BACKGROUND OF THE INVENTION
1. Field of the Invention
[0001] The present invention mainly relates to a yarn winding machine having a configuration
to remove fly-waste, yarn waste, and the like.
2. Description of the Related Art
[0002] When the yarn winding machine processes a fiber bundle and / or a yarn and the like,
unnecessary fly-waste, yarn waste, and the like (rejection material) is generated
during its operation. Supposing that the rejection material is left unattended, not
only it can cause a degradation of the quality of a package if the rejection material
adheres to the package and the like, but can lead to malfunctioning of the yarn winding
machine in itself. A yarn winding machine that generates a suction current at an appropriate
point to suck and remove the rejection material is known in the art. Japanese Patent
Application Laid-Open No.
S63-50537 and Japanese Patent Application Laid-Open No.
2012-132112 disclose this kind of yarn winding machines.
[0003] The Japanese Patent Application Laid-Open No.
S63-50537 discloses a yarn winding machine having a configuration in which a suction port of
a blower, which removes fly-waste and the like by suction, is oriented downward. Moreover,
a filter is attached to the suction port. When the blower is operated, the fly-waste
and the like is deposited on the filter. When the operation of the blower is stopped
thereby stopping application of the suction force, the fly-waste and the like falls
in a lower part.
[0004] The Japanese Patent Application Laid-Open No.
2012-132112 discloses a yarn winding machine including a section duct and a section blower that
are provided for each of a predetermined number of spinning units, and a main duct
and a main blower that collectively transport the fly-waste and the like accumulated
in the section duct. In the Japanese Patent Application Laid-Open No.
2012-132112, to prevent occurrence of variation in the effect of the suction current generated
by the main blower according to a distance from the main blower, it is disclosed to
set a rotational speed of blades of each of the section blowers different. Specifically,
a control is provided so that the rotational speed of the blades of the section blower
becomes slow as the one goes nearer the main blower.
[0005] However, in Japanese Patent Application Laid-Open No.
S63-50537, no configuration to collect the fly-waste and the like that has fallen in the lower
part is disclosed. Japanese Patent Application Laid-Open No.
2012-132112 discloses to set the rotational speed of the blades in each of the section blowers
different; however, the document does not disclose to change the rotational speed
of the blades of each of the section blowers with passage of time.
[0006] Moreover, Japanese Published Examined Application No.
H5-29699 discloses to, while a common main blower is operating, discharge the accumulated
fly-waste to the main duct by sequentially stopping the section blowers one by one.
However, Japanese Published Examined Application No.
H5-29699 does not disclose to change the rotational speed of the blades of each of the section
blowers with passage of time.
SUMMARY OF THE INVENTION
[0007] An object of the present invention is, in a yarn winding machine having a section
duct, a section blower, a main duct, and a main blower, to provide a configuration
that easily removes the rejection material that is deposited on a filter member by
using the suction current generated by the main blower, and that reduces a load on
the main blower.
[0008] A yarn winding machine according to one aspect of the present invention includes
a plurality of winding units; a section duct through which rejection material generated
in at least one of the winding units flows; a section suction device having a rotating
blade and generating a suction current in the section duct for sucking the rejection
material from the winding unit; a filter member arranged between the section duct
and the section suction device; a main duct connected to the section duct and through
which the rejection material from the section duct flows; a main suction device that
generates a suction current in the main duct for moving the rejection material from
the section duct; and a controlling section that performs, when the main suction device
is generating the suction current, a deceleration control of temporarily reducing
a rotational speed of the blade while maintaining the rotating state of the blade.
[0009] A suction control method according to another aspect of the present invention is
for implementation in a yarn winding machine that includes a plurality of winding
units; a section duct through which rejection material generated in at least one of
the winding units flows; a section suction device having a rotating blade and generating
a suction current in the section duct for sucking the rejection material from the
winding unit; a filter member arranged between the section duct and the section suction
device; a main duct connected to the section duct and through which the rejection
material from the section duct flows; and a main suction device that generates a suction
current in the main duct for moving the rejection material from the section duct.
The suction control method includes performing, when the main suction device is generating
the suction current, a deceleration control of temporarily reducing a rotational speed
of the blade while maintaining the rotating state of the blade.
[0010] The above and other objects, features, advantages and technical and industrial significance
of this invention will be better understood by reading the following detailed description
of presently preferred embodiments of the invention, when considered in connection
with the accompanying drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
[0011]
FIG. 1 is a front view of a spinning frame according to one embodiment of the present
invention.
FIG. 2 is a longitudinal cross-sectional view of the spinning frame.
FIG. 3 is a front cross-sectional view indicating a configuration of a fly-waste removing
section.
FIG. 4 is a graph of a process to control a rotational speed of blades of a section
blower according to a negative pressure.
FIG. 5 is an enlarged cross-sectional view of a state in which fly-waste is deposited
on a filter member.
FIG. 6 is an enlarged cross-sectional view of a state in which the fly-waste deposited
on the filter member has been removed.
FIG. 7 is a flowchart of a processing relating to a deceleration control.
FIG. 8 is an enlarged cross-sectional view indicating a position of a pressure detecting
sensor of a fly-waste removing section according to a first variation.
FIG. 9 is a table indicating a schedule for determining a start timing of a deceleration
control according to a second variation.
DETAILED DESCRIPTION
[0012] Exemplary embodiments of a spinning frame (a yarn winding machine) according to the
present invention are explained in detail below with reference to the accompanying
drawings. A spinning frame 1 as a yarn winding machine shown in FIG. 1 includes a
large number of spinning units (winding units) 2 arranged side-by-side, a yarn joining
cart 3, a blower box 4, and a motor box 5.
