[0001] The invention relates to an assembly of a sewer and a sewer blockage detection system.
[0002] It sometimes occurs that a sewer gets blocked, for example because of increasing
amounts of sediments getting deposited and adhered to inner walls of sewer pipes.
Such blockages also can be caused by users which accidentally or purposively drop
strange objects in lavatory bowls and then try to flush them. A blocking of the sewer
may lead to all kinds of undesired situations, like a flooding of waste-water and
pieces of excrements out of the toilet into the surroundings. At public sites like
in stores and warehouses, this may have a very negative effect on business. Besides
that it takes a lot of time to clean it all up again and have the sewer unblocked.
Therefore various kinds of sewer blockage detection systems have been developed which
are already known in a wide variety of embodiments.
[0003] For example
US 4,546,346 shows a sewer blockage detection device which can be screwed onto a threaded clean
out access opening of a sewer pipe. The detection device comprises a pneumatic switch
that is designed to get activated by a flexible diaphragm when a waste-water level
inside the sewer pipe rises above a set critical threshold level. In the event of
a blockage of the sewer pipe, the blocked material exerts pressure on the flexible
diaphragm which then closes the pneumatic switch and thereby sets off an alarm either
locally or at a remote location.
[0004] Another example is
US 1,164,882 where a rod of electrically conductive material extends into a chamber part of a
sewer pipe. As soon as the sewage rises sufficiently within the chamber, the waste-water
causes the lower contact ends of the rod to submerge. This closes an electric circuit,
since the waste-water acts as conducting medium, and an electric bell may be sounded
or another alarm signal may be given that the sewer pipe has become clogged.
[0005] GB 2 423 365 discloses the features of the preamble of claim 1 and in particular shows an embodiment
in which a detection unit has been arranged within a drainage. The detection device
comprises a magnetic float and a switch. The magnetic float is arranged to ride up
and down a support member, whereas the switch is located inside the upper end of this
support member. The magnetic float rises with the level of the fluid and, when it
reaches a predetermined level, triggers the switch and activates a warning signal.
[0006] A disadvantage with each of those known sewer blockage detection systems is that
they are relative expensive and/or are difficult to install and/or are vulnerable
to getting damaged. For example they comprise measurement and control engineering
and/or mechanical or electrical parts inside the sewer which may get damaged by the
waste-water flowing through the sewer pipe. During normal use, the known sewer blockage
detection systems may get contaminated or even blocked, for example by urinary stone
getting deposited on them. Also the measurement and control engineering and/or mechanical
or electrical parts may get damaged during an unblocking operation when a plumber's
snake or other cleaning object gets forced through the sewer pipe.
[0007] The present invention aims to at least partly overcome those disadvantages or to
provide a usable alternative. In particular the present invention aims to provide
a user-friendly and reliable sewer blockage detection system which is relative cheap
and simple.
[0008] This aim is obtained by an assembly of a sewer and a sewer blockage detection system
according to claim 1. The sewer comprises a sewer pipe for having waste-water standing
still inside or flowing through at least a bottom part thereof. The detection system
comprises a gas supply for delivering pressurized gas to a gas transport duct. For
this the gas transport duct connects with one end to the gas supply. From there the
duct extends towards the sewer pipe, and there opens out with a gas inflow opening
inside the bottom part of the sewer pipe. A measuring organ has been provided for
measuring back pressures of pressurized gas when flowing from the gas supply through
the duct into the bottom part. Further a control unit has been provided which comprises
at least one threshold value for the measured back pressures, which threshold value
is indicative for detecting blockages or risks for future blockages inside the sewer.
The control unit is designed to send out an alarm signal when back pressures which
have been measured over a certain period of time by the measuring organ keep on lying
above the threshold value. According to the inventive thought the gas inflow opening
has been provided in a lower circumferential wall section of the sewer pipe that delimits
its bottom part. Thus the gas inflow opening has been provided inside a "wet" part
of the sewer pipe wall, that is to say that lower section of the sewer pipe wall where
during normal circumstances the waste-water is at least present by standing still
or flowing alongside this lower wall section. Pressurized gas which is delivered to
the duct, flows through the duct and gets blown directly through the inflow opening
in the lower circumferential wall section into the bottom part of the sewer pipe.
