. The bottom closed caisson is then sunk and sit
on the levelled sand layer. The voids inside the caisson are usually filled with sand/stone
to increase the dead weight so that the caisson is more stable. Open end caisson itself
is a cofferdam before the bottom is sealed by concrete plug after it is sunk to the
seafloor. Thereafter, the construction steps are similar to the caisson of closed
bottom type. Piles carry the loads in a different manner, it carries the horizontal
load by bending whilst the gravity type by moving the gravity load center off the
C.G. Piles carry the vertical load by end bearing in the case of bored piles and by
skin friction in the case of driven piles.
[0003] Applicant's prior art
China Pat. Appl. Ser. Nos. 201210038405.9 and
201200104898.8 both describe a process whereby a hard seabed or soft materials in the seabed may
be dredged, and may be applied to conditions where the bedrock is close to the seabed
surface. In near shore waters, especially at an estuary where thick layers of soil
and sand have settled, the removal of soft soil materials is simply not feasible.
Accordingly, what is needed is a method of fixing an offshore marine platform to a
seabed which includes thick layers of soft materials that typically cannot be completely
removed.
Differences in foundation between offshore platform and sea-crossing bridges
[0004] The aforementioned foundation types mostly come from bridge engineering. The bridge
foundation is typical to have small portion of gravity loads but significant portion
of horizontal loads from wind, wave and earthquake. As a result, overturning moment
is the dominant load to resist. The offshore platform foundation has significant gravity
loads as well as lateral loads so that both cases have significant effects on the
platform. The overturning moment is induced by lateral loads. To resist bending moment
in marine environment of thick layer of soft material, piles are effective and relatively
cheaper than the caisson foundation which requires the removal of the soft material.
The piles mobilize the skin friction resistance of the pile shaft whereas the caisson
is put on an excavated hole in the seabed that the soil is loosely contact with the
walls and as a result the caisson wall cannot generate meaningful friction. However,
a caisson has large bearing area hence, it is good in resisting gravity loads. The
present invention takes the merits of both cases, i.e. a foundation offers friction
resistance as the piles does and end bearing resistance as the caisson does.
Geological environment
[0005] In seabed where bedrock level is not close to the seafloor and not too deep to be
reached by piles, the foundation type should be friction piles.
[0006] In seabed where bedrock level is close to the seafloor or not too deep to be reached
by excavation, caisson foundation may be considered.
[0007] In seabed where load bearing stratum level is not too deep to be reached by excavation,
the invented foundation type is effective since it takes the advantages of having
friction resistance and end bearing resistance of friction piles and caisson respectively.
SUMMARY
[0008] An example embodiment is directed to a construction method for fixing a foundation
for supporting waterborne structures such as an offshore platform to a seabed, the
foundation having one or more hollow columns that are to be fixed in the seabed, such
as a seabed comprising a thick layer of soft marine deposits. The construction method
comprises:
- A) a steel tube with an internal clear diameter greater than the external diameter
of the hollow column by a tolerance margin is driven into the seabed at the designated
location until it reaches the design founding level,
- B) excavate the materials inside the steel tube down to the founding level,
- C) lift the first segment of the bottom closed hollow column into the steel tube which
is able to float in the water. Whilst the first segment is held in position, the second
segment is added to the column under a locking mechanism achieved by matched cast
male and female positioning blocks and shear keys; the jointing procedures are to
coat the two joining faces with epoxy resin or equivalent then lower the second segment
onto the first segment and compress the joint with prestressing by stressing bars
threaded through the two segments. The design length of each individual segment should
be such that the assembled column is capable floating in the water. After all segments
are assembled, the column is water ballasted to sink to the bottom of the steel tube.
- D) the gap between the steel tube and the hollow column and the void underneath the
hollow column base are filled by pressure grout with underwater concrete starting
from the low points at the base slab gradually pushing the front upward until the
said concrete and cement emerging from the gap at the seafloor. After the said concrete
and cement gained strength, the steel tube is now bonded to the hollow column and
they become a single integral unit.
- E) cut the steel tube at the mud line of the seafloor;
[0009] Alternatively, the cutting of the steel tube can be carried out before the installation
of the first segment.