[0013] As shown in FIG. 1, each of the spinning units 2 includes, sequentially arranged
from upstream to downstream, a drafting device 7, a spinning device 9, a fly-waste
removing section 30, a yarn accumulating device 12, and a winding device 13. The terms
"upstream" and "downstream" in the explanation of FIGS. 1 and 2 refer to upstream
and downstream, respectively, in a running (transportation) direction of a sliver
15, a fiber bundle 8, and a spun yarn 10 during spinning.
[0014] The drafting device 7 is arranged near an upper end of a frame 6 of the spinning
frame 1. The drafting device 7 includes four roller pairs of a back roller pair 16,
a third roller pair 17, a middle roller pair 19, and a front roller pair 20 sequentially
from upstream. An apron belt 18 is stretched over each of the rollers of the middle
roller pair 19. The drafting device 7 drafts the sliver 15 supplied from a not-shown
sliver case until the fiber bundle 8 attains a predetermined thickness. The fiber
bundle 8 drafted by the drafting device 7 is supplied to the spinning device 9.
[0015] The spinning device 9 includes a swirling current generating chamber (not-shown)
through which the fiber bundle 8 can be passed. The spinning device 9 generates a
swirling current in the swirling current generating chamber by jetting compressed
air from not-shown nozzles inside of the swirling current generating chamber. The
spinning device 9 generates the spun yarn 10 by applying twists to the fiber bundle
8 by using the swirling current.
[0016] In the spinning device 9, fibers (fly-waste) that could not be twisted into the spun
yarn 10 in the spinning are generated. The fly-waste removing section 30 includes
suction pipes 91, section ducts 31, and a main duct 37. The fly-waste is transported
through the suction pipes 91, the section ducts 31, and the main duct 37 of the fly-waste
removing section 30 to a not-shown accumulation chamber (a cotton accumulation box).
The accumulation chamber is connected to an end of the main duct 37. The fly-waste
that flows through the main duct 37 is accumulated in the accumulation chamber. With
this arrangement, because the fly-waste does not stay in the swirling current generating
chamber, generation of the swirling current is not interfered. A detailed configuration
of the fly-waste removing section 30 will be explained later.
[0017] The yarn accumulating device 12 is arranged downstream of the spinning device 9.
As shown in FIG. 2, the yarn accumulating device 12 includes a yarn accumulating roller
21 and a motor 25 that rotationally drives the yarn accumulating roller 21.
[0018] The yarn accumulating roller 21 temporarily accumulates the spun yarn 10 by winding
a certain amount of the spun yarn 10 on an outer peripheral surface thereof. The spun
yarn 10 is pulled from the spinning device 9 and transported to the downstream side
at a predetermined speed by causing the yarn accumulating roller 21 to rotate at a
predetermined rotational speed with the spun yarn 10 wound on the outer peripheral
surface thereof. Because the spun yarn 10 can be temporarily accumulated on the outer
peripheral surface of the yarn accumulating roller 21, the yarn accumulating device
12 can function as a kind of buffer. The buffering function of the yarn accumulating
device 12 avoids troubles (for example, slackening and the like of the spun yarn 10)
caused by a mismatch in a spinning speed of the spinning device 9 and a winding speed
(the speed of the spun yarn 10 being wound into a package 45) due to some reason.
[0019] An upstream guide 23 is arranged little upstream of the yarn accumulating roller
21. The upstream guide 23 guides the spun yarn 10 to the outer peripheral surface
of the yarn accumulating roller 21.
[0020] A yarn clearer 52 is arranged between the spinning device 9 and the yarn accumulating
device 12. The spun yarn 10 generated in the spinning device 9 passes the yarn clearer
52 before it is wound on the yarn accumulating device 12. The yarn clearer 52 monitors
a thickness of the running spun yarn 10. Upon detecting a yarn defect in the spun
yarn 10, the yarn clearer 52 transmits a yarn-defect detection signal to a not-shown
unit controller.
[0021] Upon receiving the yarn-defect detection signal from the yarn clearer 52, the unit
controller cuts the spun yarn 10 by stopping driving of the spinning device 9, and
stops winding and the like by the winding device 13. The unit controller sends a control
signal to the yarn joining cart 3 to cause the yarn joining cart 3 to travel to the
spinning unit 2. After completion of yarn joining by the yarn joining cart 3, the
unit controller drives the spinning device 9 again to cause the winding device 13
to restart the winding.
[0022] As shown in FIGS. 1 and 2, the yarn joining cart 3 includes a yarn joining device
43, a suction pipe 44, and a suction mouth 46. When a yarn breakage or a yarn discontinuation
occurs in a certain spinning unit 2, the yarn joining cart 3 travels on a rail 41
and stops at a work position corresponding to that spinning unit 2. The suction pipe
44 swings upward about a shaft to catch a spun yarn 10 from the spinning device 9,
and then swings downward about the shaft to guide the spun yarn 10 to the yarn joining
device 43. The suction mouth 46 swings downward about a shaft to catch a spun yarn
10 from the package 45, and then swings upward about the shaft to guide the spun yarn
10 to the yarn joining device 43. The yarn joining device 43 joins the spun yarns
10 guided thereto.
[0023] The winding device 13 includes a cradle arm 71, a winding drum 72, and a traversing
device 75. The cradle arm 71 is supported so as to be pivotable around a support shaft
70. The cradle arm 71 rotatably supports a bobbin 48 on which the spun yarn 10 is
to be wound. The winding drum 72 rotates in a state of being in contact with an outer
peripheral surface of the bobbin 48 or the package 45. The traversing device 75 includes
a traversing guide 76 that guides the spun yarn 10. The winding device 13 drives the
winding drum 72 with a not-shown electric motor while causing the traversing guide
76 to perform a reciprocating movement with a not-shown driving member. As a result,
the spun yarn 10 is wound into the package 45 while traversing the spun yarn 10.
