Technical Field
[0001] The present invention relates to heat pump chilling systems equipped with a plurality
of heat pump chilling devices and methods of controlling the heat pump chilling systems.
Background Art
[0002] In the related art, a heat pump chilling system equipped with a plurality of heat
source devices, such as a water heater system for supplying, for example, hot water
or cold water, is known. The overall operation of the plurality of heat source devices
is controlled so that a predetermined requested capacity is obtained from the plurality
of heat source devices (e.g., see Patent Literatures 1 and 2). Patent Literature 1
discloses a connected water heater system that fills a bathtub with an accurate amount
of hot water by using hot water supplied from a plurality of heat source devices (water
heater devices). To achieve this configuration, the connected water heater system
first injects hot water by simultaneously activating the plurality of heat source
devices, operates only a single one of the heat source devices immediately before
a target amount of hot water is reached at an intermediate stage of hot-water filling
control, and stops the operation of some of the heat source devices. Patent Literature
2 discloses a water heater system that preliminarily stores the number of devices
to be operated depending on the time required for boiling water and the required amount
of hot water in the form of a data table, and sequentially activates the heat source
devices of the number of devices based on the data table while shifting the activation
time by a predetermined time period.
Citation List
Patent Literature
[0005] Document
US2011315093A1 discloses a heat pump chilling system according to the preamble of claim 1.
Summary of Invention
Technical Problem
[0006] However, because all of the heat source devices are activated at the time of activation
in Patent Literature 1, the overall operating capacity of the plurality of heat source
devices sometimes becomes excessive. On the other hand, in the case where the plurality
of heat source devices are successively activated by a predetermined time period,
as in Patent Literature 2, it takes too much time for completing the activation in
a water heater system having a large number of heat source devices. Thus, when the
power is to be restored from a power-off state, a significant time period is similarly
spent for recovering to the original heating or cooling capacity.
[0007] The present invention has been made to solve the problems mentioned above, and an
object thereof is to provide a heat pump chilling system and a method of controlling
the heat pump chilling system in which a plurality of heat pump chilling devices of
the number of devices that is neither too large nor too small for the requested capacity
can be activated within a short period of time, regardless of the number of heat pump
chilling devices.
Solution to Problem
[0008] A heat pump chilling system and a method of controlling a heat pump chilling system
according to the present invention are set forth in claim 1 and in claim 10.
Advantageous Effects of Invention
[0009] In the heat pump chilling system and the method of controlling the heat pump chilling
system according to an embodiment of the present invention, the number of devices
with which the requested capacity is obtained is calculated based on the operating
capacity of each of the plurality of heat pump chilling devices stored in the storage
unit, and the heat pump chilling devices are simultaneously activated, so that the
heat pump chilling devices of the number of devices that is neither too large nor
too small can be activated within a short period of time.
Brief Description of Drawings
[0010]
[Fig. 1] Fig. 1 is a schematic diagram illustrating a heat pump chilling system according
to Embodiment 1 of the present invention.
[Fig. 2] Fig. 2 is a block diagram illustrating an example of a system control device
in the heat pump chilling system in Fig. 1.
[Fig. 3] Fig. 3 is a flowchart illustrating an operational example of the heat pump
chilling system in Fig. 1.
[Fig. 4] Fig. 4 illustrates an example of an activation time in the heat pump chilling
system in Figs. 1 and 2.
[Fig. 5] Fig. 5 illustrates an example of an activation time in a heat pump chilling
system in the related art.
[Fig. 6] Fig. 6 is a block diagram illustrating an example of a system control device
in a heat pump chilling.
[Fig. 7] Fig. 7 is a flowchart illustrating an operational example of the system control
device in the heat pump chilling system in Fig. 6.
[Fig. 8] Fig. 8 is a block diagram illustrating an example of a system control device
in a heat pump chilling.
[Fig. 9] Fig. 9 is a flowchart illustrating an operational example of the heat pump
chilling system in Fig. 8.
[Fig. 10] Fig. 10 is a block diagram illustrating an example of a system control device
in a heat pump chilling system according to Embodiment 4 of the present invention.
[Fig. 11] Fig. 11 is a flowchart illustrating an operational example of the heat pump
chilling system in Fig. 10.
[0011] Heat pump chilling systems illustrated in Fig. 6, Fig. 7. Fig. 8, Fig. 9 and described
in the corresponding parts of the description do not fall under the scope of the claims.
Embodiment 1
[0012] A heat pump chilling system according to an embodiment of the present invention will
be described below in detail with reference to the drawings. Fig. 1 is a schematic
diagram illustrating a heat pump chilling system according to Embodiment 1 of the
present invention. In a heat pump chilling system 1 in Fig. 1, a plurality of heat
pump chilling devices 2A to 2E are connected in parallel with a load 3 by using an
inlet pipe 4 and an outlet pipe 5, and a heat medium, such as water and an antifreeze
solution, serving as a medium for exchanging heat energy circulates between the plurality
of heat pump chilling devices 2A to 2E and the load 3. The load 3 is constituted of,
for example, a load-side heat exchanger, and, for example, air-conditioning or supplying
of hot water is performed by using the load-side heat exchanger. Although the load
3 is described as being constituted of a load-side heat exchanger, the load 3 may
alternatively be constituted of, for example, a hot-water tank or a cold-water tank,
or may be constituted of a heat storage tank.
[0013] The inlet pipe 4 starts from the load 3 and branches off toward the plurality of
heat pump chilling devices 2A to 2E and allows the heat medium to flow therethrough.
Pumps 6A to 6E are each attached to a corresponding one of sections of the inlet pipe
4 branching off toward the heat pump chilling devices 2A to 2E. The outlet pipe 5
causes the heat medium that has exchanged heat in the plurality of heat pump chilling
devices 2A to 2E to merge and flow toward the load 3. By driving the pumps 6A to 6E,
the heat medium circulates between the heat pump chilling devices 2A to 2E and the
load 3 via the inlet pipe 4 and the outlet pipe 5.
[0014] The plurality of heat pump chilling devices 2A to 2E are constituted of, for example,
heat-pump-type heat source devices and have, for example, identical configurations
and the same operating capacities. The heat pump chilling devices 2A to 2E are each
provided with a refrigeration cycle including a compressor 11, a heat-source-side
heat exchanger 12, and a refrigerant pipe 13. The compressor 11 compresses refrigerant
to a high-temperature high-pressure state. The heat-source-side heat exchanger 12
is constituted of, for example, a plate-type heat exchanger and causes the refrigerant
flowing through the refrigeration cycle and the heat medium flowing in from the inlet
pipe 4 to exchange heat with each other.
[0015] The plurality of heat pump chilling devices 2A to 2E are individually provided with
control devices 14 that control the operation of the heat pump chilling devices 2A
to 2E. The control devices 14 are connected to one another via a communication network
15 to be capable of transferring, for example, control information to and from one
another. Furthermore, one representative device (e.g., the heat pump chilling device
2A in Fig. 1) among the plurality of heat pump chilling devices 2A to 2E is provided
with a system control device 20 that controls the entire heat pump chilling system
1. The system control device 20 controls the operation of the heat pump chilling devices
2A to 2E via the communication network 15. Although the system control device 20 is
described as being provided in the heat pump chilling device 2A as an example, the
system control device 20 may be installed as an independent device separate from the
heat pump chilling device 2A.
[0016] Furthermore, the heat pump chilling system 1 includes an inlet temperature sensor
7 that detects the temperature of water, as an inlet temperature Ti, in the inlet
pipe 4 immediately before the water is distributed to the plurality of heat pump chilling
devices 2A to 2E, and also includes an outlet temperature sensor 8 that detects the
temperature of water, as an outlet temperature To, in the outlet pipe 5 immediately
after the water is merged from the plurality of heat pump chilling devices 2A to 2E.
In other words, the inlet temperature sensor 7 detects the temperature of the heat
medium that is to flow into the load 3 as the inlet temperature Ti, and the outlet
temperature sensor 8 detects the temperature of the heat medium flowing out from the
load 3 as the outlet temperature To.
