BACKGROUND OF THE INVENTION
TECHNICAL FIELD
[0001] The present invention relates to a construction method of a jet spouting anchor and
a structure of the spouting anchor, belonging to the technical field of soil drilling
of fixed buildings.
DESCRIPTION OF THE RELATED ART
[0002] Jet spouting anchoring is an effective soil body supporting, protecting and reinforcing
technology, has been widely applied at home and abroad, and has advantages of low
cost, quick effect, etc. A traditional jet spouting anchor is provided with a 5-10
long anchoring segment. The cement in the anchoring segment accounts for 12%-18%,
and the strength of cement soil is relatively low in the 7-30 days. Due to the low
strength, the anchor cannot be made into a pressure-type anchor, and can only be made
as a tension-type anchor. The anti-pulling force of the anchor is provided by the
lateral friction force between the anchoring segment and soil body. Limited by the
low strength of the cement soil of the anchoring segment, the anti-pulling force of
the anchor is usually low, obviously low in the soft soil, which fails to meet the
engineering requirements of the tension standard for the short maintenance period
of the anchor. Meanwhile, the tension-type anchor cables cannot be recycled through
dismantling the core. Therefore, the traditional jet spouting anchor cannot be recycled
through dismantling the core. The traditional jet spouting anchor always suffers from
the problems of low anti-pulling force and failure to recycling through dismantling
the core, which seriously affect the application of the traditional jet spouting anchor.
[0003] The construction method of the traditional jet spouting anchor is as follows: 1)
A three-blade bit is used to perform water jet spouting, wherein the aperture is 150-200mm;
the jet spouting is deep to the anchor bottom, without water pressure; 2) the drill
rod and the bit exist, and a drill rod with a high-pressure nozzle is used to push
the anchor body into an anchor hole; 3) after the anchor body is pushed in place,
high-pressure cement paste jet spouting is carried out at a pressure of 15-25MPa;
the drill rod exists along with the jet spouting; the jet spouted part is the traditional
anchoring segment; the anchoring segment is 8-12m long; jet spouting is carried out
one more time at a segment about 0.5-1m away from the end of the anchoring segment;
the anchoring segment has a cement content of 110kg per meter; and 4) after the jet
spouting of the anchoring segment ends, the drill rod exists.
[0004] See FIG. 1 and FIG. 2. The structure of a foundation pit support formed by a traditional
jet spouting anchor and concrete pile walls includes a water-pressure jet spouting
cut-drilling segment 1 and a cement-paste jet spouting cut-drilling segment 2. The
cement paste in the cement-paste jet spouting cut-drilling segment 2 gets hardened
and encloses an anchor cable carrier and one end of each of anchor cables 3, and the
other end of each of the anchor cables 3 passes through the water-pressure jet spouting
cut-drilling segment 1 and is fixed at an anchor head.
[0005] During construction, due to the needs of the construction period, the maintenance
period of the anchor is merely about 7-21 days. In this way, the early strength of
the anchor refers to the strength of the cement paste in the cement paste in the cement-paste
jet spouting cut-drilling segment 2 in the 7-12 days. After making tests repeatedly,
the applicant found that the traditional jet spouting anchor has the following problems:
[0006] The drilling speed of the drill rod of the traditional jet spouting anchor in the
cement paste in the cement-paste jet spouting cut-drilling segment 2 is 25-50cm/min.
Due to the quick jet spouting speed of the drill rod, the maximum inner diameter of
the cross section of the formed cement paste in the cement-paste jet spouting cut-drilling
segment 2 is similar to the inner diameter of the cross section of the water-pressure
jet spouting cut-drilling segment 1. Besides, the cement in the cement paste in the
cement paste in the cement-paste jet spouting cut-drilling segment 2 of the traditional
jet spouting anchor accounts for 12%-18%, and the anti-pulling force of the traditional
jet spouting anchor is generated by the friction force between piles and the soil
body, so the traditional jet spouting anchor belongs to a tension-type anchor. For
this reasons, in order to provide sufficient pulling bearing capability, the cement
paste in the cement-paste jet spouting cut-drilling segment 2 is formed to be relatively
long, thereby resulting in slow hardening of the cement paste in the cement paste
in the cement-paste jet spouting cut-drilling segment 2 and low early strength of
the traditional jet spouting anchor, and failing to provide sufficient anti-pulling
bearing capability. Therefore, the traditional jet spouting anchor has a low anti-pulling
force.