[0024] A configuration of the fly-waste removing section 30 is explained below while referring
to FIG. 3. The terms "upstream" and "downstream" in the explanation of the fly-waste
removing section 30 refer to upstream and downstream, respectively, in a transportation
direction (that is, a direction in which a suction current flows) of the rejection
material.
[0025] The fly-waste removing section 30 includes, as shown in FIG. 3, the section ducts
31, section blowers (section suction devices) 32, filter members 33, pressure detecting
sections 35 (negative pressure detecting sections), the main duct 37, and a main blower
(a main suction device) 38 (See FIG. 1). The section blower 32 and the main blower
38 can be a suction device other than a blower.
[0026] In the spinning frame 1 according to the present embodiment, the suction pipe 91
shown in FIG. 2 is provided for each of the spinning units 2. The suction pipe 91
connects the spinning unit 2 to the section duct 31. In the present embodiment, an
upstream end of the suction pipe 91 is connected to the spinning device 9 (specifically,
to a not-shown exhaust chamber formed downstream of the swirling current generating
chamber) of the spinning unit 2. As shown in FIG. 3, the suction pipes 91 of a predetermined
number (20 in the present embodiment) of the spinning units 2 are connected to one
section duct 31. In the present embodiment, because one suction pipe 91 is arranged
per spinning unit 2, 20 suction pipes 91 are connected to one section duct 31. One
section duct 31 is arranged for the predetermined number of the spinning units 2 (in
the following explanation, the group of the predetermined number of the spinning units
2 will be referred to as a section). The number of the spinning units 2 can be the
same or can be different in different sections. Accordingly, the number of the suction
pipes 91 and the number of the spinning units 2 connected to one section duct 31 can
be the same or can be different in different section ducts 31. Each section duct 31
is connected to the main duct 37 and to an exhaust duct 34 in the downstream side
thereof. Accordingly, a suction current generated by the main blower 38 also acts
inside the section duct 31.
[0027] The section blower 32 is arranged near the filter member 33 but inside the exhaust
duct 34. The section blower 32 has blades 32a that generate a suction current by rotating
and a section blower driving section (a section driving section) 32b that drives the
blades 32a. The section blower driving section 32b is an electric motor and it is
controlled by a section blower controlling section (a controlling section) 39. One
section blower controlling section 39 can be arranged in a controlling device that
controls the entire spinning frame 1, or can be arranged in each section.
[0028] As shown in FIG. 3, the filter member 33 is arranged at a connecting part of the
section duct 31 and the exhaust duct 34. The filter member 33 is a net. The mesh of
the net of the filter member 33 is set such that rejection material 81 cannot but
air (a later-explained suction current 82) can pass through it.
[0029] The pressure detecting section 35 is arranged in a region between the filter member
33 and the section blower 32 but inside the exhaust duct 34. The pressure detecting
section 35 detects the pressure (the negative pressure) in this region. At least the
suction current 82 generated by the section blower 32 acts in this region. The pressure
detecting section 35 outputs a pressure detection signal to the section blower controlling
section 39.
[0030] The section blower 32 sucks air from the section duct 31 via the filter member 33
thereby generating the suction current 82 inside the section duct 31, inside the suction
pipe 91, and the like. The suction current 82 is used mainly to move the rejection
material 81, which is generated in the spinning device 9, via the suction pipe 91
to a downstream end of the section duct 31.
[0031] The suction current 82 that passes through the filter member 33 is exhausted to the
outside via an outlet 34a of the exhaust duct 34. The remaining suction current 82
along with the rejection material 81 flows into the main duct 37 via an opening 36
formed between the section duct 31 and the main duct 37. That is, in a state in which
both the main blower 38 and the section blower 32 are being driven, a part of the
suction current 82 in the section duct 31 flows toward the section blower 32 while
the remaining part of the suction current 82 in the section duct 31 flows toward the
main duct 37. In the present embodiment, the section duct 31 and the main duct 37
are directly connected to each other. The opening 36 is arranged in a connecting part
of the section duct 31 and the main duct 37. The opening 36 is arranged in a downstream
end of the section duct 31. The filter member 33 is arranged also in the downstream
end of the section duct 31. In the present embodiment, a member to open and close
(a shutter and the like) the opening 36 is not provided. Accordingly, because of a
suction current 83 flowing in the main duct 37, the fly-waste moves into the main
duct 37 from the section duct 31 via the opening 36.
[0032] The main blower 38 is arranged near one end of the main duct 37 but inside the blower
box 4 (see FIG. 1). The main blower 38 generates a negative pressure downstream of
the main duct 37 thereby causing the suction current 83 to flow inside the main duct
37. The main blower 38 is always operated. That is, blades of the main blower 38 are
always rotated during the winding. The rotation of the main blower 38 is controlled
by the section blower controlling section (the controlling section) 39. Alternatively,
a main blower controlling section can be provided separately from the section blower
controlling section 39, and the rotation of the main blower can be controlled by this
main blower controlling section. The rejection material 81 is taken by this suction
current 83 to the not-shown accumulation chamber (the cotton accumulation box) arranged
at the one end of the main duct 37.
[0033] In the present embodiment, the fly-waste removing section 30 is configured so that
a flow rate of the suction current 82 exhausted from the exhaust duct 34 is higher
than a flow rate of the suction current 82 introduced into the main duct 37. As a
result, a power consumption of the main blower 38 can be reduced because the flow
rate of the suction current 83 sucked by the main blower 38 can be set low. However,
the flow rate of the suction current 82 exhausted from the exhaust duct 34 can also
be set lower than the flow rate of the suction current 82 introduced into the main
duct 37.
