[0001] The present invention relates to cable-mounted fluked burying devices for increasing
both the penetration and holding capacity of a drag embedment marine anchor and cable
system.
[0002] Such fluked burying devices are disclosed in
US Patent No. 3,685,479 which shows a first fluked burying device for mounting on a wire hawser and a second
fluked burying device for mounting in a chain cable to form an integral link thereof.
The fluked burying devices interact with seabed soil to impress axial forces in the
cable which increase holding capacity directly. The devices also increase holding
capacity indirectly by impressing transverse forces in the cable which counteract
penetration resistance thereof to promote deeper penetration of the anchor with consequent
increase in capacity.
[0003] Disadvantages of the first fluked burying device include slippage of clamping means
attaching the device to the wire hawser and both handling and operational damage arising
from localised bending of the wire hawser due to lack of articulation at both forward
and aft ends of the device.
[0004] Disadvantages of the second fluked burying device include: a requirement for structural
adaptation to carry high transmitted loads in the anchor cable which are considerably
in excess of those contributed by the device; a requirement for costly connecting
shackles to provide an adequate degree of articulation while carrying high transmitted
loads; and a Classification Society requirement for the application of a high proof
load to the device and to the shackles, on completion of manufacturing, equal to that
required for the associated chain cable. The last-mentioned Classification Society
requirement applies to all devices which are integral with the chain and through which
chain tension is transmitted.
[0005] It is an object of the present invention to provide a fluked burying device for increasing
the penetration and holding capacity of a drag embedment marine anchor and chain cable
system which overcomes the above-noted disadvantages. It is a further object of the
present invention to provide a modified fluked burying device capable of acting, additionally,
as a substitute for a marine anchor used in a drag embedment marine anchor and chain
cable system.
[0006] According to the present invention, a fluked burying device is defined by the features
of claim 1.
[0007] Preferably, said defined attitude comprises alternate links of said chain cable being
maintained in a plane at right angles to said plane of symmetry.
[0008] Preferably, said first contact points transfer axial load to corresponding points
on a first link of said chain cable and said second contact points transfer transverse
load to corresponding points on a second link of said chain cable.
[0009] Preferably, said second contact points are positioned such as to constrain induction
of bending stresses in said link of said chain cable during operation of said fluked
burying device to be similar to that which occurs in a wildcat of a windlass for tensioning
said chain cable.
[0010] Preferably, said second contact points are positioned on said body member at two
locations to bear on two of said links spaced apart such as to oppose turning moment
induced in said fluked burying device during interaction with a seabed soil while
penetrating therein with said chain cable taut.
[0011] Preferably, said two positions of said second contact points are spaced apart by
not less than 12 times bar diameter of said links and, preferably, not less than 20
times said bar diameter.
[0012] Preferably, said second contact points are positioned such that said corresponding
load transfer points on a link lying in a plane at right angles to said plane of symmetry
are spaced from said plane of symmetry by a distance in the range of 0.8 to 1.0 times
the nominal diameter of said link.
[0013] Preferably, said second contact points are positioned such that said corresponding
load transfer points on a link lying in a plane at right angles to said plane of symmetry
are separated from a central point of a crown section, lying in said plane of symmetry,
of said link by a distance in the range of 0.4 to 0.6 times the nominal diameter of
said link measured in a direction parallel to said axis of said chain cable.
[0014] Preferably, said attachment means comprises a pocket in said body member arranged
of accommodate a link of said chain cable.
[0015] Preferably, said pocket constrains said link of said chain cable to lie in a plane
at right angles to said plane of symmetry.
[0016] Preferably, said first contact points are located adjacent said fluke member whereby
tensile loading impressed in said chain cable by said fluked burying device substantially
bypasses the portion of said body member lying forward of said first contact points.
[0017] Preferably, said elongate members are plate-like.
[0018] Preferably, said pocket comprises an elongate slot perforating each of said plate-like
elongate members to accommodate said link.
[0019] Preferably, said elongate members are spaced apart by a distance between 1.06 and
1.1 times the nominal diameter of said link.
[0020] Preferably, said body member has a width less than that of a link of said chain cable,
measured transverse to said chain cable.
[0021] Preferably, said elongate members each have a width less than a bar diameter of a
link of said chain cable and, further preferably, less than 0.5 times said bar diameter,
measured transverse to said chain cable.
[0022] Preferably, said elongate members are splayed apart at an extremity such that a link
of said chain cable emergent from said extremity can swing freely sideways from said
plane of symmetry through an angle of up to 20°, with 12° further preferred.
[0023] Preferably, said emergent link can swing in said plane of symmetry through an angle
of up to 90° from said longitudinal axis.
[0024] Preferably, said fluked burying device including said second contact points at two
spaced locations also includes a roll stabilizer.
[0025] Preferably, a fluked burying device terminating said chain cable includes a yaw stabilizer.
[0026] Preferably, said fluked burying device is arranged such that a straight line containing
a centre point of a forward crown section, lying in said plane of symmetry, of a link
in a foremost pocket in said body member and a point of projection onto said plane
of symmetry of a foremost point of said fluke member is inclined to said longitudinal
axis at an angle in the range of 25° to 35°, with 30° further preferred.
[0027] Embodiments of the present invention will now be described by way of example with
reference to the accompanying drawings wherein:
Fig.1 shows an oblique front view of a fluked burying device;
Fig. 2 shows an oblique rear view of the fluked burying device of Fig.1;
Fig. 3 shows a plan view of the fluked burying device of Fig. 1;
Fig. 3A shows a detail of Fig. 3 to a larger scale;
Fig. 4 shows a side view of the fluked burying device of Fig. 1;
Fig. 5 shows a view of the fluked burying device of Fig. 1 in direction X of Fig.
4:
Fig. 6 shows a section Y-Y of the fluked burying device of Fig. 4;
Fig. 6A shows effective footing width W of inclined studless chain cable;
Fig. 7 shows a side view of a modification of the fluked burying device of Fig. 1;
Fig. 8 shows fluked burying devices installed in a deep layer of soil;
Fig. 8A shows fluked burying devices installed in a shallow layer of soil over rock;
Fig. 9 shows an oblique view of the fluked burying device of Fig. 1 with roll stabilizers;
Fig. 10 shows an oblique view of the fluked burying device of Fig. 7 with yaw stabilizers.
