Technical Field
[0001] The present invention relates to an air conditioner which performs defrosting operation
when frost formation on an outdoor heat exchanger is detected during heating operation.
Background Art
[0002] In an air conditioner including an indoor unit and an outdoor unit, frost is formed
on an outdoor heat exchanger during heating operation, thereby adversely affecting
heat exchanging. Accordingly, detection of frost formation on the outdoor heat exchanger
is performed by detecting temperature of the outdoor heat exchanger. Upon detection
of frost formation, defrosting operation is performed.
[0003] Meanwhile, when heating operation is started and a compressor is operated, refrigerant
circulates forming a refrigeration cycle. At the beginning of driving of the compressor,
the outdoor heat exchanger is rapidly cooled since drawing pressure of the compressor
is large. For that reason, if judgment whether or not defrosting operation is to be
performed is made based on the temperature of the outdoor heat exchanger, erroneous
detection of frost formation occurs every time the compressor operates, thus causing
defrosting operation to be performed. In order to avoid such unnecessary operation,
Patent Literature 1 describes that a masking time period is set such that defrosting
operation will not be performed for a predetermined time period after operation of
the compressor.
Citation list
Patent Literature
Summary of Invention
Technical Problem
[0005] During the masking time period after operation of the compressor, defrosting operation
will not be performed. Meanwhile, when the room temperature reaches a set temperature,
"thermo-OFF" for stopping the compressor is performed, and when the temperature decreases
after a while, "thermo-ON" for operating the compressor is performed. If the thermo-OFF
and the thermo-ON are repeated in a short cycle, defrosting operation will not be
performed since a masking time period is set. As a result of that, frost will not
be removed even if frost forms on the outdoor heat exchanger, and the outdoor heat
exchanger will freeze, disabling heating operation.
[0006] In view of what has been described above, it is an objective of the present invention
to provide an air conditioner which enables defrosting of an outdoor heat exchanger
when thermo-OFF and thermo-ON are repeated in a short cycle.
Solution to Problem
[0007] An air conditioner of the present invention includes a frost formation detecting
section for detecting frost formation on an outdoor heat exchanger during heating
operation, and a control apparatus for performing defrosting operation upon detection
of frost formation, wherein the control apparatus invalidates detection of frost formation
during a predetermined masking time period from start of heating operation, and validates
detection of frost formation after elapse of the masking time period. Moreover, the
control apparatus forcibly performs defrosting operation when thermo-OFF for stopping
the compressor during heating operation and thermo-ON for operating the stopped compressor
are repeatedly performed.
[0008] When thermo-OFF and thermo-ON are repeated before elapse of a masking time period,
defrosting operation will not be performed since detection of frost formation is invalidated.
In such a situation, defrosting operation is forcibly performed.
[0009] The control apparatus performs defrosting operation when thermo-ON, in which operation
time period of thermo-ON is not more than a specified time period which is set to
be not less than the masking time period, is performed for a predetermined number
of times. That is, the control apparatus checks if an operation time period of immediately
preceding thermo-ON is not more than a specified time period when starting thermo-ON,
makes a count when it is not more than specified time period, and performs defrosting
operation when the count reaches the predetermined number of times. The repeating
of thermo-OFF and thermo-ON in a short cycle is judged based on the operation time
period of thermo-ON.
Advantageous Effects of Invention
[0010] According to the present invention, by forcibly performing defrosting operation upon
coming into a situation in which thermo-OFF and thermo-ON are repeated in a short
cycle, it is made possible to eliminate an adverse effect that defrosting of the outdoor
heat exchanger cannot be performed in such a situation.
Brief Description of Drawings
[0011]
[Figure 1] Figure 1 is a schematic configuration diagram of a refrigeration cycle
of an air conditioner of the present invention.
[Figure 2] Figure 2 is a control block diagram of the air conditioner.
[Figure 3] Figure 3 is a flowchart when defrosting operation of a first embodiment
is performed.
[Figure 4] Figure 4 is a flowchart when defrosting operation of a second embodiment
is performed.
[Figure 5] Figure 5 is a flowchart when defrosting operation of a third embodiment
is performed.
[Figure 6] Figure 6 is a flowchart when defrosting operation of a fourth embodiment
is performed.
Description of Embodiments
(First Embodiment)
[0012] Figure 1 shows an air conditioner of a first embodiment. The air conditioner of a
heat pump type is configured such that an outdoor unit 1 and an indoor unit 2 are
connected by piping and wiring. The outdoor unit 1 includes a compressor 3, a four-way
valve 4, an outdoor heat exchanger 5, an expansion valve 6, and an outdoor fan 7.