[0017] The system control device 20 has a function of controlling the activation of the
plurality of heat pump chilling devices 2A to 2E based on the inlet temperature Ti
and the outlet temperature To. In particular, the system control device 20 performs
control to activate the single heat pump chilling device 2A among the plurality of
heat pump chilling devices 2A to 2E at the start of operation. Subsequently, if an
operation capacity does not satisfy the requested capacity, the system control device
20 simultaneously activates the heat pump chilling devices 2B to 2E of a predetermined
number to compensate for the deficiency for the requested capacity. Although the following
description relates to a case where the heat pump chilling device 2A serving as the
representative device is the single device to be activated at the start of operation,
another one of the heat pump chilling devices 2B to 2E may be selected as the single
device to be activated at the start of operation.
[0018] Fig. 2 is a block diagram illustrating an example of the system control device in
the heat pump chilling system in Fig. 1. The system control device 20 will be described
with reference to Figs. 1 and 2. The system control device 20 controls the operation
of the plurality of heat pump chilling devices 2A to 2E and particularly has a function
of controlling the activation of the plurality of heat pump chilling devices 2A to
2E. In detail, the system control device 20 has a requested-capacity calculating unit
21, a target-temperature setting unit 22, an operating-capacity calculating unit 23,
a storage unit 24, a number-of-devices calculating unit 25, and an activation control
unit 26.
[0019] The requested-capacity calculating unit 21 calculates a requested capacity Tdg based
on a target temperature Tref and the inlet temperature Ti. In detail, the requested-capacity
calculating unit 21 calculates an absolute value of a difference between the target
temperature Tref and the inlet temperature Ti as the requested capacity Tdg. The target
temperature Tref is set in the target-temperature setting unit 22. For example, the
target-temperature setting unit 22 may acquire the target temperature Tref from an
information input unit, such as a keyboard and a touchscreen, or may have the target
temperature Tref stored in advance.
[0020] With regard to each of the plurality of heat pump chilling devices 2A to 2E, the
operating-capacity calculating unit 23 calculates an operating capacity indicating
the capacity for heating or cooling the heat medium based on the inlet temperature
Ti and the outlet temperature To and stores the operating capacity into the storage
unit 24. As described above, the plurality of heat pump chilling devices 2A to 2E
have the same operating capacities Td, and the heat pump chilling device 2A activated
alone at the start of operation is activated. The operating-capacity calculating unit
23 calculates the operating capacity Td of the heat pump chilling device 2A activated
alone at the start of operation and stores the calculated operating capacity Td of
the heat pump chilling device 2A as the operating capacity Td of each of the remaining
heat pump chilling devices 2B to 2E into the storage unit 24. In detail, the operating-capacity
calculating unit 23 calculates an absolute value |Ti - Tol of a temperature difference
between the inlet temperature Ti and the outlet temperature To as the operating capacity
Td of the heat pump chilling device 2A and stores it into the storage unit 24. Moreover,
the operating-capacity calculating unit 23 stores the operating capacity Td of the
heat pump chilling device 2A as the operating capacity of each of the remaining heat
pump chilling devices 2B to 2E into the storage unit 24.
[0021] Based on the operating capacity Td of each of the plurality of heat pump chilling
devices 2A to 2E stored in the storage unit 24, the number-of-devices calculating
unit 25 calculates the number n of devices to be activated for obtaining the requested
capacity Tdg calculated by the requested-capacity calculating unit 21. In detail,
the number-of-devices calculating unit 25 calculates the number n of devices to be
activated by using a ceiling function (Tdg/Td) in which the requested capacity (target
temperature difference) Tdg is divided by the operating capacity (temperature difference)
Td. Thus, in a case where the operating capacity Td satisfies the requested capacity
Tdg (Tdg ≤ Td), the number n of devices to be activated, which is an output value
of the ceiling function, is equal to 1. In contrast, in a case where the operating
capacity Td is deficient for the requested capacity Tdg (Tdg > Td), the number n of
devices to be activated, which is an output value of the ceiling function, is larger
than or equal to 2. If the number n of devices to be activated exceeds a total number
N of installed devices among the plurality of heat pump chilling devices 2A to 2E,
the number-of-devices calculating unit 25 sets the total number of devices as the
number n of devices to be activated.
[0022] As mentioned above, the activation control unit 26 performs control to activate the
single heat pump chilling device 2A alone at the start of operation or when the operation
is resumed at the time of a power restoring process. Furthermore, the activation control
unit 26 activates the heat pump chilling devices 2B to 2E of the number n of devices
to be activated calculated in the number-of-devices calculating unit 25. In this case,
the activation control unit 26 simultaneously activates the devices of the number
(n - 1), excluding the single already-activated device, among the heat pump chilling
devices 2B to 2E. For example, in a case where the number n of devices to be activated
calculated in the number-of-devices calculating unit 25 is equal to 1, this implies
that the requested capacity is already satisfied by activating the single device.
In this case, the activation control unit 26 does not activate the remaining heat
pump chilling devices 2B to 2E. On the other hand, if the number n of devices to be
activated calculated in the number-of-devices calculating unit 25 is larger than or
equal to 2, the activation control unit 26 performs control to simultaneously activate
the devices of the number (n - 1) among the heat pump chilling devices 2B to 2E. In
this case, the order of priority in which the heat pump chilling devices 2B to 2E
are to be activated may be preset in the activation control unit 26 or may be determined
randomly.
[0023] Thus, control can be performed so that the operating capacity Td of the entire system
is increased if the operating capacity Td is deficient for the requested capacity
Tdg and that the operating capacity Td is decreased if the operating capacity Td exceeds
the requested capacity Tdg. If the operating capacity Td is deficient for the requested
capacity Tdg, the number-of-devices calculating unit 25 subsequently makes an activation
plan for determining the operating capacity of each of the plurality of remaining
heat pump chilling devices 2B to 2E, and when the plan is set, the activation control
unit 26 commands the respective control devices 14 to perform activation via the communication
network 15.
[0024] Fig. 3 is a flowchart illustrating an operational example at the time of activation
in the heat pump chilling system 1. The operational example of the heat pump chilling
system 1 will be described with reference to Figs. 1 to 3. First, any one (e.g., the
heat pump chilling device 2A) of the heat pump chilling devices 2A to 2E is activated
with the maximum capacity under the control of the activation control unit 26 (step
ST1). Then, when the activation of the single heat pump chilling device 2A is completed,
the inlet temperature Ti detected in the inlet temperature sensor 7 and the outlet
temperature To detected in the outlet temperature sensor 8 are acquired and are stored
into the storage unit 24 (step ST2).
[0025] Subsequently, based on the inlet temperature Ti and the outlet temperature To, the
operating-capacity calculating unit 23 calculates an absolute value of a temperature
difference given by the single heat pump chilling device 2A as the operating capacity
Td. Then, this operating capacity Td is stored as the operating capacity Td of each
of the plurality of heat pump chilling devices 2A to 2E into the storage unit 24 (step
ST3).
[0026] Then, the temperature difference between the target temperature Tref and the inlet
temperature Ti is calculated as the requested capacity Tdg in the requested-capacity
calculating unit 21 and is stored into the storage unit 24 (step ST4). The calculation
of the operating capacity Td (step ST3) and the calculation of the requested capacity
Tdg (step ST4) may be performed in no particular order and may be performed concurrently
with each other. Subsequently, the number-of-devices calculating unit 25 reads the
operating capacity Td and the requested capacity Tdg from the storage unit 24 and
calculates the number n of heat pump chilling devices 2B to 2E to be activated (step
ST5). The activation control unit 26 simultaneously activates the heat pump chilling
devices 2B to 2E of the calculated number n of devices to be activated (step ST6).
[0027] According to Embodiment 1 described above, since the devices of the calculated number
n of heat pump chilling devices 2B to 2E to be activated necessary for the requested
capacity are simultaneously activated, activation can be performed within a short
period of time in a fixed period even in a system in which the number of heat pump
chilling devices 2A to 2E is large, and the devices of the number n among the heat
pump chilling devices 2A to 2E that is neither too large nor too small for the requested
capacity Tdg can be activated.