[0028] Referring to Figs. 1 to 6, a fluked burying device
1 is formed in two parts
2, 3 comprising a port half
2 and a starboard half
3, arranged for opposed attachment to each other about and in parallel with chain cable
4. Fluked burying device
1 is symmetrical about a plane of symmetry
5 (Figs. 4 and 5) which contains axis
6 of chain cable
4 which extends internally within shank
7 thereof. Plane of symmetry
5 is vertically orientated when fluked burying device
1 is buried in seabed soil
38 of seabed
39 (Fig.8). Port and starboard halves
2, 3 include shank 7 and fluke
8. Shank
7 comprises forward shank
7A, extending forward of fluke
8, and aft shank
7B, extending aft of fluke
8. Shank
7 and fluke
8 are formed respectively by plates
9 and
10 joined together at junction
11. Plate
9 of shank
7 has three slots
12A, 12B, and 12C (Figs. 1, 2 and 4) formed therein to function as pockets for accommodating links
17A, 17B, and
17C respectively of chain cable
4. Links
16 are held in plane of symmetry 5 whereas links
17 are held at right angles thereto. Slots
12A, 12B, and
12C are axially aligned in a plane
13 (Fig. 4) disposed at right angles to plane of symmetry
5. Longitudinal axis
14 of fluked burying device
1 is defined by the intersection of plane of symmetry
5 with plane
13 (Figs. 3 and 4). Thus, slots
12A, 12B, and
12C hold axis
6 substantially coincident with axis
14.
[0029] Port and starboard halves
2, 3 of fluked burying device
1 are assembled with plates
9 in parallel with plane of symmetry
5 and with corresponding slots
12A, 12B, and
12C registering with each other. Halves
2 and
3 and are fastened together sideways about chain cable
4 by means of bolts
15 passing through plates
9 and spacers
15A which serve to maintain sufficient clearance for links
16 (Fig. 5) of chain cable
4 lying in plane of symmetry
5 to avoid clamping of links
16 by plates
9. Thus, spacers
15A space plates
9 apart by a distance in the range of 1.05 to 1.1 times the nominal diameter
D (Fig. 4) of chain cable
4. Slots
12A, 12B, and
12C provide a loose fit about corresponding links
17A, 17B, and
17C to provide sufficient clearance in a direction parallel to axis
14 (Fig. 4) to allow chain cable
4 to stretch under extreme loading without being restrained by slots
12A, 12B, and
12C.
[0030] Plate
9 has lower extension
9A and upper extension
9B, at junction
11, provided to support fluke
8. Tapered plate ribs
18 are welded to plates 9 and
10 to increase the bending resistance of fluke
8. Plate rib extensions
18A bearing against each other at plane of symmetry
5 take compressive loading between halves
2 and
3 of fluked burying device
1 (Figs. 2 and 3). Distance
E (Fig. 4) separating forward end
12D of slot
12C from aft end
12E of slot
12B is chosen to provide minimal clearance between forward end
12D and link
17C and minimal clearance between aft end
12E and link
17B. Forward end
12D of slot
12C bearing on link
17C constitutes aft stop point
19A which prevents fluked burying device
1 from being pushed aft on chain cable
4 when fluke
8 is subjected to soil loading during forwards embedment of fluked burying device
1. Aft end
12E of slot
12B bearing on link
17B constitutes forward stop point
19B to arrest fluked burying device 1 from being pushed forward on chain cable
4 when fluke
8 is subjected to soil loading during rearwards recovery of fluked burying device
1. Thus, stop points
19A and
19B act together to locate fluked burying device
1 in a fixed position axially on chain cable
4 while the beforementioned allowance for stretching ensures that axial loading can
be transferred only via stop points
19A or
19B irrespective of the magnitude of tension in chain cable
4.
[0031] Since links
17A, 17B, and
17C are fitted loosely in respective slots
12A, 12B, and
12C, relative movement between chain cable
4 and fluked burying device
1 causes either stop point
19A to bear on link
17C or stop point
19B to bear on link
17B to act as the sole point of transfer of axial force into chain cable
4 from plate
9 of fluked burying device
1 during forwards embedment and rearwards recovery respectively. Importantly, location
of stop point
19A proximal to junction
11 eliminates direct stress in almost the whole of forward shank
7A arising from soil loading on fluke
8. Since tensile loading impressed in chain cable
4 aft of fluked burying device
1 bypasses both forward shank
7A and aft shank
7B, no direct tensile stresses resulting therefrom are additionally induced therein.
[0032] Transverse reaction bearing forces between shank
7 and links
17A and
17C of taut chain cable
4 acting through bearing contact points
A at the forward ends of slots
12A and bearing contact points
B at the aft ends of slots
12C (Fig. 4) provide a resisting moment to counteract a moment arising from loading of
fluke
8 which tends to rotate fluked burying device
1 in plane of symmetry
5 relative to forward and aft portions of axis
6 of chain cable
4 external to fluked burying device
1. Bearing contact points
A and
B are separated by a moment arm distance
L (Fig. 4) approximately equal to 20 times the nominal bar diameter
D (Figs. 4 and 6) of links
16 and
17 of chain cable
4 although, for a fluked burying device
1 pocketing only two of links
17, distance
L could be as low as approximately 12 times diameter
D. The bending moment induces bending stresses in shank
7 which predominate in forward shank
7A (Fig. 4) when concentrated loading occurs at tip
20 of fluke
8 due to lodging, say, on an obstruction such as a rock. However, peak tensile bending
moment stresses are not boosted by added direct stresses with the result that shank
7 and, particularly, forward shank
7A may be of lighter and thus lower cost construction. This advantageous arrangement
arises from the separation distance
M (Fig. 4), approximately equal to 15D, provided between the forward application points
A of transverse loading and the points
19A of axial loading and is an important aspect of fluked burying device
1.
[0033] Plate
10 of fluke
8 is inclined to plate
9 of shank
7 at an angle
α (Fig. 5) in the range 90° to 115°, with 95° preferred. Junction
11 between plate
10 of fluke
8 and plate
9 of shank
7 is inclined to axis
14 at angle
β (Fig. 4) which is in the range of 35° to 60°, with 50° preferred. Leading edge
21 of fluke
8 is inclined to junction
11 at an angle
γ (Fig. 1) in the range 45° to 75°, with 60° preferred. A straight line
22 (Fig. 4), in plane of symmetry
5, joining centre
23 of a forward crown section
24 of pocketed link
17A to a point of projection
25 of tip
20 of fluke
8 onto plane of symmetry
5, is inclined to axis
14 at an acute angle
δ and forms, aft of tip
20, an acute angle
ε with a projection line
26 of junction
11 onto plane of symmetry
5. Angle
δ is in the range of 25° to 35°, with 30° preferred and angle
ε is in the range of 60° to 85°, with 80° preferred for fluked burying device
1 and 65° preferred for terminal fluked burying device
1A (Fig. 7) described below.
[0034] The length of junction
11 is approximately 17 times diameter
D. The length of trailing edge
27 of fluke
8 is approximately 13 times diameter
D. Thus, when diameter
D equals 50mm, the fluke area of fluked burying device
1 projected on a plane (not shown), containing junction
11 and at right angles to plane of symmetry
5, is approximately 0.9 square metre.
