Technical Field
[0001] The present invention relates to a traffic management system for managing a train
service on a railroad.
Background Art
[0002] In a train service on a railroad, an initial planned timetable may be disturbed when
a traffic disturbance such as a technical problem or an accident occurs on a train
in service. In such a case, a train dispatcher who manages the train service aims
to recover from the traffic disturbance by replanning the timetable, manually controlling
routes of trains, etc. using a traffic management system.
[0003] PTL 1 discloses a technology for providing a replanning system which can provide
plentiful information for a dispatcher to make a decision of replanning strategy and
good operability. PTL 1 states that "A process of displaying a traffic condition,
a process of predicting a traffic condition, a process of checking a prediction result,
a process of displaying the result, and a process of suggesting a restoration plan
are provided. When a traffic condition is displayed, it is possible to select a display
mode in which a planned timetable, an actual timetable, and a predicted timetable
are overlapped and displayed or separately displayed according to a request of the
dispatcher. When a traffic condition is predicted, the dispatcher may select a prediction
strategy suitable for a situation from among a plurality of prediction strategies,
a prediction check result is displayed as a hindrance mark or an automatic proposal
mark, and the displayed hindrance mark or automatic proposal mark is picked using
a mouse, thereby describing content of the mark or proposing a restoration plan."
(See paragraph 0005).
Citation List
Patent Literature
Summary of Invention
Technical Problem
[0005] Various patterns are present as a pattern of a train service operation (hereinafter
referred to as an "operation pattern"). Examples thereof include an running line change,
platform blockage, etc. Further, examples of the running line change include a bi-directional
running in which upward and downward trains run on the same track.
[0006] In an replanning operation in which a timetable is changed in response to notification
of the traffic disturbance, an operation pattern that avoids the occurring transport
obstacle is implemented in some cases (hereinafter the operation pattern that avoids
the transport obstacle will be referred to as an obstacle avoidance operation).
[0007] In the obstacle avoidance operation, the dispatcher is forced to perform a troublesome
operation such as changing or setting each train service which may have a complicated
influence.
[0008] However, PTL 1 does not describe any specific function for supporting an obstacle
restoration operation by the dispatcher. For example, PTL 1 does not describe what
type of information is provided to the dispatcher for the obstacle restoration operation.
[0009] An object of the invention is to provide a technical solution that satisfactorily
supports an operation of avoiding an obstacle by the dispatcher.
Solution to Problem
[0010] A traffic management system according to an aspect of the present invention includes:
a display unit for displaying a train graph screen which represents movement of a
train over time as a diagram on a plane defined by an axis in a time direction and
an axis in a route direction; and a processing unit for determining restoration plan
in which trains run in a designated obstacle avoidance operation pattern for an obstacle
avoidance operation time slot and an obstacle avoidance operation area which are specified
on a train graph screen; a processing unit for displaying a train graph which corresponds
to the determined restoration plan.
[0011] A traffic management system according to another aspect of the present invention
includes : a display unit for displaying an track diagram screen that indicates positions
of trains at a current time on a track; and a processing unit for setting a subsequent
station ahead of an obstacle occurrence position corresponding to a position at which
an obstacle occurs and up to a station to which a train heading for the obstacle occurrence
position is allowed be turned back in a reverse direction by tracing a route from
the obstacle occurrence position as warning target stations when the obstacle occurs
on the track, and displaying the warning target stations on the track diagram screen.
[0012] A traffic management system according to still another aspect of the present invention
includes: a storage unit for storing platform allocation management information that
associates a virtual platform ID corresponding to information determining a direction
and a role of each platform with a physical platform ID; and a processing unit for
determining restoration plan such that the physical platform associated with the virtual
platform is used in the direction and for the role of the virtual platform.
Advantageous Effects of Invention
[0013] According to the invention, it is possible to satisfactorily support a train service
operation of avoiding an obstacle by a dispatcher. When the operation of avoiding
an obstacle by the dispatcher is smoothly performed, it is possible to suppress an
increase in traffic disturbance caused by an occurrence of an obstacle as much as
possible, to improve punctuality of a train service, and to suppress loss such as
a decrease in profit due to the traffic disturbance.
Brief Description of Drawings
[0014]
[FIG. 1] FIG. 1 is a schematic block diagram of a traffic management system according
to the present embodiment.
[FIG. 2] FIG. 2 is a block diagram illustrating a functional configuration of the
traffic management system.
[FIG. 3] FIG. 3 is a table illustrating an example of a timetable in the present embodiment.
[FIG. 4] FIG. 4 is a table illustrating an example of obstacle information in the
present embodiment.
[FIG. 5A] FIG. 5A is a diagram illustrating a display example of an track diagram
screen at the time of occurrence of an obstacle.
[FIG. 5B] FIG. 5B is a diagram illustrating a display example of an influence range
due to the obstacle on a train graph screen.
[FIG. 5C] FIG. 5C is a flowchart illustrating a process of specifying a range in which
an influence of the obstacle is received.
[FIG. 5D] FIG. 5D is a flowchart illustrating a process of specifying a warning range
in which an influence of the obstacle may be propagated.
[FIG. 5E] FIG. 5E is a diagram illustrating an example of the train graph screen when
the obstacle occurs.
[FIG. 5F] FIG. 5F is a diagram illustrating an example of the train graph screen when
a sub-event is added as the obstacle information.
[FIG. 6A] FIG. 6A is a diagram illustrating a display example of the train graph screen
when a dispatcher specifies a area and a time slot in which a bi-directional operation
is performed.
[FIG. 6B] FIG. 6B is a diagram illustrating a state of correction of an obstacle avoidance
operation time slot and an obstacle avoidance operation area.
[FIG. 6C] FIG. 6C is a table for description of an example of a method of correcting
the obstacle avoidance operation time slot and the obstacle avoidance operation area.
[FIG. 7A] FIG. 7A is a diagram illustrating a display of a train graph screen that
shows a train service plan in which the bi-directional operation is performed in an
obstacle avoidance operation area and an obstacle avoidance operation time slot specified
by the dispatcher.
[FIG. 7B] FIG. 7B is a diagram illustrating a display of a train graph screen that
shows a train service plan in which an obstacle avoidance operation time slot is corrected.
[FIG. 7C] FIG. 7C is a diagram for description of a method of determining a train
service plan in which the bi-directional operation is applied.
[FIG. 7D] FIG. 7D is a flowchart illustrating a process of determining a time at which
an obstacle avoidance operation is ended.
[FIG. 8A] FIG. 8A is a diagram illustrating an example of a screen display when the
dispatcher inputs an restoration from the obstacle.
[FIG. 8B] FIG. 8B is a diagram illustrating a display example of a screen inquiring
of the supervisor whether to end the obstacle avoidance operation from a train graph
screen 13.