BRIEF SUMMARY OF THE INVENTION
[0007] The first technical problem to be solved by the present invention is to, aiming at
defects in the prior art, provide a construction method of and a structure of a pressure-dispersion
type bit expanded anchor which has high early cement coil hardening strength and a
high anti-pulling bearing capacity.
[0008] The second technical problem to be solved by the present invention is to, on the
basis of the first technical problem, provide a construction method of and a structure
of a pressure-dispersion type bit expanded anchor with anchor cables which can be
recycled by dismantling cores.
[0009] The first technical solution provided by the present invention to solve the first
technical problem is a construction method of a pressure-dispersion type bit expanded
anchor, wherein a drill rod is employed to perform cut-drilling through water-pressure
jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in
turn to respectively form a water-pressure jet grouting cut-drilling segment and a
cement-paste-pressure jet grouting cut-drilling segment which communicate with each
other from the inside to the outside, and the drill rod ends the cut-drilling through
cement-paste-pressure jet grouting and then exits when reaching the tail end of the
cement-paste-pressure jet grouting cut-drilling segment.
[0010] The cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling;
when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled
to be 4~8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling
segment is controlled to be 2-4m, so that the maximum inner diameter of the cross
section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm;
the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment
and the cement-paste-pressure jet grouting cut-drilling segment is within the range
of 0.2-0.4.
[0011] When the soil is clay, silty clay or floury soil, the amount of the cement paste
used is controlled to be 1.0-2 ton such that the content of the cement mixed in the
cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment
reaches 30%-40%.
[0012] when the soil is sandy soil, the content of the cement paste used is controlled to
be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved
in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
[0013] The cement soil in the cement-paste jet grouting cut-drilling segment gets hardened
and fixes an anchor cable carrier and anchor cables; and when the hardening strength
of the cement soil meets the tensioning and locking strength of a pressure type anchor,
the maintenance period of the cements does not exceed 20 days.
[0014] In the present invention, the content of the cement mixed in the cement soil in the
cement-paste-pressure jet grouting cut-drilling segment is determined according to
the mass percentage of the soil body in the cement-paste-pressure jet grouting cut-drilling
segment as required in the design. The mass of the soil body per stere is generally
1,600-2,000kg. When the soil is clay, silty clay or floury soil, the content of the
cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting
cut-drilling segment is 30%-40%; and when the soil is sandy soil, the content of the
cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting
cut-drilling segment is 15%-30%.
[0015] According to the present invention, the drill rod is employed to perform cut-drilling
through water-pressure jet grouting and cut-drilling through cement-paste-pressure
jet grouting in soil in turn; the cement-paste-pressure jet grouting type cut-drilling
is the one-time cut-drilling; when the one-time cut-drilling occurs, the drilling
speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure
jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner
diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling
segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting
cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment
is within the range of 0.2-0.4.
- 1) The present invention provides a pressure type anchor, while the traditional jet
spouting anchor is a tension type anchor, different in the stressing mechanism. The
anti-pulling resistance of the anchor provided by the present invention depends on
the lateral friction force of the hardened cement soil in the cement-paste-pressure
jet spouting cut-drilling segment and the end bearing capability generated by the
cross section of the hardened cement soil, greatly improving the anti-pulling capability.
The technology can be utilized in a stable soil layer as an anchoring segment, thereby
giving a full play to the end bearing capability of the pressure-type anchor and ensuing
small discreteness of the anti-pulling force.
