[0001] The present invention relates to an air conditioner, and more particularly to an
air conditioner that is capable of improving the operation efficiency thereof through
heat exchange between an air-conditioning cycle for cooling the interior of a room
and a refrigeration cycle for refrigerating food and of efficiently recovering refrigeration
oil to a compressor.
[0002] In general, an air conditioner is an apparatus that cools or heats the interior of
a room using an air-conditioning cycle including a compressor, an outdoor heat exchanger,
an expansion device, and an indoor heat exchanger. That is, the air conditioner may
be configured as a cooler, which cools the interior of a room, or a heater, which
heats the interior of a room. In addition, the air conditioner may be configured as
a combined cooling/heating air conditioner, which selectively cools or heats the interior
of a room.
[0003] In the case in which the air conditioner is configured as a combined cooling/heating
air conditioner, it includes a cooling/heating switching valve for changing the flow
channel of a refrigerant compressed by a compressor depending on whether a cooling
operation or a heating operation is being performed.
[0004] When the air conditioner performs the cooling operation, the refrigerant compressed
by the compressor flows into the outdoor heat exchanger via the cooling/heating switching
valve and the outdoor heat exchanger serves as a condenser. Further, the refrigerant
condensed by the outdoor heat exchanger is expanded by the expansion device and then
flows into the indoor heat exchanger. In this case, the indoor heat exchanger serves
as an evaporator and the refrigerant evaporated by the indoor heat exchanger flows
into the compressor again via the cooling/heating switching valve.
[0005] When the air conditioner performs the heating operation, the refrigerant compressed
by the compressor flows into the indoor heat exchanger via the cooling/heating switching
valve and the indoor heat exchanger serves as a condenser. Further, the refrigerant
condensed by the indoor heat exchanger is expanded by the expansion device and then
flows into the outdoor heat exchanger. In this case, the outdoor heat exchanger serves
as an evaporator and the refrigerant evaporated by the outdoor heat exchanger flows
into the compressor again via the cooling/heating switching valve.
[0006] A plurality of indoor units each having an indoor heat exchanger may be installed
on such an air conditioner. Only some of the plurality of indoor units may operate
as a partial load. When some of the connected indoor units are stopped, a refrigerant
of a low-pressure gas state is present within the indoor heat exchanger of the stopped
indoor unit. When the refrigerant is charged in consideration of the number of connected
indoor units, the amount of refrigerant of an indoor unit that is in a non-operation
mode moves to the outdoor heat exchanger, and thus a refrigerant circulation state
is changed. Accordingly, the optimal amount of refrigerant may not be distributed
to the air-conditioning cycle.
[0007] Further, when the air conditioner performs the heating operation, the functions of
the outdoor heat exchanger and the indoor heat exchanger are changed. The ratio of
the volumes of the outdoor heat exchanger and indoor heat exchanger is changed depending
on the number of connected indoor units. Furthermore, it is necessary to control the
amount of refrigerant in response to a change in cooling/heating operation mode.
[0008] Accordingly, a receiver in which a refrigerant is stored is installed in the air-conditioning
cycle in order to optimize the amount of refrigerant of the air-conditioning cycle.
The receiver functions to move a refrigerant stored therein to the air-conditioning
cycle when the amount of refrigerant in the air-conditioning cycle is insufficient
and to store the refrigerant in the air-conditioning cycle when the amount of refrigerant
in the air-conditioning cycle is excessive, so the amount of refrigerant in the air-conditioning
cycle is set to an optimal amount.
[0009] Furthermore, a supercooler for supercooling a refrigerant that has passed through
the outdoor heat exchanger when the cooling operation is performed is installed on
the air conditioner. The supercooler is disposed between the outdoor heat exchanger
and the indoor heat exchanger and functions as an intercooler.
[0010] Recently, a low-temperature storage unit for storing food in a low-temperature state,
such as a showcase, has been installed in large-scale supermarkets. A complex-type
air conditioner in which an air-conditioning cycle circuit for air-conditioning the
interior of a room and a refrigeration cycle circuit for refrigerating the low-temperature
storage unit are integrated is installed in a building in which such a low-temperature
storage unit is installed.
[0011] In the case of a complex-type air conditioner, the supercooler supercools a refrigerant
that has passed through the condenser of the refrigeration cycle circuit and superheats
a refrigerant that has passed through the condenser of the air-conditioning cycle
circuit by performing heat exchange between the refrigerant passing through the condenser
of the refrigeration cycle circuit and the refrigerant passing through the condenser
of the air-conditioning cycle circuit.
[0012] However, such a conventional air conditioner has problems in that an installation
space is limited because the receiver and the supercooler are separately formed. Further,
because a great number of refrigerant pipes must be used to form the receiver and
the supercooler into a cycle circuit, the structure is complicated, the manufacturing
cost is increased, and the refrigeration efficiency is low.
[0013] The evaporator of the refrigeration cycle circuit is disposed in the showcase, and
the condenser is disposed outdoors.
[0014] In the air conditioner including the refrigeration cycle circuit, in order to ensure
the reliability of the compressor, there is a need to appropriately recover refrigeration
oil, which has been discharged with the refrigerant from the compressor, to the compressor
and thus to prevent depletion of the refrigeration oil in the compressor.
[0015] In general, the viscosity of the refrigeration oil used in the air conditioner is
increased as the temperature decreases. The temperature of the refrigerant in the
evaporator used in the showcase of the refrigeration cycle circuit is substantially
maintained in the range from -40°C to -5°C.
[0016] Therefore, the viscosity of the oil in the gas line, which connects the discharge
port of the evaporator to the suction port of the compressor in the refrigeration
cycle circuit, is greatly increased and the fluidity thereof is decreased. The refrigeration
oil remains in the gas line and does not return to the compressor, which results in
a decrease in the reliability of the compressor.
[0017] Further, the length of the gas line between the evaporator and the compressor is
generally from tens of meters to hundreds of meters. However, there is a problem in
that the installation length of the gas line is limited due to the refrigeration oil
remaining in the gas line.
[0018] As shown in FIG. 10, most refrigeration oil that does not return to the compressor
remains in the gas line.
[0019] Therefore, the present invention has been made in view of the above problems, and
it is an object of the present invention to provide a cooling receiver for an air
conditioner in which a supercooler and a receiver are integrated and an air conditioner
including the same.
[0020] It is another object of the present invention to provide an air conditioner in which
the length of a gas line is extended, thereby improving installation freedom, enhancing
operational efficiency, improving the reliability of a compressor, and facilitating
the recovery of oil to the compressor.
[0021] These objects are achieved with the features of the claims.