Advantageously no system elements like measurement and control engineering and/or
mechanical or electrical parts of the sewer blockage detection system need to be provided
inside the sewer pipe. In fact the entire measuring can take place outside the sewer.
The system can be considered as self-cleaning. A (semi-) permanent flow of pressurized
gas through the gas inflow opening keeps the system efficiently unblocked and prevents
sediments like urinary stone to be able to deposit inside it. If it is deemed necessary
to perform a cleaning operation of the inside of the sewer pipe, for example because
a risk for future blockages has been detected, then it is not necessary to first have
the sewer blockage detection system removed. The construction of the system is simple
and cheap, while at the same time it can easily and quickly be installed at all kinds
of places along the outside of a sewer pipe.
[0009] Thus a simple assembly has been obtained with which risks for blockages to occur
in the near future inside a sewer pipe can be reliably predicted. This makes it possible
to timely take appropriate precautionary measures in order to prevent a full blocking
of the sewer which may lead to all kinds of other problems. Gas pressure differences
which occur because of differences in water column pressure inside the sewer, can
easily be measured by the system and used as indication for increased or decreased
waste-water level. By setting a suitable threshold value in combination with a suitable
time period, the system is capable of communicating whether for example merely a temporary
increase of the waste-water level inside the sewer has taken place or that a more
permanent increase of the waste-water level is taking place. If at some point in time
a gas pressure is measured which lies above the threshold value, while subsequently
after a time period x a gas pressure is measured which indicates that the waste-water
level has decreased again to a normal level, then no alarm signal gets sent out, and
one can assume that it was merely a peak load. Such a peak load can occur when a lot
of people use the sewer at a same time, for example when visiting the rest room at
the end of a common coffee or lunch break. If however at some point in time a gas
pressure is measured which lies above the threshold value, while subsequently after
a time period x still a gas pressure is measured which lies above said threshold value,
then an alarm signal gets sent out, because then one can assume that a blockage is
going to occur soon. The setting of a suitable threshold value can be dependent on
a desired safety level in trying to detect/predict future blockages, and can even
be made variable in time.
[0010] It is noted that
US 3,638,490 and
US 3,965,740 disclose fluid flow measuring devices which make use of introduction of pressurized
gas into a stream of waste-water which flows through a sewer pipe. For this a rigid
elongated tube has gotten positioned such into the sewer pipe that it gets to lie
on the bottom thereof. This tube at one end is connected to a flexible hose. The hose
in turn is connected to either a pressure vessel filled with pressurized air, or to
a compressor. The opposite free end of the tube is provided with a gas outlet. During
use pressurized gas is forced through the hose into the immersed rigid tube and out
of its gas outlet into the waste-water. Measuring means are provided which are responsive
to the force or pressure which is required to force the gas into the stream of waste-water.
Back pressures which are measured are indicative for the depth and/or velocity of
the stream of waste-water inside the sewer pipe. In contrast to the present invention
those known gas-pressure operated level measurement systems are unable to detect blockages
to occur in a sewer pipe. Their control unit does not comprises at least one threshold
value for the measured back pressures that is indicative for detecting blockages or
risks for future blockages inside the sewer and is not designed to send out an alarm
signal when the measured back pressures over a period of time lie above such a threshold
value. Further it is noted that their functioning leaves to be desired, and that they
are particularly destined to be used for large sewer and water users. For example
they need a large manhole opening for being able to properly get them positioned inside
a sewer pipe. Also they form an obstacle inside the sewer pipe, behind which all kinds
of objects and particles inside the waste-water may remain hanging, and thus start
to form a blockage themselves. Further it is noted that the detection systems first
need to be removed before it is possible to start a cleaning or unblocking operation
of the sewer pipe. Furthermore it is disadvantageous that
US 3,638,490 needs a weighted streamlining foot to keep the tube in its best possible operating
position in the flow, whereas
US 3,965,740 needs a compressible clamping collar for getting it clamped inside the sewer pipe.
The foot and the clamp also may lead to all kinds of objects and particles inside
the waste-water remain hanging behind them.