- 2) The drilling speed of the drill rod in the present invention is controlled to be
4-8cm/min, far smaller than the jet spouting cut-drilling speed of the traditional
jet spouting anchor, so the maximum inner diameter of the cross section of the cement-paste-pressure
jet spouting cut-drilling segment is 600-800mm. In this way, the bearing capability
of a single anchor cable is enhanced, increasing safety rating and improving the initial
pre-stress of the anchor at the same time. Therefore, the deformation of supporting
and protecting structures can be better controlled.
- 3) The cement-paste-pressure jet spouting cut-drilling of the present invention is
one-time drilling, and the cement-paste-pressure jet spouting cut-drilling of the
traditional jet spouting anchor is two-level drilling. The present invention reduces
the drilling times.
- 4) When the soil is clay, silty clay or floury soil, the content of the cement mixed
in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling
segment reaches 30%-40%; and when the soil is sandy soil, AND the content of the cement
mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling
segment reaches 15%-30%, far higher than the content of the mixed cement mixed in
the cement paste in the traditional jet spouting anchor structure, equivalent to that,
without increase in the cement amount, the cement is completely used in a 2-4m cement-paste-pressure
jet grouting cut-drilling segment to perform high-cement-ratio jet spouting replacement
in the present invention. The present invention directly gets the point, so the cement-paste-pressure
jet grouting cut-drilling segment has advantages of a small length, a large diameter
and a high cement ratio, directly enhancing the cement soil strength and early strength
of the anchoring segment of the anchor of the present invention. During actual engineering
construction, the maintenance time for the cement soil strength of the cement-paste-pressure
jet grouting cut-drilling segment to increase to the designed strength is reduced,
and the long-existing problems of low cement soil strength and low early strength
of the traditional jet spouting anchor, and problem of failure to manufacture the
pressure are completely solved.
- 5) The cement paste in the cement-paste-pressure jet grouting cut-drilling segment
overflows to fill in a part of the water-pressure jet spouting cut-drilling segment,
and the content of the mixed cement of the part in the water-pressure jet spouting
cut-drilling segment is (5%-10%), so the strength is higher than the original soil.
[0016] The second technical solution provided by the present invention to solve the first
technical problem is a structure of a pressure-dispersion type bit expanded anchor,
wherein the construction method of a pressure-dispersion type bit expanded anchor
according to claim 1 is adopted to respectively form a water-pressure jet grouting
cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment
which communicate with each other from the inside to the outside; the cement paste
in the rotary cement-paste-pressure jet grouting cut-drilling segment gets hardened
and encloses an anchor cable carrier and an anchor cable; the length of the cement-paste-pressure
jet grouting cut-drilling segment is controlled to be 2-4m; the maximum inner diameter
of the cross section of the cement-paste-pressure jet grouting cut-drilling segment
is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting
cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment
is within the range of 0.2-0.4:
[0017] When the soil is clay, silty clay or floury soil, the content of the cement mixed
in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling
segment is 30%-40%.
[0018] When the soil is sandy soil, the content of the cement mixed in the cement soil reserved
in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
[0019] In order to solve the second technical problem, the present invention makes the following
improvement on the above technical solution: the anchor cable carriers are at least
two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting
cut-drilling segment at an interval along the length direction of the cement-paste
jet grouting cut-drilling segment; the anchor cables are anchor cables provided with
membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers;
when the anchor cable carriers are hinge type carriers, anchor cables are coiled on
the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate
type carriers, each flat plate type carrier is fixed with a fused anchor fixture for
holding one end of an anchor cable.