[0010] Another example embodiment is directed to a construction method for fixing a foundation
for supporting waterborne structures such as an offshore platform to a seabed, the
foundation having one or more hollow columns that are to be fixed in the seabed, such
as a seabed comprising a thick layer of soft marine deposits. The construction method
comprises:
- A) a steel tube with an internal clear diameter greater than the external diameter
the hollow column by a tolerance margin is driven into the seabed at the designated
location until it reaches the design founding level,
- B) excavate the materials inside the steel tube down to the founding level,
- C) lift the bottom closed hollow column in one piece into the steel tube which is
able to float in the water thereafter while the column is held in position water ballast
is employed to sink the column to the bottom of the steel tube.
- D) the gap between the steel tube and the hollow column and the void underneath the
hollow column base are filled with pressure grout of underwater concrete and cement
starting from the low points at the base slab gradually pushing the front upward until
the said concrete and cement emerging from the gap at the seafloor. After the said
concrete and cement gained strength, the steel tube is now bonded to the hollow column
and they become a single integral unit.
- E) cut the steel tube at the mud line of the seafloor;
[0011] Alternatively, the cutting of the steel tube can be carried out before the installation
of the hollow column.
[0012] In the method, the steel tube is used as a retaining structure when the marine soil
inside the steel tube is removed and during installation of the hollow column. Finally
it becomes part of the foundation system integrated with the hollow column contributing
its friction resistance to the load carrying capacity in addition to the end bearing
capacity of the hollow column which is a caisson by definition. The load carrying
mechanism will be at first the load is resisted by the end bearing of the caisson,
as the load increases that triggers the yielding of the bearing area immediately mobilizes
the skin friction resistance from the steel tube wall. The ultimate load carrying
capacity of such a system will be the end bearing capacity+skin friction resistance.
Conventional pile capacity is friction resistance and that for caisson is the end
bearing capacity.
[0013] The large space inside the hollow column has significant buoyancy that would compensate
portion of the gravity loads that in turn reduces the bearing pressure on the founding
stratum, i.e. the founding stratum can be located much shallower than the conventional
caisson support. The buried depth of the wall in the present invention is supported
by the lateral pressure of the overburden soil, that improves stability.
[0014] The large space inside the hollow column can be used as storage, for example, the
space can be used as fresh water tank to store the rain water fell on the platform.
Since the void is huge, the stored fresh water can satisfy the drinking water consumption
of the staff working and living on the platform. The storage can be used to store
oil as well.
[0015] The construction method in the present invention involves no complicated underwater
works. The only underwater work is the cutting of the surplus steel tube at the mud
line on the seafloor.
[0016] Optionally, the bottom slab of the hollow column is tapered with its apex pointing
downward so that the pressure grout of underwater concrete and cement at the low points
of the hollow column can be facilitated to flow easily upward to fill the gap.
[0017] Optionally, the bottom of the excavation inside the steel tube is backfilled with
a layer of sand/stone to fill any large cavity in the founding layer to stop the large
volume loss of injected underwater concrete and cement grout.
[0018] Optionally, the hollow column is fabricated by matched segment casting method, wherein
the #i+1 segment is cast against completed #i segment end to end, a so-called matched
cast method commonly adapted in bridge construction. The positioning blocks and the
shear keys in the completed #i segment will produce matching reversal positioning
blocks and shear keys in the matched face of the #i+1 segment.
[0019] Optionally, the matched cast method described in the above is also applied to stressing
ducts and stressing blocks for prestressing operation.
[0020] Optionally, the last segment or the end of one single piece hollow column has starter
reinforcement bars sticking out from the end for lapping the reinforcement cage of
the platform for insitu concreting to form a permanent joint between the hollow column
and the platform.
[0021] Optionally, the marine platform is precaast and is transported on sea by an auxiliary
floater.
[0022] Optionally, the marine platform and the floater have opening for the insertion of
the hollow column, and mechanism to hold the hollow column in position.
[0023] Optionally, brackets are welded to the steel tube for supporting the propping to
the marine platform during the forming of insitu concrete joint between the marine
platform and the hollow column.
[0024] Optionally, pressure pipes are pre-installed in the hollow column for injection of
the underwater concrete and cement grout.