[0028] In detail, Fig. 4 illustrates an example of an activation time in the heat pump chilling
system in Figs. 1 and 2. In Fig. 4, for example, if the compressor 11 at the start
of operation or when the power is restored from a power-off state is in a stopped
state, activation of the heat pump chilling devices 2A to 2E starts after an activation
protection time period tw (e.g., about five minutes), which is a standby state of
the compressor 11, for protecting the compressor 11. Subsequently, the heat pump chilling
devices 2A to 2E start operating after a time period ts (e.g., about three minutes)
required for the activation. Thus, the heat pump chilling devices 2A to 2E require
a time period of (tw + ts) from the start of activation to the start of operation.
[0029] As mentioned above, in the heat pump chilling system 1, the single heat pump chilling
device 2A is activated alone at the start of operation, and then the remaining heat
pump chilling devices 2B to 2E are simultaneously activated. The activation protection
time period tw progresses concurrently with respect to all of the heat pump chilling
devices 2A to 2E. Thus, the time taken until a plurality of the heat pump chilling
devices 2A to 2E, with which the requested capacity Tdg is obtained, start operating
is a fixed time period (tw + 2ts) obtained by adding the time period (tw + ts) from
the start of activation to the start of operation of the single heat pump chilling
device 2A to the time period tw taken until the second device and onward start operating.
[0030] Fig. 5 illustrates an example of an activation time in a heat pump chilling system
in the related art. In Fig. 5, an activation standby time period td (e.g., about two
to three minutes) in which the heat pump chilling devices 2B to 2E wait for activation
is set. In the related art, the time taken for activating the first device is also
(ts + tw). However, since the second device and onward are sequentially activated,
a time period of (ts + tw + (n - 1) × td) is required. Thus, the larger the number
of heat pump chilling devices 2A to 2E, the longer it takes to activate the system
for satisfying the requested capacity. Thus, in the heat pump chilling system 1, a
plurality of the heat pump chilling devices 2A to 2E for satisfying the requested
capacity Tdg can be activated within a short period of time.
[0031] In particular, to calculate the operating capacity Td of each of the plurality of
heat pump chilling devices 2B to 2E from the operating capacity Td of the single heat
pump chilling device 2A activated alone at the start of operation, since the number
n of devices to be activated can be calculated based on the operating capacity Td
in actual operation, the number n of devices to be activated satisfying the requested
capacity Tdg can be calculated with high accuracy. Specifically, the locations where
the plurality of heat pump chilling devices 2A to 2E are installed and the connected
load 3 vary. Thus, if the operating capacity Td of each of the heat pump chilling
devices 2A to 2E is stored as a fixed value in the storage unit 24 at the time of
shipment, the actual operating capacity Td may sometimes deviate from the operating
capacity Td stored in the storage unit 24. In contrast, in the heat pump chilling
system 1, the operating capacity Td is stored in the storage unit 24 after the installation
locations of the heat pump chilling devices 2A to 2E are set and the load 3 connected
to the heat pump chilling devices 2A to 2E is specified. Consequently, the operating
capacity Td corresponding to the load 3 can be calculated with high accuracy.
[0032] Fig. 6 is a block diagram illustrating a system control device in a heat pump chilling
system. A system control device 120 in the heat pump chilling system will be described
with reference to Fig. 6. In the system control device 120, sections having configurations
identical to those in the system control device 20 are given the same reference signs,
and descriptions thereof will be omitted. The system control device 120 differs from
the system control device 20 according to Embodiment 1 in that the plurality of heat
pump chilling devices 2A to 2E are simultaneously activated from the start of operation.
[0033] In the system control device 120 in Fig. 6, the storage unit 24 stores the operating
capacity Td for each of the plurality of heat pump chilling devices 2A to 2E. Similar
to Embodiment 1, the operating capacities Td stored in the storage unit 24 are stored
when, for example, the heat pump chilling device 2A is activated alone. Alternatively,
the operating capacities Td may be stored in the storage unit 24 at the time of shipment.
[0034] Based on the operating capacities stored in the storage unit 24 for the respective
heat pump chilling devices 2A to 2E, a number-of-devices calculating unit 125 calculates
the number n of devices to be simultaneously activated for obtaining the requested
capacity Tdg calculated by the requested-capacity calculating unit 21 by using a ceiling
function (Tdg/Td). In this case, the calculated number n of devices to be activated
is directly used as the number of devices to be simultaneously activated since not
a single one of the plurality of heat pump chilling devices 2A to 2E is activated.
Then, an activation control unit 126 performs control to simultaneously activate the
heat pump chilling devices 2A to 2E of the number n of devices to be activated calculated
in the number-of-devices calculating unit 125.
[0035] Fig. 7 is a flowchart illustrating an operational example of the system control device
in the heat pump chilling system in Fig. 6. The operational example of the system
control device 120 will be described with reference to Figs. 6 and 7. First, the number-of-devices
calculating unit 25 reads the operating capacities (temperature differences) Td of
the plurality of heat pump chilling devices 2A to 2E stored in the storage unit 24
(step ST11). At the same time, the inlet temperature Ti is acquired from the inlet
temperature sensor 7 and is stored into the storage unit 24 (step ST12).
[0036] Subsequently, the requested capacity Tdg is calculated from the target temperature
Tref set in the target-temperature setting unit 22 and the acquired inlet temperature
Ti and is stored into the storage unit 24 (step ST13). Then, the number-of-devices
calculating unit 125 calculates the number n of devices to be simultaneously activated
based on the operating capacities Td of the plurality of heat pump chilling devices
2A to 2E and the requested capacity Tdg (step ST14). Subsequently, the devices of
the number n among the heat pump chilling devices 2A to 2E are simultaneously activated
by the activation control unit 126 (step ST15).
[0037] According to the system described above, the number n of devices to be activated
among the heat pump chilling devices 2A to 2E required for the requested capacity
Tdg is calculated based on the operating capacities Td stored in the storage unit
24 for the respective heat pump chilling devices 2A to 2E, so that the devices of
the number n to be activated can be simultaneously activated. Thus, activation can
be performed within a shorter period of time even in a heat pump chilling system in
which the number of heat pump chilling devices 2A to 2E is large, and the devices
of the number among the heat pump chilling devices 2A to 2E that is neither too large
nor too small for the requested capacity Tdg can be activated, as in Embodiment 1.
[0038] Fig. 8 is a block diagram illustrating a system control device in a heat pump chilling
system. A system control device 220 in the heat pump chilling system will be described
with reference to Fig. 8. In the system control device 220, sections having configurations
identical to those in the system control device 20 according to Embodiment 1 are given
the same reference signs, and descriptions thereof will be omitted. The system control
device 220 differs from the system control device 20 according to Embodiment 1 in
that an operating-capacity calculating unit 223 learns the operating capacities of
the heat pump chilling devices 2A to 2E and stores the operating capacities into a
storage unit 224.
[0039] The operating-capacity calculating unit 223 in Fig. 8 calculates the operating capacity
Td of the heat pump chilling device 2A activated alone at the start of operation and
stores a value obtained by optimizing calculated results corresponding to the number
of learning times as an optimized operating capacity Tds into the storage unit 224.
In detail, a value that specifies the number of learning times is preset in the operating-capacity
calculating unit 223. On the other hand, the number of learning times already experienced
for each of the heat pump chilling devices 2A to 2E is stored in the storage unit
24. For example, if the operating-capacity calculating unit 223 determines that the
number of learning times of the heat pump chilling device 2A activated at the start
of operation has reached the specified value, the number-of-devices calculating unit
25 calculates the number n of devices to be activated based on the optimized operating
capacity Tds stored in the storage unit 224.
[0040] If the number of learning times has not reached the specified value, the operating-capacity
calculating unit 223 optimizes the operating capacity Tds stored in the storage unit
224. The operating-capacity calculating unit 223 calculates the operating capacity
Td of the heat pump chilling device 2A activated alone at the start of operation and
stores the operating capacity Td into the storage unit 24. An average value of operating
capacities Td corresponding to the number of learning times is stored in the storage
unit 224. Optimization is performed by calculating an average value in which a newly
calculated operating capacity Td is incorporated, and the optimized operating capacity
Tds stored in the storage unit 224 is updated.