- 1) The anchor cable carriers are at least two carriers which are fixed in the hardened
cement soil in the cement-paste jet grouting cut-drilling segment at an interval along
the length direction of the cement-paste jet grouting cut-drilling segment; and the
anchor cable carriers are hinge type carriers or flat plate type carriers; when the
anchor cable carriers are hinge type carriers, anchor cable. Compared with the prior
art where a single anchor cable carrier fixes a plurality of anchor cables, the stress
is dispersed when at least two anchor cable carrier is adopted, so the anchor belongs
to a load-dispersing type anchor. 2) When the anchor cable carriers are hinge type
carriers, anchor cables are coiled on the hinge type carriers in U-shape, and after
the engineering construction is ended, one end of each of the anchor cables can be
released through the hinge type carrier to recover the anchor cables; when the when
the anchor cable carriers are flat plate type carriers, each flat plate type carrier
is fixed with a fused anchor fixture for holding one end of an anchor cable, and after
the engineering construction is ended, one end of each of the anchor cables can be
released through the fused anchor fixture, which means that the present invention
can recover the anchor cables by dismantling the core, and the traditional jet spouting
anchor cannot recover the anchor cables by dismantling the core. 3) The anchor is
provided with membranes, and the anchor cables are non-adhesive anchor cables, so
all the front ends of all the anchor cable carriers are free ends, capable improving
the requirements for the initial pre-stress on the anchor of the present invention
(1.1 times the designed value, 1.0 time higher than the standard value), thereby realizing
testing of every cable, reducing the pit displacement and achieving the effect safer
than supports.
[0020] The first change of the first technical solution is as follows: The anchor cable
carriers is on anchor cable carrier which is fixed in the hardened cement soil in
the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables
provided with membranes; the anchor cable carrier is a hinge type carrier or flat
plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor
cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier
is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor
fixture for holding one end of an anchor cable.
[0021] The second change of the first technical solution is as follows: The drill rod brings
the anchor cable carrier and the anchor cable in when drilling.
[0022] The third change of the first technical solution is as follows: After the drill rod
ends the cut-drilling through cement-paste-pressure jet grouting and then exits, the
anchor cable carrier and the anchor cables are brought in the cement-paste jet grouting
cut-drilling segment in the non-jet-spouting state.
[0023] The fourth change of the first technical solution is as follows: The tensioning and
locking strength of the pressure-type anchor is greater than 2Mpa.
[0024] The fifth change of the first technical solution is as follows: The inner diameter
of the cross section of the water-pressure jet-spouting cut-drilling segment is 150-200mm.
[0025] The sixth change of the first technical solution is as follows: The water pressure
of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure
of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement
ratio of the cement paste is 1.0-1.5.
[0026] The seventh change of the first technical solution is as follows: When the drill
rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits
after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling
segment, the cement-paste-pressure jet grouting cut-drilling segment is supplemented
with the cement paste at a low pressure; when the anchor has a waterproof curtain,
the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof
curtain.
[0027] The eighth change of the first technical solution is as follows: The length ratio
of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting
cut-drilling segment is 0.06-0.3.
[0028] The first change of the second technical solution is as follows: The anchor cable
carriers are at least two carriers which are fixed in the hardened cement soil in
the cement-paste jet grouting cut-drilling segment at an interval along the length
direction of the cement-paste jet grouting cut-drilling segment; the anchor cables
are anchor cables provided with membranes; the anchor cable carriers are hinge type
carriers or flat plate type carriers; when the anchor cable carriers are hinge type
carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when
the anchor cable carriers are flat plate type carriers, each flat plate type carrier
is fixed with a fused anchor fixture for holding one end of an anchor cable.
[0029] The second change of the second technical solution is as follows: The anchor cable
carriers is on anchor cable carrier which is fixed in the hardened cement soil in
the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables
provided with membranes; the anchor cable carrier is a hinge type carrier or flat
plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor
cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier
is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor
fixture for holding one end of an anchor cable.
[0030] The third change of the second technical solution is as follows: The length ratio
of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting
cut-drilling segment is 0.06-0.3.
[0031] As a change of the above technical solution: The cement used for making the cement
paste is cement with a common strength rating or a high-mark cement with a strength
rating of 52.5Mpa or above.
[0032] The applicant found that, compared with cements with a common strength rating, for
example, the cement with a rating of P.o.42.5, the high-mark cement with a strength
rating 52.5Mpa or above can obviously improve the early bearing capability of the
anchor and improve the early strength of the anchor.