[0025] Optionally, shear keys preferably of triangular shape with the sharp tips pointing
downward are welded evenly to the inner face of the steel tube in order to enhance
the bond between the steel tube and the hollow column.
BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The example embodiment will become more fully understood from the detailed description
given herein below and the accompanying drawings, wherein like elements are represented
by like reference numerals, which are given by way of illustration only and thus are
not limitative of the example embodiments herein.
FIG. 1 (a) Indicatively shows a steel tube being driven into the seabed by vibro hammer
FIG. 1(b) Indicatively shows the steel tube being driven into the founding stratum
and the marine deposit inside the tube is removed
FIG. 1(c) Indicatively shows the surplus length of the steel tube being cut at the
mud line level of the seafloor
FIG. 2 Indicatively shows the platform is carried by the auxiliary floater
FIG. 3 Indicatively shows the first segment of the hollow column being lifted into
the steel tube
FIG. 4 Indicatively shows the joining of the hollow column segments
FIG. 5 Indicatively shows the pressure grout of underwater concrete and cement to
fill the gap and cavity around the assembled hollow columns
FIG. 6 Indicatively shows the assembled segments and the casting of insitu joint between
platform and hollow columns
FIG. 7 completed offshore platform with assembled columns
FIG. 8 Indicatively shows the installation of steel tube by vibro hammer mounted on
a ship
FIG. 9 Indicatively shows the excavation of soil inside the steel tube
FIG. 10 Indicatively shows the final preparation stage of the steel tube
FIG. 11 Indicatively shows the installation of the hollow column with pre-installed
pressure pipes
FIG. 12 Indicatively shows the pressure grout of underwater concrete and cement to
fill the gap and cavity around the hollow columns
[0027] Parts List
- 1.
- Sea surface
- 2.
- Seabed/ seafloor
- 3.
- Bed rock
- 4.
- Soil strata
- 5.
- Founding level / founding statum/ load bearing stratum
- 11.
- Offshore platform
- 21.
- Hollow column
- 22.
- Pre-installed pressure pipes
- 25.
- Starter bars
- 27.
- Insitu concrete
- 31.
- Auxiliary floater
- 32.
- Supporting frame
- 61.
- Opening for column insertion
- 62.
- Temporary structure to contain the hollow column segment
- 101.
- Steel tube
- 102.
- Sand/stone layer
- 104.
- Shear key
- 105.
- Vibro hammer
- 107.
- Injected concrete and cement grout
- 109.
- Surplus section of steel tube
- 111.
- Steel bracket
- 112.
- Temporary props
- 113.
- Hydraulic jack
DETAILED DESCRIPTION
[0028] As used herein, the phrase "present invention" should not be taken as an absolute
indication that the subject matter described by the term " is covered by either the
claims as they are filed, or by the claims that may eventually issue after patent
prosecution; while the term "present invention" is used to help the reader to get
a general feel for which disclosures herein are believed as maybe being new, this
understanding, as indicated by use of the term "present invention," is tentative and
provisional and subject to change over the course of patent prosecution as relevant
information is developed and as the claims are potentially amended.
[0029] Reference throughout this specification to "one example embodiment" or "an embodiment"
means that a particular system, method, feature, structure or characteristic described
in connection with the embodiment is included in at least one embodiment. Thus, the
appearances of the phrases "in one example embodiment" or "in an embodiment" in various
places throughout this specification are not necessarily all referring to the same
embodiment. Further, the particular systems, methods, features, structures or characteristics
may be combined in any suitable manner in one or more example embodiments.
[0030] The term "and/or" may be understood to mean non-exclusive or; for example, A and/or
B means that: (i) A is true and B is false; or (ii) A is false and B is true; or (iii)
A and B are both true.
[0031] As used in this specification and the appended claims, the singular forms "a," "an,"
and "the" include plural referents unless the content clearly dictates otherwise.
The term "or" is generally employed in its sense including "and/or" unless the content
clearly dictates otherwise.
[0032] In the drawings, identical reference numbers identify similar elements or acts. The
size and relative positions of elements in the drawings are not necessarily drawn
to scale.