[FIG. 9A] FIG. 9A is a diagram illustrating a train service plan as a train graph
at the time of returning from the bi-directional operation to a normal operation.
[FIG. 9B] FIG. 9B is a diagram for description of another train service plan at the
time of returning from the bi-directional operation to the normal operation.
[FIG. 9C] FIG. 9C is a diagram for description of another train service plan at the
time of returning from the bi-directional operation to the normal operation.
[FIG. 10A] FIG. 10A is a diagram illustrating a display example of the track diagram
screen when a technical problem occurred on a certain train at a certain station.
[FIG. 10B] FIG. 10B is a diagram illustrating a table for managing allocation of a
platform.
[FIG. 10C] FIG. 10C is a diagram illustrating an example of timetable information
using a virtual platform and a physical platform.
[FIG. 11] FIG. 11 is a diagram illustrating a state in which an running line of a
downward passing train is specified by dragging a mouse on a track diagram screen
12.
[FIG. 12] FIG. 12 is a diagram illustrating an example in which various information
exchanged on a system in relation to the occurrence of the traffic disturbance is
displayed in time series by text.
[FIG. 13A] FIG. 13A is a diagram illustrating an example of a screen display that
defines time, a sender, and classification of information as filtering conditions.
[FIG. 13B] FIG. 13B is a diagram illustrating an example of a screen display in which
classification of information is allowed to be selected by a button operation in filtering.
Description of Embodiments
[0015] A schematic description will be given of an embodiment of a traffic management system
according to the invention.
[0016] FIG. 1 is a schematic block diagram of a traffic management system according to the
present embodiment. A traffic management system 10 includes a human machine interface
(HMI) 11, a timetable management device 14, a route control device 15, an obstacle
information management device 16, a replanning device 17, and a network 18. The traffic
management system 10 is connected to field equipment 30 through an field equipment
management system 20. The field equipment management system 20 is a system disposed
on a site side, and monitors or controls the field equipment 30 in cooperation with
the traffic management system 10. The field equipment 30 corresponds to various facilities
such as a switch, a traffic light, a track circuit, etc. used for a train service
at a site.
[0017] The HMI 11 is an interface for displaying to a dispatcher and receiving an operation
of the dispatcher. The HMI 11 displays a traffic condition in real time, receives
a change in a timetable, and transmits a received change request to a related device.
The HMI 11 is a terminal device having two display devices as an example, and displays
two screens corresponding to an track diagram screen 12 and a train graph screen on
the respective display devices. The track diagram screen 12 displays a current train
position using a track diagram. The train graph screen 13 displays a predicted timetable
and an actual timetable in which each train service plan and actuals are displayed
as a path representing movement of a train over time.
[0018] The timetable management device 14 holds data of a timetable created in advance in
an accompanying storage unit 14a. When a change in the timetable is requested during
the operation, the timetable management device 14 receives a timetable change plan
based on the request from the replanning device 17, and updates the data of the timetable
held by the storage unit 14a based on received data. The timetable management device
14 provides data of the timetable to another device as necessary. In addition, the
timetable management device 14 receives information about a travel record of the train
from the field equipment 30 and stores the received information.
[0019] The route control device 15 records information related to route control such as
field equipment status information, train position information, etc. in an accompanying
storage unit 15a. The route control device 15 instructs the field equipment managing
system 20 to control a set or cancel the route of the train based on the timetable
received from the timetable management device 14. The field equipment management system
20 receiving this instruction controls the field equipment 30 such as the traffic
light, the switch, etc. to realize the indicated setting or canceling of the route.
[0020] The obstacle information management device 16 records information related to management
of the obstacle such as obstacle information, track linkage, etc. in an accompanying
storage unit 16a. The obstacle information management device 16 manages obstacle information
corresponding to information about an obstacle related to the train service. Examples
of the obstacle information include obstacle information automatically given from
the field equipment management system 20 and obstacle information given by transmission
and reception of information between related devices related to management of the
train service.
[0021] The replanning device 17 stores information such as rules for timetable planning
in an accompanying storage unit 17a. When the change of the train service plan is
necessary, the replanning device 17 creates a modified timetable based on an operation
from the HMI 11. The replanning device 17 transmits the modified timetable to the
timetable management device 14 to update the timetable of the timetable management
device 14.
[0022] In addition, the replanning device 17 may predict a future traffic condition based
on a current traffic condition.
[0023] In addition, the replanning device 17 may transmit the modified timetable to the
timetable management device 14 to display the modified timetable on the HMI 11 before
updating data used for the route control, thereby urging the dispatcher to visibly
check the new timetable in advance.
[0024] Here, an example in which the timetable management device 14, the route control device
15, the obstacle information management device 16, and the replanning device 17 are
physically separately implemented is shown. However, the invention is not limited
to this example. It suffices to functionally implement the devices, and a physical
configuration is not particularly limited. As another example, all the devices may
be implemented on one computer or implemented by being dispersed on a plurality of
computers.
[0025] FIG. 2 is a block diagram illustrating a functional configuration of the traffic
management system. The traffic management system 10 includes a display unit 10A, a
processing unit 10B, a storage unit 10C, and an operation unit 10D. The display unit
10A and the operation unit 10D correspond to the HMI 11 of FIG. 1, the processing
unit 10B corresponds to the timetable management device 14, the route control device
15, the obstacle information management device 16, and the replanning device 17 of
FIG. 1, and the storage unit 10C corresponds to the storage units 14a, 15a, 16a, and
17a.
[0026] The display unit 10A displays a train graph screen that represents movement of the
train over time as a diagram on a plane defined by an axis in a time direction and
an axis in a route direction. When an obstacle avoidance operation type corresponding
to a type of obstacle avoidance operation for servicing a train by avoiding an obstacle,
an obstacle avoidance operation time slot corresponding to a time slot in which an
obstacle avoidance operation is applied, and an obstacle avoidance operation area
corresponding to an area in which the obstacle avoidance operation is applied are
specified, the processing unit 10B determines a train service plan such that the train
is serviced in the obstacle avoidance operation time slot and the obstacle avoidance
operation area and in a service mode of the obstacle avoidance operation type, and
displays a train paths based on the timetable on the train graph screen. In this way,
when the dispatcher specifies the obstacle avoidance operation type, the obstacle
avoidance operation time slot, and the obstacle avoidance operation area, the traffic
management system automatically determines a timetable in which the obstacle avoidance
operation of the service mode is applied in the time slot and the area, and thus it
is possible to facilitate an operation of applying a predetermined service mode, and
to support the dispatcher. For example, with regard to an obstacle avoidance operation
type, the dispatcher only needs to input a type such as a bi-directional operation,
and a complicated operation such as modifying individual train services to implement
the bi-directional operation is unnecessary. It is possible to reduce situations in
which a delay in response or an error in response occurs due to a complicated operation
for recovery, and the train is stuck in a place outside a station to cause confinement
in the train. In addition, since a complicated obstacle avoidance operation can be
easily carried out, a possibility of continuing a train service increases even in
a case in which an operation would have been interrupted in the past. A part of a
timetable which predicts the future is referred to as a predicted timetable. Since
a train timetable from the past to the present has a record of an actual train service,
the traffic management system 10 is able to generate a prediction timetable.