The indoor unit 2 includes an indoor heat exchanger 8 and an indoor fan 9. The compressor
3, the four-way valve 4, the outdoor heat exchanger 5, the expansion valve 6, and
the indoor heat exchanger 8 are connected by piping to form a refrigerant circuit.
To connect the piping of the indoor unit 2 and the piping of the outdoor unit 1, a
two-way valve 10 and a three-way valve 11 are provided in the outdoor unit. The two-way
valve 10 is interposed in the piping connecting the expansion valve 6 and the indoor
heat exchanger 8, and the three-way valve 11 is interposed in the piping connecting
the four-way valve 4 and the indoor heat exchanger 8.
[0013] Driving the compressor 3 causes the refrigerant to circulate the refrigerant circuit.
A refrigeration cycle for heating or cooling is formed by the refrigerant circulating
around the refrigerant circuit. In a cooling cycle, the refrigerant circulates in
the order from the compressor 3, the four-way valve 4, the outdoor heat exchanger
5, the expansion valve 6, and the indoor heat exchanger 8. In a heating cycle, the
refrigerant circulates in the order from the compressor 3, the four-way valve 4, the
indoor heat exchanger 8, the expansion valve 6, and the outdoor heat exchanger 5.
[0014] Then, as shown in Figure 2, the air conditioner includes a control apparatus 12 which
controls the refrigeration cycle to perform air conditioning operations such as cooling,
heating, and dehumidification. Moreover, the air conditioner includes a room temperature
detector 13, an outside air temperature detector 14, an outdoor heat exchanger temperature
detector 15 for detecting temperature of the outdoor heat exchanger 5, and an indoor
heat exchanger temperature detector 16 for detecting temperature of the indoor heat
exchanger 8. Each of the temperature detectors 13 to 16 uses a temperature sensor
such as a thermistor.
[0015] The control apparatus 12 controls each of a rotational frequency (operational frequency)
of the compressor 3, an opening of the expansion valve 6, a rotational frequency of
the outdoor fan 7, and a rotational frequency of the indoor fan 9 based on the temperature
detected by each of the temperature detectors 13 to 16 according to an instructed
operation mode. Note that the control apparatus 12 is made up of an indoor control
section provided in the indoor unit 2, and an outdoor control section provided in
the outdoor unit 1. The indoor control section and the outdoor control section are
connected so as to be communicable with each other, and control the operations of
the indoor unit 2 and the outdoor unit 1 in cooperation with each other. The outdoor
control section transmits detection signals, which are inputted from a plurality of
temperature detectors 14 and 15, altogether to the indoor control section, and the
indoor control section manages detected temperature information.
[0016] Here, when heating operation is performed, the temperature of the outdoor heat exchanger
5 becomes lower than the outside air temperature, and frost forms on the surface of
the outdoor heat exchanger 5. Accordingly, in order to detect frost formation on the
outdoor heat exchanger 5, a frost formation detecting section is made up by the outside
air temperature detector 14 and the outdoor heat exchanger temperature detector 15.
The frost formation detecting section performs operation of detecting frost formation
during air conditioning operation. When the difference between the outside air temperature
and the temperature of the outdoor heat exchanger 5 becomes not less than a predetermined
temperature, the frost formation detecting section detects that frost is formed on
the outdoor heat exchanger 5.
[0017] The control apparatus 12 judges appropriateness of defrosting operation based on
the output of the frost formation detecting section. That is, the control apparatus
12 judges that a defrosting condition is met when the difference between the outside
air temperature and the temperature of the outdoor heat exchanger 5 is not less than
a predetermined value, and that the defrosting condition is unmet when the difference
between the outside air temperature and the temperature of the outdoor heat exchanger
5 is less than a predetermined value. The control apparatus 12 performs defrosting
operation if a detection result meets the defrosting condition. Reverse defrosting
is performed as the defrosting operation. During heat operation, the compressor is
stopped and the operation is switched to cooling operation. Note that detection of
frost formation may be performed based on the temperature of the outdoor heat exchanger
5. When the temperature of the outdoor heat exchanger 5 becomes not more than a specified
temperature below freezing point, it is judged that the defrosting condition is fulfilled.