[0033] Unless the context requires otherwise, throughout the specification and claims that
follow, the word "comprise" and variations thereof, such as "comprises" and "comprising,"
are to be construed in an open, inclusive sense, that is, as "including, but not limited
to."
[0034] As used in the specification and appended claims, the terms "correspond," "corresponds,"
and "corresponding" are intended to describe a ratio of or a similarity between referenced
objects. The use of "correspond" or one of its forms should not be construed to mean
the exact shape or size.
[0035] As used herein, the term "hollow column" refers to a hollow cylindrical column fixed
in the seabed in a body of water on which a wind power turbine, marine building, and/or
bridge may be mounted thereon.
[0036] As will be described in more detail hereafter, the example construction method for
fixing a hollow column to the seabed includes driving a steel tube with an internal
clear diameter larger than the external diameter of the hollow column by a tolerance
margin into the seabed down to the founding stratum, removing the soil inside the
the steel tube, inserting the hollow column and lowering the hollow column by water
ballast to the founding level. With the pre-installed pressure pipes, pressure grout
of underwater concrete and cement are to fill the gap and cavity around the hollow
column starting from the low part gradually moving upward until the underwater concrete
and the cement grout emerge from the gap at the seabed. The hollow column is then
fixed successfully into the seabed and is ready to be integrated with the platform.
No underwater works are involved.
[0037] In an example, the platform which is floated in by a auxiliary floater may be rested
on the propping supported from brackets welded to the steel tube, or rested on the
brackets cast in the top end of the last segment of the hollow column. Prior to the
insertion of the hollow column, a monitoring camera may be used to investigate the
founding stratum if there are any large voids or gaps. If found, these voids and gaps
are filled with sand and gravel.
[0038] Having supported on the the brackets as mentioned above and the level is set by jack
action, reinforcement bars are connected to the mechanical splicers embedded at walls
of the column opening in the platform, reinforcement bars are fixed and lapped to
the starter bars from the top end of the last segment of the hollow column. Insitu
concrete is cast for the connecting joint. After the concrete gained strength, temporary
props are removed and the floater is disassemble. The platform construction is completed.
[0039] General concepts of the example embodiment having been described above, the following
FIGS. 1-12 should be referred to for describing an example method of fixing an offshore
marine platform adapted to support wind turbines, bridges and marine buildings thereon
to a seabed which may include a thick layer of soft materials within a marine environment.
The example method is based on fixing a precast, reinforced, concrete hollow cylindrical
column having a diameter in a range of about 8-10m or larger to a seabed using a steel
tube with an internal clear diameter larger than the external diameter of the hollow
column by a tolerance margin say 300mm. The example embodiment suits a seabed overlain
with a layer of soft material, which is common in a near shore seabed.
[0040] FIGS. 1-7 and 8-12 illustrate two example embodiments of the method as directed to
a near shore application. It is understood that a person of skill in the art is capable
of extending this example application to any similar type of water zones. It should
be clear that the construction vessels used in this example could be of any similar
construction vessels; hence, details of their function are omitted herein for purposes
of brevity.
[0041] Initially, a plurality of steel tube 101 each for the installation of a hollow column
21, e.g., for example, four (4) steel tubes for a platform 11, are driven into the
seabed 2 to the founding stratum 5. FIG. 1(a) shows a steel tube 101 is driven into
the seabed by a vibro hammer 105. FIG. 1(b) shows the steel tube is driven down to
the founding stratum 5 and the marine soil 4 inside the steel tube 101 is removed.
FIG. 1(c) shows the surplus steel tube 109 is cut at the mud line level on the seafloor
2. Alternatively, the surplus steel tube 109 may be cut after the installation of
the hollow column 21.
[0042] FIG. 2 illustrates a platform 11 with 4 column openings 61 is supported by an auxiliary
floater 31 and towed into position aligning the column center with the steel tube
center.
[0043] FIG. 3 illustrates the first segment 1A is inserted into the column opening 61 and
is able to float in the water.
[0044] FIG. 4 illustrates the fifth segment 5A of the hollow column 21 is stacking on the
end of the fourth segment 4A after segments 1A to 4A have been assembled. They are
joined by using prestresss to compress two epoxy resin coated matching faces together.
The assembled segment length (1A-4A) is designed to be able to float on the water
with the added weight of the next segment and in this case is 5A.