[0041] Furthermore, if the number of learning times has reached the specified value, an
activation control unit 226 performs control to simultaneously activate the devices
of the number n that satisfy the requested capacity Tdg at the start of operation.
If the number of learning times is smaller than or equal to the specified value, the
activation control unit 226 activates the single heat pump chilling device 2A alone
at the start of operation so that the operating capacity Td is learned. Subsequently,
the activation control unit 226 performs control to simultaneously activate the devices
of the number (n - 1) among the heat pump chilling devices 2B to 2E that satisfy the
requested capacity Tdg.
[0042] Fig. 9 is a flowchart illustrating an operational example of the system control device
in the heat pump chilling system in Fig. 8. The operational example of the system
control device 220 will be described with reference to Figs. 8 and 9. First, the operating-capacity
calculating unit 223 reads the number of learning times from the storage unit 224
(step ST21), and it is determined whether or not the read number of learning times
satisfies the specified value (step ST22). If the number of learning times is larger
than or equal to the specified value, it is determined that the learning is already
completed, and the optimized operating capacity Tds stored in the storage unit 224
is used as the operating capacity Td of each of the heat pump chilling devices 2A
to 2E (step ST23). Subsequently, the inlet temperature sensor 7 detects the inlet
temperature Ti (step ST24).
[0043] If the number of learning times is smaller than the specified value, a new number
of learning times obtained by adding 1 to the number of learning times is stored into
the storage unit 24 (step ST25). Then, the activation control unit 226 activates the
single heat pump chilling device 2A with the maximum operating capacity (step ST26).
When the activation of the single heat pump chilling device 2A is completed, the inlet
temperature sensor 7 detects the inlet temperature Ti (step ST27). Subsequently, the
absolute value of the temperature difference between the inlet temperature Ti and
the outlet temperature To is calculated as an operating capacity Td, and an average
value of operating capacities Td corresponding to the number of learning times is
stored as the optimized operating capacity Tds into the storage unit 224 (step ST28).
[0044] Then, the requested capacity Tdg is calculated in the requested-capacity calculating
unit 21 (step ST29), and the number n of devices to be activated using the optimized
operating capacity Tds is calculated in a number-of-devices calculating unit 225 (step
ST30). Then, the activation control unit 226 determines whether or not the single
heat pump chilling device 2A is already activated alone (step ST31). In other words,
it is determined whether or not the operating capacity Tds has been learned.
[0045] If the single heat pump chilling device 2A is already activated alone (if the operating
capacity Tds has been learned), the devices of the number (n - 1) among the heat pump
chilling devices 2B to 2E are activated (step ST32). If the single heat pump chilling
device 2A is not activated alone (if the number of learning times is larger than or
equal to the specified value), the devices of the number n among the heat pump chilling
devices 2A to 2E are simultaneously activated (step ST33).
[0046] The operating capacity (temperature difference) Td of the single heat pump chilling
device 2A operating with the maximum capacity is learned and is stored into the storage
unit 24 so that the activation can be performed within the shortest activation time
after the learning. Furthermore, since the optimized operating capacity Tds is stored
in the storage unit 24, a difference from the actual operating capacity Td is small,
whereby the number n of devices to be activated can be calculated with high accuracy.
Moreover, the devices of the number n among the heat pump chilling devices 2A to 2E
that is neither too large nor too small for the requested capacity Tdg can be activated,
as in Embodiment 1.
Embodiment 4
[0047] Fig. 10 is a block diagram illustrating a system control device in a heat pump chilling
system according to Embodiment 4 of the present invention. A system control device
320 in the heat pump chilling system will be described with reference to Fig. 10.
In the system control device 320 according to Embodiment 4, sections having configurations
identical to those in the system control device 20 according to Embodiment 1 are given
the same reference signs, and descriptions thereof will be omitted. The system control
device 320 according to Embodiment 4 differs from the system control device 20 according
to Embodiment 1 in that the number ns of devices to be activated and the number nf
of devices to be activated are calculated in consideration of the energy efficiency
of each of the heat pump chilling devices 2A to 2E.
[0048] The storage unit 24 in Fig. 10 preliminarily stores a capacity ratio A corresponding
to the maximum energy efficiency, and a number-of-devices calculating unit 325 calculates
the number ns of devices to be activated in consideration of the capacity ratio A.
In detail, the number-of-devices calculating unit 325 calculates the number ns of
devices to be activated in a case where all of the heat pump chilling devices 2A to
2E are activated at the capacity ratio A by using a ceiling function (Tdg/(Td × A)).
Normally, the capacity ratio A corresponding to the maximum energy efficiency of the
heat pump chilling devices 2A to 2E often ranges between 60% and 90%.
[0049] Because the heat pump chilling devices 2B to 2E operate with restricted capacities,
the number ns of devices to be activated to be calculated tends to be large. If the
calculated number ns of devices to be activated is larger than the total number N
of installed devices, the number-of-devices calculating unit 325 calculates a combination
of the number nf of devices to be activated among the heat pump chilling devices 2A
to 2E operating with the maximum operating capacity (i.e., a capacity ratio of 100%)
and the number ns of devices to be activated among the heat pump chilling devices
2A to 2E operating at the preset capacity ratio A, so that the requested capacity
Tdg is satisfied.
[0050] In detail, the number-of-devices calculating unit 325 calculates a ceiling function
((Tdg - (N × Td × A))/((1 - A) × Td)) as the number nf of devices to be activated
at a capacity ratio of 100%. Subsequently, the number-of-devices calculating unit
325 calculates the number (ns = N - nf) of devices to be activated at the capacity
ratio A. Then, the activation control unit 26 controls the plurality of heat pump
chilling devices 2A to 2E to activate the devices of the number of ns at the capacity
ratio of 100% and to activate the devices of the number nf at the capacity ratio A
among the total number N of installed devices.
[0051] Fig. 11 is a flowchart illustrating an operational example of the heat pump chilling
system in Fig. 10. First, for example, the single heat pump chilling device 2A among
the heat pump chilling devices 2A to 2E is activated with the maximum capacity of
100% (step ST41). Then, the inlet temperature Ti and the outlet temperature To immediately
upon completion of the activation of the single heat pump chilling device 2A are detected
and stored into the storage unit 24 (step ST42). Subsequently, the operating capacity
Td of the single heat pump chilling device 2A based on the inlet temperature Ti and
the outlet temperature To is stored into the storage unit 24, and the operating capacities
of the remaining heat pump chilling devices 2B to 2E are similarly stored as the operating
capacities Td into the storage unit 24 (step ST43).
[0052] Then, the requested capacity (target temperature difference) Tdg is calculated by
the requested-capacity calculating unit 21 based on the target temperature Tref set
in the target-temperature setting unit 22 and the inlet temperature Ti and is stored
into the storage unit 24 (step ST44). The number-of-devices calculating unit 325 calculates
the number ns of devices to be activated in a case where all of the heat pump chilling
devices 2A to 2E are activated at the capacity ratio A so that the required capacity
is obtained (step ST45). Then, the number-of-devices calculating unit 325 determines
whether or not the number n of devices to be activated at the calculated capacity
ratio A is larger than the total number N of installed devices (step ST46).
[0053] If the number ns of devices to be activated is smaller than or equal to the total
number N of installed devices, the devices of the number (n - 1) among the heat pump
chilling devices 2B to 2E, excluding the already-activated single device, are activated
at the capacity ratio A (step ST47). On the other hand, if the number ns of devices
to be activated at the capacity ratio A exceeds the total number N of installed devices
(ns > N), the number nf of devices that have to be activated with the maximum capacity
is calculated to compensate for the shortage amount even when all of the installed
devices of the total number N are activated at the capacity ratio A (step ST48), and
the number ns of devices to be activated at the capacity ratio A is recalculated (step
ST49). Subsequently, under the control of the activation control unit 26, the devices
of the number (nf - 1), excluding the already-activated single device, among the heat
pump chilling devices 2B to 2E are activated with the maximum capacity, and the devices
of the number of ns among the heat pump chilling devices 2B to 2E are activated at
the capacity ratio A (step ST49).
