(19)
(11) EP 3 276 167 B8

(12) CORRECTED EUROPEAN PATENT SPECIFICATION
Note: Bibliography reflects the latest situation

(15) Correction information:
Corrected version no 1 (W1 B1)

(48) Corrigendum issued on:
19.06.2019 Bulletin 2019/25

(45) Mention of the grant of the patent:
10.04.2019 Bulletin 2019/15

(21) Application number: 16181486.8

(22) Date of filing: 27.07.2016
(51) International Patent Classification (IPC): 
F03D 13/20(2016.01)
E02D 27/42(2006.01)

(54)

BOLT CONNECTION FOR A TOWER OF A WIND TURBINE

SCHRAUBVERBINDUNG FÜR EINEN TURM EINER WINDTURBINE

RACCORD À BOULON DESTINÉ À UNE TOUR D'UNE ÉOLIENNE


(84) Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

(43) Date of publication of application:
31.01.2018 Bulletin 2018/05

(73) Proprietor: Siemens Gamesa Renewable Energy A/S
7330 Brande (DK)

(72) Inventors:
  • Hoeeg, Christian Elkjaer
    8381 Tilst (DK)
  • Jensen, Martin Johan Smith
    7080 Børkop (DK)

(74) Representative: Aspacher, Karl-Georg et al
Siemens Aktiengesellschaft Postfach 22 16 34
80506 München
80506 München (DE)


(56) References cited: : 
US-A- 2 495 037
US-A- 4 887 949
US-A- 4 719 724
   
       
    Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).