[0011] Further it is noted that from
JP60250215 a level measuring device of a water discharge pipe is known which makes use of introduction
of compressed air in the pipe together with making use of a detector for detecting
back-pressure of the compressed air. This level measurement device also is unable
to detect blockages to occur in the discharge pipe. Its control unit does not comprise
at least one threshold value for the measured back pressures that is indicative for
detecting blockages or risks for future blockages inside the sewer and is not designed
to send out an alarm signal when the measured back pressures over a period of time
lie above such a threshold value.
[0012] In a preferred embodiment according to the present invention a connection nipple
has been mounted to an outer side of the lower circumferential wall section of the
sewer pipe at the position of the gas inflow opening. The duct then can easily be
connected to this nipple, preferably releasably. More importantly the entire duct
and also the nipple can remain outside the sewer pipe and thus in no way are able
to negatively influence the flow of waste-water through there.
[0013] In a further embodiment the gas inflow opening can be formed by a through hole that
has been drilled in the lower circumferential wall section of the sewer pipe. This
is a flexible and quick operation which can be performed at various desired locations
alongside a sewer. The nipple advantageously can also be used as a guide for the drill
during a drilling operation through the sewer pipe wall. Thus the drill does not have
a tendency to slip away and the gas inflow opening can be accurately provided at exactly
the aimed position cq height. It is then no longer necessary to drill in a radial
direction relative to a mostly tubular sewer pipe wall. For example the gas inflow
opening then can be drilled in a substantially horizontal direction through said lower
circumferential wall section. This helps to give an installer sufficient manoeuvring
space around the sewer pipe during installation.
[0014] In an even further embodiment a manifold can be used for connecting the duct to the
sewer pipe. The manifold can be given a shape which is complementary to the outer
side of the lower circumferential wall section of the sewer pipe around the position
of the gas inflow opening. The connection between the manifold and the sewer pipe
can be achieved in various ways, but advantageously the manifold gets adhered to the
pipe by means of a suitable glue. Instead of using a manifold it is also possible
to take out an entire part of the sewer pipe and have it replaced by a segment that
already includes the gas inflow opening and/or nipple.
[0015] In a variant the duct is a flexible hose. This makes the system flexible to get installed
at all kinds of places including underground.
[0016] The diameter of the duct and/or of the gas inflow opening can have all kinds of dimensions.
Preferably it is smaller than 8 mm. In practice this has appeared to be a suitable
upper range which makes it possible to use a gas supply with a relative low debit
and output pressure.
[0017] The gas supply may comprise a pump, in particular an electric pump. The pump can
be kept relative light. The output pressure of the pump may be variable and for example
depend on the diameter of the sewer pipe. It is possible to have the system continuously
blow in pressurized gas. Advantageously the pump is designed to suck in and deliver
pressurized environmental air as pressurized gas to the duct. This is not only cheap
and simple, but also does not pollute the waste-water or harm the environment.
[0018] Advantageously the control unit may connect to a monitoring device. This connection
preferably is wireless, in particular via a modem function to the internet. The monitoring
device then for example can be a computer screen that is connected to the internet,
but also a screen of a smart phone or any other device/screen, to which a user can
log into. Thus data and/or graphics can be shown to the user which show the changing
waste-water levels inside the pipe. This may further help the user to properly predict
risks for future blockages. Also it may help the user in better comprehending the
normal use of the sewer including its peak loads over time.
[0019] In a further preferred embodiment the gas inflow opening and duct at an inner side
of the lower circumferential wall section of the sewer pipe do not comprise any parts
at all which project into the bottom part of the sewer pipe. The inner side of the
sewer pipe thus can remain a smooth wall along which the waste-water can easily flow.
[0020] In an embodiment, the gas inflow opening has been provided in the lower circumferential
wall section at a height of less than 2 cm of a bottom of the sewer pipe. On the one
hand this maximum height provides sufficient space for being able to provide the gas
inflow opening/duct/nipple to the sewer pipe from a sideways direction. On the other
hand this maximum height is considered to lie well below a minimum level of the waste
water inside the sewer pipe (the abovementioned bottom part of the sewer pipe). The
height of the gas inflow opening may also be higher, for example when this is possible
because of a certain fall/slope of the sewer pipe.