[0035] Forward extremity
28 of plates
9 of forward shank
7A and rearward extremity
29 of plates
9 of aft shank
7B each have a radius
R (Fig. 4) made equal to 1.5 times diameter
D. This allows forward emergent link
16A (Figs. 1,2, 4 and 5) to pivot on link
17A, which is restrained in slot
12A, through some 180° in plane of symmetry
5 and allows link
17D (Fig. 4) to pivot simultaneously on link
16A through some 180° in a plane transverse to plane of symmetry
5. Similarly, rearward emergent link
16B (Figs. 2 and 4) can pivot on link
17C, which is restrained in slot
12C, but through only about 150° in plane of symmetry
5 due to chain cable
4 being restrained by making contact with fluke
8, while link
17E remains able to pivot simultaneously on link
16B through some 180° in a plane transverse to plane of symmetry
5.
[0036] Transverse loading contact points
A and
B (Figs. 3 and 3A) between plates
9 of shank
7 and links
17A and
17C are located at positions which normally occur when such chain links are loaded in
a wildcat (also known as a cable-lifter or gypsy) of a windlass. These load transfer
points are known from Figure 14 in published paper number 3813 of the
Offshore Technology Conference, Houston, May, 1980, by A. Berg and A. Taraldsen, of
Det Norske Veritas, which indicates that a central point of a load transfer area on a link lies at a
distance of approximately
0.9D from a transverse plane containing the central axis of the chain link and separated
by a distance of approximately
0.5D from the centre of a crown section of the link measured in a direction parallel to
the central axis of the link. Accordingly, contact points
A and
B in shank
7 are arranged to be spaced by distance
X (Fig. 3A) from plane of symmetry
5 and located such as to be separated from central point
23 of crown section
24 of link
17A or link
17C, respectively, by distance
Y measured in a direction parallel to axis
6 of chain cable
4. Distance
X is in the range 0.8D to 1.0D and distance
Y is in the range 0.4D to 0.6D so that links
17A and
17C are loaded as if in a wildcat.
[0037] In a 5-pocket wildcat, commonly adopted for service in the offshore drilling industry,
the angular displacement between adjacent supported and unsupported chain links is
36°. When fluked burying device
1 is embedded in seabed soil
38, link
16A can become displaced angularly in plane of symmetry
5 through a maximum of 30° from adjacent supported link
17A due to coming into alignment with line
22 (Fig. 4) when a localised force is applied at tip
20 of fluke
8 by, say, a rocky obstruction. Therefore, the transverse component of tension in chain
cable
4 which gives rise to induction of bending stresses in supported link
17A is less than would occur in a wildcat by a factor sin30/sin36 = 0.85. Thus, constraint
in slots
12A enables links
17A (and, similarly,
17C) to be operated at 15 per cent lower bending stress for equivalent axial tension
than occurs in a wildcat.
[0038] Forward extremity
28 and rearward extremity
29 of plates
9 are splayed apart from lines
A1 and
B1 just aft and forward of points
A and
B respectively (Figs. 4 and 5) through a bend angle
θ (Fig.3) of 20° to allow links
16A and
16B to pivot through angle
θ out of plane of symmetry
5 before being arrested by the splayed extremities
28 and
29. This allows azimuthal veering of chain cable
4 to be accommodated without bending link
16A or link
16B. Since spacing
1.1D between plates
9 is less than width
1.5D of a wildcat groove, the above-noted spacing of bearing points
A and
B from plane of symmetry
5 is maintained despite extremities
28 and
29 being splayed apart.
[0039] The component of force acting transversely on fluked burying device
1 or terminal fluked burying device
1A when link
16A has pivoted 20° sideways out of plane of symmetry
5, due to azimuthal veering of chain cable
4 while taut, is 34 per cent of tensile loading in chain cable
4. This is sufficient to turn fluked burying device 1 or terminal fluked burial device
1A into the direction of veering when embedded in seabed soil
38 with the result that peak pivoting of link
16A, in actuality, is considerably less than 20°. Thus, link
16A (and, similarly, link
16B) is subjected only to tensile loading during such veering.
[0040] The above described combination of support, constraint, and freedom of articulation
accorded links
17D,
16A, and
17A and links
17C,
16B, and
17E by plates
9 at extremities
28 and
29 enables chain cable
4 issuing from shank
7 of fluked burying device
1 to function normally, without incurring a penalty by way of increased bending stresses
in links
17A or
17C, and so fulfil the function of two heavy and expensive shackles which are thus rendered
unnecessary.
[0041] The penetration resistance of chain cable
4 moving in direction
P (Figs. 6A and 8), inclined at angle
Ø to axis
6, in seabed soil
38, is proportional to area
AP of unit length of chain cable
4 viewed obliquely in direction
P, where
AP is gross area, neglecting internal apertures in chain cable
4 through which, in practice, soil is unable to flow. The width
W (Fig. 6A) of a unit length of rectangular strip footing of area equal to
AP is the effective footing width of chain cable
4 moving in direction
P.
W is a measure of the penetration resistance of chain cable
4 in seabed soil
38. When viewed in direction
P, links
17 appear to close and merge together as
Ø decreases, thus indicating that
W varies inversely and non-linearly with
Ø (Fig. 6A). With respect to studless chain, in which width
WL of link
17 is 3.35D, it may be determined that for 0° ≤
Ø ≤ 10°, 3.35D ≥
W ≥ 3.25D; for
Ø = 30°,
W = 2.69D; and for
Ø = 90°,
W = 2.48D. Thus, substantially maximum penetration resistance, being 3.25/3.35 x 100
= 97 per cent, remains present when
Ø is as high as 10° and,similarly, 80 per cent of maximum penetration resistance remains
present for
Ø equal to 30°. Accordingly, width
WS (Fig. 6) of shank
7 is restricted to being not greater than width
WL, which is equal to 3.35D for studless chain, so that shank
7 does not add to the penetration resistance of chain cable
4 at the critical stage of penetrating into a firm seabed surface
40 when
Ø is small. Further, adoption of a lesser width for shank
7 in the range of 1.9D to 2.2D is preferred when
Ø increases as high as 30°, which is known to occur when a series of several fluked
burying devices
1 penetrate deeply to depth
Z (Fig. 8) below seabed surface
40.
[0042] Plates
9 and
10 are of thickness
t9 (Figs. 6) and
t10 (Fig. 5) respectively and may be of equal thickness for economy of fabrication. Thickness
t9 of plates
9 is chosen to be less than diameter
D so that width
WS of shank
7 is less than 3.35D. Preferably, thickness
t9 is chosen to be not more than
0.6D, and preferably less than 0.5D, to minimise the penetration resistance added by shank
7 to chain cable
4 at higher angles of inclination to axis
6 of the penetration direction
P of chain cable
4.