[0034] A method to remove the rejection material 81 deposited on the filter member 33 is
explained below with reference to FIGS. 4 to 7.
[0035] A curve labeled "rotational speed" in FIG. 4 shows an example of time variation of
the rotational speed of the blades 32a of the section blower 32. As shown in FIG.
4, the section blower controlling section 39 performs a normal control and a deceleration
control.
[0036] The normal control is a control in which the blades 32a are rotated at a substantially
constant rotational speed (within a predetermined speed range). The section blower
controlling section 39 performs the normal control not only when the spun yarn 10
is being wound but also when the winding of the spun yarn 10 is interrupted during
the yarn joining and the like. In the present embodiment, the "predetermined speed
range" is a speed range of the rotational speed, in the normal control, after an increase
from the rotational speed at the time of ending of the deceleration control. In the
example shown in FIG. 4, the "predetermined speed range" is the speed, represented
by the horizontal line of the curve, that is higher than the speed for the deceleration
control. The "predetermined speed range" can be a constant speed as shown in FIG.
4, or can be varied within a predetermined range so that the average speed is equal
to the speed shown in FIG. 4.
[0037] The deceleration control is a control to maintain the rotation of the blades 32a
while temporarily reducing the rotational speed of the blades 32a. A control to completely
stop the rotation of the blades 32a is not included in the deceleration control. When
returning to the normal control after the deceleration control, it is necessary to
accelerate the blades 32a. The present embodiment has been explained with the assumption
that such an acceleration is carried out while the normal control is being performed.
In the present embodiment, because only the normal control and the deceleration control
are performed while the winding of the spun yarn 10 is being performed, the normal
control and the deceleration control are performed alternately (in other words, the
deceleration control is performed after the normal control, and the normal control
is performed after the deceleration control again). Because the main blower 38 is
always operated as mentioned above, the main blower 38 is continuously operated while
one change between the deceleration control and the normal control is being performed.
[0038] The section blower controlling section 39 removes the deposited rejection material
81 by switching the control between the normal control and the deceleration control
according to an amount of the rejection material 81 deposited on the filter member
33. A specific explanation is given below.
[0039] When the rejection material 81 is deposited on the filter member 33, as shown in
FIG. 5, the mesh of the filter member 33 is blocked by the rejection material 81.
As a result, it is difficult for the suction current 82 generated by the section blower
32 to flow in the section duct 31. On the other hand, because it is easy for the suction
current 82 to flow in the exhaust duct 34, the negative pressure in the exhaust duct
34 increases. Accordingly, the negative pressure detected by the pressure detecting
section 35 increases as the amount of the rejection material 81 deposited on the filter
member 33 increases. A curve labeled "pressure" in FIG. 4 shows that the pressure
detected by the pressure detecting section 35 increases with passage of time. An increase
of the negative pressure means a change of the pressure in the negative direction.
[0040] The section blower controlling section 39 determines the amount of the rejection
material 81 deposited on the filter member 33 based on a detection value indicative
of the pressure detected by the pressure detecting section 35. Specifically, the section
blower controlling section 39 judges whether the detection value obtained in the pressure
detecting section 35 is higher than a predetermined threshold (S101 of FIG. 7).
[0041] Upon judging that the detection value obtained in the pressure detecting section
35 is higher than the predetermined threshold, the section blower controlling section
39 checks whether the other section blowers 32 are under the deceleration control
(S102). Upon checking that none of the other section blowers 32 is under the deceleration
control, the section blower controlling section 39 turns off an electric power supply
to the corresponding section blower driving section 32b (that is, stops supply of
the electric power to the corresponding section blower driving section 32b) (S103,
start of the deceleration control).
[0042] When the electric power supply to the section blower driving section 32b is turned
off, as shown in FIG. 4, the rotational speed of the blades 32a decreases. Therefore,
the suction current 82 acting on the rejection material 81 deposited on the filter
member 33 becomes weak. Accordingly, as shown in FIG. 5, the rejection material 81
is moved into the main duct 37 by the action of the suction current 83 generated by
the main blower 38. Thus, the rejection material 81 deposited on the filter member
33 can be removed by performing the deceleration control.
[0043] A load on the main blower 38 increases when one section blower 32 is under the deceleration
control. Accordingly, when the deceleration control is simultaneously performed in
a plurality of the section blowers 32, the rejection material 81 may not be removed
from the filter member 33. Accordingly, when the other section blowers 32 are under
the deceleration control, the section blower controlling section 39 starts the deceleration
control in the next section blower 32 at a timing at which the deceleration control
in all the other section blowers 32 is completed (in other words, at a timing at which
none of all the section blowers 32 is under the deceleration control) (the process
in above-mentioned S102).
[0044] The section blower controlling section 39 counts an elapsed time from the start of
the deceleration control. The section blower controlling section 39 judges whether
the elapsed time exceeds a predetermined time (S104). At a timing of judging that
the elapsed time exceeds the predetermined time, the section blower controlling section
39 turns on the electric power supply to the corresponding section blower driving
section 32b (that is, restarts the supply of the electric power to the corresponding
section blower driving section 32b), (S105, end of the deceleration control). As a
result, as shown in FIG. 4, the rotational speed of the blades 32a of the section
blower 32 increases and reaches the rotational speed for the normal control.
[0045] The predetermined time is set shorter than the time necessary for the rotation of
the blades 32a of the section blower 32 to stop. Accordingly, the blades 32a can be
prevented from completely stopping. As a result, because the suction force of the
section blower 32 does not become zero, the load on the main blower 38 can be reduced.