[0021] It is possible to provide only one gas inflow opening of which the gas inflow back
pressure gets monitored. This gas inflow opening then preferably lies close to a position
where the waste water enters the sewer pipe, that is to say as much upstream as possible.
This is because this makes it possible to monitor a maximum length of downstream sewer
pipe on possible future blockages. Moreover this upstream positioning of the gas inflow
opening then also comes to lie closest to there where the most contamination is likely
to build up. For example depositions of greases and the like in case of a sink connecting
to the sewer pipe, and depositions of urinary stone and the like in cases of a toilet
connecting to the sewer pipe. In the alternative it is also possible to provide for
a plurality of gas inflow openings along a length of sewer pipe, which al get monitored
for changes in gas inflow back pressures.
[0022] Further advantageous embodiments are stated in the subclaims.
[0023] The invention also relates to a method for operating the assembly.
[0024] The invention shall be explained in more detail below with reference to the accompanying
drawings, in which:
- Fig. 1 shows a schematic view of an embodiment of the assembly of sewer pipe and sewer
blockage detection system according to the invention;
- Fig. 2 shows a possible connection of the duct of fig. 1 to the sewer pipe; and
- Fig. 3 is a view of fig. 2 with an increased waste-water level.
[0025] A sewer pipe in fig. 1 has been given the reference numeral 1. The sewer pipe 1 comprises
a bottom part 2 which is delimited by a so-called lower circumferential wall section
1' of the pipe 1. An upper part 3 of the pipe 1 is delimited by a so-called upper
circumferential wall section 1". During normal use the bottom part 2 remains filled
with waste-water, whereas the upper part 3 remains filled with air. This minimum level
of the waste-water has been indicated with a wave line 2a.
[0026] The pipe 1 has a cylindrical cross section with a diameter D of approximately 100
mm. The level 2a inside the bottom part 2 here has a height H1 of less than 20 mm.
[0027] When batches of additional waste-water get to flow through the pipe 1, the level
of the waste-water inside the pipe 1 temporarily shall increase and not only fill
up the bottom part 2 but also partly or wholly the upper part 3.
[0028] Should for some reason the level of the waste-water inside the pipe 1 after a certain
time interval x not drop back to the minimum level 2a, but remain lying at or above
a certain threshold waste-water level 2b inside the pipe 1, then this can be seen
as an indication that the pipe 1 is already partly blocked and that a full blockage
of the pipe 1 is likely to occur at short notice. The threshold level 2b inside the
upper part 3 here has a height H2 which lies in between H1 and D. The height H2 of
the threshold level 2b and the time interval x are to be determined by a user in dependence
of the diameter of the sewer pipe 1 and a risk analysis for future sewer pipe blockages
to occur in the sewer pipe 1.
[0029] Outside the sewer pipe 1 a detection system 5 is provided. The system 5 comprises
an electric pump 6 which via an air inlet is able to take in air, pressurize this
air and feed it into a gas transport duct 8. The duct 8 connects to a gas inflow opening
9 which is provided in the lower circumferential wall section 1'.
[0030] During use the pump 6 continuously feeds pressurized air into the duct 8. From there
the pressurized air flows through the duct 8 and via the gas inflow opening 9 into
the waste-water inside the pipe 1.
[0031] The system 5 comprises a pressure measuring organ 10 which is designed to continuously
or intermittently measure so-called back pressures inside the duct 8. The measured
back pressure Pb is dependent on the output pressure Pp of the pump and of the waste-water
column pressure Pw which occurs at the position of the inflow opening 9 at the time
the measurement takes place. The waste-water pressure Pw is dependent on the height
of the level of the waste-water inside the pipe 1 at that time. Fig. 2 shows a situation
with a waste-water level which is lower than in Fig. 3. Therefore there it goes that
Pw1 < Pw2, and since Pp is kept the same, it follows that a back pressure Pb1 measured
for the situation in fig. 2 shall be lower than a back pressure Pb2 measured for the
situation in fig. 3.
[0032] The measured back pressures Pb over time are sent to a control unit 15. This control
unit 15 is programmed with a threshold value with which the measured back pressures
Pb can be compared. This threshold value is set to correspond to the determined threshold
level 2b. Furthermore the control unit 15 is programmed with the time interval x.