[0043] Referring now to Fig. 7, terminal fluked burying device
1A is a modification of fluked burying device
1 better suited for use as a terminal device at the end of chain cable
4. Shank
7 of terminal fluked burying device
1A is made hook-shaped in side view and lengthened to accommodate five links
17 of chain cable
4 in five slots
12. Fluke
8 is enlarged and offset from plane
13 and axis
14 such that furthest aft point
30 of junction
11 lies on or below plane
13. Shank
7 of fluked burying device
1A is splayed apart adjacent forward extremity
28A in the same manner as for fluked burying device
1. Also, links
16A and
17A are supported and loaded in the same manner as for fluked burying device
1. The increased offset loading of fluke
8 results in higher bending moments in shank
7. These induce higher stresses which are accommodated by increasing appropriately the
section depth of plates
9 with distance from end
28A of shank
7 and adding doubler plates
31 between plates
9 to act as spacers which increase the strength of shank
7 without increasing width
WS thereof. Two contoured spacer plates
32 are welded to each of plates
9 to act both as spacers and provide stop points
19C and
19D which differ from previously shown stop points
19A and
19B in that penultimate link
33 and ultimate link
34 of chain cable
4, lying in plane of symmetry 5, are restrained thereby. Heavy bolts
35 pass through plates
9 and spacer plates
32 to prevent spacer plates
32 from being forced apart by large forces transferred thereto from ultimate link
34. Ultimate link
34 may also serve as a lug for attachment of a pendant line to facilitate installation.
Plates
9 of shank
7 are extended to tip
20 of fluke
8 by way of tapered stiffeners
36 and
37 to enable terminal fluked burying device
1A to withstand high concentrated loading applied at tip
20. Thus, terminal fluked burying device
1A is, in essence, a marine drag embedment anchor constructed in two halves for assembly
sideways onto chain cable
4 with chain cable
4 therein acting as a parallel load-bearing element and providing sufficient articulation
to eliminate both a need for a conventional heavy and expensive shackle and the high
penetration resistance penalty associated with such a shackle.
[0044] Fluked burying devices
1 and
1A may be fitted with roll stabilizers
42 and yaw stabilizers
43 respectively (Figs. 9 and 10).
[0045] Roll stabilizers
42 (Fig. 9) comprise rectangular plates
43 attached one at each side of fluked burying device
1 to edge
44 of fluke plate
10 at a position approximately midway along the length of edge
44 with edge
45 of plate
43 being aligned with edge
44. Plates
43 lie in plane
46 which is disposed at right angles to plane of symmetry
5 (Figs. 3 and 5) and which is inclined at an angle
Δ to axis
14 of fluked burying device
1. Plane
46 intersects plane of symmetry
5 in line
46A. Angle
Δ is subtended by line
46A and axis
14 and is in the range of 0° to 40°, with 20° preferred. The area of plate
43 is in the range of 8 to 12 per cent of the area of each plate
10 with 10 per cent preferred. Soil incident on plate
43 produces a force parallel to plane of symmetry
5 which gives rise to a roll moment about axis
6 of chain cable
4. Any rolling action of fluked burying device
1 causes one of plates
43 to bury deeper in soil
38 than the other and so gives rise to a net imbalance in roll moments about axis
6 acting in opposition to the rolling action, thus providing a roll stabilizing effect.
Fluked burying device
1 need be stabilized only in roll since tension in chain cable
4 resists yaw misalignment, between axis
14 of fluked burying device
1 and those portions of axis
6 of chain cable
4 adjacent and external to fluked burying device
1, by giving rise to a large countervailing moment.
[0046] Yaw stabilizers
46 (Fig. 10) comprise substantially triangular plates
47 attached one at each side of terminal fluked burying device
1A. A forward apex
47A of triangular plate
47 is attached to edge
48 of fluke plate
10 at a position approximately midway along the length of edge
48. Upper edge
49 of triangular plate
47 lies in plane
50 containing fluke plate
10 which is extended locally to support triangular plate
47. Triangular plate
47 is located in plane
51 which is inclined at angle
Ω to plane of symmetry
5 (Figs. 3 and 5) such that the intersection (not shown) between plane
51 and plane of symmetry
5 is at right angles to axis
14 of terminal fluked burying device
1A. Thus, when angle
α (Fig. 5) of fluked burying device
1A equals 90°, angle
Ω is included between edges
48 and
49. Angle
Ω is in the range of 10° to 35°, with 20° preferred. The area of triangular plate
47 is in the range of 8 per cent to 20 per cent of the area of each fluke plate
10, with 14 per cent preferred. Any rolling of terminal fluked burying device
1A causes yaw to occur due to a lack of a countervailing moment being produced from
through tension in chain cable
4, as previously mentioned for fluked buying device
1. Thus, terminal fluked burying device
1A is subject to a roll-yaw couple. Since the resistance in soil
38 to rolling of terminal fluked buying device
1A is greater than the resistance to yawing, it is easier and more effective to stabilize
in yaw than in roll. Stabilization in yaw preventing fluke point
20 of fluked burying device
1A from moving sideways along a helical roll-yaw path that would otherwise occur under
the influence of a roll-yaw couple. Any rolling action of fluked burying device
1 causes one of triangular plates
47 to bury deeper in soil
38 than the other and so gives rise to a stabilizing net imbalance in yaw moments about
the articulation contact point between links
16A and
17A of chain cable
4 adjacent foremost end
28A of shank
7. This acts against incipient rolling action by preventing fluke point
20 from moving sideways along the unstable helical roll-yaw path.
[0047] Several fluked burying devices
1 may be used in conjunction with terminal fluked burying device
1A (Fig. 8) to enable the full load carrying capability of any size of chain cable to
be exploited fully. Each fluked burying device
1 effectively cancels adjacent penetration resistance of chain cable
4 in seabed soil
38 to allow terminal fluked burying device
1A to achieve penetration depth
Z below seabed surface
40 sufficient for the load contributions of each device, in aggregate, to match the
breaking load of chain cable
4. In seabeds
39 having penetrable soils
38 of limited vertical extent overlying impenetrable rock layer
41 (Fig. 8A), an extended series of fluked burying devices
1 may be deployed and installed against layer
41, again with the load contributions from each device, in aggregate, being able to
match the breaking load of chain cable
4.