[0022] In accordance with an aspect of the present invention, there is provided an air conditioner
including an air-conditioning cycle circuit including a first compressor for compressing
a first refrigerant, a first condenser for condensing the first refrigerant compressed
by the first compressor, a first expansion device for expanding the first refrigerant
that has passed through the first condenser, and a first evaporator for evaporating
the first refrigerant that has passed through the first expansion device, the air-conditioning
cycle circuit performing an air-conditioning operation through circulation of the
first refrigerant, a refrigeration cycle circuit including a second compressor for
compressing a second refrigerant, a second condenser for condensing the second refrigerant
compressed by the second compressor, a second expansion device for expanding the second
refrigerant that has passed through the second condenser, and a second evaporator
for evaporating the second refrigerant that has passed through the second expansion
device, the refrigeration cycle circuit refrigerating stored food through circulation
of the second refrigerant, a cooling receiver for performing heat exchange between
the first refrigerant that has passed through the first condenser and the second refrigerant
that has passed through the second condenser, a first bypass unit for diverting a
portion of the second refrigerant that has passed through the second compressor so
as to exchange heat with the second refrigerant that has passed through the second
evaporator, and a control unit for controlling overall operation of the air conditioner.
When an oil recovery operation is performed, the control unit performs control such
that the first bypass unit enables heat exchange between the second refrigerant discharged
from the second compressor and the second refrigerant that has passed through the
second evaporator.
[0023] The objectives and other advantages of the invention may be realized and attained
by the structure particularly pointed out in the written description and claims hereof
as well as the appended drawings.
[0024] The above and other objects, features and other advantages of the present invention
will be more clearly understood from the following detailed description taken in conjunction
with the accompanying drawings, in which:
FIG. 1A is a configuration diagram showing an air conditioner according to an embodiment
of the present invention;
FIG. 1B is a control block diagram of the air conditioner according to the embodiment
of the present invention;
FIG. 2 is a detailed view of a cooling receiver shown in FIG. 1;
FIG. 3 is a sectional view taken along line A-A in FIG. 2;
FIG. 4 is a diagram showing the flow of refrigerant when the cooling operation and
the refrigeration operation of the air conditioner according to the embodiment of
the present invention are performed at the same time;
FIG. 5 is a diagram showing the flow of refrigerant when the heating operation and
the refrigeration operation of the air conditioner according to the embodiment of
the present invention are performed at the same time;
FIG. 6 is a diagram showing the flow of refrigerant when only the refrigeration operation
of the air conditioner according to the embodiment of the present invention is performed;
FIG. 7 is a diagram showing the flow of refrigerant when the cooling operation, the
refrigeration operation and the oil recovery operation of the air conditioner according
to the embodiment of the present invention are performed at the same time;
FIG. 8A is a configuration diagram showing an air conditioner according to another
embodiment of the present invention;
FIG. 8B is a control block diagram of the air conditioner according to another embodiment
of the present invention;
FIG. 9 is a diagram showing the flow of refrigerant when the cooling operation, the
refrigeration operation and the oil recovery operation of the air conditioner according
to another embodiment of the present invention are performed at the same time; and
FIG. 10 is a view showing the amount of residual oil in respective parts of a conventional
air conditioner.
[0025] Advantages and features of the present invention and methods for achieving those
of the present invention will become apparent upon referring to embodiments described
later in detail with reference to the attached drawings. However, embodiments are
not limited to the embodiments disclosed hereinafter and may be embodied in different
ways. The embodiments are provided for perfection of disclosure and for informing
persons skilled in this field of art of the scope of the present invention. The same
reference numerals may refer to the same elements throughout the specification.
[0026] Spatially-relative terms such as "below", "beneath", "lower", "above", or "upper"
may be used herein to describe one element's relationship to another element as illustrated
in the Figures. It will be understood that spatially-relative terms are intended to
encompass different orientations of the device in addition to the orientation depicted
in the Figures. For example, if the device in one of the figures is turned over, elements
described as "below" or "beneath" other elements would then be oriented "above" the
other elements. The exemplary terms "below" or "beneath" can, therefore, encompass
both an orientation of above and below. Since the device may be oriented in another
direction, the spatially-relative terms may be interpreted in accordance with the
orientation of the device.
[0027] The terminology used in the present disclosure is for the purpose of describing particular
embodiments only and is not intended to limit the disclosure. As used in the disclosure
and the appended claims, the singular forms "a", "an" and "the" are intended to include
the plural forms as well, unless context clearly indicates otherwise. It will be further
understood that the terms "comprises" and/or "comprising," when used in this specification,
specify the presence of stated features, integers, steps, operations, elements, and/or
components, but do not preclude the presence or addition of one or more other features,
integers, steps, operations, elements, components, and/or groups thereof.
[0028] Unless otherwise defined, all terms (including technical and scientific terms) used
herein have the same meaning as commonly understood by one of ordinary skill in the
art. It will be further understood that terms, such as those defined in commonly used
dictionaries, should be interpreted as having a meaning that is consistent with their
meaning in the context of the relevant art and the present disclosure, and will not
be interpreted in an idealized or overly formal sense unless expressly so defined
herein.
[0029] In the drawings, the thickness or size of each layer is exaggerated, omitted, or
schematically illustrated for convenience of description and clarity. Also, the size
or area of each constituent element does not entirely reflect the actual size thereof.
[0030] Hereinafter, exemplary embodiments of the present invention will be described with
reference to the accompanying drawings.
[0031] FIG. 1A is a configuration diagram showing an air conditioner according to an embodiment
of the present invention, and FIG. 1B is a control block diagram of the air conditioner
according to the embodiment of the present invention.
[0032] Referring to FIG. 1, the air conditioner according to the embodiment of the present
invention includes an air-conditioning cycle circuit 1 and a refrigeration cycle circuit
2. The air-conditioning cycle circuit 1 may include an air-conditioning outdoor unit
O1 that is installed outdoors and an air-conditioning indoor unit I1 that is installed
indoors. The refrigeration cycle circuit 2 may include a refrigeration outdoor unit
02 that is installed outdoors and a refrigeration indoor unit I2 that is installed
indoors. The air-conditioning cycle circuit 1 may air-condition (or cool/heat) the
interior of a room. The refrigeration cycle circuit 2 may refrigerate (or cool/freeze)
food stored in the refrigeration indoor unit I2.
[0033] First, the air-conditioning cycle circuit 1 will now be described.
[0034] The air-conditioning cycle circuit 1 may include a first compressor 11, an outdoor
heat exchanger 13, a first expansion device 14 and 15, and an indoor heat exchanger
16. That is, the air-conditioning cycle circuit 1 includes a first compressor 11 for
compressing a first refrigerant, a first condenser for condensing the first refrigerant
compressed by the first compressor 11, a first expansion device 14 and 15 for expanding
the first refrigerant that has passed through the first condenser, and a first evaporator
for evaporating the refrigerant that has passed through the first expansion device
14 and 15. The first refrigerant that has passed through the first evaporator is supplied
to the first compressor 11 again.
[0035] In the air-conditioning cycle circuit 1, when the cooling operation is performed,
a refrigerant may sequentially circulate through the first compressor 11, the outdoor
heat exchanger 13, the first expansion device 14 and 15, the indoor heat exchanger
16, and the first compressor 11. In the air-conditioning cycle circuit 1, when the
cooling operation is performed, the outdoor heat exchanger 13 may function as a first
condenser, and the indoor heat exchanger 16 may function as a first evaporator.
[0036] Further, in the air-conditioning cycle circuit 1, when the heating operation is performed,
a refrigerant may sequentially circulate through the first compressor 11, the indoor
heat exchanger 16, the first expansion device 14 and 15, the outdoor heat exchanger
13, and the first compressor 11. In the air-conditioning cycle circuit 1, when the
heating operation is performed, the outdoor heat exchanger 13 may function as a first
evaporator, and the indoor heat exchanger 16 may function as a first condenser.