[0045] FIG. 5 illustrates a completed hollow column 21 comprising 8 segments 1A to 8A and
the gap and cavity and void around the hollow column are filled with pressure grout
of umderwater concrete and cement 107. After the underwater concrete and cement grout
107 hardened, props 112 are installed on the brackets 111 around the column 21 supporting
the platform 21.
[0046] FIG. 6 illustrates the insitu casting of the joint between the hollow column 21 and
the platform 11. The reinforcement bar mechanical splicers (not shown) embedded in
the wall of the column openings 61 are re-attached with reinforcement bars (not shown)
that lap the starter bars 25 to form the reinforcement cage which is then cast with
insitu concrete 27 to complete the joint.
[0047] FIG. 7 illustrates the completed platform 11 supported by hollow column 21 integrated
with the steel tube 101.
[0048] Another example embodiment is illustrated in FIGS. 8-12 in which,
[0049] FIG. 8 shows a piling vessel using a vibro hammer 105 to drive a steel tube 101 down
into the seabed 2 through the soft marine deposit layer 4 and reaches the firm founding
stratum 5.
[0050] FIG. 9 illustrates a dredger excavates and removes the soft materials inside the
steel tube 101 down to the founding stratum 5.
[0051] FIG. 10 illustrates the surplus length of the steel tube 101 above the seafloor 2
level is cut and taken away.
[0052] FIG. 11 illustrates a bottom closed hollow column which floats in the water and is
grabbed and stabilized in a vertical position by a construction vessel is navigated
to the position that the center of the hollow column 21 is aligned with the center
of the steel tube 101. Gradually loosen the grab and ballast the hollow column 21
with water, the hollow column sinks gradually into the steel tube 101 until it reaches
the bottom founding level 5 above the backfilled sand/stone layer (if any). Thereafter,
the hollow column's level and position and the verticality are all maintained by the
construction vessel.
[0053] FIG. 12 illustrates whilst the hollow column floats inside the steel tube and be
constrained by construction vessel (not shown but referred to FIG. 11), a floating
batching plant vessel pumps underwater concrete and cement grout into the pre-installed
pressure pipes 22 to pressure fill up the gap and cavity between the hollow column
21 and the steel tube 101 and the gap/void with the founding layer 5. After the underwater
concrete and the cement grout hardened, the hollow column is fixed in the seabed successfully
that provides friction resistance and end bearing resistance to the hollow column
21. The fixing of a hollow column 21 in the thick layer of soft material in marine
environment is completed. Platform 11 is then constructed in a similar manner.
[0054] In order to increase the bond between the inner surface of the steel tube 101 and
the external surface of the hollow column 21, the steel tube of surface is welded
with a plurality of triangular shear keys 104 as shown in the enlarged diagram of
FIG. 1(b). Orientation of the triangle shear keys is that the sharp angles of the
shear keys 104 are pointing downward; this orientation facilitates penetration in
soil layers. These shear keys 104 should be distributed evenly on the surface.
[0055] Steel brackets 111 as illustrated in FIG. 1(b) are welded to the Steel tube several
layers around the expected mud line level since the final setting level of the steel
tube 101 after hammered into the seabed varies so that several layers should cover
the variation to ensure that when the surplus length of the steel tube 109 be cut
from the mud line at the seafloor 2, there at least one layer of bracket 111 can be
used.
[0056] The example embodiment is applicable to seabeds having different geological conditions,
which may broadly be classified into three (3) categories: 1) a seabed composed of
a soft material, mainly marine mud; 2) a seabed composed of sandy clay, and 3) a seabed
formed of hard weathered rock. The present inventive embodiment is effective in all
three categories although the hollow column 21 becomes purely a caisson that carries
loads in end bearing.
[0057] According to the example embodiment above, the installation and construction of marine
structures or offshore platforms using the example hollow column 21 eliminates the
need for a temporary cofferdam, and the using of precast hollow column 21 in segments
or better in one piece greatly reduce cost and construction time. Additionally, using
the hollow column 21 to store fresh water could help to solve the fresh water supply
problem for the persona working and living on the platform 11.