[0033] If the control unit 15 detects that back pressures Pb have been measured which remain
lying above the set threshold value over a period of time which is longer than the
set time interval x, then an alarm signal is sent out to a user. This user then timely
can take appropriate measures to prevent the sewer pipe 1 from further clogging/blocking,
and for example perform a check if the pipe 1 needs to be cleaned and/or unblocked.
[0034] Even when an alarm signal has not been sent out, it is already possible for the user
to check and monitor the functioning of the sewer pipe 1. For this the control unit
15 has a data connection preferably via the internet or intranet to a Cloud environment
16. A user can log into this Cloud environment 16 via a device 17 with a screen. On
this screen the user can then be presented with data and/or graphics which show the
measured back pressures against time. Thus the user can closely watch how the sewer
is operating and if maintenance needs to be performed even well before an alarm signal
is sent out.
[0035] In fig. 2 it is shown that the inflow opening 9 is formed by a hole 20 which has
been drilled into the sewer pipe 1. A manifold 21 which is equipped with an outwardly
projecting nipple 22 is glued to the pipe 1. The duct 8 which here is formed by a
flexible hose with an inner diameter d is clamped around the nipple 22. The inner
diameter d of the duct as well as the inner diameter of the inflow opening 20 have
been chosen smaller than 8 mm. In this way the amount of gas which needs to be blown
into the pipe 1 can be kept limited, while still being possible to perform suitable
measurements of the back pressures.
[0036] Besides the embodiments shown numerous variants are possible. For example the dimensions
and shapes of the various parts can differ. The duct can also be connected to the
pipe in other manners, and instead of a pump it is also possible to use a vessel filled
with pressurized gas. Instead of using a pressure measuring organ it is also possible
to use other kinds of measuring organs, like for example performing a measurement
to an axis of the pump and/or measuring the energy consumption of the pump. It is
also possible to fill the control unit with more than one threshold value for the
back pressure and/or time interval such that account can be taken for already known
peak load moments.
[0037] Thus according to the invention an advantageous system and method are provided with
which sewer pipes and maintenance thereof can be further optimized in a simple an
effective manner which can easily be installed to already existing sewers.
1. An assembly of a sewer and a sewer blockage detection system, comprising:
- a sewer pipe (1) for having waste-water flowing through at least a bottom part (2)
thereof;
- a measuring organ (10); and
- a control unit (15),
in which the control unit (15) is designed to send out an alarm signal when a blockage
is detected in the sewer pipe (1),
characterized in that,
the assembly further comprises:
- a gas supply for delivering pressurized gas;
- a gas transport duct (8) which connects with one end to the gas supply, which extends
from there towards the sewer pipe (1), and then opens out inside the bottom part (2),
wherein the measuring organ (10) is designed for measuring back pressures (Bp) of
pressurized gas when flowing from the gas supply through the duct (8) into the bottom
part (2),
wherein the control unit (15) comprises at least one threshold value for the measured
back pressures (Bp), which threshold value is indicative for detecting blockages or
risks for future blockages inside the sewer,
wherein the control unit (15) is designed to send out the alarm signal when back pressures
(Bp) which have been measured over a period of time by the measuring organ (10) lie
above said threshold value,
wherein a gas inflow opening (9) has been provided in a lower circumferential wall
section of the sewer pipe (1) that delimits its bottom part (2), and
wherein the duct (8) connects to the gas inflow opening (9) such that pressurized
gas which is delivered to the duct (8), flows through the duct (8) and gets blown
directly through the gas inflow opening (9) in said lower circumferential wall section
into the bottom part (2) of the sewer pipe (1).
2. An assembly according to claim 1, wherein a connection nipple (22) has been mounted
to an outer side of the lower circumferential wall section of the sewer pipe (1) at
the position of the gas inflow opening (9), and wherein the duct (8) has been connected
with its other end to the nipple (22).
3. An assembly according to one of the preceding claims, wherein the gas inflow opening
(9) is formed by a hole drilled in the lower circumferential wall section of the sewer
pipe (1).
4. An assembly according to one of the preceding claims, wherein a manifold (21) that
is complementary to the sewer pipe (1) has been connected, in particular glued, to
an outer side of the lower circumferential wall section of the sewer pipe (1) around
the position of the gas inflow opening (9).