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
[0033] The present invention is described in further detail with reference to the attached
drawings.
FIG. 1 is a structural view of a traditional jet-spouting anchor.
FIG. 2 is a structural view of a foundation pit support formed by the traditional
jet-spouting anchor and concrete pile walls.
FIG. 3 is structural view of a pressure-dispersion type bit expanded anchor according
to an embodiment of the present invention.
FIG. 4 is a structural view of a foundation pit support formed by the pressure-dispersion
type bit expanded anchor and concrete pile walls.
FIG. 5 is a schematic view of structures of a water-pressure jet spouting cut-drilling
segment and a cement-paste-pressure jet spouting cut-drilling segment of the traditional
jet spouting anchor.
FIG. 6 is a schematic view of structures of a water-pressure jet spouting cut-drilling
segment and a cement-paste-pressure jet spouting cut-drilling segment of the pressure-dispersion
type bit expanded anchor of the present invention.
FIG. 7 is a comparison diagram of the strength-age increase of the structure of the
pressure-dispersion type bit expanded anchor of the present invention and the structure
of the traditional jet spouting anchor.
DETAILED DESCRIPTION OF THE INVENTION
EMBODIMENT
[0034] A construction method of a pressure-dispersion type bit expanded anchor of this embodiment,
as shown in FIG. 3 and FIG. 4, adopts a drill rod to perform cut-drilling through
water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting
in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment
1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate
with each other from the inside to the outside, the drill rod ending the cut-drilling
through cement-paste-pressure jet grouting and then exiting when reaching the tail
end of the cement-paste-pressure jet grouting cut-drilling segment 2.
[0035] The cement-paste-pressure jet grouting type cut-drilling segment 2 is one-time cut-drilling
segment; when the one-time cut-drilling occurs, the drilling speed of the drill rod
is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting
cut-drilling segment 2 is controlled to be 2-4m, so that the maximum inner diameter
of the cross section of the cement-paste-pressure jet grouting cut-drilling segment
is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting
cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment
2 is within the range of 0.2-0.4.
[0036] When the soil is clay, silty clay or floury soil, the content of the cement paste
used is controlled to be 1.0-2 ton such that the content of the cement mixed in the
cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment
2 reaches 30%-40%.
[0037] When the soil is sandy soil, the content of the cement paste used is controlled to
be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved
in the cement-paste-pressure jet grouting cut-drilling segment 2 reaches 15%-30%.
[0038] The cement soil in the cement-paste jet grouting cut-drilling segment 2 gets hardened
and fixes an anchor cable carrier and anchor cables 3; and when the hardening strength
of the cement soil meets the tensioning and locking strength of a pressure type anchor,
the maintenance period of the cements does not exceed 20 days.
[0039] The pressure-type anchor of the present invention refers to the pressure-type anchor
defined in the Technical Specification for Ground Anchors (Cables) issued by the Standardization
Institute of Chinese Construction enacted Technical specification.
[0040] The anchor cables 3 of the present invention can be steel strands, etc. The anchor
cables 3 are provided with membranes. The anchor cables 3 provided with the membranes
can be steel strands sheathed with plastic.
[0041] As shown in FIG. 5 and FIG. 6, the stepping speed of the drill rod of the cement-paste
jet grouting cut-drilling segment 2 of a traditional jet spouting anchor is 20-40cm/min,
and the length of the cement-paste jet grouting cut-drilling segment 2 is 8-12m; sometimes,
jet spouting is executed one more time at a segment which is 0.5-1m away from the
end of the cement-paste jet grouting cut-drilling segment 2; the inner diameter of
the cross section of the cement-paste jet grouting cut-drilling segment 2 is 200-300mm,
and the content of the cement mixed in the cement soil reserved in the cement-paste
jet grouting cut-drilling segment 2 is 12%-18%. According to the present invention,
the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling
segment 2 of the pressure-dispersion type bit expanded anchor is 4-8cm/min; the maximum
inner diameter of the cross section of the cement-paste jet grouting cut-drilling
segment 2 is 600-800mm; when the soil is clay, silty clay or floury soil, the content
of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting
cut-drilling segment reaches 30%-40%; and when the soil is sandy soil, and the content
of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting
cut-drilling segment reaches 15%-30%.