[0058] The example embodiment having been described, it is apparent that such may have many
varied applications. For example, the method of fixing the hollow column 21 into the
seabed 2 as disclosed herein is not limited to the specific example embodiment described
above. Various changes and modifications thereof may be effected by one skilled in
the art without departing from the spirit or scope of protection. For example, elements
and/or features of different illustrative embodiments could be combined with each
other and/or substituted for each other within the scope of this disclosure.
[0059] The present invention, in various embodiments, configurations, and aspects, includes
components, methods, processes, systems and/or apparatus substantially as depicted
and described herein, including various embodiments, sub-combinations, and subsets
thereof. Those of skill in the art will understand how to make and use the present
invention after understanding the present disclosure. The present invention, in various
embodiments, configurations, and aspects, includes providing devices and processes
in the absence of items not depicted and/or described herein or in various embodiments,
configurations, or aspects hereof, including in the absence of such items as may have
been used in previous devices or processes, e.g., for improving performance, achieving
ease and\or reducing cost of implementation.
[0060] The foregoing discussion of the invention has been presented for purposes of illustration
and description. The foregoing is not intended to limit the invention to the form
or forms disclosed herein. In the foregoing Detailed Description for example, various
features of the invention are grouped together in one or more embodiments, configurations,
or aspects for the purpose of streamlining the disclosure. The features of the embodiments,
configurations, or aspects of the invention may be combined in alternate embodiments,
configurations, or aspects other than those discussed above. This method of disclosure
is not to be interpreted as reflecting an intention that the claimed invention requires
more features than are expressly recited in each claim. Rather, as the following claims
reflect, inventive aspects lie in less than all features of a single foregoing disclosed
embodiment, configuration, or aspect. Thus, the following claims are hereby incorporated
into this Detailed Description, with each claim standing on its own as a separate
preferred embodiment of the invention.
[0061] Moreover, though the description of the invention has included description of one
or more embodiments, configurations, or aspects and certain variations and modifications,
other variations, combinations, and modifications are within the scope of the invention,
e.g., as may be within the skill and knowledge of those in the art, after understanding
the present disclosure. It is intended to obtain rights which include alternative
embodiments, configurations, or aspects to the extent permitted, including alternate,
interchangeable and/or equivalent structures, functions, ranges or steps to those
claimed, whether or not such alternate, interchangeable and/or equivalent structures,
functions, ranges or steps are disclosed herein, and without intending to publicly
dedicate any patentable subject matter.
1. A construction method for fixing a bottom closed hollow column into seabed and adapted
to support a waterborne structure thereon to a seabed, comprising:
a) drive a steel tube, with an internal clear diameter greater than the external diameter
of the hollow column by a tolerance margin, into the seabed at an installation location
until it reaches the designated founding stratum,
b) excavate and remove the material inside the steel tube down to the designated founding
stratum,
c) lift the bottom closed first segment of the hollow column into the steel tube vertically
and float in the water; while the first segment is held in position, the second segment
is lifted onto the first segment end to end aligned by the matched cast positioning
blocks and shear keys; the joining faces of the two segments are coated with epoxy
resin or equivalent and the two faces are joined tightly by compression set up by
the stressing bars threaded through the preformed ducts across the joining faces;
repeat the above steps until the final segment which should expose above the water
surface,
d) fill up the gap and cavity between the steel tube and the hollow column and between
the hollow column base and the founding stratum by pressure grout of underwater concrete
and cement; after hardening, the hollow column and the steel tube become an integral
unit that takes the loads by surface friction resistance between the steel tube surface
and the soil, and by end bearing resistance from the designated founding stratum in
the seabed,
e) cut the steel tube at the mud line level of the seabed; wherein the step e) may
be performed before the step c) and after step b), or may be performed after step
d).
2. A construction method for fixing a bottom closed hollow column into seabed and adapted
to support a waterborne structure thereon to a seabed, comprising:
a) drive a steel tube, with an internal clear diameter greater than the external diameter
of the hollow column by a tolerance margin, into the seabed at an installation location
until it reaches the designated load bearing stratum,
b) excavate the material inside the steel tube down to the designated founding stratum,
c) lift the bottom closed whole unit of the hollow column into the steel tube vertically
and ballast it with water until it sinks to its final depth at the designated founding
stratum.
d) fill up the gap and cavity between the steel tube and the hollow column and between
the hollow column base and the founding stratum by pressure grout of underwater concrete
and cement; after hardening, the hollow column and the steel tube become an integral
unit that takes the loads by surface friction resistance between the steel tube surface
and the soil, and by end bearing resistance from the designated founding stratum in
the seabed,
e) cut the steel tube at the mud line level of the seabed; wherein the step e) may
be performed before the step c) and after step b), or may be performed after step
d).