[0054] According to Embodiment 4 described above, activation of the plurality of heat pump
chilling devices 2A to 2E is controlled in consideration of the energy efficiency,
so that the overall heat pump chilling system can be activated in an operational state
with good energy efficiency. Furthermore, the devices of the number n among the heat
pump chilling devices 2A to 2E that is neither too large nor too small for the requested
capacity Tdg can be activated within a short period of time, as in Embodiment 1.
[0055] Although Fig. 11 corresponds to a case where the single heat pump chilling device
2A is activated alone at the start of operation, the number n of devices to be activated
may be calculated in consideration of the aforementioned capacity ratio A even when
the heat pump chilling devices 2A to 2E are to be simultaneously activated for the
requested capacity Tdg. Furthermore, the requested capacity stored in the storage
unit 24 may be optimized.
[0056] Embodiments of the present invention are not limited to Embodiments described above.
For example, although, in the foregoing description, the requested-capacity calculating
unit 21 calculates an absolute value of a difference between the target temperature
Tref and the inlet temperature Ti as the requested capacity Tdg, the requested-capacity
calculating unit 21 may calculate an absolute value |Tref - Tol of a difference between
the target temperature Tref and the outlet temperature To as the requested capacity
Tdg. In this case, if the single heat pump chilling device 2A is activated alone at
the start of operation, which is not covered by the invention as defined in the claims,
the requested capacity Tdg being a positive value implies shortage, whereas a negative
value implies that the requested capacity Tdg is satisfied. Thus, the number-of-devices
calculating unit 25 is only required to calculate the number of devices that satisfy
the shortage amount of the requested capacity Tdg. If a single device among the heat
pump chilling devices 2A to 2E is not activated at the start of operation, operation
similar to that in Embodiment 2 described above is performed since the inlet temperature
Ti and the outlet temperature To are the same value.
[0057] Furthermore, although the same operating capacities Td are stored in the storage
unit 24 corresponding to the plurality of heat pump chilling devices 2A to 2E in Figs.
6 and 7, the devices may have different operating capacities Td. However, such a configuration
does not fall under the scope of the claims. In this case, the number-of-devices calculating
unit 25 may determine the number n of devices to be activated so that a combination
of the heat pump chilling devices 2A to 2E satisfying the requested capacity is achieved.
[0058] Furthermore, as an example, a case where the activation control unit 26 activates
the heat pump chilling device 2A and the operation capacity Td of the heat pump chilling
device 2A is learned, the activation control unit 26 may randomly set a heat pump
chilling device to be activated alone at the start of operation from among the plurality
of heat pump chilling devices 2A to 2E. Moreover, each of the heat pump chilling devices
2A to 2E may be activated alone, and the operating capacity Td thereof may be calculated
and stored into the storage unit 24.
Reference Signs List
[0059] 1 heat pump chilling system 2A to 2E heat pump chilling device 3 load 4 inlet pipe
5 outlet pipe 6A to 6E pump 7 inlet temperature sensor 8 outlet temperature sensor
11 compressor 12 heat-source-side heat exchanger 13 refrigerant pipe 14 control device
15 communication network 20, 120, 220, 320 system control device 21 requested-capacity
calculating unit 22 target-temperature setting unit 23, 223 operating-capacity calculating
unit 24, 224 storage unit 25, 125, 225, 325 number-of-devices calculating unit 26,
126, 226 activation control unit A capacity ratio n, nf, ns number of devices to be
activated N total number of installed devices Td operating capacity Tdg requested
capacity Tds optimized operating capacity Ti inlet temperature To outlet temperature
Tref target temperature
1. A heat pump chilling system in which a plurality of heat pump chilling devices (2A
to 2E) provided with refrigeration cycles through which refrigerant flows are connected
in parallel with a load (3) and in which a heat medium having exchanged heat with
the refrigerant in the plurality of heat pump chilling devices (2A to 2E) circulates
to the load (3), wherein the plurality of heat pump chilling devices (2A to 2E) are
configured to have the same operating capacities, the heat pump chilling system comprising:
an inlet temperature sensor (7) detecting a temperature of the heat medium flowing
into the plurality of heat pump chilling devices (2A to 2E) from the load (3) as an
inlet temperature (Ti);
an outlet temperature sensor (8) detecting a temperature of the heat medium flowing
into the load (3) from the plurality of heat pump chilling devices (2A to 2E) as an
outlet temperature (To); and
a system control device (20) configured to control operation of the plurality of heat
pump chilling devices (2A to 2E) based on the inlet temperature (Ti) detected in the
inlet temperature sensor (7) and the outlet temperature (To) detected in the outlet
temperature sensor (8), characterized by
the system control device (20) including
a storage unit (24) configured to store an operating capacity (Td) for each of the
plurality of heat pump chilling devices (2A to 2E),
a requested-capacity calculating unit (21) configured to calculate a requested capacity
(Tdg) based on the inlet temperature (Ti) or the outlet temperature (To) and a set
target temperature (Tref),
a number-of-devices calculating unit (25) configured to calculate the number of devices
to be activated among the plurality of heat pump chilling devices (2A to 2E) satisfying
the requested capacity (Tdg) calculated by the requested-capacity calculating unit
(21) based on the operating capacity (Td) stored in the storage unit (24) for each
of the plurality of heat pump chilling devices (2A to 2E),
an activation control unit (26) configured to activate the plurality of heat pump
chilling devices of the number of devices to be activated calculated in the number-of-devices
calculating unit (25) by activating a single one of the plurality of heat pump chilling
devices alone at a start of operation and then simultaneously activating zero or more
of the plurality of heat pump chilling devices of the remaining number of the number
of devices to be activated calculated in the number-of-devices calculating unit (25),
and
an operating-capacity calculating unit (23) configured to calculate the operating
capacity (Td) of the single activated heat pump chilling device based on the inlet
temperature (Ti) and the outlet temperature (To) after the single heat pump chilling
device is activated, and store the calculated operating capacity (Td) into the storage
unit (24) as the operating capacity (Td) of each of the plurality of heat pump chilling
devices (2A to 2E).
2. The heat pump chilling system of claim 1, wherein, after the single heat pump chilling
device is activated, the activation control unit (26) is configured to simultaneously
activate the plurality of heat pump chilling devices of the remaining number of the
number of devices to be activated corresponding to the requested capacity (Tdg) calculated
by the requested-capacity calculating unit (21).
3. The heat pump chilling system of any one of claims 1 or 2, wherein the activation
control unit (26) is configured to activate the single heat pump chilling device with
a maximum operating capacity.
4. The heat pump chilling system of any one of claims 1 to 3, wherein the operating-capacity
calculating unit (23) is configured to calculate a difference between the inlet temperature
(Ti) and the outlet temperature (To) as the operating capacity (Td) of the single
heat pump chilling device.
5. The heat pump chilling system of any one of claims 1 to 4, wherein, based on a plurality
of the operating capacities, the operating-capacity calculating unit (223) is configured
to optimize the operating capacity stored in the storage unit (224), each of the plurality
of the operating capacities being calculated every time the single heat pump chilling
device is activated.
6. The heat pump chilling system of claim 5,
wherein the storage unit (224) is configured to store the number of times the operating
capacity stored in the storage unit (224) is optimized as the number of learning times,
and
wherein when the number of learning times is smaller than or equal to a preset specified
number, the operating-capacity calculating unit (223) is configured to optimize the
operating capacity.
7. The heat pump chilling system of claim 6,
wherein when the number of learning times is smaller than or equal to the preset specified
number, the activation control unit (26) is configured to activate the single heat
pump chilling device alone at the start of operation and then activate zero or more
of the plurality of heat pump chilling devices of the remaining number of the number
of devices to be activated calculated in the number-of-devices calculating unit (25)
based on the optimized operating capacity, and
wherein when the number of learning times is larger than the preset specified number,
the activation control unit (26) is configured to activate the plurality of heat pump
chilling devices of the number of devices to be activated calculated in the number-of-devices
calculating unit (25) at the start of operation based on the optimized operating capacity.