[0027] In this instance, the processing unit 10B determines the timetable in the obstacle
avoidance operation time slot and the obstacle avoidance operation area such that
the timetable is consistent with a train service in a preceding time slot of the obstacle
avoidance operation time slot, and determines a timetable in a subsequent time slot
of the obstacle avoidance operation time slot such that the train service plan is
consistent with the train service plan in the obstacle avoidance operation time slot.
In this way, since the timetable is automatically determined such that the train service
in the obstacle avoidance operation time slot is consistent with the preceding and
subsequent time slots, the dispatcher may easily modify a timetable consistent with
preceding and subsequent time slots only by indicating the obstacle avoidance operation
time slot, the obstacle avoidance operation area, and the obstacle avoidance operation
type.
[0028] For example, when it is presumed that the obstacle avoidance operation type corresponds
to a bi-directional operation in which trains in two directions are allowed to travel
on a single track by dividing a time, the processing unit 10B determines a bi-directional
operation area corresponding to an area in which the bi-directional operation is performed
defined by a first end station and a second end station at both ends based on the
obstacle avoidance operation range, and determines a timetable such that when a train
(first train) enters the bi-directional operation section from the first end station,
another train (second train) arriving at the second end station is kept waiting, and
the second train is allowed to enter the bi-directional operation section after the
first train arrives at the second end station. In this way, the timetable in which
trains in two directions are allowed to travel on the same track may be determined
by the traffic management system 10. Thus, when an obstacle occurs, the dispatcher
may set a bi-directional operation by an easy way to continue a service of trains
for both directions.
[0029] In addition, when the obstacle avoidance operation time slot, the obstacle avoidance
operation area, and the obstacle avoidance operation type are specified, the processing
unit 10B corrects the obstacle avoidance operation range to an extended range in which
the originally intended obstacle avoidance operation range is included and a train
service of the obstacle avoidance operation type is applicable. Since the obstacle
avoidance operation range and the obstacle avoidance operation type specified by the
dispatcher are automatically corrected such that there is no inconsistency in a configuration
of the facility, etc., the dispatcher may easily apply an appropriate obstacle avoidance
operation.
[0030] In addition, when the bi-directional operation is performed as an obstacle avoidance
operation type, the processing unit 10B corrects the specified obstacle avoidance
operation area to an extended area including the obstacle avoidance operation area
and having a station, in which a crossover is present between one track and another
track, at each of both ends. In this way, since the obstacle avoidance operation area
specified by the dispatcher is automatically corrected to an area in which the bi-directional
operation is allowed, the dispatcher may easily make appropriate setting.
[0031] In this case, when there is a train traveling in an opposite direction to an original
direction at a time when the obstacle avoidance operation time slot ends in the originally
intended train service plan, the processing unit 10B performs correction to set a
time until the train arrives at an end station of the obstacle avoidance operation
range to the obstacle avoidance operation time slot. In this way, since the obstacle
avoidance operation time slot specified by the dispatcher is automatically corrected
to be consistent with the bi-directional operation, the dispatcher may easily set
the obstacle avoidance operation time slot appropriate for the bi-directional operation.
[0032] In addition, according to another viewpoint, in the traffic management system 10
of the present embodiment, the display unit 10A displays the track diagram screen
12 that indicates an position of the train at a current time on the track. When an
obstacle occurs on the track, the processing unit 10B sets a station in front of an
obstacle occurrence position corresponding to a position at which the obstacle occurs
and stations up to a station to which a train heading for the obstacle occurrence
position can be turned back in a reverse direction by tracing the route from the obstacle
occurrence position to warning target stations, and displays the warning target stations
on the track diagram screen. In this way, since a station in a range in which a train
may not be turned back when the train enters at the occurrence of an obstacle is displayed
on the track diagram screen as a warning target station, the dispatcher may easily
perform operation arrangement such that there is no train that may not be turned back
at the occurrence of an obstacle. Normally, this warning target station is considered
as a station at which progress of a train needs to be immediately stopped. When the
dispatcher performs a train hold operation based on a display of the warning target
station, it is possible to prevent situations such as a situation in which a train
stops before a signal due to inappropriate hold setting, a situation in which a train
stays in a section that does not allow the train to be turned back and thus even a
partial service may not be resumed, etc.
[0033] In addition, the processing unit 10B sets a station which is a adjacent station of
a warning target station to an attention target station, and displays the attention
target station on the track diagram screen 12. In this way, a route in a reverse direction
of an obstacle occurrence track at which even though operation of a train service
may not be immediately stopped but should be monitored carefully because a train passes
right beside an obstacle occurring place can be displayed as attention target stations.
A station at which a train may not be able to depart since a preceding train is blocking
the route can also be displayed as attention target stations. When such an attention
target station is set, it is possible to prevent confusion that may occur in the future,
and to shorten time required for recovery of a timetable. The above-described warning
target station or attention target station may be displayed not only on the track
diagram screen 12 but also on the train graph screen 13.
[0034] In addition, according to still another viewpoint, in the traffic management system
10 of the present embodiment, the storage unit 10C stores platform allocation management
information that associates a virtual platform corresponding to information determining
a direction and role for each platform with a physical platform. The processing unit
10B determines a timetable such that the physical platform associated with the virtual
platform is used in the direction and for the role of the virtual platform. In this
way, the supervisor may easily determine a timetable in which a platform is appropriately
allocated by allocating a physical platform to a virtual platform for which a direction
and role are determined. In addition, it is possible to collectively set platform
used for all trains included in a timetable by setting a physical platform corresponding
to a virtual platform. When time required for the dispatcher to input change data
to the system is shortened, and another command task subsequent to platform setting
change is rapidly carried out by such collective setting, it is possible to expect
that recovery time from the traffic disturbance can be shortened.
[0035] In addition, the display unit 10A displays the platform allocation management information.
The operation unit 10D allows individual setting of the platform allocation management
information for each train by operation input. When a physical platform used by a
certain train in a timetable is designated, the processing unit 10B determines the
timetable by giving priority to the individually set physical platform over the virtual
platform, and causes the display unit 10A to display the determined timetable. In
this way, the dispatcher may individually set a physical platform used by each train
of the timetable, and thus may easily and flexibly perform setting using collective
setting by a virtual platform and individual setting by a physical platform.