[0048] Terminal fluked burial device
1A, now simply referred to as fluked burial device
1A, may also be used in place of fluked burying device
1 to exploit the advantage of having a fluke offset from axis
6 of chain cable
4. A series of fluked burying devices
1A may, for example, be used on a hard sea bed surface
40 where offset flukes
8 are able to penetrate almost fully before underside
41 (Fig. 7) of shank
7 bears on surface
40 of seabed
39 to resist or even arrest further embedment.
[0049] It will be readily appreciated that variations of the above described fluked burying
devices are possible within the scope of the present invention. For example, plates
9 of shank
7 may be provided with a different number of slots
12 than shown in the accompanying drawings. Also, additional elongated split spacers
(not shown) between plates
9, split about plane of symmetry
5, may be provided along the periphery of shank
7 to enable external welding along the split line to be performed, after assembly of
fluked burying device
1 onto chain cable
4, if so desired for long term service.
[0050] The present invention provides numerous advantages. Since fluked burying devices
1 and
1A are each constructed in two halves for final assembly on chain cable
4, the number deployed and the spacing between devices can be selected to suit soil
conditions and user preferences. The devices are readily and cheaply transportable
in gauge in standard shipping containers while disassembled. Incorporating chain cable
4 within fluked burial devices
1 and
1A and the splaying of plates 9 of shank 7 to provide an adequate degree of articulation
eliminates need for expensive shackles. The use of chain cable
4 as a major load-bearing element within devices
1 and
1A allows a significant reduction in stresses to be achieved which results in reduced
structural cost. The ability to distribute loading along a length of chain cable
4 by using a multiplicity of fluked burying devices
1 in conjunction with a terminal fluked burying device
1A allows high holding capacity to be obtained from seabeds having shallow or deep sediment
conditions in a manner and at a low cost hitherto unobtainable.
1. A fluked burying device (1, 1A) for mounting on a chain cable (4), formed substantially
in two halves (2, 3) for opposed sideways assembly on said chain cable (4) includes
a plane of symmetry (5) and comprises a body member (7) comprising two elongate members
(9, 10) each disposed substantially parallel to said plane of symmetry (5) and each
extending when mounted on the chain cable along one of two opposed sides of said chain
cable (4) and a fluke member (8) attached to the body member (7) at an acute angle
of inclination to a longitudinal axis (14) of said body member (7), and includes attachment
means (12A, 12B, 12C, 19A, 19B), in the form of elongated slots for holding said body
member (7) in a fixed position on a chain cable (4) comprising a series of links (16,
17) by means of bolts (15) extending between the parts of the body member (7), whereby
said longitudinal axis (14) is maintained substantially aligned with an axis (6) of
said chain cable (4), said body member (7) being adapted to maintain said chain cable
(4) extending in a defined attitude therein, said attachment means (12B, 12C) including
first contact points (19A, 19B, 19C, 19D) on said body member (7) engaging corresponding
points on a link (17B, 17C) of said chain cable (4) and second contact points (A,
B) on said body member (7) engaging corresponding points on a link (17A, 17C) of said
chain cable (4).
2. A fluked burying device (1, 1A), according to claim 1, wherein said defined attitude
comprises alternate links (17) of said chain cable (4) being maintained in a plane
at right angles to said plane of symmetry (5).
3. A fluked burying device (1, 1A), according to claims 1 or 2, wherein said second contact
points (A, B) are positioned such as to constrain induction of bending stresses in
said link (17A, 17C) of said chain cable (4) during operation of said fluked burying
device (1, 1A) to be similar to that which occurs in a wildcat of a windlass when
tensioning said chain cable (4).
4. A fluked burying device (1), as claimed in claims 1 to 3, wherein said second contact
points (A, B) are positioned on said body member (7) at two locations to bear on two
of said links (17A, 17C) spaced apart such as to oppose turning moment induced in
said fluked burying device (1) during interaction with a seabed soil (38) while penetrating
therein when said chain cable (4) is taut.
5. A fluked burying device (1), according to claim 4, wherein said two locations of said
second contact points (A, B) are spaced apart by not less than 12 times bar diameter
(D) of said links (16, 17) and, preferably, not less than 20 times said bar diameter
(D).
6. A fluked burying device (1, 1A), according to claims 1 to 5, wherein said second contact
points (A, B) are positioned such that said corresponding load transfer points on
a link (17A, 17C) lying in a plane at right angles to said plane of symmetry (5) are
spaced from said plane of symmetry (5) by a distance in the range of 0.8 to 1.0 times
the nominal bar diameter (D) of said link (17A, 17C).
7. A fluked burying device (1, 1A), as claimed in claims 1 to 6, wherein said second
contact points (A, B) are positioned such that said corresponding load transfer points
on a link (17A, 17C) lying in a plane at right angles to said plane of symmetry (5)
are separated from a central point of a crown section, lying in said plane of symmetry
(5), of said link (17A, 17C) by a distance in the range of 0.4 to 0.6 times the nominal
bar diameter (D) of said link (17A, 17C) measured in a direction parallel to said
axis (6) of said chain cable.
8. Afluked burying device (1, 1A), according to claims 1 to 7, wherein said attachment
means (12A, 12B, 12C, 19A,19B) comprises a pocket (12A, 12B, 12C) in said body member
arranged to accommodate a link (17A, 17B, 17C) of said chain cable (4).
9. A fluked burying device (1, 1A), according to claim 8, wherein said pocket (12A, 12B,
12C) constrains said link (17A, 17B, 17C) of said chain cable (4) to lie in a plane
at right angles to said plane of symmetry (5).
10. A fluked burying device (1, 1A), as claimed in any preceding claim, wherein said first
contact points (19A, 19B, 19C, 19D) are located adjacent said fluke member (8) whereby
tensile loading impressed in said chain cable (4) by said fluked burying device (1,
1A) substantially bypasses that portion of said body member (7) lying forward of said
first contact points (19A, 19B, 19C, 19D).
11. A fluked burying device (1, 1A), as claimed in claim 1 , wherein said elongate members
(9, 10) are plate-like.
12. A fluked burying device (1, 1A), according to claim 11 , wherein said pocket (12A,
12B, 12C) comprises an elongate slot (12A, 12B, 12C) perforating each of said plate-like
elongate members (9,10) to accommodate said link (17A, 17B, 17C).
13. A fluked burying device (1, 1A), as claimed in claim 11 or 12 wherein said plate-like
elongate members (9, 10) are spaced apart by a distance between 1.06 and 1.1 times
the nominal diameter of said link (16, 17).
14. A fluked burying device (1, 1A), as claimed in any preceding claim, wherein said body
member (7) has a width less than that of a link (16, 17) of said chain cable (4),
measured transverse to said chain cable (4).
15. A fluked burying device (1, 1A), as claimed in claims 11 to 14 wherein said plate-like
elongate members (9, 10) each have a thickness (t9) less than bar diameter (D) of
a link (16, 17) of said chain cable (4) and, further preferably, less than 0.5 times
said bar diameter (D).