[0042] According to the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment, the anchor cable carriers are at least two carriers which
are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling
segment 2 at an interval along the length direction of the cement-paste jet grouting
cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes;
the anchor cable carriers are hinge type carriers or flat plate type carriers; when
the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the
hinge type carriers in U-shape; and when the anchor cable carriers are flat plate
type carriers, each flat plate type carrier is fixed with a fused anchor fixture for
holding one end of an anchor cable 3. The anchor cable carriers may be two, three
or more.
[0043] According to the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment, the drill rod brings the anchor cable carrier and the anchor
cables 3 in when drilling.
[0044] According to the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment, the tensioning and locking strength of the pressure type
anchor is greater than 2Mpa.
[0045] According to the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment, the inner diameter of the cross section of the water-pressure
jet spouting cut-drilling segment 1 is 150-200mm.
[0046] According to the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment, the water pressure of the rotary water jet spouting cut-drilling
is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling
is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
[0047] According to the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment, when the drill rod ends the cut-drilling through cement-paste-pressure
jet grouting and then exits after reaching the tail end of the cement-paste-pressure
jet grouting cut-drilling segment 2, the cement-paste-pressure jet grouting cut-drilling
segment 2 is supplemented with the cement paste at a low pressure; when the anchor
has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at
the junction of the waterproof curtain.
[0048] According to the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment, the length ratio of the cement-paste jet grouting cut-drilling
segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
[0049] A structure of a pressure-dispersion type bit expanded anchor is provided in this
embodiment, wherein the construction method of a pressure-dispersion type bit expanded
anchor is adopted to respectively form a water-pressure jet grouting cut-drilling
segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate
with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure
jet grouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier
and an anchor cable 3; the length of the cement-paste-pressure jet grouting cut-drilling
segment 2 is controlled to be 2-4m; the maximum inner diameter of the cross section
of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the
ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment
1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the
range of 0.2-0.4.
[0050] When the soil is clay, silty clay or floury soil, the content of the cement mixed
in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling
segment 2 is 30%-40%.
[0051] When the soil is sandy soil, the content of the cement mixed in the cement soil reserved
in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
[0052] The anchor cable carriers in this embodiment are at least two carriers which are
fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment
2 at an interval along the length direction of the cement-paste jet grouting cut-drilling
segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor
cable carriers are hinge type carriers or flat plate type carriers; when the anchor
cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type
carriers in U-shape; and when the anchor cable carriers are flat plate type carriers,
each flat plate type carrier is fixed with a fused anchor fixture for holding one
end of an anchor cable 3. The anchor cable carriers may be two, three or more.
[0053] In this embodiment, the length ratio of the cement-paste jet grouting cut-drilling
segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
[0054] In this embodiment, the cement used for making the cement paste is cement with a
common strength rating or a high-mark cement with a strength rating of 52.5Mpa or
above.
[0055] The construction method and the structure of the pressure-dispersion type bit expanded
anchor rod in this embodiment are compared with those of the traditional jet spouting
anchor, as shown in table 1:
Table 1
Characteristics |
Pressure-dispersion type bit expanded anchor rod in this embodiment |
Traditional jet spouting anchor |
Steel strand |
Not adhesive |
Adhesive |
Stressing mechanism |
Pressure type |
Tension type |
Early cement strength |
High |
Low |
Recyclable through core dismantling |
Recyclable |
Not recyclable |
Length of the water-pressure jet grouting cut-drilling segment |
Long |
Short |
Displacement control performance |
High |
Low |
[0056] It can be seen that, by the construction method and structure of the pressure-dispersion
type bit expanded anchor in this embodiment, the cement-paste jet grouting cut-drilling
segment 2 has a small length, a large diameter and a high cement content and is quick
in cement hardening, directly improving the structure strength of the pressure-dispersion
type bit expanded anchor and the early strength of the structure of the pressure-dispersion
type bit expanded anchor, in particular improving the early anti-pulling capability
of the cement-paste jet grouting cut-drilling segment 2. During actual engineering
construction, the maintenance time for the cement soil strength of the cement-paste-pressure
jet grouting cut-drilling segment to increase to the designed strength is reduced.