[0037] The air-conditioning cycle circuit 1 may further include a cooling/heating switching
valve 12 configured to enable a refrigerant to circulate through the first compressor
11, the outdoor heat exchanger 13, the first expansion device 14 and 15, and the indoor
heat exchanger 16 when the cooling operation is performed and to enable a refrigerant
to circulate through the first compressor 11, the indoor heat exchanger 16, the first
expansion device 14 and 15, and the outdoor heat exchanger 13 when the heating operation
is performed.
[0038] The first compressor 11 may suck a refrigerant, may compress the refrigerant, and
may then discharge the compressed refrigerant. A plurality of the first compressors
11 may be connected in parallel or in series. A suction flow channel 11a through which
a refrigerant is sucked into the first compressor 11 may be connected to the first
compressor 11. A discharge flow channel 11b through which a compressed refrigerant
is discharged from the first compressor 11 may be connected to the first compressor
11. When a plurality of first compressors 11 is connected in parallel, the suction
flow channel 11a may be connected to the plurality of first compressors 11 in parallel,
and the discharge flow channel 11b may be connected to the plurality of first compressors
11 in parallel.
[0039] The outdoor heat exchanger 13 may function as the first condenser in which a refrigerant
compressed by the first compressor 11 is condensed when the cooling operation is performed.
The outdoor heat exchanger 13 may function as the first evaporator in which a refrigerant
expanded by the first expansion device 14 and 15 is evaporated when the heating operation
is performed. The outdoor heat exchanger 13 may be embodied as an air-refrigerant
heat exchanger configured to perform heat exchange between outdoor air and a refrigerant.
Alternatively, the outdoor heat exchanger 13 may be embodied as a water-refrigerant
heat exchanger configured to perform heat exchange between heat source water, such
as water or antifreeze, and a refrigerant.
[0040] The first expansion device 14 and 15 may include an outdoor expansion valve 14 for
expanding a refrigerant flowing toward the outdoor heat exchanger 13. The first expansion
device 14 and 15 may include an indoor expansion valve 15 for controlling a refrigerant
flowing into or out of the indoor heat exchanger 16. The outdoor expansion valve 14
may be installed between the indoor expansion valve 15 and the outdoor heat exchanger
13, and may be installed closer to the outdoor heat exchanger 13 than to the indoor
heat exchanger 16. The outdoor expansion valve 14 may not expand a refrigerant when
the cooling operation is performed, but may expand a refrigerant when the heating
operation is performed. The outdoor expansion valve 14 may be fully open in the cooling
operation, and the opening degree thereof may be controlled to a set value in the
heating operation. The outdoor expansion valve 14 may be installed on a bypass pipe
installed on a refrigerant pipe between the outdoor heat exchanger 13 and the indoor
expansion valve 15. A check valve configured to enable a refrigerant to flow toward
the indoor expansion valve 15 in the cooling operation and to enable a refrigerant
to flow toward the outdoor expansion valve 14 by blocking the refrigerant in the heating
operation may be installed on the refrigerant pipe between the outdoor heat exchanger
13 and the indoor expansion valve 15. The indoor expansion valve 15 may be installed
between the outdoor heat exchanger 13 and the indoor heat exchanger 16, and may be
installed closer to the indoor heat exchanger 16 than to the outdoor heat exchanger
13.
[0041] The indoor heat exchanger 16 may function as the first evaporator in which a refrigerant
expanded by the first expansion device 14 and 15 is evaporated when the cooling operation
is performed. The indoor heat exchanger 16 may function as the first condenser in
which a refrigerant compressed by the first compressor 11 is condensed when the heating
operation is performed.
[0042] The cooling/heating switching valve 12 may be formed of a 4-way valve. That is, the
cooling/heating switching valve 12 may be connected to the first compressor 11 through
the suction flow channel 11a of the first compressor 11, may be connected to the first
compressor 11 through the discharge flow channel 11b of the first compressor 11, may
be connected to the outdoor heat exchanger 13 through a suction/discharge flow channel
13a of the outdoor heat exchanger 13, and may be connected to the indoor heat exchanger
16 through an air-conditioning gas line 17.
[0043] Further, the outdoor heat exchanger 13 and the indoor heat exchanger 16 may be connected
to each other through an air-conditioning liquid line 18.
[0044] An air-conditioning gas line valve 17a configured to open/shut the air-conditioning
gas line 17 may be installed on the air-conditioning gas line 17. An air-conditioning
liquid line valve 18a configured to open/shut the air-conditioning liquid line 18
may be installed on the air-conditioning liquid line 18.
[0045] The air-conditioning cycle circuit 1 may further include a first accumulator (not
shown) installed between the cooling/heating switching valve 12 and the first compressor
11. The first accumulator is installed on the suction flow channel 11a of the first
compressor 11. Accordingly, a refrigerant that flows from the cooling/heating switching
valve 12 toward the first compressor 11 may flow into the first accumulator. A liquid-state
refrigerant, among the refrigerant that has flowed into the first accumulator, may
accumulate in the first accumulator, and a gaseous-state refrigerant, among the refrigerant
that has flowed into the first accumulator, may be sucked into the first compressor
11.
[0046] Second, the refrigeration cycle circuit 2 will now be described.
[0047] The refrigeration cycle circuit 2 may include a second compressor 21, a second condenser
23, a second expansion device 25, and a second evaporator 26.
[0048] In the refrigeration cycle circuit 2, a second refrigerant may sequentially circulate
through the second compressor 21, the second condenser 23, the second expansion device
25, the second evaporator 26, and the second compressor 21.
[0049] The second compressor 21 may suck a refrigerant, may compress the refrigerant, and
may discharge the compressed refrigerant. A plurality of the second compressors 21
may be connected in parallel or in series. A suction flow channel 21a through which
a refrigerant is sucked into the second compressor 21 may be connected to the second
compressor 21. A discharge flow channel 21c through which a compressed refrigerant
is discharged from the second compressor 21 may be connected to the second compressor
21. When a plurality of second compressors 21 is connected in parallel, the suction
flow channel 21a may be connected to the plurality of second compressors 21 in parallel,
and the discharge flow channel 21c may be connected to the plurality of second compressors
21 in parallel.
[0050] The second condenser 23 condenses a refrigerant compressed by the second compressor
21. The second condenser 23 may be embodied as an air-refrigerant heat exchanger configured
to perform heat exchange between outdoor air and a refrigerant. Alternatively, the
second condenser 23 may be embodied as a water-refrigerant heat exchanger configured
to perform heat exchange between heat source water, such as water or antifreeze, and
a refrigerant. A condenser fan 23a for supplying outdoor air to the second condenser
23 may be disposed close to the second condenser 23.
[0051] The second expansion device 25 expands a refrigerant that enters the second evaporator
26. The second expansion device 25 may be installed between the second condenser 23
and the second evaporator 26, and may be installed closer to the second evaporator
26 than to the second condenser 23.