16. A fluked burying device (1, 1A), according to claims 11 to 13 and 15 wherein said
elongate members (9, 10) are splayed apart at an extremity (28, 29) such that a link
(16A, 16B) of said chain cable (4) emergent from said extremity (28, 29) can swing
freely sideways from said plane of symmetry (5) through an angle (θ) of up to 20°,
with 12° further preferred.
17. A fluked burying device (1, 1A), according to claim 16 wherein said emergent link
(16A, 16B) can swing in said plane of symmetry (5) through an angle of up to 90° from
said longitudinal axis (14).
18. Afluked burying device (1), according to any preceding claim, wherein said fluked
burying device (1) includes roll stabilizers (42).
19. A fluked burying device (1A), according to any preceding claim, wherein said fluked
burying device (1A) includes yaw stabilizers (46).
20. A fluked burying device (1, 1A), according to any preceding claim, wherein said fluked
burying device (1, 1A) is arranged such that a straight line (22) containing a centre
point of a forward crown section, lying in said plane of symmetry (5), of a link (17A)
in a foremost pocket (12A) in said body member (7) and a point of projection (25)
onto said plane of symmetry (5) of a foremost point (20) of said fluke member (8)
is inclined to said longitudinal axis (14) at an angle (δ) in the range of 25° to
35°, with 30° further preferred.
1. Eingrabvorrichtung mit Flunke (1, 1A), die zum Anbringen einer Ankerkette (4) dient
und im Wesentlichen aus zwei Hälften (2, 3) zum Anordnen auf gegenüberliegenden Seiten
der Ankerkette (4) gebildet ist und welche eine Symmetrieebene (5) beinhaltet und
ein Grundelement (7) umfasst, welches zwei längliche Elemente (9, 10), welche jeweils
im Wesentlichen parallel zur Symmetrieebene (5) angeordnet sind und sich jeweils im
an der Ankerkette montierten Zustand entlang einer der zwei gegenüberliegenden Seiten
der Ankerkette (4) erstrecken, sowie ein Flunkenelement (8) umfasst, welches am Grundelement
(7) in einem spitzen Neigungswinkel bezüglich einer Längsachse (14) des Grundelements
(7) angebracht ist, und Befestigungsmittel (12A, 12B, 12C, 19A, 19B) in Form von länglichen
Schlitzen aufweist, um das Grundelement (7) in einer festen Position an der eine Serie
von Kettengliedern (16, 17) umfassenden Ankerkette (4) mittels Bolzen (15) zu halten,
welche sich zwischen den Teilen des Grundelements (7) erstrecken, wodurch die Längsachse
(14) im Wesentlichen an der Achse (6) der Ankerkette (4) ausgerichtet ist, wobei das
Grundelement (7) so eingerichtet ist, die Ankerkette (4) so zu halten, dass sie sich
darin in einer definierten Ausrichtung erstreckt, wobei die Befestigungsmittel (12B,
12C) erste Kontaktpunkte (19A, 19B, 19C, 19D) auf dem Grundelement (7) aufweisen,
welche mit entsprechenden Punkten an einem Kettenglied (17B, 17C) der Ankerkette (4)
zusammengreifen, und zweite Kontaktpunkte (A, B) auf dem Grundelement (7) aufweisen,
welche mit entsprechenden Punkten auf einem Kettenglied (17A, 17C) der Ankerkette
(4) zusammengreifen.
2. Eingrabvorrichtung mit Flunke (1, 1A) nach Anspruch 1,
bei welcher die definierte Ausrichtung umfasst, dass abwechselnd die Kettenglieder
(17) der Ankerkette (4) in einer Ebene gehalten werden, die im rechten Winkel zur
Symmetrieebene (5) steht.
3. Eingrabvorrichtung mit Flunke (1, 1A) nach Anspruch 1 oder 2,
bei welcher die zweiten Kontaktpunkte (A, B) derart positioniert sind, dass sie das
Einleiten von Biegespannungen in das Kettenglied (17A, 17C) der Ankerkette (4) während
der Verwendung der Eingrabvorrichtung mit Flunke (1, 1A) so begrenzen, dass sie ähnlich
zu denen sind, die beim Spannen der Ankerkette (4) im Kettenrad einer Ankerwinde auftreten.
4. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der Ansprüche 1 bis 3,
bei welcher die zweiten Kontaktpunkte (A, B) auf dem Grundelement (7) an zwei Stellen
positioniert sind, so dass sie auf zwei der Kettenglieder (17A, 17C) wirken, welche
derart voneinander beabstandet sind, dass sie einem Drehmoment entgegenwirken, welches
in die Eingrabvorrichtung mit Flunke (1, 1A) während deren Wechselwirkung mit dem
Meeresgrund (38) während des in diesen erfolgenden Eindringens eingeleitet wird, wenn
die Ankerkette (4) gespannt ist.
5. Eingrabvorrichtung mit Flunke (1, 1A) nach Anspruch 4,
bei welcher die beiden Stellen der zweiten Kontaktpunkte (A, B) voneinander um nicht
weniger als zwölf mal dem Nenndurchmesser (D) der Kettenglieder (16, 17) und bevorzugt
um nicht weniger als 20 mal dem Nenndurchmesser (D) beabstandet sind.
6. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der Ansprüche 1 bis 5,
bei welcher die zweiten Kontaktpunkte (A, B) so positioniert sind, dass entsprechende
Kraftübertragungspunkte an einem Kettenglied (17A, 17C), die in einer Ebene im rechten
Winkel zur Symmetrieebene (5) liegen, von der Symmetrieebene (5) um einen Abstand
von 0,8 bis 1,0 mal dem Nenndurchmesser (D) des Kettengliedes (17A, 17C) entfernt
sind.
7. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der Ansprüche 1 bis 6,
bei welcher die zweiten Kontaktpunkte (A, B) so positioniert sind, dass entsprechende
Kraftübertragungspunkte an einem Kettenglied (17A, 17C), welche in einer Ebene im
rechten Winkel zur Symmetrieebene (5) liegen, von einem in der Symmetrieebene liegenden
Mittelpunkt eines Scheitelpunktabschnitts des Kettengliedes (17A, 17C) um einen Abstand
von 0,4 bis 0,6 mal dem Nenndurchmesser (D) des Kettengliedes (17A, 17C) getrennt
liegen, wobei dieser Abstand in einer Richtung parallel zur Achse (6) der Ankerkette
gemessen ist.
8. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der Ansprüche 1 bis 7,
bei welcher das Befestigungsmittel (12A, 12B, 12C, 19A, 19B) eine Tasche (12A, 12B,
12C) im Grundelement umfasst, die dazu ausgelegt ist, ein Kettenglied (17A, 17B, 17C)
der Ankerkette (4) aufzunehmen.