[0018] When operation is started and the compressor 3 starts to operate, the temperature
of the outdoor heat exchanger 5 significantly decreases in the beginning of the start
of operation. For that reason, the detection result meets the defrosting condition
even though frost is not formed on the outdoor heat exchanger 5. Accordingly, a masking
time period, during which detection of frost formation is invalidated for a predetermined
time period from the start of heating operation, is set. The control apparatus 12
does not perform defrosting operation during a period from the start of operation
until the masking time period has elapsed. When the masking time period elapses, the
control apparatus 12 judges necessity of defrosting operation based on the output
of the frost formation detecting section.
[0019] Moreover, during heating operation, when the room temperature reaches a set temperature,
thermo-OFF for stopping the compressor 3 is performed. When the room temperature decreases
after a while, thermo-ON for operating the compressor 3 is performed. When thermo-ON
is performed as well, the control apparatus 12 invalidates detection of frost formation
during a masking time period from the start of operation of the compressor 3. When
the masking time period elapses, the control apparatus 12 validates detection of frost
formation.
[0020] By the way, if thermo-ON is performed repeatedly while the masking time period has
not elapsed, the defrosting operation will not be performed during this period even
if frost is formed on the outdoor heat exchanger 5. When thermo-ON continues at a
short cycle, frost formed on the outdoor heat exchanger 5 grows, and the outdoor heat
exchanger 5 will be frozen. Accordingly, the control apparatus 12 forcibly performs
defrosting operation when thermo-OFF and thermo-ON are repeatedly performed.
[0021] The control apparatus 12 checks if the operation time period of immediately preceding
thermo-ON is not more than a specified time period when thermo-OFF is started. The
specified time period is set to be not less than the masking time period. For example,
when the masking time period is 7 minutes, the specified time period is set to be
12 minutes. The control apparatus 12 performs defrosting operation when thermo-ON,
whose operation time period is not more than the specified time period, is performed
for a predetermined number of times.
[0022] When heating operation is started, as shown in Figure 3, the control apparatus 12
confirms if the room temperature matches a thermo-ON condition (S1). The thermo-ON
condition is a case in which the room temperature is lower than the set temperature.
When the room temperature is lower than the set temperature and matches the thermo-ON
condition, the compressor 3 starts operating in a heating cycle (S2). Note that when
the room temperature is not less than the set temperature, the compressor 3 remains
to be stopped. At this time, the indoor fan 9 is driven and air blowing operation
is performed.
[0023] Upon performing thermo-ON, the control apparatus 12 confirms if the room temperature
matches the thermo-OFF condition (S3). The thermo-OFF condition is a case in which
the room temperature is not less than the set temperature. When the room temperature
is lower than the set temperature, and does not match the thermo-OFF condition, the
control apparatus 12 checks operation time period from the start of heating operation.
The control apparatus 12 confirms if the operation time period has exceeded a specified
time period (7 minutes) (S4). During this period, frost formation detection is invalidated.
When operation time period has exceeded the masking time period, the control apparatus
12 validates frost formation detection and starts detection (S5).
[0024] During heating operation, the control apparatus 12 validates frost forming detection
and confirms if the detection result meets the defrosting condition (S6). When the
detection result meets the defrosting condition, the control apparatus 12 performs
normal defrosting operation (S7). Moreover, a count to be described below of the number
of operations of thermo-ON is reset.
[0025] When the room temperature matches the thermo-OFF condition, the control apparatus
12 causes the compressor 3 to stop (S8). Then, the control apparatus 12 checks the
operation time period of thermo-ON (S9). When the operation time period is not more
than the specified time period (12 minutes), the control apparatus 12 adds 1 to the
count of the number of operations of thermo-ON, and stores the count in a memory (S10).
The control apparatus 12 confirms if the count of the number of operations reaches
a predetermined number of times, for example, 6 times (S11) .
[0026] When the operation time period of thermo-ON is longer than the specified time period,
or the count is less than the predetermined number of times, the control apparatus
12 confirms if the room temperature matches the thermo-ON condition (S1) while continuing
thermo-OFF.
[0027] When the room temperature further decreases due to thermo-OFF and the thermo-ON condition
is fulfilled, the control apparatus 12 causes the compressor 3 to operate (S2). The
room temperature increases due to thermo-ON. When the room temperature becomes higher
than the set temperature, the thermo-OFF condition is fulfilled (S3), and the compressor
stops (S8). The control apparatus 12 checks the operation time period of immediately
preceding thermo-ON (S9). When the operation time period is not more than the specified
time period (12 minutes), the control apparatus 12 adds 1 to the count of the number
of operations of thermo-ON (S10), and confirms if the count reaches the predetermined
number of times (S11).