[0046] Referring now to FIG. 8, a first variation of the present embodiment is explained
below. In the first variation, the pressure detecting section 35 is arranged in a
region that is inside the suction pipe 91. In this region, the suction current 82
of at least the section blower 32 acts. When the rejection material 81 deposits on
the filter member 33, as shown in FIG. 5, the mesh of the filter member 33 is blocked
by the rejection material 81. As a result, it is difficult for the suction current
82 generated by the section blower 32 to flow in the section duct 31. Accordingly,
the negative pressure inside the section duct 31 and inside the suction pipe 91 decreases.
An decrease of the negative pressure means a change of the pressure in the positive
direction.
[0047] The section blower controlling section 39 according to this variation judges whether
the negative pressure detected by the pressure detecting section 35 is lower than
a predetermined threshold. Upon judging that the negative pressure detected by the
pressure detecting section 35 is lower than the predetermined threshold, the section
blower controlling section 39 performs the deceleration control.
[0048] The negative pressure in a region inside the fly-waste removing section 30 and nearer
to the spinning unit 2 than the filter member 33 decreases with deposition of the
rejection material 81. Accordingly, it is allowable to arrange the pressure detecting
section 35 at a point at which the suction current acts in the spinning unit 2. In
the present variation, the pressure detecting section 35 is arranged in one of the
plurality of the suction pipes 91; however, it is allowable to arrange the pressure
detecting section 35 in each of the plurality of the suction pipes 91.
[0049] The pressure detecting section 35 is arranged between the filter member 33 and the
section blower 32. Moreover, the pressure detecting section 35 can be arranged in
the section duct 31, the suction pipe 91, and the like. The number and the installation
locations of the pressure detecting sections 35 can be different in each of the sections.
The pressure detecting section 35 may also be omitted in a certain section.
[0050] It is allowable to arrange the pressure detecting section 35 in the spinning unit
2. Specifically, the pressure detecting section 35 can be arranged in an exhaust channel
arranged downstream of the swirling current generating chamber of the spinning device
9. That is, the pressure detecting section 35 can be arranged upstream of the suction
pipe 91.
[0051] A second variation of the present embodiment is explained below while referring to
FIG. 9. In the present embodiment and the first variation of the present embodiment,
the timing of starting the deceleration control is determined based on a detection
result obtained in the pressure detecting section 35. In contrast, in the second variation,
the deceleration control is performed at a preset schedule.
[0052] An example of such a schedule is shown in FIG. 9. According to the schedule shown
in FIG. 9, the spinning frame 1 has ten sections, and one deceleration control is
performed in each of the sections for five seconds and the deceleration control is
repeated after one hour while changing the sections. The schedule is set so that the
timing of performing the deceleration control in each of the sections is different.
The control performed by the section blower controlling section 39 can be simplified
by determining the start timing of the deceleration control with the method explained
in the second variation.
[0053] The schedule of the deceleration control can be set based on desired values input
by an operator by using a not-shown setting section and the like, or can be set as
default in the spinning frame 1. In the schedule of the deceleration control, it is
allowable to set different number of times and / or duration from the number of times
and / or the duration mentioned above.
[0054] As explained above, the spinning frame 1 includes the spinning units 2, the section
ducts 31, the section blowers 32, the filter members 33, the main duct 37, the main
blower 38, and the section blower controlling section 39. Each of the plurality of
the section ducts 31 is arranged for at least one spinning unit 2. The rejection material
81 generated in the spinning unit 2 flows through the corresponding section duct 31.
The rejection material 81 generated in a certain spinning unit 2 flows through the
corresponding section duct 31. The section blower 32 generates the suction current
82 that sucks the rejection material 81 in the section duct 31. The filter member
33 is arranged between the section duct 31 and the section blower 32. The main duct
37 is connected to a plurality of the section ducts 31. The rejection material 81
flows through the section duct 31 to the main duct 37. The main blower 38 generates
the suction current 83 in the main duct 37 to move the rejection material 81. When
the main blower 38 is generating the suction current 83, the section blower controlling
section 39 performs the deceleration control of temporarily reducing the rotational
speed of the blades 32a while maintaining the rotating state of the blades 32a.
[0055] As a result, the suction force in the section duct 31 can be reduced by performing
the deceleration control of reducing the rotational speed of the blades 32a of the
section blower 32. While this deceleration control is being performed, the rejection
material 81 deposited on the filter member 33 can be removed easily by using the suction
current 83 generated by the main blower 38. Moreover, the load on the main blower
38 can be suppressed because the rotation of the blades 32a of the section blower
32 is not completely stopped.
[0056] The section blower controlling section 39 of the spinning frame 1 can perform the
normal control of rotating the blades 32a of the section blower 32 in the predetermined
speed range. The deceleration control is started after completion of the normal control.
[0057] The section blower controlling section 39 can send the rejection material 81, which
is deposited by performing the normal control, to the main duct 37 by performing the
deceleration control.
[0058] The section blower controlling section 39 of the spinning frame 1, after completion
of the deceleration control, increases the rotational speed of the blades 32a of the
section blower 32 so that the rotational speed falls in the predetermined speed range
for the normal control.
[0059] As a result, the section blower controlling section 39 can recover the rotational
speed of the blades 32a, which was reduced during the deceleration control, to the
predetermined speed range for the normal control.
[0060] The section blower 32 of the spinning frame 1 includes the section blower driving
section 32b that generates a power to rotate the blades 32a. The section blower controlling
section 39 performs the deceleration control by turning off an electric power of the
section blower driving section 32b.
[0061] As a result, the deceleration control of the rotational speed of the blades 32a of
the section blower 32 can be performed easily.
[0062] The section blower controlling section 39 of the spinning frame 1 turns on the electric
power of the section blower driving section 32b (that is, restarts the supply of the
electric power to the section blower driving section 32b) before the rotation of the
blades 32a of the section blower 32 stops.