9. Eingrabvorrichtung mit Flunke (1, 1A) nach Anspruch 8,
bei welcher die Tasche (12A, 12B, 12C) das Kettenglied (17A, 17B, 17C) der Ankerkette
(4) so einschränkt, dass dieses in einer Ebene im rechten Winkel zur Symmetrieebene
(5) liegt.
10. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der vorigen Ansprüche,
bei welcher die ersten Kontaktpunkte (19A, 19B, 19C, 19D) sich benachbart zum Flunkenelement
(8) befinden, wodurch eine Zugspannung, die auf die Ankerkette (4) durch die Eingrabvorrichtung
mit Flunke (1, 1A) ausgeübt wird, denjenigen Abschnitt des Grundelements (7) ausspart,
welcher in Vorwärtsrichtung vor den ersten Kontaktpunkten (19A, 19B, 19C, 19D) liegt.
11. Eingrabvorrichtung mit Flunke (1, 1A) nach Anspruch 1, beim welcher die länglichen
Elemente (9, 10) plattenartig sind.
12. Eingrabvorrichtung mit Flunke (1, 1A) nach Anspruch 11,
bei welcher die Tasche (12A, 12B, 12C) einen länglichen Schlitz (12A, 12B, 12C) umfasst,
welcher in jeden der plattenartigen Elemente (9, 10) eingebracht ist, um das Kettenglied
(17A, 17B, 17C) aufzunehmen.
13. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der Ansprüche 11 oder 12,
bei welcher die plattenartigen länglichen Elemente (9, 10) voneinander in einem Abstand
zwischen 1,06 und 1,1 mal dem Nenndurchmesser des Kettengliedes (16, 17) entfernt
sind.
14. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der vorigen Ansprüche,
bei welcher das Grundelement (7) eine Breite aufweist, die geringer ist, als die eines
Kettenglied es (16, 17) der Ankerkette (4), gemessen quer zur Ankerkette (4).
15. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der Ansprüche 11 bis 14,
bei welcher die plattenartigen länglichen Elemente (9, 10) jeweils eine Dicke (t9)
aufweisen, die kleiner ist als der Nenndurchmesser (D) eines Kettengliedes (16, 17)
der Ankerkette (4) und weiter bevorzugt weniger als 0,5 mal den Nenndurchmesser (D)
beträgt.
16. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der Ansprüche 11 bis 13 und 15,
bei welcher die länglichen Elemente (9, 10) an einem Ende (28, 29) derart auseinandergespreizt
sind, dass ein Kettenglied (16A, 16B) der Ankerkette (4), welches aus dem Ende (28,
29) hervortritt, frei zur Seite aus der Symmetrieebene (5) über einen Winkel (θ) von
bis zu 20°, weiter bevorzugt 12°, schwingen kann.
17. Eingrabvorrichtung mit Flunke (1, 1A) nach Anspruch 16,
bei welcher das hervortretende Kettenglied (16A, 16B) in der Symmetrieebene (5) über
einen Winkel von bis zu 90° von der Längsachse (14) schwingen kann.
18. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der vorigen Ansprüche,
bei welcher die Eingrabvorrichtung mit Flunke (1, 1A) Querstabilisatoren (42) aufweist.
19. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der vorigen Ansprüche,
bei welcher die Eingrabvorrichtung mit Flunke (1, 1A) Gierstabilisatoren (46) aufweist.
20. Eingrabvorrichtung mit Flunke (1, 1A) nach einem der vorigen Ansprüche,
bei welcher die Eingrabvorrichtung mit Flunke (1, 1A) so angeordnet ist, dass eine
gerade Linie (22), die einerseits den Mittelpunkt eines in Vorwärtsrichtung gelegenen,
in der Symmetrieebene (5) des Scheitelabschnitts eines Kettengliedes (17A) in einer
vordersten Tasche (12A) in dem Grundelement (7), und andererseits den Punkt einer
Projektion (25) eines vordersten Punktes (20) des Flunkenelements (8) auf die Symmetrieebene
(5) enthält, zur Längsachse (14) um einen Winkel (δ) im Bereich von 25° bis 35°, bevorzugt
30°, geneigt ist.
1. Dispositif d'enfouissement à pattes (1, 1A) pour un montage sur un câble-chaîne (4),
formé sensiblement en deux moitiés (2, 3) pour un assemblage latéral opposé sur ledit
câble-chaîne (4), qui comprend un plan de symétrie (5) et comporte un élément corps
(7) comprenant deux éléments allongés (9, 10) disposés chacun sensiblement parallèlement
audit plan de symétrie (5) et s'étendant chacun, lorsqu'ils sont montés sur le câble-chaîne,
le long de l'un des deux côtés opposés dudit câble-chaîne (4), et un élément patte
(8) fixé à l'élément corps (7) à un angle d'inclinaison aigu par rapport à un axe
longitudinal (14) dudit élément corps (7), et comprend un moyen de fixation (12A,
12B, 12C, 19A, 19B), sous la forme de fentes allongées pour maintenir ledit élément
corps (7) dans une position fixe sur un câble-chaîne (4) comprenant une série de maillons
(16, 17) au moyen de boulons (15) s'étendant entre les parties de l'élément corps
(7), ce par quoi ledit axe longitudinal (14) est maintenu sensiblement aligné avec
un axe (6) dudit câble-chaîne (4), ledit élément corps (7) étant apte à maintenir
ledit câble-chaîne (4) s'étendant dans une attitude définie, ledit moyen de fixation
(12B, 12C) comprenant des premiers points de contact (19A, 19B, 19C, 19D) sur ledit
élément corps (7) engageant des points correspondants sur un maillon (17B, 17C) dudit
câble-chaîne (4) et des seconds points de contact (A, B) sur ledit élément corps (7)
engageant des points correspondants sur un maillon (17A, 17C) dudit câble-chaîne (4).
2. Dispositif d'enfouissement à pattes (1, 1A) selon la revendication 1, dans lequel
ladite attitude définie comprend des maillons alternés (17) dudit câble-chaîne (4)
qui sont maintenus dans un plan à angles droits par rapport audit plan de symétrie
(5).
3. Dispositif d'enfouissement à pattes (1, 1A) selon la revendication 1 ou 2, dans lequel
lesdits seconds points de contact (A, B) sont positionnés de façon à limiter l'induction
de contraintes de flexion dans ledit maillon (17A, 17C) dudit câble-chaîne (4) pendant
le fonctionnement dudit dispositif d'enfouissement à pattes (1, 1A) pour qu'elle soit
similaire à celle qui se produit dans un barbotin d'un bourriquet lors de la mise
en tension dudit câble-chaîne (4).