5. An assembly according to one of the preceding claims, wherein the duct (8) is a flexible
hose.
6. An assembly according to one of the preceding claims, wherein the diameter of the
duct (8) and/or the gas inflow opening (9) is smaller than 8 mm.
7. An assembly according to one of the preceding claims, wherein the gas supply comprises
a pump (6), in particular an electric pump.
8. An assembly according to claim 7, wherein the pump (6) is designed to suck in and
deliver pressurized environmental air as pressurized gas to the duct (8).
9. An assembly according to one of the preceding claims, wherein the control unit (15)
connects to a monitoring device.
10. An assembly according to one of the preceding claims, wherein the gas inflow opening
(9) at an inner side of the lower circumferential wall section of the sewer pipe (1)
does not comprise parts which project into the bottom part (2) of the sewer pipe (1).
11. An assembly according to one of the preceding claims, wherein the gas inflow opening
(9) has been provided in the lower circumferential wall section at a height of less
than 2 cm of a bottom of the sewer pipe (1).
12. A method for operating the assembly according to one of the preceding claims, comprising
the steps:
- have waste-water flow through at least the bottom part (2) of the sewer pipe (1);
- have pressurized gas delivered to the gas inflow opening (9) via the gas transport
duct (8);
- have back pressures (Bp) of the pressurized gas measured when it flows from the
gas supply through the duct (8) into the bottom part (2); and
- have the control unit (15) send out an alarm signal when the measured back pressures
(Bp) over a set period of time lie above a set threshold value,
wherein the pressurized gas gets blown directly through the gas inflow opening (9)
in said lower circumferential wall section into the bottom part (2) of the sewer pipe
(1).
1. Anordnung eines Abwasserkanals und eines Kanalblockierungs-Detektionssystems, umfassend:
- ein Abwasserrohr (1), um Abwasser wenigstens durch einen unteren Teil (2) davon
zu führen;
- ein Messorgan (10); und
- eine Steuereinheit (15),
in der die Steuereinheit (15) dazu ausgelegt ist, ein Alarmsignal auszusenden, wenn
eine Verstopfung in dem Abwasserrohr (1) festgestellt wird,
dadurch gekennzeichnet,
dass die Anordnung ferner umfasst:
- eine Gasversorgung zur Abgabe von Druckgas;
- eine Gastransportführung (8), die mit einem Ende mit der Gasversorgung in Verbindung
steht, die sich von dort zum Abwasserrohr (1) erstreckt, und dann innerhalb des unteren
Teils (2) mündet, wobei das Messorgan (10) zum Messen von Gegendrücken (Bp) von Druckgas
beim Strömen von der Gaszufuhr durch die Führung (8) in den unteren Teil (2) ausgelegt
ist,
wobei die Steuereinheit (15) mindestens einen Schwellenwert für die gemessenen Gegendrücke
(Bp) umfasst, wobei dieser Schwellenwert indikativ für das Erkennen von Verstopfungen
oder Risiken für zukünftige Verstopfungen innerhalb des Abwasserkanals ist,
wobei die Steuereinheit (15) so ausgelegt ist, dass sie das Alarmsignal aussendet,
wenn Gegendrücke (Bp), die über einen Zeitraum durch das Messorgan (10) gemessen wurden,
oberhalb des Schwellenwertes liegen,
wobei eine Gaseinströmöffnung (9) in einem seinen unteren Teil (2) begrenzenden unteren
Umfangswandabschnitt des Abwasserrohrs (1) bereitgestellt wurde, und
wobei die Führung (8) so mit der Gaseinströmöffnung (9) in Verbindung steht, dass
Druckgas, das der Führung (8) zugeführt wird, durch die Führung (8) strömt und direkt
durch die Gaseinströmöffnung (9) in dem unteren Umfangswandabschnitt in den unteren
Teil (2) des Abwasserrohrs (1) eingeblasen wird.
2. Anordnung nach Anspruch 1, wobei ein Verbindungsnippel (22) an einer äußeren Seite
des unteren Umfangswandabschnitts des Abwasserrohrs (1) an der Position der Gaseinströmöffnung
(9) angebracht ist, und wobei die Führung (8) mit ihrem anderen Ende mit dem Nippel
(22) verbunden worden ist.