8. The heat pump chilling system of any one of claims 1 to 7, wherein the number-of-devices
calculating unit (25) is configured to calculate the number of devices to be activated
in a case where the plurality of heat pump chilling devices (2A to 2E) operate at
a preset capacity ratio (A) being lower than a maximum operating capacity.
9. The heat pump chilling system of claim 8, wherein when the calculated number of devices
to be activated when the operation is performed at the capacity ratio (A) is larger
than the total number of installed devices among the plurality of heat pump chilling
devices (2A to 2E), the number-of-devices calculating unit (25) is configured to calculate
a combination of the number of devices among the plurality of heat pump chilling devices
(2A to 2E) to be operated with the maximum operating capacity and the number of devices
to be activated among the plurality of heat pump chilling devices (2A to 2E) to be
operated at the preset capacity ratio (A) so that the requested capacity (Tdg) is
satisfied.
10. A method of controlling a heat pump chilling system in which a plurality of heat pump
chilling devices (2A to 2E) provided with refrigeration cycles through which refrigerant
flows are connected in parallel with a load (3) so that a heat medium circulates to
the load (3) and in which the plurality of heat pump chilling devices (2A to 2E) cause
the refrigerant and the heat medium to exchange heat with each other, wherein the
plurality of heat pump chilling devices (2A to 2E) are configured to have the same
operating capacities, the method comprising:
calculating a requested capacity (Tdg) based on an inlet temperature (Ti) of flow
from the load (3) to the plurality of heat pump chilling devices (2A to 2E), an outlet
temperature (To) of flow from the plurality of heat pump chilling devices (2A to 2E)
to the load (3), and a set target temperature (Tref); characterized by
calculating the number of devices to be activated among the plurality of heat pump
chilling devices (2A to 2E) with which the calculated requested capacity (Tdg) is
obtained based on an operating capacity stored in a storage unit (24) for each of
the plurality of heat pump chilling devices (2A to 2E);
activating the plurality of heat pump chilling devices (2A to 2E) of the calculated
number of devices (2A to 2E) to be activated by activating a single one of the plurality
of heat pump chilling devices (2A) alone at a start of operation and then simultaneously
activating zero or more of the plurality of heat pump chilling devices (2B to 2E)
of the remaining number of the number of devices to be activated calculated in the
step of calculating the number of devices to be activated;
calculating the operating capacity (Td) of the single activated heat pump chilling
device (2A) based on the inlet temperature (Ti) and the outlet temperature (To) after
the single heat pump chilling device (2A) is activated; and
storing the calculated operating capacity (Td) into the storage unit (24) as the operating
capacity (Td) of each of the plurality of heat pump chilling devices (2A to 2E).
1. Wärmepumpen-Kühlsystem, in dem eine Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A
bis 2E), die mit Kältekreisläufen, durch die Kühlmittel strömt, bereitgestellt sind,
einer Last (3) parallel geschaltet ist und in dem ein Wärmemedium, das mit dem Kühlmittel
in der Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) Wärme ausgetauscht hat,
zu der Last (3) zirkuliert, wobei die Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A
bis 2E) ausgelegt ist, um die gleichen Betriebskapazitäten aufzuweisen, wobei das
Wärmepumpen-Kühlsystem Folgendes umfasst:
einen Einlasstemperatursensor (7), der eine Temperatur des Wärmemediums, das aus der
Last (3) in die Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) einströmt,
als Einlasstemperatur (Ti) detektiert;
einen Auslasstemperatursensor (8), der eine Temperatur der Wärmemediums, das aus der
Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) in die Last (3) einströmt,
als Auslasstemperatur (To) detektiert; und
eine Systemsteuervorrichtung (20), die ausgelegt ist, um den Betrieb der Vielzahl
von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) basierend auf der in dem Einlasstemperatursensor
(7) detektierten Einlasstemperatur (Ti) und der in dem Auslasstemperatursensor (8)
detektierten Auslasstemperatur (To) zu steuern, dadurch gekennzeichnet, dass
die Systemsteuervorrichtung (20) Folgendes umfasst
eine Speichereinheit (24), die ausgelegt ist, um eine Betriebskapazität (Td) für jede
aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) zu speichern,
eine Angefragte-Kapazität-Berechnungseinheit (21), die ausgelegt ist, um eine angefragte
Kapazität (Tdg) basierend auf der Einlasstemperatur (Ti) oder der Auslasstemperatur
(To) und einer eingestellten Solltemperatur (Tref) zu berechnen,
eine Vorrichtungsanzahl-Berechnungseinheit (25), die ausgelegt ist, um die Anzahl
von zu aktivierenden Vorrichtungen aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen
(2A bis 2E), die die von der Angefragte-Kapazität-Berechnungseinheit (21) berechnete
angefragte Kapazität (Tdg) erfüllen, basierend auf der in der Speichereinheit (24)
für jede aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) gespeicherten
Betriebskapazität (Td) zu berechnen,
eine Aktivierungssteuereinheit (26), die ausgelegt ist, um die Vielzahl von Wärmepumpen-Kühlvorrichtungen
der Anzahl von zu aktivierenden Vorrichtungen, die in der Vorrichtungsanzahl-Berechnungseinheit
(25) berechnet wurde, durch Aktivieren einer einzelnen aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen
zu Beginn eines Betriebsvorgangs und anschließend gleichzeitiges Aktivieren von null
oder mehr aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen der restlichen Anzahl
der in der Vorrichtungsanzahl-Berechnungseinheit (25) berechneten Anzahl von zu aktivierenden
Vorrichtungen zu aktivieren, und
eine Betriebskapazität-Berechnungseinheit (23) die ausgelegt ist, um die Betriebskapazität
(Td) der einzelnen aktivierten Wärmepumpen-Kühlvorrichtung basierend auf der Einlasstemperatur
(Ti) und der Auslasstemperatur (To) zu berechnen, nachdem die einzelne Wärmepumpen-Kühlvorrichtung
aktiviert wurde, und die berechnete Betriebskapazität (Td) in der Speichereinheit
(24) als Betriebskapazität (Td) jeder aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen
(2A bis 2E) zu speichern.
2. Wärmepumpen-Kühlsystem nach Anspruch 1, wobei, nachdem die einzelne Wärmepumpen-Kühlvorrichtung
aktiviert wurde, die Aktivierungssteuereinheit (26) ausgelegt ist, um die Vielzahl
von Wärmepumpen-Kühlvorrichtungen der restlichen Anzahl aus der Anzahl von zu aktivierenden
Vorrichtungen, die die von der Angefragte-Kapazität-Berechnungseinheit (21) berechnete
angefragte Kapazität (Tdg) erreichen, gleichzeitig zu aktivieren.
3. Wärmepumpen-Kühlsystem nach Anspruch 1 oder 2, wobei die Aktivierungssteuereinheit
(26) ausgelegt ist, um die einzelne Wärmepumpen-Kühlvorrichtung mit einer Höchstbetriebskapazität
zu aktivieren.
4. Wärmepumpen-Kühlsystem nach einem der Ansprüche 1 bis 3, wobei die Betriebskapazität-Berechnungseinheit
(23) ausgelegt ist, um eine Differenz zwischen der Einlasstemperatur (Ti) und der
Auslasstemperatur (To) als Betriebskapazität (Td) der einzelnen Wärmepumpen-Kühlvorrichtung
zu berechnen.
5. Wärmepumpen-Kühlsystem nach einem der Ansprüche 1 bis 4, wobei die Betriebskapazität-Berechnungseinheit
(223) basierend auf einer Vielzahl von Betriebskapazitäten ausgelegt ist, um die in
der Speichereinheit (224) gespeicherte Betriebskapazität zu optimieren, wobei jede
aus der Vielzahl von Betriebskapazitäten jedes Mal, dass die einzelne Wärmepumpen-Kühlvorrichtung
aktiviert wird, berechnet wird.
6. Wärmepumpen-Kühlsystem nach Anspruch 5,
wobei die Speichereinheit (224) ausgelegt ist, um die Male, die die in der Speichereinheit
(224) gespeicherte Betriebskapazität optimiert wurde, als Anzahl von Lernereignissen
zu speichern, und
wobei, wenn die Anzahl von Lernereignissen geringer oder gleich einer voreingestellten
spezifizierten Anzahl ist, die Betriebskapazität-Berechnungseinheit (223) ausgelegt
ist, um die Betriebskapazität zu optimieren.