[0052] The second evaporator 26 may evaporate a refrigerant while refrigerating food stored
in the refrigeration indoor unit I2 by performing heat exchange between the refrigerant
expanded by the second expansion device 25 and the air within the refrigeration indoor
unit I2.
[0053] The second compressor 21 may be connected to the second evaporator 26 through the
suction flow channel 21a. Further, the second compressor 21 may be connected to the
second condenser 23 through the discharge flow channel 21c. Furthermore, the second
condenser 23 and the second evaporator 26 may be connected to each other through a
refrigeration liquid line 26a.
[0054] A first suction flow channel valve 21b configured to open/shut the suction flow channel
21a is installed on the suction flow channel 21a of the second compressor 21. A second
suction flow channel valve 26b configured to open/shut the refrigeration liquid line
26a is installed on the refrigeration liquid line 26a.
[0055] The refrigeration cycle circuit 2 may further include a second accumulator 70 installed
between the second evaporator 26 and the second compressor 21. The second accumulator
70 is installed on the suction flow channel 21a of the second compressor 21. Accordingly,
a refrigerant flowing from the second evaporator 26 toward the second compressor 21
may flow into the second accumulator 70, a liquid-state refrigerant, among the refrigerant
that has flowed into the second accumulator 70, may accumulate in the second accumulator
70, and a gaseous-state refrigerant, among the refrigerant that has flowed into the
second accumulator 70, may be sucked into the second compressor 21.
[0056] Further, the air conditioner according to the embodiment of the present invention
further includes a cooling receiver 50 configured to perform heat exchange between
the refrigerant that has passed through the second condenser 23 and the refrigerant
that has passed through one of the indoor heat exchanger 16 and the outdoor heat exchanger
13, which functions as the first condenser, and to store the heat-exchanged refrigerant.
A detailed explanation of the cooling receiver 50 will be made later with reference
to FIGs. 2 and 3.
[0057] The embodiment may further include an outdoor air temperature sensor 83 configured
to measure the temperature of outdoor air. The outdoor air temperature sensor 83 measures
the temperature of outdoor air and transmits the measured temperature to a control
unit 90.
[0058] The embodiment further includes an oil level sensor 22 configured to detect the amount
of oil within the second compressor 21. The oil level sensor 22 detects the amount
of oil within the second compressor 21 and transmits the information about the amount
of oil to the control unit 90.
[0059] A discharge temperature sensor 81 configured to measure the temperature of the second
refrigerant discharged from the second evaporator 26 is mounted on the suction flow
channel 21a of the second compressor 21. The discharge temperature sensor 81 transmits
the information about the temperature of the refrigerant discharged from the second
evaporator 26 to the control unit 90. The discharge temperature sensor 81 is disposed
at a position of the suction flow channel 21a of the second compressor 21 that is
close to the second evaporator 26. That is, the discharge temperature sensor 81 is
disposed at a portion of the suction flow channel 21a of the second compressor 21
that is close to the second evaporator 26.
[0060] A discharge pressure sensor 82 configured to detect the pressure of the second refrigerator
discharged from the second evaporator 26 is installed on the suction flow channel
21a of the second compressor 21. The discharge pressure sensor 82 transmits the information
about the pressure of the second refrigerant discharged from the second evaporator
26 to the control unit 90.
[0061] A first bypass unit diverts a portion of the second refrigerant that has passed through
the second compressor 21 so that the portion of the second refrigerant exchanges heat
with the second refrigerant that has passed through the second evaporator 26. When
the cooling operation or the heating operation (normal operation) is performed, the
first bypass unit is in a closed state. When the oil recovery operation is performed,
the first bypass unit supplies a portion of the high-temperature and high-pressure
refrigerant discharged from the second compressor 21 to the suction flow channel 21a
of the second compressor 21, which is the discharge port of the second evaporator
26. When the oil recovery operation is performed, the first bypass unit enables a
portion of the high-temperature and high-pressure refrigerant discharged from the
second compressor 21 to bypass the second condenser 23, the second expansion device
25 and the second evaporator 26.
[0062] The high-temperature and high-pressure refrigerant supplied to the suction flow channel
21a of the second compressor 21 by the first bypass unit increases the temperature
of the second refrigerant within the suction flow channel 21a of the second compressor
21. The oil within the suction flow channel 21a of the second compressor 21 is increased
in temperature and solubility and is decreased in viscosity. The oil, which has high
viscosity and remains in the suction flow channel 21a of the second compressor 21
in normal operation, is decreased in viscosity and is therefore easily recovered to
the second compressor 21 by the pressure of the refrigerant. Consequently, there is
an effect in that the reliability of the second compressor 21 is improved.
[0063] The first bypass unit includes a first bypass pipe 61, which connects the discharge
flow channel 21c of the second compressor 21, which connects the second compressor
21 to the second condenser 23, to the suction flow channel 21a of the second compressor
21, which connects the second evaporator 26 to the second compressor 21, and a first
control valve 63, which is installed on the first bypass pipe 61 in order to control
the flow of the refrigerant.
[0064] The first bypass pipe 61 guides a portion of the second refrigerant compressed by
the second compressor 21 to the discharge port of the second evaporator 26. One end
of the first bypass pipe 61 is connected to the discharge flow channel 21c of the
second compressor 21 and the opposite end of the first bypass pipe 61 is connected
to the suction flow channel 21a of the second compressor 21.
[0065] The first control valve 63 controls the flow of the refrigerant passing through the
first bypass pipe 61. The first control valve 63 may include a solenoid valve or an
electronic expansion valve. The first control valve 63 includes an electronic expansion
valve, which enables the opening degree thereof to be variably controlled. The opening
degree of the first control valve 63 is controlled in response to the control signal
from the control unit 90. Depending on the control of the opening degree of the first
control valve 63, the air conditioner according to the embodiment may perform the
oil recovery operation during the cooling operation (normal operation) or may perform
only the oil recovery operation while the cooling operation is stopped. Here, "normal
operation" refers to operation including the cooling operation, the heating operation
and the refrigeration operation, other than the oil recovery operation.
[0066] A second bypass unit diverts a portion of the second refrigerant that has passed
through the second compressor 21 so that the portion of the second refrigerant exchanges
heat with the second refrigerant that has passed through the second evaporator 26.
When the cooling operation or the heating operation is performed (i.e. upon normal
operation), the second bypass unit is in a closed state. When the oil recovery operation
is performed and the temperature of outdoor air is lower than a predetermined temperature,
the second bypass unit additionally supplies a portion of the high-temperature and
high-pressure refrigerant discharged from the second compressor 21 to the suction
flow channel 21a of the second compressor 21, which is the discharge port of the second
evaporator 26. When the oil recovery operation is performed, the second bypass unit
enables a portion of the high-temperature and high-pressure refrigerant discharged
from the second compressor 21 to bypass the second condenser 23, the second expansion
device 25 and the second evaporator 26.