[0036] In addition, when a physical platform is individually set with respect to a train
in the timetable by the operation unit 10D, the processing unit 10B determines whether
setting by a virtual platform is consistent with setting by a physical platform. In
this way, even when the dispatcher inputs contradictory setting, the traffic management
system 10 detects the contradictory setting, and thus it is possible to prevent a
timetable including contradiction in platform setting from being generated. In this
way, it is possible to construct a route in accordance with setting of the train service
plan to realize a timetable.
[0037] In addition, the processing unit 10B causes the display unit 10A to display a configuration
of a route including each platform of each station as a diagram, sets a platform for
each train having a specified travel pattern based on an instruction on the operation
unit 10D, and causes the display unit 10A to display the platform used by the specified
train. In this way, the dispatcher may collectively set a platform used in each station
for each travel pattern of a train, and it is be expected that recovery time from
a traffic disturbance can be shortened by speeding up a command task.
[0038] Hereinafter, a more specific embodiment will be described in detail with reference
to drawings.
Embodiment
[0039] A configuration of the traffic management system according to the present embodiment
is the same as that illustrated in FIG. 1 and FIG. 2.
[0040] FIG. 3 is a table illustrating an example of a train service plan in the present
embodiment. The train service plan of FIG. 3 corresponds to timetable information
recording a time of arrival to a station, a time of departure from a station, a used
platform at each station, and a traveling track (direction) for a train traveling
on a certain route. A traveling track corresponding to a certain station indicates
a track on which a train travels after departing from the station until the train
arrives at a subsequent station. In a column of a used platform, a name of a virtually
determined platform (virtual platform) is described. The virtual platform will be
described below.
[0041] In the example of FIG. 3, a train departs from platform "Down1" of station A, departing
the station at 7:15:00 to travel along a down track, passes through platform "Nonstop
down" of station B at 7:26:30, passes through platform "Down1" of station C at 7:29:45,
and arrives at platform "Up1" of station D at 7:34:00. Then, the train departs from
station D at 7:34:45 to travel along an up track, passes through platform "Nonstop
up" of station E at 7:40:00, and arrives at platform "Up2" of station F at 7:45:00.
Further, the train departs from station F at 7:45:00 to arrive at platform "Down1"
of station G at 7:50:15, departs at 7:51:00 to travel along a down track, and arrives
at platform "Down1" of station H corresponding to a terminal station at 7:58:30.
[0042] FIG. 4 is a table illustrating an example of obstacle information in the present
embodiment. For example, when an event of a certain obstacle occurs, the obstacle
information management device 16 illustrated in FIG. 1 allocates an event ID to the
obstacle, and records content, an occurrence place, and an occurrence time of the
obstacle in the table present in the storage unit 16a. In addition, when another event
occurs in response to the obstacle, the obstacle information management device 16
records the event as a sub-event in the table. The obstacle information management
device 16 allocates a sub-event ID to the occurring sub-event, and records content
and an occurrence time of the event in the table.
[0043] FIG. 4 illustrates an example in which a car of a train number 1A has technical problem,
and the obstacle is described as an event of event ID = 5 in the table that records
the obstacle information. The technical problem occurred at a spot 4.5 km away from
station B on a down line, at 7:50. In response to the problem, a situation confirmation
report are made at 8:00, first aid is being tried from 8:05, and recovery of the obstacle
is estimated at 9:00.
[0044] FIG. 5A is a diagram illustrating a display example of the track diagram screen at
the occurrence of an obstacle. FIG. 5A illustrates a display example of the track
diagram screen 12 when train 1A traveling between station B and station C gets technical
problem. Referring to FIG. 5A, a circular icon having x in content is displayed at
an obstacle occurrence position of a track diagram. When information of the obstacle
corresponding to the problem on train 1A is input, the obstacle information management
device 16 automatically extracts an influence of the problem of train 1A and a area
thereof, and displays the influence and the area on the track diagram screen 12.
[0045] Referring to FIG. 5A, on an upward line directed rightward in the figure, station
A, station B, and station C correspond to warning target stations, which are indicated
by broken line arrows. In addition, on the upward line, a preceding station of station
A corresponds to an attention target station, which is indicated by a one-dot-chain
line arrow. On a downward line, station B, station C, and station D correspond to
attention target stations, which are indicated by one-dot-chain line arrows.
[0046] With regard to station B on the upward line, when a subsequent train of train 1A
departs from station B, train 1A becomes an obstacle, and the following train becomes
stuck. For this reason, a train directed from station B to station C should not depart.
In addition, here, on the assumption that there is no facility for turning back at
station B, when the following train of train 1A departs from station A, the following
train is likely to be stuck in the same manner. For this reason, a train directed
from station A to station B also should not depart. In this way, when an obstacle
occurrence position and information of the track diagram are combined, it is possible
to specify an area at which departure of a train should be held, and to hold a train
in a state in which a partial service can be rapidly resumed. A detailed process will
be described using FIG. 5C.
[0047] FIG. 5B is a diagram illustrating a display example of specific situations of the
warning target station and the attention target station described above on the train
graph screen. On the train graph screen, similarly to FIG. 5A, a circular icon having
x in content is displayed at a point corresponding to a position and time at which
an obstacle occurs . In addition, by displaying hatching of different patterns for
a region 50 on the train graph screen corresponding to the area which corresponds
to the broken line arrow in FIG. 5A and a region 51 on the train graph screen corresponding
to the area which corresponds to the one-dot-chain line arrow in FIG. 5A, these regions
are visualized on the train graph screen. In FIG. 5B, a range of a warning target
and a range of an attention target are distinguished by hatching patterns. However,
in addition to the above-described distinction, it is also possible to distinguish
between up and down lines corresponding to a target by further increasing a hatching
pattern.
[0048] FIG. 5C is a flowchart illustrating a process of specifying a range in which an influence
of the obstacle is received. Referring to FIG. 5C, in response to occurrence of an
obstacle, the obstacle information management device 16 extracts a station located
one station ahead of an obstacle occurrence position and a station located one station
behind the obstacle occurrence position in a progress direction of a train (step S101).
Subsequently, the obstacle information management device 16 adds the extracted stations
as warning target stations (step S102).
[0049] Subsequently, the obstacle information management device 16 performs warning target
station addition loop processing of steps S103 and S104.
[0050] In the warning target station addition loop processing, the obstacle information
management device 16 determines whether a last added backward station can turn back
a train (step S103) . When the last added station is a station that can turn back
a following train, the obstacle information management device 16 ends the process
as it is. On the other hand, the last added station is a station that cannot turn
back a train, the obstacle information management device 16 adds a backward station
of the last added station as a warning target station (step S104), and returns to
step S103. In this way, the obstacle information management device 16 extracts all
the warning target station.
[0051] In addition, in FIG. 5A, the train directed from station C to station B passes right
beside the obstacle occurrence position, and thus there is a possibility that some
influence such as a temporary speed limit may be applied. In this way, a range that
may receive a secondary influence is set to an attention target region even though
the range is not a direct influence range in which departure of a train should be
immediately held.