3. According to the claims 1 and 2, the hollow column bottom is a conic shape.
4. According to any claim, prior to step c) backfill sad/stone in the bottom of the steel
tube.
5. According to claim 1 or 3 or 4, the characteristic of the method in the joining of
any two segments is to achieve by complementary male and female shear keys and ducts
for prestressing and anchorage from the matched casting of one segment against the
end of the completed segment.
6. According to claim 1 or 3 or 4 or 5, the characteristic of the method in the joining
of any two segments is achieved by complementary male and female positioning and ducts
for prestressing and anchorage from the matched casting of one segment against the
end of the completed segment.
7. According to any claim 1, 3, 4, 5 or 6, the characteristic of the method in the joining
of any two segments is achieved by complementary male and female shear keys and ducts
for prestressing and anchorage from the matched casting of one segment against the
end of the completed segment.
8. According to any claim 1, 3, 4, 5, 6 or 7, the characteristic of the method is the
segment axial length of the first segment greater than the length of any segment.
9. According to any claim 8, the characteristic of the method in the joining of a series
of segments the buoyancy of the series of segments is greater than the sum of dead
weight of the series of segments
10. According to claim 2, the characteristic of the method is to backfill the bottom of
the steel tube a layer of sand/stone before step c).
11. According to any claim of the above method, steel shear keys in the form of triangle
with its sharp angle point downward are welded uniformly in the inner of the face
of the steel tube.
12. An offshore waterborne structure especially offshore platform comprising at least
one hollow column supporting a beam-and-slab type platform wherein the method includes:
transport the on land prefabricated platform by floater in sea to the installation
location,
according to the method of any of the above claims, the platform is joined to the
last installed segment of the hollow column or the above water portion of the hollow
column by insitu concrete.
13. According to any of the above claims, the last segment of the hollow column or the
top end of the single piece hollow column is embedded with starter reinforcement bars
for lapping.
14. According to claims 12 or 13, disassembled steel props are erected on the steel brackets
welded to the outer face of the steel tube to support the platform with mechanism
to level the platform before it is fixed.
15. According to any claim of the above method, pipes are embedded in the wall of hollow
column for pumping underwater concrete outside the wall.
16. According to claims 12 to 15, steel shear keys are welded uniformly to the inner face
of the steel tube with the sharp angle pointing downward.
17. A waterborne platform especially offshore platform according to the method of claims
1-11, the fixing of hollow column includes the steps:
penetrate to the founding level of a steel tube,
locate a bottom closed hollow column with a portion of it exposed above the water
surface, and
underwater concrete is grouted between the inner face of the steel tube and outer
face of the hollow column.
18. According to claim 17, the hollow column is formed with a number of segments and the
segments are joined by shear keys.
19. According to claim 17 or 18, steel shear keys in triangle shape are welded uniformly
to the inner face of the steel tube with the sharp angle pointing downward.
20. According to claim 18, starter reinforcement bars are installed in the last segment
of the hollow column or installed in the top end of the hollow column for lapping.
21. According to claims 17-20, the said platform is installed with pipes in its wall and
have egress outlet outside to pump the underwater concrete out.
22. A waterborne structure especially offshore platform wherein the installation method
according to claims 12-16 includes:
at least one hollow column and one beam-and-slab type platform formed according to
any claims 17-21.
23. According to claim 22, the last hollow column segment or the top end of the one piece
column, reinforcement lapping bars are pre-installed.
24. According to claim 22 or 23 the said platform is leveled whilst the platform is supported
from underneath props which sit on the bracket welded to the steel tube outside face.
25. According to any of the claims 22-24, pipes for pumping underwater concrete out of
the hollow column are pre-installed in the wall and the slab of the hollow column.