3. Anordnung nach einem der vorhergehenden Ansprüche, wobei die Gaseinströmöffnung (9)
durch ein Loch gebildet ist, das in den unteren Umfangswandabschnitt des Abwasserrohrs
(1) gebohrt ist.
4. Anordnung nach einem der vorhergehenden Ansprüche, wobei ein Anschlussstück (21),
das zu dem Abwasserrohr (1) komplementär ist, mit einer äußeren Seite des unteren
Umfangswandabschnitts des Abwasserrohrs (1) ringsum die Position der Gaseinströmöffnung
(9) verbunden, insbesondere geklebt, ist.
5. Anordnung nach einem der vorhergehenden Ansprüche, wobei die Führung (8) ein flexibler
Schlauch ist.
6. Anordnung nach einem der vorhergehenden Ansprüche, wobei der Durchmesser der Führung
(8) und / oder der Gaseinströmöffnung (9) kleiner als 8 mm ist.
7. Anordnung nach einem der vorhergehenden Ansprüche, wobei die Gasversorgung eine Pumpe
(6), insbesondere eine elektrische Pumpe, umfasst.
8. Anordnung nach Anspruch 7, wobei die Pumpe (6) dazu ausgelegt ist, Umgebungsluft einzusaugen
und unter Druck stehende Umgebungsluft als Druckgas an den Kanal (8) abzugeben.
9. Anordnung nach einem der vorhergehenden Ansprüche, wobei die Steuereinheit (15) mit
einer Überwachungseinrichtung in Verbindung steht.
10. Anordnung nach einem der vorhergehenden Ansprüche, wobei die Gaseinströmöffnung (9)
an einer inneren Seite des unteren Umfangswandabschnitts des Abwasserrohrs (1) keine
Teile umfasst, die in den unteren Teil (2) des Abwasserrohrs (1) hineinragen.
11. Anordnung nach einem der vorhergehenden Ansprüche, wobei die Gaseinströmöffnung (9)
in dem unteren Umfangswandabschnitt in einer Höhe von weniger als 2 cm von einem Boden
des Abwasserrohrs (1) bereitgestellt ist.
12. Verfahren zum Betreiben der Anordnung nach einem der vorhergehenden Ansprüche, umfassend
die Schritte:
- Strömenlassen von Abwasser mindestens durch den unteren Teil (2) des Abwasserrohrs
(1);
- Zuführen von Druckgas über die Gastransportführung (8) zu der Gaseinströmöffnung
(9);
- Messen von Gegendrücken (Bp) des Druckgases, wenn es von der Gasversorgung durch
die Führung (8) in den unteren Teil (2) strömt; und
- Aussenden eines Alarmsignals durch die Steuereinheit (15), wenn die gemessenen Gegendrücke
(Bp) über einen festgelegten Zeitraum oberhalb eines festgelegten Schwellenwertes
liegen,
wobei das Druckgas direkt durch die Gaseinströmöffnung (9) in dem unteren Umfangswandabschnitt
in den unteren Teil (2) des Abwasserrohrs (1) eingeblasen wird.
1. Assemblage d'un égout et d'un système de détection de blocage d'égout, comprenant
:
- une canalisation d'égout (1) permettant l'écoulement d'eaux usées à travers au moins
une partie inférieure (2) de celle-ci ;
- un organe de mesure (10) ; et
- une unité de commande (15),
dans lequel l'unité de commande (15) est conçue pour émettre un signal d'alarme lorsqu'un
blocage est détecté dans la canalisation d'égout (1),
caractérisé en ce que
l'assemblage comprend en outre :
- une alimentation en gaz pour une alimentation en gaz pressurisé ;
- une conduite de transport de gaz (8) qui se relie avec une extrémité de l'alimentation
en gaz, qui s'étend de là en direction de la canalisation d'égout (1) puis s'ouvre
vers l'intérieur de la partie inférieure (2),
l'organe de mesure (10) étant conçu pour la mesure de pressions arrière (Bp) du gaz
pressurisé lorsqu'il s'écoule de l'alimentation en gaz à travers la conduite (8) vers
la partie inférieure (2),
l'unité de commande (15) comprenant au moins une valeur seuil pour les pressions arrière
(Bp) mesurées, cette valeur seuil indiquant la détection de blocage ou de risques
de futurs blocages à l'intérieur de l'égout,
l'unité de commande (15) étant conçue pour émettre un signal d'alarme lorsque des
pressions arrière (Bp) qui ont été mesurées pendant une période par l'organe de mesure
(10) se trouvent au-dessus de ladite valeur seuil,
une ouverture d'entrée de gaz (9) ayant été réalisée dans une section de paroi circonférentielle
inférieure de la canalisation d'égout (1) qui délimite sa partie inférieure (2) et
la conduite (8) se reliant à l'ouverture d'entrée de gaz (9) de façon à ce que le
gaz pressurisé qui est introduit dans la conduite (8) s'écoule à travers la conduite
(8) et soit soufflé directement à travers l'ouverture d'entrée de gaz (9) dans ladite
section de paroi circonférentielle inférieure vers la partie inférieure (2) de la
canalisation d'égout (1).