[0067] The high-temperature and high-pressure refrigerant supplied to the suction flow channel
21a of the second compressor 21 by the second bypass unit increases the temperature
of the second refrigerant within the suction flow channel 21a of the second compressor
21. The oil within the suction flow channel 21a of the second compressor 21 is increased
in temperature and solubility and is decreased in viscosity. The oil, which has high
viscosity and remains in the suction flow channel 21a of the second compressor 21
in normal operation, is decreased in viscosity and is therefore easily recovered to
the second compressor 21 by the pressure of the refrigerant. Consequently, there is
an effect in that the reliability of the second compressor 21 is improved. That is,
the second bypass unit functions to additionally increase the temperature of the second
refrigerant within the suction flow channel 21a of the second compressor 21 in the
environment in which the oil recovery operation is not smoothly performed by the first
bypass unit.
[0068] The second bypass unit includes a second bypass pipe 62, which connects the discharge
flow channel 21c of the second compressor 21, which connects the second compressor
21 to the second condenser 23, to the suction flow channel 21a of the second compressor
21, which connects the second evaporator 26 to the second compressor 21, and a second
control valve 64, which is installed on the second bypass pipe 62 in order to control
the flow of the refrigerant.
[0069] The second bypass pipe 62 guides a portion of the second refrigerant compressed by
the second compressor 21 to the discharge port of the second evaporator 26. One end
of the second bypass pipe 62 is connected to the discharge flow channel 21c of the
second compressor 21 and the opposite end of the second bypass pipe 62 is connected
to the suction flow channel 21a of the second compressor 21.
[0070] The second control valve 64 controls the flow of the refrigerant passing through
the second bypass pipe 62. The second control valve 64 may include a solenoid valve
or an electronic expansion valve. The second control valve 64 includes an electronic
expansion valve, which enables the opening degree thereof to be variably controlled.
The opening degree of the second control valve 64 is controlled in response to the
control signal from the control unit 90.
[0071] In order to efficiently recover the oil from the suction flow channel 21a of the
second compressor 21, the connection positions of the first and second bypass pipes
61 and 62 are important. In terms of the lengths and efficiency of the pipes, the
connection position between the first bypass pipe 61 and the discharge flow channel
of the second compressor 21 may be closer to the second compressor 21 than the connection
position between the second bypass pipe 62 and the discharge flow channel of the second
compressor 21, and the connection position between the first bypass pipe 61 and the
suction flow channel of the second compressor 21 may be closer to the second compressor
21 than the connection position between the second bypass pipe 62 and the suction
flow channel of the second compressor 21. When the temperature of the outdoor air
is high, the refrigerant is guided to a position close to the second compressor 21
through the first bypass pipe 61. When the temperature of the outdoor air is low,
the refrigerant is guided to a position close to the second evaporator 26 through
the second bypass pipe 62. Accordingly, the efficiency of the oil recovery operation
may be enhanced and the operational load of the second accumulator may be reduced.
[0072] Further, the embodiment may further include a check valve, which is installed on
the discharge flow channel of the second compressor 21 in order to prevent the second
refrigerant that has passed through the second compressor 21 from flowing backward.
The check valve may be disposed between the branch point of the first bypass pipe
61 and the branch point of the second bypass pipe 62.
[0073] The refrigerant that flows into the suction flow channel 21a of the second compressor
21 through the first and second bypass pipes 61 and 62 may convert the refrigerant
within the suction flow channel 21a of the second compressor 21 into a two-phase refrigerant.
Therefore, the opposite end of the first bypass pipe 61 and the opposite end of the
second bypass pipe 62, which are connected to the suction flow channel 21a of the
second compressor 21, may be disposed between the second accumulator and the second
evaporator 26. However, the opposite end of the first bypass pipe 61 and the opposite
end of the second bypass pipe 62 may alternatively be disposed between the second
accumulator and the second compressor 21.
[0074] The control unit 90 controls the overall operation of the air conditioner. The control
unit 90 may include a processing device, which performs a logical determination, and
a memory.
[0075] Based on various detected information, the control unit 90 performs control such
that the air conditioner selectively performs normal operation or an oil recovery
operation. During the oil recovery operation, the control unit 90 may perform control
such that normal operation is performed or is stopped.
[0076] When the oil within the compressor 21 is insufficient, the control unit 90 determines
that the oil recovery operation is needed and starts the oil recovery operation. In
an example, when the oil level value transmitted from the oil level sensor 22 is lower
than a reference oil level value, the control unit 90 performs the oil recovery operation.
When the oil level value transmitted from the oil level sensor 22 is higher than the
reference oil level value, the control unit 90 performs normal operation. In another
example, when a predetermined time has elapsed since the start of operation of the
air conditioner, the control unit 90 may perform the oil recovery operation. Here,
the predetermined time may be set within the range from 2 hours to 5 hours. Specifically,
the control process in which the oil recovery operation is performed on the basis
of time is used when communication with the second evaporator 26 installed in the
showcase is impossible.
[0077] When the temperature of the suction flow channel 21a of the second compressor 21
is low, the control unit 90 may determine that the oil recovery operation is needed
and may start the oil recovery operation. When the discharge temperature value transmitted
from the discharge temperature sensor 81 is lower than a reference discharge temperature
value, the control unit 90 performs the oil recovery operation. When the discharge
temperature value transmitted from the discharge temperature sensor 81 is higher than
the reference discharge temperature value, the control unit 90 performs normal operation.
[0078] In the oil recovery operation, the control unit 90 controls the first bypass unit
such that the second refrigerant that has been discharged from the second compressor
21 and the second refrigerant that has passed through the second evaporator 26 perform
heat exchange with each other. That is, the control unit 90 controls the first bypass
unit so as to guide the second refrigerant discharged from the second compressor 21
to the discharge port of the second evaporator 26.
[0079] In an example, in normal operation, the control unit 90 drives the second compressor
21 so as to supply cool air to the showcase. In the oil recovery operation, the control
unit 90 drives the second compressor 21 and opens the first control valve 63 so as
to supply the high-temperature and high-pressure refrigerant to the suction flow channel
21a of the second compressor 21. In the oil recovery operation, the control unit 90
may control the opening degree and the opening time of the first control valve 63.
[0080] In another example, in the oil recovery operation, the control unit 90 fully opens
the first control valve 63. When the temperature of the outdoor air is lower than
a predetermined temperature (-15°C to 5°C), the control unit 90 controls the second
control valve 64 so as to be open. When the temperature of the outdoor air is higher
than the predetermined temperature, the control unit 90 controls the second control
valve 64 so as to be closed.
[0081] In a further example, in the oil recovery operation, the control unit 90 may increase
the operation speed of the second compressor 21 above the operation speed at the time
of normal operation. In this case, the flow rate of the second refrigerant is increased
and thus the recovery of the oil is smoothly achieved.
[0082] When the oil recovery operation is performed during the cooling operation, the control
unit 90 may rotate the condenser fan 23a at a maximum speed. When the oil recovery
operation is performed during the heating operation, the control unit 90 may stop
the condenser fan 23a or may rotate the condenser fan 23a at a lower speed than in
the refrigeration operation. The refrigeration load of the refrigeration cycle circuit
may be reduced by varying the speed of the condenser fan 23a.
[0083] The control unit 90 may perform control such that the above-described specific embodiments
associated with the oil recovery operation are performed at the same time or at different
times or such that only one of the embodiments is performed.
[0084] FIG. 2 is a detailed view of the cooling receiver shown in FIG. 1, and FIG. 3 is
a sectional view taken along line A-A in FIG. 2.