4. Dispositif d'enfouissement à pattes (1) selon les revendications 1 à 3, dans lequel
lesdits seconds points de contact (A, B) sont positionnés sur ledit élément corps
(7) à deux emplacements pour reposer sur deux desdits maillons (17A, 17C) espacés
de façon à s'opposer à un moment de rotation induit dans ledit dispositif d'enfouissement
à pattes (1) pendant une interaction avec un sol de fond marin (38) tout en pénétrant
dans celui-ci lorsque ledit câble-chaîne (4) est tendu.
5. Dispositif d'enfouissement à pattes (1) selon la revendication 4, dans lequel lesdits
deux emplacements desdits seconds points de contact (A, B) sont espacés de pas moins
de 12 fois le diamètre de barre (D) desdits maillons (16, 17) et, de préférence, de
pas moins de 20 fois ledit diamètre de barre (D).
6. Dispositif d'enfouissement à pattes (1, 1A) selon les revendications 1 à 5, dans lequel
lesdits seconds points de contact (A, B) sont positionnés de telle sorte que lesdits
points de transfert de charge correspondants sur un maillon (17A, 17C) se trouvant
dans un plan à angles droits par rapport audit plan de symétrie (5) sont espacés dudit
plan de symétrie (5) d'une distance comprise dans la plage allant de 0,8 à 1 fois
le diamètre de barre nominal (D) dudit maillon (17A, 17C).
7. Dispositif d'enfouissement à pattes (1, 1A) selon les revendications 1 à 6, dans lequel
lesdits seconds points de contact (A, B) sont positionnés de telle sorte que lesdits
points de transfert de charge correspondants sur un maillon (17A, 17C) se trouvant
dans un plan à angles droits par rapport audit plan de symétrie (5) sont séparés d'un
point central d'une section de couronne, se trouvant dans ledit plan de symétrie (5),
dudit maillon (17A, 17C) d'une distance comprise dans la plage allant de 0,4 à 0,6
fois le diamètre de barre nominal (D) dudit maillon (17A, 17C) mesuré dans une direction
parallèle audit axe (6) dudit câble-chaîne.
8. Dispositif d'enfouissement à pattes (1, 1A) selon les revendications 1 à 7, dans lequel
ledit moyen de fixation (12A, 12B, 12C, 19A, 19B) comprend une poche (12A, 12B, 12C)
dans ledit élément corps, agencée pour recevoir un maillon (17A, 17B, 17C) dudit câble-chaîne
(4).
9. Dispositif d'enfouissement à pattes (1, 1A) selon la revendication 8, dans lequel
ladite poche (12A, 12B, 12C) contraint ledit maillon (17A, 17B, 17C) dudit câble-chaîne
(4) à se trouver dans un plan à angles droits par rapport audit plan de symétrie (5).
10. Dispositif d'enfouissement à pattes (1, 1A) selon l'une quelconque des revendications
précédentes, dans lequel lesdits premiers points de contact (19A, 19B, 19C, 19D) sont
situés adjacents audit élément patte (8), ce par quoi un chargement de traction marqué
dans ledit câble-chaîne (4) par ledit dispositif d'enfouissement à pattes (1, 1A)
contournant sensiblement cette partie dudit élément corps (7) se trouvant en avant
desdits premiers points de contact (19A, 19B, 19C, 19D).
11. Dispositif d'enfouissement à pattes (1, 1A) selon la revendication 1, dans lequel
lesdits éléments allongés (9, 10) sont du type plaque.
12. Dispositif d'enfouissement à pattes (1, 1A) selon la revendication 11, dans lequel
ladite poche (12A, 12B, 12C) comprend une fente allongée (12A, 12B, 12C) perforant
chacun desdits éléments allongés de type plaque (9, 10) pour recevoir ledit maillon
(17A, 17B, 17C).
13. Dispositif d'enfouissement à pattes (1, 1A) selon les revendications 11 ou 12, dans
lequel lesdits éléments allongés de type plaque (9, 10) sont espacés d'une distance
comprise entre 1,06 et 1,1 fois le diamètre nominal dudit maillon (16, 17).
14. Dispositif d'enfouissement à pattes (1, 1A) selon l'une quelconque des revendications
précédentes, dans lequel ledit élément corps (7) a une largeur inférieure à celle
d'un maillon (16, 17) dudit câble-chaîne (4), mesurée transversalement audit câble-chaîne
(4).
15. Dispositif d'enfouissement à pattes (1, 1A) selon les revendications 11 à 14, dans
lequel lesdits éléments allongés de type plaque (9, 10) ont chacun une épaisseur (t9)
inférieure au diamètre de barre (D) d'un maillon (16, 17) dudit câble-chaîne (4) et,
de préférence, inférieure à 0,5 fois ledit diamètre de barre (D).
16. Dispositif d'enfouissement à pattes (1, 1A) selon les revendications 11 à 13 et 15,
dans lequel lesdits éléments allongés (9, 10) sont écartés à une extrémité (28, 29)
de telle sorte qu'un maillon (16A, 16B) dudit câble-chaîne (4) émergeant à partir
de ladite extrémité (28, 29) peut pivoter librement latéralement par rapport audit
plan de symétrie (5) sur un angle (θ) allant jusqu'à 20°, de préférence 12°.
17. Dispositif d'enfouissement à pattes (1, 1A) selon la revendication 16, dans lequel
ledit maillon émergeant (16A, 16B) peut pivoter dans ledit plan de symétrie (5) sur
un angle allant jusqu'à 90° par rapport audit axe longitudinal (14).
18. Dispositif d'enfouissement à pattes (1) selon l'une quelconque des revendications
précédentes, ledit dispositif d'enfouissement à pattes (1) comprenant des stabilisateurs
en roulis (42).
19. Dispositif d'enfouissement à pattes (1A) selon l'une quelconque des revendications
précédentes, ledit dispositif d'enfouissement à pattes (1A) comprenant des stabilisateurs
en lacet (46).
20. Dispositif d'enfouissement à pattes (1, 1A) selon l'une quelconque des revendications
précédentes, ledit dispositif d'enfouissement à pattes (1, 1A) étant agencé de telle
sorte qu'une ligne droite (22) contenant un point central d'une section de couronne
vers l'avant, se trouvant dans ledit plan de symétrie (5), d'un maillon (17A) dans
une première poche (12A) dans ledit élément corps (7) et un point de projection (25)
sur ledit plan de symétrie (5) d'un premier point (20) dudit élément patte (8) est
inclinée vers ledit axe longitudinal (14) à un angle (δ) compris dans la plage allant
de 25° à 35°, de préférence 30°.