2. Assemblage selon la revendication 1, dans lequel un téton de connexion (22) a été
monté sur un côté extérieur de la section de paroi circonférentielle inférieure de
la canalisation d'égout (1) au niveau de la position de l'ouverture d'entrée de gaz
(9) et dans lequel la conduite (8) a été connectée, avec son autre extrémité, au téton
(22).
3. Assemblage selon l'une des revendications précédentes, dans lequel l'ouverture d'entrée
de gaz (9) est constituée d'un trou percé dans la section de paroi circonférentielle
inférieure de la canalisation d'égout (1).
4. Assemblage selon l'une des revendications précédentes, dans lequel un collecteur (21),
qui est complémentaire de la canalisation d'égout (1), a été connecté, plus particulièrement
collé, à un côté extérieur de la section de paroi circonférentielle inférieure de
la canalisation d'égout (1) autour de la position de l'ouverture d'entrée de gaz (9).
5. Assemblage selon l'une des revendications précédentes, dans lequel la conduite (8)
est un tuyau flexible.
6. Assemblage selon l'une des revendications précédentes, dans lequel le diamètre de
la conduite (8) et/ou l'ouverture d'entrée de gaz (9) est inférieur à 8 mm.
7. Assemblage selon l'une des revendications précédentes, dans lequel l'alimentation
en gaz comprend une pompe (6), plus particulièrement une pompe électrique.
8. Assemblage selon la revendication 7, dans lequel la pompe (6) est conçue pour aspirer
et introduire un air environnemental pressurisé en tant que gaz pressurisé dans la
conduite (8).
9. Assemblage selon l'une des revendications précédentes, dans lequel l'unité de commande
(15) se relie à un dispositif de surveillance.
10. Assemblage selon l'une des revendications précédentes, dans lequel l'ouverture d'entrée
de gaz (9), sur un côté intérieur de la section de paroi circonférentielle inférieure
de la canalisation d'égout (1), ne comprend pas des parties qui dépassent dans la
partie inférieure (2) de la canalisation d'égout (1).
11. Assemblage selon l'une des revendications précédentes, dans lequel l'ouverture d'entrée
de gaz (9) a été disposée dans section de paroi circonférentielle inférieure à une
hauteur inférieure à 2 cm d'un fond de la canalisation d'égout (1).
12. Procédé d'exploitation de l'assemblage selon l'une des revendications précédentes,
comprenant les étapes suivantes :
- écoulement des eaux usées à travers au moins la partie inférieure (2) de la canalisation
d'égout (1) ;
- introduction de gaz pressurisé dans l'ouverture d'entrée de gaz (9) via la conduite
de transport de gaz (8) ;
- mesure des pressions arrière (Bp) du gaz pressurisé lorsqu'il s'écoule de l'alimentation
de gaz) à travers la conduite (8) dans la partie inférieure (2) ; et
- émission par l'unité de commande (15) d'un signal d'alarme lorsque les pressions
arrière (Bp) mesurées sur une période déterminée se trouvent au-dessus d'une valeur
seuil déterminée,
le gaz pressurisé étant soufflé directement à travers l'ouverture d'entrée de gaz
(9) dans ladite section de paroi circonférentielle inférieure vers la partie inférieure