[0085] Referring to FIGs. 1 to 3, the cooling receiver 50 includes a cooling unit 51 and
a receiver unit 54 in which at least one end of the cooling unit 51 is disposed.
[0086] The cooling unit 51 includes at least one first refrigerant flow channel 52 through
which a refrigerant that has passed through the second condenser 23 flows and a second
refrigerant flow channel 53 configured to surround the outer circumference of some
of the at least one first refrigerant flow channel 52. The refrigerant that has passed
through one of the outdoor heat exchanger 13 and the indoor heat exchanger 16, which
functions as the first condenser, exchanges heat with the refrigerant flowing through
the first refrigerant flow channel 52 while flowing through the inside of the second
refrigerant flow channel 53. Accordingly, the refrigerant flowing through the first
refrigerant flow channel 52 is supercooled, and the refrigerant flowing through the
second refrigerant flow channel 53 is gasified.
[0087] At least one end of the cooling unit 51 is disposed in the receiver unit 54, and
a supercooled refrigerant flowing out of the first refrigerant flow channel 52 is
stored in the receiver unit 54.
[0088] The cooling unit 51 and the receiver unit 54 are formed to have a cylindrical shape
having an empty space inside and are formed to be long in upward and downward directions.
The diameter of the first refrigerant flow channel 52 may be the smallest, the diameter
of the second refrigerant flow channel 53 may be greater than that of the first refrigerant
flow channel 52, and the diameter of the receiver unit 54 may be greater than that
of the second refrigerant flow channel 53. Further, the first refrigerant flow channel
52 may be formed of seven smalldiameter pipes.
[0089] The cooling unit 51 may have an upper end inserted and disposed in the receiver unit
54 and may have a lower end protruding below the receiver unit 54 so as to be exposed
outside the receiver unit 54.
[0090] In the cooling unit 51, the upper end of the first refrigerant flow channel 52, which
is disposed within the receiver unit 54, is open, and the upper end of the second
refrigerant flow channel 53 is closed. The open upper end of the first refrigerant
flow channel 52 may protrude upwards from the upper end of the second refrigerant
flow channel 53. Accordingly, refrigerant flowing through the first refrigerant flow
channel 52 may be supercooled through heat exchange with a refrigerant flowing through
the second refrigerant flow channel 53. Subsequently, the supercooled refrigerant
may flow out of the open upper end of the first refrigerant flow channel 52 and may
be stored in the internal space of the receiver unit 54.
[0091] A first inlet flow channel 52a and a second inlet flow channel 53a are disposed in
a portion of the cooling unit 51 that protrudes below the receiver unit 54. Further,
a first outlet flow channel 53b is disposed above the receiver unit 54, and a second
outlet flow channel 54a is disposed below the receiver unit 54.
[0092] The first inlet flow channel 52a is connected to the first refrigerant flow channel
52 through the second refrigerant flow channel 53. The first inlet flow channel 52a
supplies the first refrigerant flow channel 52 with refrigerant that has passed through
the second condenser 23. In the case in which a plurality of first refrigerant flow
channels 52 is disposed within the second refrigerant flow channel 53, the first inlet
flow channel 52a may branch into a plurality of first inlet flow channels within the
second refrigerant flow channel 53 and the plurality of first inlet flow channels
may be connected to the plurality of first refrigerant flow channels 52.
[0093] The second inlet flow channel 53a is connected to the second refrigerant flow channel
53. The second inlet flow channel 53a supplies the second refrigerant flow channel
53 with refrigerant that has passed through one of the outdoor heat exchanger 13 and
the indoor heat exchanger 16, which functions as the first condenser. The second refrigerant
flow channel 53 is connected to the air-conditioning liquid line 18 via a heat-recovery
liquid line 34 branching from the air-conditioning liquid line 18 that connects the
second outdoor heat exchanger 13 and the indoor heat exchanger 16. That is, the heat-recovery
liquid line 34 connects the second refrigerant flow channel 53 and the air-conditioning
liquid line 18. A heat recovery expansion device 34a is installed on the heat-recovery
liquid line 34. Accordingly, a portion of the refrigerant that has passed through
the first condenser may move to the first evaporator through the air-conditioning
liquid line 18. The remainder of the refrigerant may move to the heat-recovery liquid
line 34, may be expanded by the heat recovery expansion device 34a, and may then move
to the second inlet flow channel 53a. The refrigerant that has moved to the second
inlet flow channel 53a may be supplied to the second refrigerant flow channel 53.
[0094] The first outlet flow channel 53b is connected to the upper portion of the second
refrigerant flow channel 53 within the receiver unit 54 through the upper end of the
receiver unit 54. Accordingly, refrigerant supplied to the second refrigerant flow
channel 53 through the second inlet flow channel 53a may pass through the second refrigerant
flow channel 53 and may then escape through the first outlet flow channel 53b. The
first outlet flow channel 53b protruding above the receiver unit 54 is connected to
the suction flow channel 11a of the first compressor 11 via a heat-recovery gas line
35. Accordingly, the refrigerant that has escaped through the first outlet flow channel
53b may move to the suction flow channel 11a of the first compressor 11 through the
heat-recovery gas line 35 and may then be supplied to the first compressor 11.
[0095] The second outlet flow channel 54a is connected to the refrigeration liquid line
26a. Accordingly, supercooled refrigerant that has escaped through the upper end of
the first refrigerant flow channel 52 and is stored in the receiver unit 54 may escape
through the second outlet flow channel 54a, may move to the refrigeration liquid line
26a, and may then be supplied to the second evaporator 26.
[0096] A cap 54b configured to cover the upper end of the receiver unit 54 may be disposed
in the upper end of the receiver unit 54. When the cap 54b is disposed, the first
outlet flow channel 53b may penetrate the cap 54b.
[0097] Further, at least one mounting bracket 55 may be disposed in the lower portion of
the receiver unit 54. The mounting bracket 55 may include a ring-shaped main body
unit 55a configured to surround the outer circumferential surface of the receiver
unit 54 and a plurality of mounting units 55b disposed on the outer circumferential
surface of the main body unit 55a while being equidistantly spaced apart from each
other. The mounting bracket 55 may include three mounting units 55b. The mounting
unit 55b may be mounted on the refrigeration outdoor unit 02 so as to couple the receiver
unit 54 to the refrigeration outdoor unit 02.
[0098] A heat-recovery liquid line valve 34b configured to open/shut the heat-recovery liquid
line 34 is installed on the heat-recovery liquid line 34. Heat-recovery gas line valves
35a and 35b configured to open/shut the heat-recovery gas line 35 are installed on
the heat-recovery gas line 35. The heat-recovery gas line valves 35a and 35b include
a first heat-recovery gas line valve 35a disposed in the refrigeration outdoor unit
02 and a second heat-recovery gas line valve 35b disposed in the air-conditioning
outdoor unit O1.
[0099] The air-conditioning gas line valve 17a, the air-conditioning liquid line valve 18a,
the first suction flow channel valve 21b, the second suction flow channel valve 26b,
the heat-recovery liquid line valve 34b, and the heat-recovery gas line valves 35a
and 35b may be open at normal times and may be shut by a worker when maintenance or
repair of the air conditioner (for example, filling with a refrigerant or correcting
a malfunction) is performed.