[0052] FIG. 5D is a flowchart illustrating a process of specifying an attention target range.
The process of specifying the attention target range is repeatedly performed for each
warning target station.
[0053] First, the obstacle information management device 16 selects a warning target station
to be processed (step S201) . Subsequently, the obstacle information management device
16 adds a backward station of the selected warning target station in an upward direction
as attention target station (step S202) . Further, the obstacle information management
device 16 adds a backward station of the selected warning target station in a downward
direction as an attention target station (step S203) .
[0054] FIG. 5E is a diagram illustrating an example of the train graph screen when an obstacle
occurs.
[0055] When an obstacle occurs, and information about the obstacle is input, the obstacle
information management device 16 displays the obstacle information on the train graph
screen 13. The train graph screen 13 at a time at which the obstacle occurs is illustrated
in FIG. 5E.
[0056] It can be understood that train 1A located between station B and station C at a current
time has a technical problem. When a predetermined operation is performed on an icon
indicating the obstacle, the obstacle information management device 16 displays specific
information about the obstacle and an action to be taken on the obstacle. Examples
of the predetermined operation include click, mouse-over, etc. For example, display
of the specific information about the obstacle and the action to be taken on the obstacle
corresponds to pop-up display, etc. In the example of FIG. 5A, an obstacle occurrence
time and an obstacle occurrence position are displayed as a specific obstacle, and
a call with a person concerned, editing event information, and an obstacle avoidance
operation are displayed as the alternatives to be taken. The specific obstacle and
the action to be taken on the obstacle may be similarly displayed when a predetermined
operation is performed on an icon on the track diagram screen.
[0057] FIG. 5F is a diagram illustrating an example of the train graph screen when a sub-event
is added as the obstacle information. A straight line horizontally extending from
an icon indicating an obstacle indicates an influence of occurrence of the obstacle,
a thick part in the middle indicates a time at which first aid action starts with
respect to the obstacle, and a right end portion indicates an estimated time of recovery.
In this way, it is possible to visualize an extent of influence due to occurrence
of the obstacle. In the example of FIG. 5F, when a predetermined operation is performed
on a recovery estimation part, an obstacle occurrence time and a recovery estimated
time are displayed. In this way, when event information or sub-event information are
visualized and displayed on the train graph screen, it is possible to easily detect
a relation between an occurring event and a train service, and the dispatcher may
rapidly and easily determine a necessary change of the timetable. If the timetable
is quickly modified, an operation interruption time at the occurrence of a traffic
disturbance is shortened, and it is possible to continue a service of each train according
to the modified timetable.
[0058] Next, a description will be given of a series of processes in a case in which when
an obstacle occurs, the dispatcher performs a bi-directional operation, in which a
single track is alternately used by trains in two directions, in an influence receiving
range in a time slot in which the obstacle have an influence.
[0059] Here, a case of performing a bi-directional operation, in which trains in two directions
alternately pass on one side track not involved with trouble, between station B and
station C from the state illustrated in FIG. 5A is given as an example of replanning.
[0060] FIG. 6A is a diagram illustrating a display example of the train graph screen when
the dispatcher first specifies an area and a time slot in which a bi-directional operation
is needed.
[0061] It is presumed that the dispatcher specifies a range in which the bi-directional
operation is needed to include an icon indicating an obstacle and a line extending
rightward from the icon and indicating an influence of the obstacle on the train graph
screen 13. For example, it is possible to specify a rectangular region on the train
graph screen 13. In this case, the rectangular region corresponds to the bi-directional
operation range. In FIG. 6A, the specified rectangular region is indicated by hatching.
For example, this selection operation may be performed by dragging of a mouse, etc.
[0062] This operation is an operation of specifying an obstacle avoidance operation time
slot and an obstacle avoidance operation area, and a hatching part indicates the specified
range. When the obstacle avoidance operation time slot and the obstacle avoidance
operation area are specified, the replanning device 17 corrects the obstacle avoidance
operation time slot and the obstacle avoidance operation area as necessary, generates
a modified timetable for applying an obstacle avoidance operation of a specified obstacle
avoidance operation type to the region, and transmits the modified timetable to the
timetable management device 14. Here, the obstacle avoidance operation type corresponds
to the bi-directional operation. Hereinafter, a description will be given on the assumption
that a process related to modification of the timetable is performed by the replanning
device 17. However, actual functional arrangement is not limited thereto, and another
device in the traffic management system 10 may perform the process.
[0063] FIG. 6B is a diagram illustrating a state of correction of the obstacle avoidance
operation time slot and the obstacle avoidance operation area. Since a crossover between
upward and downward tracks is not present between station B and station C as illustrated
in FIG. 5A, station B and station C may not be used as end stations of the bi-directional
operation. Station A and station D have crossovers, and thus may be used as end stations
of the bi-directional operation.
[0064] Therefore, as illustrated in FIG. 6B, the replanning device 17 automatically corrects
the range in which the bi-directional operation (as a type of obstacle avoidance operation)
is applied (the obstacle avoidance operation time slot and the obstacle avoidance
operation area) to a range using station A and station D as end stations at both sides.
When such correction is determined on the system side, the dispatcher may immediately
start to input the bi-directional operation without considering a track configuration
of each station, and may realize shortening of time required to change the timetable,
that is, resumption of the train service in a short time.
[0065] FIG. 6C is a diagram for description of an example of a method of correcting the
obstacle avoidance operation time slot and the obstacle avoidance operation area.
The replanning device 17 holds a table illustrated in FIG. 6C in advance.
[0066] The table of FIG. 6C indicates whether each station can be used as an end station
of a bi-directional operation (using either upward track or downward track). For example,
stations A, D, and E can be used as a starting station or a terminal station of bi-directional
operation both for using upward track and downward track, since a crossover connecting
the upward track and the downward track exists in each of the stations A, D, and E.
On the other hand, stations B and C can be used as neither a starting station nor
a terminal station of bi-directional operation, both for using the upward track and
the downward track.
[0067] In a case in which a train has a technical problem between station B and station
C, and a bi-directional operation is performed, in response to a region having station
B and station C as both end stations being specified, the replanning device 17 specifies
a range including station B and station C and having stations corresponding to end
stations of the bi-directional operation at both ends with reference to the table
of FIG. 6C, and corrects the obstacle avoidance operation area to the range.
[0068] Next, a description will be given for a method of creating a new train service and
a method of setting a time at which a bi-directional operation is ended. In this instance,
creation of the new train service, that is, adding and changing of train paths on
a train graph are automatically performed by the replanning device 17.
[0069] FIG. 7A is a diagram illustrating a display of a train graph screen that shows a
timetable in which the bi-directional operation is performed in an obstacle avoidance
operation area and an obstacle avoidance operation time slot specified by the dispatcher.