[0063] As a result, complete stopping of the blades 32a of the section blower 32 can be
prevented by a simple control.
[0064] Operation of the main blower 38 is continued while the section blower controlling
section 39 of the spinning frame 1 is performing the deceleration control.
[0065] As a result, the rejection material 81 deposited on the filter member 33 can be
removed surely by the suction current 83 generated by the main blower 38.
[0066] The spinning frame 1 includes the pressure detecting section 35 that detects the
negative pressure in the region in which the suction current 82 generated by the section
blower 32 acts (specifically, the region in the exhaust duct 34 between the filter
member 33 and the section blower 32). When the negative pressure detected by the pressure
detecting section 35 falls out of a predetermined range (that is, when the pressure
is higher than the predetermined threshold), the section blower controlling section
39 starts the deceleration control.
[0067] Accordingly, because there is a correlation between the amount of the rejection material
81 deposited on the filter member 33 and the intensity of the suction current 82 generated
by the section blower 32, the deceleration control can be started at an appropriate
timing.
[0068] The spinning unit 2 of the spinning frame 1 winds the spun yarn 10 during at least
the period in which the deceleration control is being performed in the corresponding
section blower 32.
[0069] As a result, the spinning frame 1 can be operated effectively as the spun yarn 10
can be wound while the deceleration control is being performed.
[0070] Exemplary embodiments and variations of the present invention are explained above.
The configuration explained above can, however, be modified as explained below.
[0071] In the above embodiments, the section blower controlling section 39 performs a control
to turn off the electric power supply to the section blower driving section 32b for
a predetermined time and then turns on the electric power supply after performing
the deceleration control to return to the normal control; however, the turning on
/ off of the electric power supply can be repeated while the deceleration control
is being performed. Moreover, the deceleration control can be performed by reducing
a rotational speed of the section blower driving section 32b to a set value (a target
value). Furthermore, in the above embodiments, the rotational speed of the blades
32a of the section blower 32 is reduced continuously; however, the rotational speed
can be reduced once and then the blades 32a can be rotated at a substantially constant
rotational speed (that is, at a rotational speed that is lower than the rotational
speed for the normal control). Moreover, it is allowable to reduce the rotational
speed of the blades 32a in steps or along a curve instead of linearly reducing the
rotational speed as shown in FIG. 4. As long as the rotational speed of the blades
32a for the deceleration control is lower than the rotational speed for the normal
control, the rotational speed of the blades 32a for the deceleration control can be
set to a desired speed other than zero.
[0072] In the above embodiments, an arrangement is made so that the deceleration control
is not performed simultaneously in a plurality of the section blowers 32. That is,
the deceleration control in one of the section blowers 32 is started after a state
in which the normal control is performed in all the section blowers 32. However, it
is allowable to perform the deceleration control simultaneously in a plurality of
the section blowers 32 by determining whether to start the deceleration control for
each of the sections and the like.
[0073] In the above embodiments, a timing of ending the deceleration control (that is, the
timing of turning on the electric power supply to the section blower driving section
32b) is determined based on the elapsed time. Alternatively, the timing of ending
the deceleration control can be determined based on the negative pressure detected
by the pressure detecting section 35 (that is, based on the amount of the rejection
material 81 deposited on the filter member 33).
[0074] The number of the spinning units 2 connected to one section duct 31 is not limited
to 20. That is, any number of the spinning units 2 between 1 and 20, or 21 or more
can be connected to one section duct 31.
[0075] The location and the orientation of the filter member 33 are not particularly limited.
For example, it is allowable to arrange the filter member 33 in an inclined manner,
like in Japanese Patent Application Laid-Open No.
2012-132112, so that it approaches toward the opening 36 as one goes downstream.
[0076] In addition to connecting the suction pipe 91 to the section duct 31, a suction pipe
through which fly-waste stuck to a drafting roller of the drafting device 7 is transported
after sucking can be connected to the section duct 31. In the spinning unit 2, a suction
port that sucks the yarn waste and the like can be arranged downstream of the spinning
device 9. Moreover, a suction pipe having such a suction port can be connected to
the section duct 31. In addition, in a spinning frame that includes one yarn joining
device for each of the spinning units 2, a pipe that sucks and transports the yarn
waste generated during the yarn joining and the like can be connected to the section
duct 31.
[0077] In the spinning unit 2, the yarn accumulating device 12 pulls the spun yarn 10 from
the spinning device 9; however, the invention is not limited to this configuration.
For example, in the spinning unit, the spun yarn 10 can be pulled from the spinning
device 9 by using a delivery roller and a nip roller, thereafter, the spun yarn 10
can be accumulated by using the yarn accumulating device 12 or a slack tube provided
downstream. When a configuration in which the spun yarn 10 is pulled from the spinning
device 9 by using the delivery roller and the nip roller is employed, the yarn accumulating
device 12 can be omitted.
[0078] The application of the present invention is not limited to the spinning frame explained
above. That is, the present invention can be applied, for example, to an open-end
spinning frame, an automatic winder, a twisting frame, a doubling machine, and the
like. When applying the present invention to, for example, the automatic winder, the
present invention can be applied to a configuration for removing the yarn waste occurring
during the yarn joining.
[0079] A yarn winding machine according to one aspect of the present invention includes
a plurality of winding units, a section duct, a section suction device, a filter member,
a main duct, and a main suction device, and a controlling section. Rejection material
generated in at least one of the winding units flows through the section duct. The
section suction device has a rotating blade and generates a suction current in the
section duct for sucking the rejection material from the winding unit. The filter
member is arranged between the section duct and the section suction device. The main
duct is connected to the section duct and the rejection material from the section
duct flows through it. The main suction device generates a suction current in the
main duct for moving the rejection material from the section duct. The controlling
section performs, when the main suction device is generating the suction current,
a deceleration control of temporarily reducing a rotational speed of the blade while
maintaining the rotating state of the blade.