[0100] The first compressor 11, the four-way valve 12, the outdoor heat exchanger 13, the
outdoor expansion valve 14, the air-conditioning gas line valve 17a, the air-conditioning
liquid line valve 18a, and the second heat-recovery gas line valve 35b may be included
in the air-conditioning outdoor unit O1. Further, the second compressor 21, the second
condenser 23, the cooling receiver 50, the first suction flow channel valve 21b, the
second suction flow channel valve 26b, the heat-recovery liquid line valve 34b, and
the first heat-recovery gas line valve 35a may be included in the refrigeration outdoor
unit 02. Furthermore, the indoor heat exchanger 16 and the indoor expansion valve
15 may be included in the air-conditioning indoor unit I1. Furthermore, the second
evaporator 26 and the second expansion device 25 may be included in the refrigeration
indoor unit I2.
[0101] The operation of the air conditioner having the above-described construction according
to the embodiment of the present invention will now be described.
[0102] FIG. 4 is a diagram showing the flow of refrigerant when the cooling operation and
the refrigeration operation of the air conditioner according to the embodiment of
the present invention are performed at the same time.
[0103] Referring to FIG. 4, the air conditioner according to the embodiment of the present
invention may perform a cooling operation for cooling the interior of a room and a
refrigeration operation for refrigerating food within the refrigeration indoor unit
12 at the same time.
[0104] That is, when the cooling operation of the air-conditioning cycle circuit 1 is performed,
the first compressor 11 is driven to discharge a refrigerant. The refrigerant discharged
by the first compressor 11 moves to the cooling/heating switching valve 12 through
the discharge flow channel 11b of the first compressor 11. The refrigerant that has
moved to the cooling/heating switching valve 12 moves to the outdoor heat exchanger
13 through the suction/discharge flow channel 13a of the outdoor heat exchanger 13.
When the cooling operation of the air-conditioning cycle circuit 1 is performed, the
outdoor heat exchanger 13 functions as the first condenser.
[0105] A portion of the refrigerant that has passed through the outdoor heat exchanger 13
moves to the indoor heat exchanger 16 through the air-conditioning liquid line 18.
The remainder of the refrigerant that has passed through the outdoor heat exchanger
13 moves to the cooling receiver 50 through the heat-recovery liquid line 34.
[0106] A portion of the refrigerant that belongs to the refrigerant that has passed through
the outdoor heat exchanger 13 and that moves to the indoor heat exchanger 16 through
the air-conditioning liquid line 18 is supplied to the indoor heat exchanger 16 in
the state in which the refrigerant has been expanded by the first expansion device
15. When the cooling operation of the air-conditioning cycle circuit 1 is performed,
the indoor heat exchanger 16 functions as the first evaporator. The refrigerant that
has moved to the indoor heat exchanger 16 may refrigerate indoor air and may be evaporated
through heat exchange with the indoor air. The refrigerant evaporated by the indoor
heat exchanger 16 may move to the cooling/heating switching valve 12 through the air-conditioning
gas line 17 and may then be supplied to the first compressor 11 again through the
suction flow channel 11a of the first compressor 11.
[0107] In the refrigeration cycle circuit 2, the second compressor 21 is driven to discharge
a refrigerant. The refrigerant discharged by the second compressor 21 moves to the
second condenser 23 through the discharge flow channel 21c of the second compressor
21. The refrigerant that has moved to the second condenser 23 moves to the second
evaporator 26 through the refrigeration liquid line 26a.
[0108] The refrigerant that has passed through the second condenser 23 is supplied to the
second evaporator 26 in the state in which the refrigerant has been expanded by the
second expansion device 25. The refrigerant that has moved to the second evaporator
26 may refrigerate food within the refrigeration indoor unit I2 and may be evaporated
through heat exchange with air within the refrigeration indoor unit I2. The refrigerant
evaporated by the second evaporator 26 may be supplied to the second compressor 21
again through the suction flow channel 21a of the second compressor 21.
[0109] The remaining refrigerant that belongs to the refrigerant that has passed through
the outdoor heat exchanger 13 of the air-conditioning cycle circuit 1 and that moves
to the cooling receiver 50 through the heat-recovery liquid line 34 may be expanded
by the heat recovery expansion device 34a, may move to the second refrigerant flow
channel 53, and may be gasified through heat exchange with the refrigerant that has
passed through the second condenser 23 of the refrigeration cycle circuit 2 within
the cooling receiver 50 while supercooling the refrigerant that has passed through
the second condenser 23.
[0110] Further, the cooling receiver 50 may be installed between the second condenser 23
and the second expansion device 25 on the refrigeration liquid line 26a. The refrigerant
that has passed through the second condenser 23 may exchange heat with the refrigerant
flowing through the second refrigerant flow channel 53 and may be supercooled while
flowing through the first refrigerant flow channel 52. The refrigerant supercooled
while flowing through the first refrigerant flow channel 52 may escape through the
open upper end of the first refrigerant flow channel 52 and may then be stored in
the receiver unit 54. The refrigerant gasified while flowing through the second refrigerant
flow channel 53 may escape from the first outlet flow channel 53b, may move to the
suction flow channel 11a of the first compressor 11 through the heat-recovery gas
line 35, and may then be supplied to the first compressor 11. Furthermore, the supercooled
refrigerant stored in the receiver unit 54 may escape through the second outlet flow
channel 54a, may move to the refrigeration liquid line 26a, and may then be supplied
to the second evaporator 26 in the state in which the refrigerant has been expanded
by the second expansion device 25. At least one of the opening time and the opening
degree of the second expansion device 25 is controlled by the control unit so that
the amount of refrigerant within the refrigeration cycle circuit 2 is optimized.
[0111] There is an effect in that the efficiency of the air conditioner is improved due
to the heat exchange through the cooling receiver 50. The control unit 90 opens the
heat recovery expansion device 34a at a minimum opening degree when the cooling operation
is performed. Accordingly, it is possible to prevent deterioration of the efficiency
of the air-conditioning cycle circuit due to excessive heat absorption in the refrigeration
cycle circuit when the cooling operation is performed.
[0112] FIG. 5 is a diagram showing the flow of refrigerant when the heating operation and
the refrigeration operation of the air conditioner according to the embodiment of
the present invention are performed at the same time.
[0113] Referring to FIG. 5, the air conditioner according to the embodiment of the present
invention may perform a heating operation for heating the interior of a room and a
refrigeration operation for refrigerating food within the refrigeration indoor unit
I2 at the same time.
[0114] That is, when the heating operation of the air-conditioning cycle circuit 1 is performed,
the first compressor 11 is driven to discharge a refrigerant. The refrigerant discharged
by the first compressor 11 moves to the cooling/heating switching valve 12 through
the discharge flow channel 11b of the first compressor 11. The refrigerant that has
moved to the cooling/heating switching valve 12 moves to the indoor heat exchanger
16 through the air-conditioning gas line 17. When the heating operation of the air-conditioning
cycle circuit 1 is performed, the indoor heat exchanger 16 functions as the first
condenser.