In the timetable, the bi-directional operation is performed until a designated end
time specified by the dispatcher, and thereafter the operation returns to a normal
operation.
[0070] However, this modification to the timetable is incomplete. Train 3B is on a different
track from a track on which the train is assumed to be between station A and station
D on the original plan, that is, train 3B is on the same track as that of train 4E.
Thus, in practice, train 3B cannot pass by train 4E between station C and station
D. For this reason, train 4E may not depart from station D until train 3B arrives
at station D.
[0071] When a bi-directional operation is applied to a timetable, the replanning device
17 automatically corrects an end time, and determines a timetable applicable to an
actual train service. A description will be given below.
[0072] FIG. 7B is a diagram illustrating a display of a train graph screen that shows a
timetable in which an obstacle avoidance operation time slot is corrected.
[0073] FIG. 7C is a diagram for description of a method of determining a train path when
the bi-directional operation is applied.
[0074] Here, an area in which the bi-directional operation is applied is between station
P and station Q. That is, an obstacle avoidance operation range is between station
P and station Q.
[0075] With regard to train 2B initially entering between station P and station Q corresponding
to the area in which the bi-directional operation is applied, the replanning device
17 obtains a time of arrival to station P using a standard operating time t1 of this
section. Subsequently, the replanning device 17 lets train 3C depart from station
P after waiting for a predetermined time (intersection hindrance time) t2 from the
time of arrival to station P of train 2B considering intersection of routes with train
2B at station P. Thereafter, similarly, the replanning device 17 lets train 4C depart
from station Q after a time obtained by adding a traveling time t3 of train 3C between
station P and station Q and an intersection hindrance time t4 of train 3C and train
4C from a time at which train 3C departs from station P. In addition, the replanning
device 17 lets train 5E depart from station P after a total time of a traveling time
t5 of train 4C between station P and station Q and an intersection hindrance time
t6 of train 4C and train 5E from a time at which train 4C departs from station Q.
When such a process is performed, it is possible to create a timetable having consistency
in a specific operation pattern corresponding to the bi-directional operation. Therefore,
the route control device can issue a control command to the field equipment management
system as the same manner as usual, even when the complicated bi-directional operation
is performed.
[0076] Next, a description will be given for a process of determining a time at which the
obstacle avoidance operation is ended.
[0077] FIG. 7D is a flowchart illustrating a process of determining a time at which the
obstacle avoidance operation is ended. First, the replanning device 17 sets a designated
end time input by the dispatcher as a scheduled end time of the obstacle avoidance
operation (step S301).
[0078] Subsequently, the replanning device 17 performs processing of step S302 to step S305,
and repeats processes from step S302 again when the scheduled end time has been updated
at the time.
[0079] In step S302, the replanning device 17 extracts all trains traveling within the obstacle
avoidance operation range at the scheduled end time of the obstacle avoidance operation
(in this case, the bi-directional operation).
[0080] Further, the replanning device 17 repeats processing of step S303 and step S304 as
many times as the number of extracted trains. In step S303, the replanning device
17 determines whether a train subjected to processing in a current loop is running
on a different track from a track on which the train is assumed to travel on the original
plan. When the train is running on the different track, the replanning device 17 sets
a time at which the train arrives at a terminal station of a corresponding section
as the scheduled end time (step S304).
[0081] In step S305, the replanning device 17 determines whether the scheduled end time
is updated in a current loop of step S302 to step S305. When the scheduled end time
has been updated, the replanning device 17 returns to step S302 and repeats processing.
When the scheduled end time has not been updated, the replanning device 17 ends a
series of processes.
[0082] In the above-described example, a scheduled end time of an obstacle restoration operation
is corrected from an end position of hatching of FIG. 7A to an end position of hatching
of FIG. 7B by the above processing.
[0083] Next, a description will be given for an operation of the dispatcher and an operation
of the traffic management system 10 at the time of recovering from an obstacle with
reference to FIGS. 8A and 8B.
[0084] For example, in response to restoration from an obstacle occurring from a technical
problem of a train, the dispatcher inputs restoration from the obstacle to the traffic
management system 10 by editing event information. When the obstacle avoidance operation
is applied for the obstacle, the obstacle information management device 16 associates
the obstacle with the obstacle avoidance operation at the time of performing the obstacle
avoidance operation. The obstacle information management device 16 determines whether
the obstacle avoidance operation is associated with the obstacle to which the restoration
is input. When the obstacle is associated with the obstacle avoidance operation, the
obstacle information management device 16 prompts the dispatcher to verify whether
to cancel the obstacle avoidance operation.
[0085] FIG. 8A is a diagram illustrating an example of a screen display when the dispatcher
inputs the restoration from the obstacle. When the dispatcher inputs the restoration
from the obstacle by applying a predetermined operation on an icon indicating obstacle
information displayed on the train graph screen 13, the obstacle information management
device 16 displays an image for prompting the dispatcher to select whether to cancel
the bi-directional operation corresponding to the obstacle avoidance operation associated
with the obstacle as a pop-up image as illustrated in FIG. 8B.
[0086] FIG. 8B is a diagram illustrating a display example of a screen inquiring of the
dispatcher whether to end the obstacle avoidance operation from the train graph screen
13.
[0087] Here, it is presumed that the bi-directional operation is associated to the obstacle
information. To prompt verification as to whether to end the bi-directional operation
associated with the obstacle information on which a predetermined operation of inputting
the restoration is performed, the obstacle information management device 16 instructs
the HMI 11 to display the screen illustrated in FIG. 8B. When the dispatcher selects
YES with respect to the display of FIG. 8B, the obstacle information management device
16 ends the event corresponding to the bi-directional operation, and instructs the
replanning device 17 to modify a timetable for returning to the normal operation.
[0088] When a certain event is performed in relation to the obstacle as described above,
the obstacle information management device 16 may record information about the performed
event by associating the information with the obstacle information. For example, an
event performed in relation to the obstacle information illustrated in FIG. 4 may
be additionally described in the obstacle information. Further, for example, when
an icon indicating the event of the obstacle is selected, and the end of the event
is input, the obstacle information management device 16 extracts an obstacle avoidance
operation associated with the obstacle with reference to a table of the obstacle information,
and displays a screen prompting verification as to whether the obstacle avoidance
operation can be ended.
[0089] Here, an example of inquiring about canceling the obstacle avoidance operation when
recovery from the obstacle is input is described. However, it is possible to inquire
about canceling the obstacle avoidance operation at another time.