[0080] With the above configuration, the suction force in the section duct can be reduced
by performing the deceleration control of reducing the rotational speed of the blade
of the section suction device. While this deceleration control is being performed,
the rejection material deposited on the filter member can be removed easily by using
the suction current generated by the main suction device. Moreover, the load on the
main suction device can be reduced because the rotation of the blade of the section
suction device is not completely stopped.
[0081] It is preferable that the above yarn winding machine further includes an accumulation
chamber that is connected to an end of the main duct for accumulating the rejection
material that flows through the main duct.
[0082] With the above configuration, work for collection of the rejection material can be
performed in a mass in one place, for example, in the accumulation chamber arranged
at an end of the machine. That is, it is not necessary to perform the work for collection
in every section.
[0083] It is preferable that the controlling section maintains a rotating state of a blade
of the main suction device during a yarn winding operation.
[0084] With the above configuration, the section suction device can be downsized.
[0085] It is preferable to arrange an opening in a connecting part between the main duct
and the section duct allowing passage of the rejection material.
[0086] With the above configuration, the rejection material in the section duct can be moved
to the main duct through the opening by the action of the suction current in the main
duct.
[0087] It is preferable to arrange the opening in a downstream end of the section duct.
[0088] With the above configuration, the rejection material can be moved to the main duct
smoothly via the opening.
[0089] In the above yarn winding machine, it is preferable that the controlling section
is capable of performing a normal control of rotating the blade of the section suction
device in a predetermined speed range, and the controlling section starts the deceleration
control after completion of the normal control.
[0090] With the above configuration, the controlling section can send the rejection material,
which is deposited by performing the normal control, to the main duct by performing
the deceleration control.
[0091] In the above yarn winding machine, it is preferable that the controlling section
increases, after completion of the deceleration control, the rotational speed of the
blade of the section suction device until the rotational speed falls in the predetermined
speed range for the normal control.
[0092] As a result, the controlling section can recover the rotational speed of the blade,
which was reduced during the deceleration control, to the predetermined speed range
for the normal control.
[0093] In the above yarn winding machine, it is preferable that the section suction device
includes a section driving section that generates a power to rotate the blade thereof,
and the controlling section performs the deceleration control by turning off an electric
power of the section driving section.
[0094] With the above configuration, the deceleration control can be performed easily on
the rotational speed of the blade of the section suction device.
[0095] In the above yarn winding machine, it is preferable that the controlling section
turns on the electric power of the section driving section before the rotation of
the blade of the section suction device stops.
[0096] With the above configuration, complete stopping of the blade of the section suction
device can be prevented with a simple control.
[0097] It is preferable that the above yarn winding machine includes a pressure detecting
section that detects a pressure ( a negative pressure) in at least a region in which
the suction current generated by the section suction device acts, and in which the
controlling section starts the deceleration control when the pressure detected by
the pressure detecting section falls outside of a predetermined range.
[0098] Accordingly, because there is a correlation between the amount of the rejection material
deposited on the filter member and the intensity of the suction current generated
by the section suction device, the deceleration control can be started at an appropriate
timing.
[0099] In the above yarn winding machine, it is preferable that the pressure detecting section
is arranged between the filter member and the section suction device.
[0100] When an excessive amount of the rejection material is deposited on the filter member,
the effect of the suction current of the section suction device becomes blunt. Accordingly,
a negative pressure between the filter member and the section suction device increases.
Therefore, by detecting the pressure in this region, the deceleration control can
be started according to the amount of the rejection material deposited on the filter
member.
[0101] In the above yarn winding machine, it is preferable to arrange the pressure detecting
section at least one among in the winding unit, in the section duct, and in between
the winding unit and the section duct.
[0102] When an excessive amount of the rejection material is deposited on the filter member,
the effect of the suction current of the section suction device becomes blunt. Accordingly,
by detecting the negative pressure in at least one of the above regions, the deceleration
control can be started according to the amount of the rejection material deposited
on the filter member.
[0103] In the above yarn winding machine, it is preferable that the controlling section
starts the deceleration control at a preset timing.
[0104] With the above configuration, the deceleration control can be started with a simple
control.
[0105] In the above yarn winding machine, it is preferable that the controlling section
starts the deceleration control in one among the section suction devices at a timing
at which the deceleration control is not being performed in any of all the section
suction devices.
[0106] Because the load on the main suction device increases when the deceleration control
is performed on one section suction device, the load on the main suction device can
be reduced by shifting the start timing of the deceleration control in each of the
section suction devices.
[0107] In the above yarn winding machine, it is preferable that the winding unit winds a
yarn during at least the period in which the deceleration control is being performed
in the section suction device.
[0108] With the above configuration, the yarn winding machine can be operated effectively
as the yarn can be wound while the deceleration control is being performed.
[0109] It is preferable that the yarn winding machine further includes an exhaust duct arranged
for each of the section ducts and having an outlet for exhausting to outside the suction
current that has passed through the filter member. Moreover, it is preferable that
the filter member is arranged at a connecting part of the section duct and the exhaust
duct, and the section suction device is arranged in the exhaust duct but between the
filter member and the outlet.
[0110] With the above configuration, the suction current generated by the section suction
device can be caused to effectively act in the section duct.
[0111] In the above explanation, the meaning of "a plurality of" also includes "a predetermined
number of".