[0057] When the construction method and structure of the pressure-dispersion type bit expanded
anchor in this embodiment are applied to the silty clay soil, the cement soil strength
age of the silty clay increases. As shown in FIG. 7, by the structure of the pressure-dispersion
type bit expanded anchor of the present invention, the strength of the cement soil
can reach design requirements after 7-15 days, equivalent to the strength of the traditional
jet spouting anchor after 28-50 days. Moreover, in the same maintenance age, the strength
of the cement soil of the pressure-dispersion type bit expanded anchor of the present
invention is far higher than the strength of the cement soil of the traditional jet
spouting anchor.
[0058] The present invention is not limited to the above embodiment. For example: 1) Of
course, when the construction method of the pressure-dispersion type bit expanded
anchor in this embodiment adopts one anchor cable carrier, the anchor cable carrier
is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet
grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with
membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers;
when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled
on the hinge type carriers in U-shape; and when the anchor cable carriers are flat
plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture
for holding one end of an anchor cable 3. 2) According to the construction method
of the pressure-dispersion type bit expanded anchor in this embodiment, after the
drill rod ends the cut-drilling through cement paste jet spouting and exits, the anchor
cable carrier and the anchor cables 3 are brought into the cement-paste jet grouting
cut-drilling segment 2 in the non-jet-spouting state; a casing technology can be employed
to bring the anchor cable carrier and the anchor cables 3 into the cement-paste jet
grouting cut-drilling segment 2, or the drill rod can be used to bring the anchor
cable carrier and the anchor cables 3 into the cement-paste jet grouting cut-drilling
segment 2, etc. 3) The anchor cable carrier is an anchor cable carrier fixed in the
hardened cement soil in the cement-paste jet grouting cut-drilling segment 2; the
anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers
are hinge type carriers or flat plate type carriers; when the anchor cable carriers
are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in
U-shape; and when the anchor cable carriers are flat plate type carriers, each flat
plate type carrier is fixed with a fused anchor fixture for holding one end of an
anchor cable 3. Technical solutions made by equivalent substitution shall all fall
within the protective scope of the claims of the present invention.
1. A construction method of a pressure-dispersion type bit expanded anchor, a drill rod
performing cut-drilling through water-pressure jet grouting and cut-drilling through
cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure
jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling
segment which communicate with each other from the inside to the outside, the drill
rod ending the cut-drilling through cement-paste-pressure jet grouting and then exiting
when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling
segment,
characterized in that,
the cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling;
when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled
to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling
segment is controlled to be 2-4m, so that the maximum inner diameter of the cross
section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm;
the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment
and the cement-paste-pressure jet grouting cut-drilling segment is within the range
of 0.2-0.4;
when the soil is clay, silty clay or floury soil, the amount of the cement paste used
is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement
soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches
30%-40%;
when the soil is sandy soil, the amount of the cement paste used is controlled to
be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved
in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%;
the cement soil in the cement-paste jet grouting cut-drilling segment gets hardened
and fixes an anchor cable carrier and anchor cables; and when the hardening strength
of the cement soil meets the tensioning and locking strength of a pressure type anchor,
the maintenance period of the cements does not exceed 20 days.
2. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, wherein the anchor cable carriers are at least two carriers which are
fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment
at an interval along the length direction of the cement-paste jet grouting cut-drilling
segment; the anchor cables are anchor cables provided with membranes; the anchor cable
carriers are hinge type carriers or flat plate type carriers; when the anchor cable
carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers
in U-shape; and when the anchor cable carriers are flat plate type carriers, each
flat plate type carrier is fixed with a fused anchor fixture for holding one end of
an anchor cable.
3. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, wherein the anchor cable carriers is on anchor cable carrier which is
fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment;
the anchor cables are anchor cables provided with membranes; the anchor cable carrier
is a hinge type carrier or flat plate type carrier; when the anchor cable carrier
is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape;
and when the anchor cable carrier is a flat plate type carrier, the flat plate type
carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
4. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, 2 or 3, wherein the drill rod brings the anchor cable carrier and the
anchor cable in when drilling.
5. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, 2 or 3, wherein after the drill rod ends the cut-drilling through cement-paste-pressure
jet grouting and then exits, the anchor cable carrier and the anchor cables are brought
in the cement-paste jet grouting cut-drilling segment in the non-jet-spouting state.
6. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, 2 or 3, wherein the water pressure of the rotary water jet spouting cut-drilling
is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling
is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
7. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, 2 or 3, wherein when the drill rod ends the cut-drilling through cement-paste-pressure
jet grouting and then exits after reaching the tail end of the cement-paste-pressure
jet grouting cut-drilling segment, the cement-paste-pressure jet grouting cut-drilling
segment is supplemented with the cement paste at a low pressure; when the anchor has
a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the
junction of the waterproof curtain.
8. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, 2 or 3, wherein the length ratio of the cement-paste jet grouting cut-drilling
segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
9. The construction method of a pressure-dispersion type bit expanded anchor according
to claim 1, 2 or 3, wherein the cement used for making the cement paste is cement
with a common strength rating or a high-mark cement with a strength rating of 52.5Mpa
or above.
10. A structure of a pressure-dispersion type bit expanded anchor according to claim 1,
the construction method of a pressure-dispersion type bit expanded anchor being adopted
to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure
jet grouting cut-drilling segment which communicate with each other from the inside
to the outside, the cement paste in the rotary cement-paste-pressure jet grouting
cut-drilling segment getting hardened and enclosing an anchor cable carrier and an
anchor cable,
characterized in that, the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled
to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure
jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of
the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure
jet grouting cut-drilling segment is within the range of 0.2-0.4;
when the soil is clay, silty clay or floury soil, the content of the cement mixed
in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling
segment is 30%-40%;
when the soil is sandy soil, the content of the cement mixed in the cement soil reserved
in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
11. The structure of a pressure-dispersion type bit expanded anchor according to claim
10, wherein the anchor cable carriers are at least two carriers which are fixed in
the hardened cement soil in the cement-paste jet grouting cut-drilling segment at
an interval along the length direction of the cement-paste jet grouting cut-drilling
segment; the anchor cables are anchor cables provided with membranes; the anchor cable
carriers are hinge type carriers or flat plate type carriers; when the anchor cable
carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers
in U-shape; and when the anchor cable carriers are flat plate type carriers, each
flat plate type carrier is fixed with a fused anchor fixture for holding one end of
an anchor cable.
12. The structure a pressure-dispersion type bit expanded anchor according to claim 10,
wherein the anchor cable carriers is on anchor cable carrier which is fixed in the
hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor
cables are anchor cables provided with membranes; the anchor cable carrier is a hinge
type carrier or flat plate type carrier; when the anchor cable carrier is a hinge
type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and
when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier
is fixed with a fused anchor fixture for holding one end of an anchor cable.
13. The structure a pressure-dispersion type bit expanded anchor according to claim 10,
11 or 12, wherein the length ratio of the cement-paste jet grouting cut-drilling segment
to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
14. The structure a pressure-dispersion type bit expanded anchor according to claim 10,
11 or 12, wherein the cement used for making the cement paste is cement with a common
strength rating or a high-mark cement with a strength rating of 52.5Mpa or above.