[0090] For example, it is possible to inquire about canceling the obstacle avoidance operation
when an estimated end time of the obstacle avoidance operation is reached, and the
obstacle has already been removed at that time. Alternatively, it is possible to inquire
about canceling the obstacle avoidance operation when the obstacle has been removed
before the estimated end time of the obstacle avoidance operation. In addition, it
is possible to inquire about extending the obstacle avoidance operation when the obstacle
remains at a point in time approaching the estimated end time of the obstacle avoidance
operation. When the dispatcher does not respond to the inquiry and leaves the inquiry
unsolved, the obstacle avoidance operation may be automatically extended in a predetermined
n-minute unit, and the inquiry may be made again after the extension period. In addition,
the extension period may be set to a period up to a time at which the obstacle avoidance
operation can be ended on the given situation. In addition, when the obstacle avoidance
operation may not be canceled in the entire obstacle avoidance region, it is possible
to determine whether a new starting station or terminal station can be set based on
a position at which the obstacle is left, and change the area when the station can
be set. In this case, the estimated end time of the obstacle avoidance operation may
be determined in the same manner as the above-described extension. In addition, in
this case, when a train is left on a platform of a certain station by setting a new
obstacle avoidance operation range, it is possible to issue a warning thereof. In
addition, for example, when a train is on a physical platform that is no longer allocated
to a virtual platform, a warning is issued. In this way, when event information and
an obstacle avoidance operation with respect to the event information are combined
and managed, for example, it is possible to prevent a problem that an operation of
appropriately returning a pattern of a train operation is not performed after an event
ends, and a train service is impeded.
[0091] Next, a description will be given of a process of ending the bi-directional operation
and returning to the normal operation with reference to FIG. 9A to FIG. 9C.
[0092] FIG. 9A is a diagram illustrating a timetable at the time of returning from the bi-directional
operation to the normal operation.
[0093] When an end of the bi-directional operation is input, the replanning device 17 generates
a timetable change plan in which whether a train traveling in a reverse direction
of an original track is present at that time is verified, and a train traveling in
an opposite direction to that of the train is allowed to enter a section where the
bi-directional operation has been performed as illustrated in FIG. 9A in response
to the train arriving at a terminal station of the bi-directional operation if the
train traveling in the reverse direction is present. On the other hand, when the train
traveling in the reverse direction of the original track is not present, the replanning
device 17 generates a timetable change plan that lets the train traveling in the opposite
direction to that of the train immediately enter the section where the bi-directional
operation has been performed.
[0094] FIG. 9B and FIG. 9C are diagrams for description of another train service plan at
the time of returning from the bi-directional operation to the normal operation. In
an example of FIG. 9A, since train 3B is traveling on a different track from a track
on which train 3B is assumed to travel, train 4E may not depart from station D until
train 3B arrives at station D, and a train directed from station D to station A may
not travel for a long time.
[0095] Meanwhile, in another example, in this instance, a train traveling in the opposite
direction may immediately enter a section where the bi-directional operation has been
performed using the other track which was unavailable during the occurrence of an
obstacle.
[0096] Recovery from the obstacle allows the other unavailable track to be used. Therefore,
in the other example, the replanning device 17 changes the timetable to allow train
4E to use this track, that is, to allow both train 3B and train 4E to use the track
in the reverse direction of the originally used track.
[0097] As illustrated in FIG. 9B, the replanning device 17 displays a menu screen that can
command a change of the timetable. Here, a change example of individually specifying
train 4E to let only train 4E travel on a reverse line will be described. In practice,
as still another example, it is possible to change the train service plan to let all
trains directed from station D to station A reverse-line travel. In this case, an
area and a time slot may be specified similarly to the example of FIG. 6A.
[0098] FIG. 9C is a diagram illustrating a timetable in a case of letting both train 3B
and train 4E travel on a reverse line. Letting train 4E also travel on the reverse
line accelerates recovery of all train timetables. FIG. 9C illustrates a case in which
train 5C is also instructed to travel on the reverse line.
[0099] Next, a description will be given of an example of bypassing a place where an obstacle
occurs by changing allocation of a platform with reference to FIGS. 10A to 10C.
[0100] FIG. 10A is a diagram illustrating a display example of the track diagram screen
when a technical problem occurs on a certain train at a certain station. FIG. 10A
illustrates an example in which train 3B gets technical problem on platform 1 of station
Y. Here, allocation of a platform may be changed by applying a predetermined operation
to an icon indicating the obstacle.
[0101] FIG. 10B is a diagram illustrating a table for managing allocation of a platform.
A platform is managed by two types of platform information, each corresponds to a
"virtual platform" and a "physical platform". The virtual platform indicates a role
such as a platform used as the first platform of a downward train. The physical platform
indicates a physical platform that identifies a position where a train actually arrives
or passes. As illustrated in FIG. 10B, the replanning device 17 may generate a timetable
change plan in which a specific physical platform is not used by changing a combination
of the virtual platform and the physical platform.
[0102] Further, in particular, when the replanning device 17 patterns a typical allocation
change in advance and holds pattern information in advance, the dispatcher may change
platform allocation by a simple operation. For example, it is determined in advance
that physical platform 2 is used as the first platform for downward trains when physical
platform 1 is unavailable, and pattern information of the change is held in advance.
Then, when the platform becomes unavailable as in a case in which a train on physical
platform 1 get technical problem, the dispatcher may easily change allocation by fetching
and applying the held pattern information. In this way, when an obstacle corresponding
to a pattern occurs, it is possible to immediately change allocation of a platform,
and continue a train service.
[0103] In addition, the replanning device 17 may hold a combination that cannot be allocated
in advance. When the dispatcher tries to allocate a platform, the replanning device
17 determines whether the input setting can be accepted with reference to the information
about the combination that cannot be allocated. In this way, it is possible to prevent
inappropriate platform allocation from being performed.
[0104] FIG. 10C is a diagram illustrating an example of a timetable using a virtual platform
and a physical platform. The timetable management device 14 basically uses a virtual
platform as a platform defined in a timetable. Further, as illustrated in FIG. 10B,
it is possible to collectively change platform allocation of all trains that use a
corresponding station by changing a physical platform allocated to a virtual platform.
[0105] Further, as indicated in No. 8 and No. 9 of FIG. 10C, a physical platform may be
designated for an individual train in the timetable. When a physical platform is set
in the timetable, the timetable management device 14 gives priority to allocation
of an individual train over collective allocation in a unit of a station illustrated
in FIG. 10B. In this way, it is possible to change platform allocation of an individual
train. In this case, the replanning device 17 may verify whether allocation of an
individual train is consistent with collective allocation for each station, and call
the attention of the dispatcher when the allocations are not consistent with each
other. In this way, when allocation of an individual train is inconsistent with allocation
for each station, or when there is a contradiction therebetween, it is possible to
alert the dispatcher by displaying a warning icon on the train graph screen. For example,
when setting of a physical platform is inconsistent with setting of a virtual platform,
or when setting for a station is inconsistent with setting for a train, it is possible
to consider displaying a warning icon that calls the attention of the dispatcher.