[0112] Although the invention has been explained with respect to specific embodiments for
a complete and clear disclosure, the appended claims are not to be thus limited but
are to be construed as embodying all modifications and alternative constructions that
may occur to one skilled in the art that fairly fall within the scope of the claims.
1. A yarn winding machine (1) comprising:
a plurality of winding units (2);
a section duct (31) through which rejection material generated in at least one of
the winding units (2) flows;
a section suction device (32) having a rotating blade (32a) and generating a suction
current (82) in the section duct (31) for sucking the rejection material from the
winding unit (2);
a filter member (33) arranged between the section duct (31) and the section suction
device (32);
a main duct (37) connected to the section duct (31) and through which the rejection
material from the section duct (31) flows;
a main suction device (38) that generates a suction current (83) in the main duct
(37) for moving the rejection material from the section duct (31); characterized by
a controlling section (39) that performs, when the main suction device (38) is generating
the suction current (83), a deceleration control of temporarily reducing a rotational
speed of the blade (32a) while maintaining the rotating state of the blade (32a).
2. The yarn winding machine (1) as claimed in Claim 1, further characterized by an accumulation chamber that is connected to an end of the main duct (37) for accumulating
the rejection material that flows through the main duct (37).
3. The yarn winding machine (1) as claimed in Claim 1 or 2, characterized in that the controlling section (39) maintains a rotating state of a blade of the main suction
device (38) during a yarn winding operation.
4. The yarn winding machine (1) as claimed in Claim 3, further characterized by an opening (36) arranged in a connecting part between the main duct (37) and the
section duct (31) allowing passage of the rejection material.
5. The yarn winding machine (1) as claimed in Claim 4, characterized in that the opening (36) is arranged in a downstream end of the section duct (31).
6. The yarn winding machine (1) as claimed in any one of Claims 1 to 5, characterized in that the controlling section (39) is capable of performing a normal control of rotating
the blade (32a) of the section suction device (32) in a predetermined speed range,
and the controlling section (39) starts the deceleration control after completion
of the normal control.
7. The yarn winding machine (1) as claimed in Claim 6, characterized in that the controlling section (39) increases, after completion of the deceleration control,
the rotational speed of the blade (32a) of the section suction device (32) until the
rotational speed falls in the predetermined speed range for the normal control.
8. The yarn winding machine (1) as claimed in any one of Claims 1 to 7, characterized in that
the section suction device (32) includes a section driving section (32b) that generates
a power to rotate the blade (32a), and
the controlling section (39) performs the deceleration control by turning off an electric
power of the section driving section (32b).
9. The yarn winding machine (1) as claimed in Claim 8, characterized in that the controlling section (39) turns on the electric power of the section driving section
(32b) before the rotation of the blade (32a) of the section suction device (32) stops.
10. The yarn winding machine (1) as claimed in any one of Claims 1 to 9, further characterized by a pressure detecting section (35) that detects a pressure in at least a region in
which the suction current (82) generated by the section suction device (32) acts,
and
wherein the controlling section (39) starts the deceleration control when the pressure
detected by the pressure detecting section (35) falls outside of a predetermined range.
11. The yarn winding machine (1) as claimed in Claim 10, characterized in that the pressure detecting section (35) is arranged between the filter member (33) and
the section suction device (32).
12. The yarn winding machine (1) as claimed in Claim 10, characterized in that the pressure detecting section (35) is arranged at least one among in the winding
unit (2), in the section duct (31), and in between the winding unit (2) and the section
duct (31).
13. The yarn winding machine (1) as claimed in any one of Claims 1 to 12, characterized in that the controlling section (39) starts the deceleration control at a preset timing.
14. The yarn winding machine (1) as claimed in any one of Claims 1 to 12, characterized in that the controlling section (39) starts the deceleration control in one among the section
suction devices (32) at a timing at which the deceleration control is not being performed
in any of all the section suction devices (32).
15. The yarn winding machine (1) as claimed in any one of Claims 1 to 14, characterized in that the winding unit (2) winds a yarn during at least the period in which the deceleration
control is being performed in the section suction device (32).
16. The yarn winding machine (1) as claimed in any one of Claims 1 to 15, further characterized by an exhaust duct (34) arranged for each of the section ducts (31) and having an outlet
(34a) for exhausting to outside the suction current (82) that has passed through the
filter member (33), and
wherein the filter member (33) is arranged at a connecting part of the section duct
(31) and the exhaust duct (34), and
the section suction device (32) is arranged in the exhaust duct (34) but between the
filter member (33) and the outlet (34a).
17. A suction control method for implementation in a yarn winding machine (1),
the yarn winding machine (1) comprising
a plurality of winding units (2);
a section duct (31) through which rejection material generated in at least one of
the winding units (2) flows;
a section suction device (32) having a rotating blade (32a) and generating a suction
current (82) in the section duct (31) for sucking the rejection material from the
winding unit (2) ;
a filter member (33) arranged between the section duct (31) and the section suction
device (32);
a main duct (37) connected to the section duct (31) and through which the rejection
material from the section duct (31) flows; and
a main suction device (38) that generates a suction current (83) in the main duct
(37) for moving the rejection material from the section duct (31), characterized in that
the suction control method includes performing, when the main suction device (38)
is generating the suction current (83), a deceleration control of temporarily reducing
a rotational speed of the blade (32a) while maintaining the rotating state of the
blade (32a).
18. The suction control method as claimed in Claim 17, characterized in that when the main suction device (38) is generating the suction current (83), the method
includes
causing a part of the suction current (82) in the section duct (31) to flow toward
the section suction device (32), and
causing the remaining suction current (82) in the section duct (31) to flow in the
main duct (37).
19. The suction control method as claimed in Claim 18, characterized in that the main suction device (38) maintains the generation of the suction current (83)