7. Wärmepumpen-Kühlsystem nach Anspruch 6,
wobei, wenn die Anzahl von Lernereignissen geringer oder gleich der voreingestellten
spezifizierten Anzahl ist, die Aktivierungssteuereinheit (26) ausgelegt ist, um basierend
auf der optimierten Betriebskapazität die einzelne Wärmepumpen-Kühlvorrichtung zu
Beginn des Betriebs allein zu aktivieren und anschließend null oder mehr aus der Vielzahl
von Wärmepumpen-Kühlvorrichtungen der restlichen Anzahl der in der Vorrichtungsanzahl-Berechnungseinheit
(25) berechneten Anzahl von zu aktivierenden Vorrichtungen zu aktivieren, und
wobei, wenn die Anzahl von Lernereignissen größer ist als die voreingestellte spezifizierte
Anzahl, die Aktivierungssteuereinheit (26) ausgelegt ist, um basierend auf der optimierten
Betriebskapazität die Vielzahl von Wärmepumpen-Kühlvorrichtungen der Anzahl von zu
aktivierenden Vorrichtungen, die in der Vorrichtungsanzahl-Berechnungseinheit (25)
berechnet wurde, zu Beginn des Betriebs zu aktivieren.
8. Wärmepumpen-Kühlsystem nach einem der Ansprüche 1 bis 7, wobei die Vorrichtungsanzahl-Berechnungseinheit
(25) ausgelegt ist, um die Anzahl von Vorrichtungen zu berechnen, die zu aktivieren
sind, wenn die Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) in einem voreingestellten
Kapazitätsverhältnis (A) arbeiten, das unter einer Höchstbetriebskapazität liegt.
9. Wärmepumpen-Kühlsystem nach Anspruch 8, wobei, wenn die berechnete Anzahl von Vorrichtungen,
die zu aktivieren sind, wenn der Betrieb in dem Kapazitätsverhältnis (A) durchgeführt
wird, größer ist als die Gesamtanzahl installierter Vorrichtungen aus der Vielzahl
von Wärmepumpen-Kühlvorrichtungen (2A bis 2E), die Vorrichtungsanzahl-Berechnungseinheit
(25) ausgelegt ist, um eine Kombination der Anzahl von Vorrichtungen aus der Vielzahl
von Wärmepumpen-Kühlvorrichtungen (2A bis 2E), die mit der Höchstbetriebskapazität
zu betreiben sind, und der Anzahl von zu aktivierenden Vorrichtungen aus der Vielzahl
von Wärmepumpen-Kühlvorrichtungen (2A bis 2E), die in dem voreingestellten Kapazitätsverhältnis
(A) zu betreiben sind, zu berechnen, sodass die angefragte Kapazität (Tdg) erreicht
wird.
10. Verfahren zum Steuern eines Wärmepumpen-Kühlsystems, in dem eine Vielzahl von Wärmepumpen-Kühlvorrichtungen
(2A bis 2E), die mit Kältekreisläufen, durch die Kühlmittel strömt, bereitgestellt
sind, mit einer Last (3) parallel geschaltet ist, so dass ein Wärmemedium zu der Last
(3) zirkuliert, und in dem die Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis
2E) bewirkt, dass das Kühlmittel und das Wärmemedium Wärme miteinander austauschen,
wobei die Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) ausgelegt ist, um
die gleichen Betriebskapazitäten aufzuweisen, wobei das Verfahren Folgendes umfasst:
Berechnen einer angefragten Kapazität (Tdg) basierend auf der Einlasstemperatur (Ti)
einer Strömung von der Last (3) zu der Vielzahl von Wärmepumpen-Kühlvorrichtungen
(2A bis 2E), der Auslasstemperatur (To) einer Strömung von der Vielzahl von Wärmepumpen-Kühlvorrichtungen
(2A bis 2E) zu der Last (3) und einer eingestellten Solltemperatur (Tref); gekennzeichnet durch
Berechnen der Anzahl von zu aktivierenden Vorrichtungen aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen
(2A bis 2E), mit der die berechnete angefragte Kapazität (Tdg) basierend auf einer
in einer Speichereinheit (24) für jede aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen
(2A bis 2E) gespeicherten Betriebskapazität erhalten wird;
Aktivieren der Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E) der berechneten
Anzahl von zu aktivierenden Vorrichtungen (2A bis 2E), durch Aktivieren einer einzelnen
aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A) allein zu Beginn eines Betriebsvorgangs
und anschließend gleichzeitiges Aktivieren von null oder mehr aus der Vielzahl von
Wärmepumpen-Kühlvorrichtungen (2B bis 2E) der restlichen Anzahl der in dem Schritt
des Berechnens der Anzahl von zu aktivierenden Vorrichtungen berechneten Anzahl von
zu aktivierenden Vorrichtungen, und
Berechnen der Betriebskapazität (Td) der einzelnen aktivierten Wärmepumpen-Kühlvorrichtung
(2A) basierend auf der Einlasstemperatur (Ti) und der Auslasstemperatur (To), nachdem
die einzelne Wärmepumpen-Kühlvorrichtung (2A) aktiviert wurde; und
Speichern der berechneten Betriebskapazität (Td) in der Speichereinheit (24) als Betriebskapazität
(Td) jeder aus der Vielzahl von Wärmepumpen-Kühlvorrichtungen (2A bis 2E).
1. Système de refroidissement de pompe à chaleur dans lequel une pluralité de dispositifs
de refroidissement de pompe à chaleur (2A à 2E) munis de cycles de réfrigération à
travers lesquels s'écoule un réfrigérant sont connectés en parallèle à une charge
(3) et dans lequel un milieu thermique ayant échangé de la chaleur avec le réfrigérant
dans la pluralité de dispositifs de refroidissement de pompe à chaleur (2A à 2E) circule
vers la charge (3), dans lequel la pluralité de dispositifs de refroidissement de
pompe à chaleur (2A à 2E) sont configurés pour avoir les mêmes capacités de fonctionnement,
le système de refroidissement de pompe à chaleur comprenant :
un capteur de température d'entrée (7) détectant une température du milieu thermique
s'écoulant dans la pluralité de dispositifs de refroidissement de pompe à chaleur
(2A à 2E) à partir de la charge (3) en tant que température d'entrée (Ti) ;
un capteur de température de sortie (8) détectant une température du milieu thermique
s'écoulant jusque dans la charge (3) à partir de la pluralité de dispositifs de refroidissement
de pompe à chaleur (2A à 2E) en tant que température de sortie (To) ; et
un dispositif de commande de système (20) configuré pour commander le fonctionnement
de la pluralité de dispositifs de refroidissement de pompe à chaleur (2A à 2E) sur
la base de la température d'entrée (Ti) détectée dans le capteur de température d'entrée
(7) et de la température de sortie (To) détectée dans le capteur de température de
sortie (8), caractérisé par
le dispositif de commande de système (20) comprenant
une unité de stockage (24) configurée pour stocker une capacité de fonctionnement
(Td) pour chacun de la pluralité de dispositifs de refroidissement de pompe à chaleur
(2A à 2E),
une unité de calcul de capacité demandée (21) configurée pour calculer une capacité
demandée (Tdg) sur la base de la température d'entrée (Ti) ou de la température de
sortie (To) et d'une température cible définie (Tref),
une unité de calcul de nombre de dispositifs (25) configurée pour calculer le nombre
de dispositifs à activer parmi la pluralité de dispositifs de refroidissement de pompe
à chaleur (2A à 2E) satisfaisant la capacité demandée (Tdg) calculée par l'unité de
calcul de capacité demandée (21) sur la base de la capacité de fonctionnement (Td)
stockée dans l'unité de stockage (24) pour chacun de la pluralité de dispositifs de
refroidissement de pompe à chaleur (2A à 2E),
une unité de commande d'activation (26) configurée pour activer la pluralité de dispositifs
de refroidissement de pompe à chaleur parmi le nombre de dispositifs à activer calculé
dans l'unité de calcul de nombre de dispositifs (25) en activant un unique de la pluralité
de dispositifs de refroidissement de pompe à chaleur seul au début du fonctionnement
puis en activant simultanément zéro ou plus de la pluralité de dispositifs de refroidissement
de pompe à chaleur parmi le nombre restant du nombre de dispositifs à activer calculé
dans l'unité de calcul de nombre de dispositifs (25), et
une unité de calcul de capacité de fonctionnement (23) configurée pour calculer la
capacité de fonctionnement (Td) du dispositif de refroidissement de pompe à chaleur
activé unique sur la base de la température d'entrée (Ti) et de la température de
sortie (To) après l'activation du dispositif de refroidissement de pompe à chaleur
unique, et stocker la capacité de fonctionnement calculée (Td) dans l'unité de stockage
(24) en tant que capacité de fonctionnement (Td) de chacun de la pluralité de dispositifs
de refroidissement de pompe à chaleur (2A à 2E).