In this way, it is possible to prevent the timetable from being modified inappropriately,
in which a route cannot be set and a train service is disturbed.
[0106] Next, a description will be given for inputting a change of a running line of a train.
The above-described bi-directional operation may be regarded as an example of this
running line change. FIG. 11 illustrates a station in which a running line of a downward
passing train is specified by dragging a mouse on a track diagram of the track screen
12.
[0107] For example, when an upward train and a downward train are set on the same track,
the replanning device 17 determines that the bi-directional operation is applied to
the part, and generates such a timetable change plan. When an running line is specified
herein with regard to a pattern of each service mode, it is possible to flexibly perform
various running line changes such as a double-track co-directional operation, an upward/downward
line switch operation, etc. in addition to the bi-directional operation.
[0108] In addition, on the contrary, with regard to a pattern of a typical service mode
such as the bi-directional operation or the upward/downward line switch operation,
a station and a platform to which an upward train and a downward train are allocated
may be specified in advance, and the replanning device 17 may hold setting information
thereof in advance. In this way, when the dispatcher selects a service mode desired
to be applied, it is possible to easily perform the obstacle avoidance operation illustrated
in FIG. 7A to FIG. 7D or FIG. 9A to FIG. 9C. In this way, when a traffic disturbance
corresponding to a pattern occurs, it is possible to immediately change the timetable,
and to minimize a time at which an operation of a train is interrupted.
[0109] FIG. 12 is a diagram illustrating an example in which various information exchanged
on a system in relation to the occurrence of the obstacle is displayed in time series
by text.
[0110] The traffic management system 10 defines a sentence format including a variable part
such as a train ID, a station name, etc. in advance, and determines information to
be described in the variable part based on an operation input of the dispatcher, etc.
or a result of calculation performed by the system with respect to the input.
[0111] A description of "Dispatcher ○○" indicates that "input obstacle occurrence information"
of 7:53 displayed in an uppermost part of FIG. 12 corresponds to information generated
based on an operation performed by the dispatcher. The traffic management system 10
determines a train in which an obstacle occurs, a position at which the obstacle occurs,
and a time at which the obstacle occurs based on the input of the dispatcher, and
generates text data in the uppermost part of FIG. 12 by describing the determined
train, position, and time in the variable part.
[0112] In addition, a description of "automatic calculation by system" indicates that "specify
obstacle influence range" of 7:53 displayed in a second uppermost part of FIG. 12
corresponds to information generated based on automatic calculation by the traffic
management system 10. The traffic management system 10 describes a train restraint
range (warning target station) and an attention calling range (attention target station)
obtained by automatic calculation in a variable part to generate text data in the
second uppermost part of FIG. 12.
[0113] In addition, a description of "train 1A crew" indicates that "obstacle cause identified"
of 8:01 displayed in a fourth uppermost part of FIG. 12 corresponds to information
which is a cause determined by a crew of train 1A and input from a terminal. When
the crew inputs information such as the cause of the obstacle, information as to whether
the train having the obstacle can move, etc. from the terminal, the traffic management
system 10 describes the information in a variable part to generate text data in the
fourth uppermost part of FIG. 12.
[0114] The traffic management system 10 distributes completed text data to terminals used
by other dispatchers, a station staff of each station, a crew of a related train,
etc. In this way, a time-series status corresponding to a type of occurring obstacle
and a type of response to the obstacle may be shared among a plurality of people concerned.
[0115] In this instance, creation and distribution of the text data are automatically performed
by the traffic management system 10, and thus the dispatcher do not have to perform
specific operation input for transmitting information. Information is automatically
distributed to another person concerned only when the dispatcher performs an operation
for responding to the above-described obstacle. For this reason, more information
may be shared without an increase in the number of operations to be performed by the
dispatcher. In this way, the dispatcher may rapidly and appropriately determine a
countermeasure against an occurring event, and minimize disturbance in a train service.
[0116] Here, an example of distributing data in a text format is described. However, the
invention may not be limited thereto. As another example, the traffic management system
10 may generate data of a chart, an image, etc., and distribute the generated data.
[0117] Next, a description will be given of a function of filtering information accumulated
in a time series. The traffic management system 10 has a function of accumulating
various types of information in a time series, and filtering the information according
to various conditions. For example, it is possible to perform filtering to extract
only information about occurrence of an obstacle, extract only information indicating
delay, or extract only information related to a change of a timetable.
[0118] The traffic management system 10 assigns tag information to each information item
at the time of generating, accumulating, and distributing each information item. At
the time of browsing the information, the traffic management system 10 and a terminal
receiving the distributed information may extract and display only information according
to a predetermined condition by filtering using the tag information.
[0119] FIG. 13A is a diagram illustrating an example of a screen display that defines time,
a sender, and classification of information as filtering conditions. FIG. 13B is a
diagram illustrating an example of a screen display in which classification of information
is allowed to be selected by a button operation in filtering. By allowing a condition
to be input by a simple input method, for example, a station staff may promptly browse
necessary information at the time of extracting and browsing only information according
to a predetermined condition using a small portable terminal. In FIG. 13B, a condition
is displayed by a character string on a button. However, the invention may not be
limited thereto. As another example, when an appropriate figure, etc. that allows
a condition to be easily detected is displayed on a button, it is possible to more
intuitively perform a filtering operation.
[0120] The above-described embodiment and examples are examples for description of the invention,
and are not intended to limit the scope of the invention to only the embodiment and
examples. Those skilled in the art may implement the invention in various other modes
without departing from the subject matter of the invention.
[0121] For example, even though the bi-directional operation is given as an example of the
obstacle avoidance operation in the present embodiment and example, the invention
is not limited thereto. As another example, it is possible to adopt an upward/downward
line reversal operation in which an upward train is allowed to travel on a downward
track and a downward train is allowed to travel on an upward track, the double-track
co-directional operation in which trains in the same direction, for example, upward
trains are distributed and allowed to travel on a plurality of tracks, etc.
[0122] In addition, even though a technical problem of a train traveling between stations
is given as an example of an obstacle in the present embodiment and example, the invention
is not limited thereto. As another example, it is possible to consider a state in
which a specific platform becomes unavailable due to a technical problems on a switch,
on a stopped train, on a station facility such as an elevator of the platform, etc.
Information about such obstacle may be displayed on the track diagram screen 12 and
the train graph screen 13.
Reference Signs List
[0123]
- 10
- traffic management system
- 10A
- display unit
- 10B
- processing unit
- 10C
- storage unit
- 10D
- operation unit
- 12
- track diagram screen
- 13
- train graph screen
- 14
- timetable management device
- 14a
- storage unit
- 15
- route control device
- 15a
- storage unit
- 16
- obstacle information management device
- 16a
- storage unit
- 17
- replanning device
- 17a
- storage unit
- 18
- network
- 20
- field equipment management system
- 30
- field equipment