[0028] Note that the operation time period of thermo-ON may exceed the masking time period
even if it is not more than the specified time period. However, when thermo-OFF and
thermo-ON are repeated after the start of heating operation, the control apparatus
12 invalidates frost formation detection. Therefore, even if the operation time period
of thermo-ON exceeds the masking time period, the control apparatus 12 does not judge
the necessity of defrosting operation. However, when the operation time period of
thermo-ON exceeds the specified time period, the control apparatus 12 validates frost
formation detection, and judges the necessity of defrosting operation. When a detection
result by the frost formation detecting section meets the defrosting condition, the
control apparatus 12 performs normal defrosting operation. At this time, the count
is reset. When defrosting is unnecessary, thermo-ON is continued, and the control
apparatus 12 confirms if the room temperature matches the thermo-OFF condition. At
this time, the count will not be reset.
[0029] When the count reaches the predetermined number of times, the control apparatus 12
forcibly starts defrosting operation (S12). Moreover, the control apparatus 12 resets
the count of the number of operations of thermo-ON to be 0. In this defrosting operation,
"careful defrosting" will be performed. That is, a heating cycle, in which the rotational
frequency of the compressor 3 is increased and the indoor fan 9 is stopped, is carried
out. When the temperature of the indoor heat exchanger 8 becomes a predetermined temperature,
for example, 54°C, operation is switched from the heating cycle to the cooling cycle.
As a result of this, since heat is accumulated in the indoor heat exchanger 8, and
high temperature refrigerant flows to the outdoor heat exchanger 5 after switching
to the cooling cycle, it is possible to surely and quickly perform defrosting. Upon
completion of defrosting operation, the control apparatus 12 switches the operation
to the heating cycle and continues the heating operation.
[0030] Thus, since defrosting operation is forcibly performed when thermo-OFF and thermo-ON
are repeated in a short cycle, it is possible to eliminate a situation that defrosting
cannot be performed even though frost is formed on the outdoor heat exchanger 5. Particularly,
in a situation in which heating operation is performed at low load when the outside
air temperature is low, it is often the case that thermo-OFF and thermo-ON are repeated
in a short cycle. Although, in such a situation, there is a risk that frost is formed
on the outdoor heat exchanger 5, and the outdoor heat exchanger 5 freezes, defrosting
of the outdoor heat exchanger 5 is surely performed, enabling heating operation to
be stably continued.
(Second Embodiment)
[0031] The cycle of thermo-ON varies depending on the outside air temperature. Since efficiency
of heating operation decreases as the outside air temperature decreases, when the
room temperature decreases, it takes more time for the room temperature to become
a set temperature. As a result of this, the operation time period of thermo-ON increases.
On the contrary, when the outside air temperature is not so low, the operation time
period of thermo-ON decreases. Accordingly, the air conditioner counts the number
of operations of thermo-ON based on a specified time period according to the outside
air temperature, and judges the necessity of frosting operation. Note that other components
are the same as those of the first embodiment.
[0032] The control apparatus 12 determines a specified time period according to the outside
air temperature. When the outside air temperature becomes higher, a shorter specified
time period is set, and when the outside air temperature becomes lower, a longer specified
time period is set. For example, the specified time period is set to 7 minutes when
the outside air temperature is not less than -5°C and is set to 12 minutes when the
outside air temperature is lower than -5°C.
[0033] The control apparatus 12 monitors the outside air temperature based on the output
of the outside air temperature detector 14 during heating operation. As shown in Figure
4, when thermo-OFF is performed (S8) after heating operation is started, the control
apparatus 12 confirms the outside air temperature (S20), and sets a specified time
period according to the outside air temperature. When the outside air temperature
is not less than -5°C, the control apparatus 12 checks the operation time period of
immediately preceding thermo-ON (S21) based on the short specified time period (7
minutes). When the outside air temperature is lower than -5°C, the control apparatus
12 checks the operation time period of immediately preceding thermo-ON (S22) based
on the long specified time period (12 minutes). When the operation time period is
not more than the specified time period, the control apparatus 12 adds 1 to the count
of thermo-ON (S10), and confirms if the count reaches the predetermined number of
times (S11). When the operation time period is longer than the specified time period,
the control apparatus 12 does not increase the count, and confirms if the room temperature
matches the thermo-ON condition (S1).