2. Système de refroidissement de pompe à chaleur selon la revendication 1, dans lequel,
après l'activation du dispositif de refroidissement de pompe à chaleur unique, l'unité
de commande d'activation (26) est configurée pour activer simultanément la pluralité
de dispositifs de refroidissement de pompe à chaleur du nombre restant du nombre de
dispositifs à activer correspondant à la capacité demandée (Tdg) calculée par l'unité
de calcul de capacité demandée (21) .
3. Système de refroidissement de pompe à chaleur selon l'une quelconque des revendications
1 ou 2, dans lequel l'unité de commande d'activation (26) est configurée pour activer
le dispositif de refroidissement de pompe à chaleur unique avec une capacité de fonctionnement
maximum.
4. Système de refroidissement de pompe à chaleur selon l'une quelconque des revendications
1 à 3, dans lequel l'unité de calcul de capacité de fonctionnement (23) est configurée
pour calculer une différence entre la température d'entrée (Ti) et la température
de sortie (To) en tant que capacité de fonctionnement (Td) du dispositif de refroidissement
de pompe à chaleur unique.
5. Système de refroidissement de pompe à chaleur selon l'une quelconque des revendications
1 à 4, dans lequel, sur la base d'une pluralité des capacités de fonctionnement, l'unité
de calcul de capacité de fonctionnement (223) est configurée pour optimiser la capacité
de fonctionnement stockée dans l'unité de stockage (224), chacune de la pluralité
des capacités de fonctionnement étant calculée chaque fois que le dispositif de refroidissement
de pompe à chaleur unique est activé.
6. Système de refroidissement de pompe à chaleur selon la revendication 5,
dans lequel l'unité de stockage (224) est configurée pour stocker le nombre de fois
où la capacité de fonctionnement stockée dans l'unité de stockage (224) est optimisée
en tant que nombre d'apprentissages, et
dans lequel lorsque le nombre d'apprentissages est inférieur ou égal à un nombre spécifié
prédéfini, l'unité de calcul de capacité de fonctionnement (223) est configurée pour
optimiser la capacité de fonctionnement.
7. Système de refroidissement de pompe à chaleur selon la revendication 6,
dans lequel lorsque le nombre d'apprentissages est inférieur ou égal au nombre spécifié
prédéfini, l'unité de commande d'activation (26) est configurée pour activer le dispositif
de refroidissement de pompe à chaleur unique seul au début du fonctionnement puis
activer zéro ou plus de la pluralité de dispositifs de refroidissement de pompe à
chaleur du nombre restant du nombre de dispositifs à activer calculé dans l'unité
de calcul de nombre de dispositifs (25) sur la base de la capacité de fonctionnement
optimisée, et
dans lequel lorsque le nombre d'apprentissages est supérieur au nombre spécifié prédéfini,
l'unité de commande d'activation (26) est configurée pour activer la pluralité de
dispositifs de refroidissement de pompe à chaleur du nombre de dispositifs à activer
calculé dans l'unité de calcul de nombre de dispositifs (25) au début du fonctionnement
sur la base de la capacité de fonctionnement optimisée.
8. Système de refroidissement de pompe à chaleur selon l'une quelconque des revendications
1 à 7, dans lequel l'unité de calcul de nombre de dispositifs (25) est configurée
pour calculer le nombre de dispositifs devant être activés dans un cas où la pluralité
de dispositifs de refroidissement de pompe à chaleur (2A à 2E) fonctionnent à un rapport
de capacité prédéfini (A) qui est inférieur à une capacité de fonctionnement maximum.
9. Système de refroidissement de pompe à chaleur selon la revendication 8, dans lequel
lorsque le nombre calculé de dispositifs devant être activés lorsque l'opération est
effectuée au rapport de capacité (A) est supérieur au nombre total de dispositifs
installés parmi la pluralité de dispositifs de refroidissement par pompe à chaleur
(2A à 2E), l'unité de calcul de nombre de dispositifs (25) est configurée pour calculer
une combinaison du nombre de dispositifs parmi la pluralité de dispositifs de refroidissement
de pompe à chaleur (2A à 2E) devant être actionnés avec la capacité de fonctionnement
maximale et du nombre de dispositifs devant être activés parmi la pluralité de dispositifs
de refroidissement de pompe à chaleur (2A à 2E) devant être actionnés au rapport de
capacité prédéfini (A) de telle sorte que la capacité demandée (Tdg) soit satisfaite.
10. Procédé de commande d'un système de refroidissement de pompe à chaleur dans lequel
une pluralité de dispositifs de refroidissement de pompe à chaleur (2A à 2E) munis
de cycles de réfrigération à travers lequel du réfrigérant s'écoule sont connectés
en parallèle à une charge (3) de sorte qu'un milieu thermique circule vers la charge
(3) et dans lequel la pluralité de dispositifs de refroidissement de pompe à chaleur
(2A à 2E) amènent le réfrigérant et le milieu thermique à échanger de la chaleur l'un
avec l'autre, dans lequel la pluralité de dispositifs de refroidissement de pompe
à chaleur (2A à 2E) sont configurés pour avoir les mêmes capacités de fonctionnement,
le procédé comprenant les étapes consistant à :
calculer une capacité demandée (Tdg) sur la base d'une température d'entrée (Ti) de
l'écoulement à partir de la charge (3) vers la pluralité de dispositifs de refroidissement
de pompe à chaleur (2A à 2E), une température de sortie (To) de l'écoulement à partir
de la pluralité de dispositifs de refroidissement de pompe à chaleur (2A à 2E) vers
la charge (3), et une température cible définie (Tref) ;
caractérisé par les étapes consistant à
calculer le nombre de dispositifs devant être activés parmi la pluralité de dispositifs
de refroidissement de pompe à chaleur (2A à 2E) avec lequel la capacité demandée calculée
(Tdg) est obtenue sur la base d'une capacité de fonctionnement stockée dans une unité
de stockage (24) pour chacun de la pluralité de dispositifs de refroidissement de
pompe à chaleur (2A à 2E) ;
activer la pluralité de dispositifs de refroidissement de pompe à chaleur (2A à 2E)
du nombre calculé de dispositifs (2A à 2E) devant être activés en activant un unique
de la pluralité de dispositifs de refroidissement de pompe à chaleur (2A) seul au
début du fonctionnement, puis activer simultanément zéro ou plus de la pluralité de
dispositifs de refroidissement de pompe à chaleur (2B à 2E) du nombre restant du nombre
de dispositifs devant être activés calculé dans l'étape de calcul du nombre de dispositifs
devant être activés ;
calculer la capacité de fonctionnement (Td) du dispositif de refroidissement de pompe
à chaleur activé unique (2A) sur la base de la température d'entrée (Ti) et de la
température de sortie (To) après que le dispositif de refroidissement de pompe à chaleur
activé unique (2A) ait été activé ; et
stocker la capacité de fonctionnement calculée (Td) dans l'unité de stockage (24)
en tant que capacité de fonctionnement (Td) de chacun de la pluralité de dispositifs
de refroidissement de pompe à chaleur (2A à 2E).