[0034] When the outside air temperature is low, if the number of operations of thermo-ON
is counted in a short specified time period, the number of operation will not be counted
when the operation time period of thermo-ON exceeds the specified time period. As
a result of this, the time period until which the necessity of defrosting operation
is judged becomes longer, and frost formed on the outdoor heat exchanger 5 grows during
that period, disabling to remove the frost. Accordingly, by changing the specified
time period to a longer time period when the outside air temperature is low, it is
made possible to surely perform counting even if the operation time period becomes
longer when the outside air temperature is low, and reduce the time period until defrosting
is performed. Therefore, it is possible to perform defrosting of the outdoor heat
exchanger 5 before frost has grown.
[0035] Moreover, when the outside air temperature is high, the operation time period of
thermo-ON is normally short. When the operation time period of thermo-ON becomes longer,
there is possibility that frost has been formed on the outdoor heat exchanger 5. In
this case, the operation time period will exceed the specified time period. If the
specified time period is set to be a short time period according to the outside air
temperature, frost formation detection becomes valid since the operation time period
of thermo-ON exceeds the specified time period. Since frost formation is detected
when frost is formed, it is possible to perform defrosting.
(Third Embodiment)
[0036] In the above described embodiments, when thermo-OFF and thermo-ON are repeated in
a short cycle, defrosting operation is forcibly performed. However, even in such a
situation, there is a case in which no frost is formed on the outdoor heat exchanger
5. In such a case, defrosting operation is unnecessary. Therefore, the air conditioner
performs frost formation detection before performing forcible defrosting operation.
That is, heating operation is performed such that frost formation detection becomes
valid in thermo-ON for a predetermined number of times. Note that, other components
are the same as those of the first or second embodiment.
[0037] The control apparatus 12 performs thermo-ON such that the operation time period exceeds
the specified time period when performing heating operation by thermo-ON for the predetermined
number of times (6 times). As shown in Figure 5, when the number of operations of
thermo-ON becomes 5 times (S30), the control apparatus 12 confirms if the room temperature
matches the thermo-ON condition (S31) while continuing thermo-ON.
[0038] If the thermo-ON condition is fulfilled, the control apparatus 12 performs the 6th
thermo-ON. The compressor 3 operates in the heating cycle (S32). At this time, the
control apparatus 12 forcibly performs heating operation for a time period longer
than the specified time period, for example, 13 minutes. Since, as a result of this,
the operation time period exceeds the specified time period, the control apparatus
12 validates frost formation detection, and judges the necessity of defrosting operation
(S33). That is, the control apparatus 12 confirms if a detection result by the frost
formation detecting section meets the defrosting condition (S6) after completion of
defrosting operation. If the detection result meets the defrosting condition, the
control apparatus 12 performs defrosting operation by "careful defrosting", and resets
the count (S12). When the detection result does not meet the defrosting condition,
the control apparatus 12 resets the count (S34), and confirms if the room temperature
matches the thermo-ON condition (S1) while continuing thermo-OFF.
[0039] In this way, although detection of frost formation is not performed while thermo-OFF
and thermo-ON are repeated in a short cycle, defrosting operation will be performed
as needed by forcibly judging the necessity of defrosting operation. When frost is
not formed on the outdoor heat exchanger 5, defrosting operation will not be performed,
thereby preventing unnecessary defrosting operation from being performed.
(Fourth Embodiment)
[0040] In the above described embodiments, when thermo-OFF and thermo-ON are repeated in
a short cycle, detection of frost formation is invalidated. Here, when heating operation
is performed by thermo-ON, the operation time period of thermo-ON becomes longer if
the room temperature is hard to be increased. In such a case, frost forms on the outdoor
heat exchanger 5, the efficiency of heating operation may have deteriorated. Accordingly,
the air conditioner is configured to perform defrosting operation by detecting frost
formation on the outdoor heat exchanger 5 when the operation time period of thermo-ON
becomes long. Note that other components are the same as those of the first to third
embodiments.
[0041] The control apparatus 12 validates detection of frost formation when the operation
time period of thermo-ON exceeds the specified time period, and judges the necessity
of defrosting operation. As shown in Figure 6, when thermo-OFF is performed, the control
apparatus 12 checks the operation time period of immediately preceding thermo-ON (S9).
When the operation time period is not more than the specified time period (12 minutes),
the control apparatus 12 adds 1 to the count of the number of operations of thermo-ON
(S10) and confirms if the count reaches a predetermined number of times, for example,
6 times (S11) .
[0042] When the operation time period of thermo-ON is longer than the specified time period,
the control apparatus 12 resets the count (S40), validates frost formation detection,
and starts frost formation detection (S41). The control apparatus 12 confirms if the
detection result meets the defrosting condition (S42). When the detection result meets
the defrosting condition, the control apparatus 12 performs normal defrosting operation
(S43). When the detection result does not meet the defrosting condition, the control
apparatus 12 confirms if the room temperature matches the thermo-ON condition (S1).
When the room temperature matches the thermo-ON condition, the control apparatus 12
performs thermo-ON and operates the compressor 3 in a heating cycle (S2).
[0043] In this way, when thermo-ON is prolonged, frost formation detection is performed.
If frost is formed on the outdoor heat exchanger 5, the defrosting operation is performed.
Therefore, even if thermo-ON and thermo-OFF are being repeated, it is possible to
surely perform defrosting of the outdoor heat exchanger 5 when defrosting is necessary.
[0044] As so far described, the air conditioner of the present invention comprises a frost
formation detecting section for detecting frost formation on an outdoor heat exchanger
5 during heating operation, and a control apparatus 12 for performing defrosting operation
upon detection of frost formation, wherein the control apparatus 12 invalidates detection
of frost formation during a predetermined masking time period from start of heating
operation, and validates the detection of frost formation after elapse of the masking
time period, and the control apparatus 12 forcibly performs defrosting operation when
thermo-OFF for stopping a compressor during heating operation and thermo-ON for operating
the stopped compressor are repeatedly performed.
[0045] When operation is performed from thermo-ON to thermo-OFF in a short cycle, frost
formation detection will not be performed due to the masking time period. However,
by forcibly performing defrosting operation when thermo-ON and thermo-OFF are repeatedly
performed in a short cycle, it is possible to prevent a situation in which frost formed
on the outdoor heat exchanger during that period grows and the outdoor heat exchanger
5 freezes.
[0046] The control apparatus 12 performs defrosting operation when thermo-ON, in which operation
time period of thermo-ON is not more than a specified time period which is set to
be not less than the masking time period, is performed for a predetermined number
of times. This makes it possible to surely perform defrosting when thermo-ON is repeated
in a shorter time period than the masking time period.
[0047] The control apparatus 12 checks if an operation time period of immediately preceding
thermo-ON is not more than a specified time period when starting thermo-ON, to make
a count when not more than the specified time period, and performs defrosting operation
when the count reaches a predetermined number of times. As a result of this, when
the operation time period of thermo-ON is longer than the specified time period, it
will be excluded from counting. In this case, normal frost formation detection and
defrosting operation become possible, enabling defrosting.
[0048] The control apparatus 12 determines the specified time period according to the outside
air temperature so that the specified time period is made shorter when the outside
air temperature is higher, and the specified time period is made longer when the outside
air temperature is lower. Since, as a result of this, the operation time period of
thermo-ON is affected by the outside air temperature, it is possible to surely count
thermo-ON in a short cycle by determining a specified time period according to the
outside air temperature, thus enabling to perform forcible defrosting operation as
soon as possible.
[0049] The control apparatus 12 resets the count when thermo-ON whose operation time period
is longer than the specified time period is performed. Since this causes frost formation
detection to be validated, defrosting operation can be performed as needed.
[0050] Note that the present invention will not be limited to the above described embodiments
and, as a matter of course, many modifications and alterations can be made to the
above described embodiments within the scope of the present invention. When thermo-OFF
and thermo-ON are repeated during heating operation, determination may be made on
whether or not forcible defrosting operation is performed. That is, when thermo-OFF
and thermo-ON are being repeated, the control apparatus 12 judges the possibility
of frost formation based on a detection result of the frost formation detecting section.
Then, the control apparatus 12 determines the necessity of forcible defrosting operation
based on the possibility of frost formation. When there is no possibility of frost
formation, it is judged that defrosting operation is not necessary. In this case,
frost formation detection is performed when the operation time period of thermo-ON
exceeds the masking time period. Moreover, when there is possibility of frost formation,
it is judged that defrosting operation is necessary, and operation according to each
of the above described embodiments is performed.
Reference Signs List
[0051]
- 1
- Outdoor unit
- 2
- Indoor unit
- 3
- Compressor
- 4
- Four-way valve
- 5
- Outdoor heat exchanger
- 6
- Expansion valve
- 7
- Outdoor fan
- 8
- Indoor heat exchanger
- 9
- Indoor fan
- 12
- Control apparatus
- 13
- Room temperature detector
- 14
- Outside air temperature detector
- 15
- Outdoor heat exchanger temperature detector
- 16
- Indoor heat exchanger temperature detector