[0115] A portion of the refrigerant that has passed through the indoor heat exchanger 16
moves to the outdoor heat exchanger 13 through the air-conditioning liquid line 18.
The remainder of the refrigerant that has passed through the indoor heat exchanger
16 moves to the cooling receiver 50 through the heat-recovery liquid line 34.
[0116] A portion of the refrigerant that belongs to the refrigerant that has passed through
the indoor heat exchanger 16 and that moves to the outdoor heat exchanger 13 through
the air-conditioning liquid line 18 is supplied to the outdoor heat exchanger 13 in
the state in which the refrigerant has been expanded by the first expansion device
14. When the heating operation of the air-conditioning cycle circuit 1 is performed,
the outdoor heat exchanger 13 functions as the first evaporator. The refrigerant that
has moved to the outdoor heat exchanger 13 may be evaporated while exchanging heat
with outdoor air. The refrigerant evaporated by the outdoor heat exchanger 13 may
move to the cooling/heating switching valve 12 through the suction/discharge flow
channel 13a of the outdoor heat exchanger 13 and may then be supplied to the first
compressor 11 again through the suction flow channel 11a of the first compressor 11.
[0117] In the refrigeration cycle circuit 2, the second compressor 21 is driven to discharge
a refrigerant. The refrigerant discharged by the second compressor 21 moves to the
second condenser 23 through the discharge flow channel 21c of the second compressor
21. The refrigerant that has moved to the second condenser 23 moves to the second
evaporator 26 through the refrigeration liquid line 26a.
[0118] The refrigerant that has passed through the second condenser 23 is supplied to the
second evaporator 26 in the state in which the refrigerant has been expanded by the
second expansion device 25. The refrigerant that has moved to the second evaporator
26 may refrigerate food within the refrigeration indoor unit I2 and may be evaporated
through heat exchange with air within the refrigeration indoor unit I2. The refrigerant
evaporated by the second evaporator 26 may be supplied to the second compressor 21
again through the suction flow channel 21a of the second compressor 21.
[0119] The remaining refrigerant that belongs to the refrigerant that has passed through
the indoor heat exchanger 16 of the air-conditioning cycle circuit 1 and that moves
to the cooling receiver 50 through the heat-recovery liquid line 34 may be expanded
by the heat recovery expansion device 34a, may move to the second refrigerant flow
channel 53, and may be gasified through heat exchange with the refrigerant that has
passed through the second condenser 23 of the refrigeration cycle circuit 2 within
the cooling receiver 50 while supercooling the refrigerant that has passed through
the second condenser 23.
[0120] Further, the refrigerant that has passed through the second condenser 23 may be supercooled
through heat exchange with the refrigerant flowing through the second refrigerant
flow channel 53 while flowing through the first refrigerant flow channel 52. The refrigerant
supercooled while flowing through the first refrigerant flow channel 52 may escape
through the open upper end of the first refrigerant flow channel 52 and may be stored
in the receiver unit 54. The refrigerant gasified while flowing through the second
refrigerant flow channel 53 may escape from the first outlet flow channel 53b, may
move to the suction flow channel 11a of the first compressor 11 through the heat-recovery
gas line 35, and may then be supplied to the first compressor 11. Furthermore, the
supercooled refrigerant stored in the receiver unit 54 may escape through the second
outlet flow channel 54a, may move to the refrigeration liquid line 26a, and may then
be supplied to the second evaporator 26 in the state in which the refrigerant has
been expanded by the second expansion device 25. At least one of the opening time
and the opening degree of the second expansion device 25 is controlled by the control
unit so that the amount of refrigerant within the refrigeration cycle circuit 2 is
optimized.
[0121] There is an effect in that the efficiency of the air conditioner is improved due
to the heat exchange through the cooling receiver 50. The control unit 90 opens the
heat recovery expansion device 34a to the maximum opening degree when the heating
operation is performed. Accordingly, it is possible to use as much waste heat from
the refrigeration cycle circuit for the air-conditioning cycle circuit as possible
in the cooling operation, thereby improving the efficiency of the air-conditioning
cycle circuit.
[0122] FIG. 6 is a diagram showing the flow of refrigerant when only the refrigeration operation
of the air conditioner according to the embodiment of the present invention is performed.
[0123] Referring to FIG. 6, the air conditioner according to the embodiment of the present
invention may perform only a refrigeration operation for refrigerating food within
the refrigeration indoor unit I2. That is, the air-conditioning cycle circuit 1 may
not operate, and only the refrigeration cycle circuit 2 may operate.
[0124] In the refrigeration cycle circuit 2, the second compressor 21 is driven to discharge
a refrigerant. The refrigerant discharged by the second compressor 21 moves to the
second condenser 23 through the discharge flow channel 21c of the second compressor
21. The refrigerant that has moved to the second condenser 23 moves to the second
evaporator 26 through the refrigeration liquid line 26a.
[0125] The refrigerant that has passed through the second condenser 23 is supplied to the
second evaporator 26 in the state in which the refrigerant has been expanded by the
second expansion device 25. The refrigerant that has moved to the second evaporator
26 may refrigerate food within the refrigeration indoor unit I2 and may be evaporated
through heat exchange with air within the refrigeration indoor unit I2. The refrigerant
evaporated by the second evaporator 26 may be supplied to the second compressor 21
again through the suction flow channel 21a of the second compressor 21.
[0126] Further, since the air-conditioning cycle circuit 1 does not operate, the refrigerant
that has passed through the second condenser 23 may not be subjected to heat exchange
while flowing through the first refrigerant flow channel 52, but may escape through
the open upper end of the first refrigerant flow channel 52 and may then be stored
in the receiver unit 54. The stored refrigerant may escape through the second outlet
flow channel 54a, may move to the refrigeration liquid line 26a, and may then be supplied
to the second evaporator 26 in the state in which the refrigerant has been expanded
by the second expansion device 25. At least one of the opening time and the opening
degree of the second expansion device 25 may be controlled by the control unit so
that the amount of refrigerant within the refrigeration cycle circuit 2 is optimized.
[0127] FIG. 7 is a diagram showing the flow of refrigerant when the cooling operation, the
refrigeration operation and the oil recovery operation of the air conditioner according
to the embodiment of the present invention are performed at the same time.
[0128] Here, only differences from the state shown in FIG. 4, in which the cooling operation
and the refrigeration operation are performed at the same time, will be described.
[0129] Referring to FIG. 7, when the oil recovery operation is performed, the second refrigerant
compressed by the second compressor 21 is supplied to the suction flow channel 21a
of the second compressor 21 by the first bypass unit. The high-temperature and high-pressure
refrigerant increases the temperature of the second refrigerant within the suction
flow channel 21a of the second compressor 21. The oil within the suction flow channel
21a of the second compressor 21 is increased in temperature and solubility and is
decreased in viscosity.
[0130] When the oil recovery operation is performed and the temperature of the outdoor air
is lower than a predetermined temperature, the control unit 90 additionally opens
the second control valve 64. Accordingly, the refrigerant compressed by the second
compressor 21 is additionally supplied to the suction flow channel 21a of the second
compressor 21 through the second bypass pipe 62.
[0131] FIG. 8A is a configuration diagram showing an air conditioner according to another
embodiment of the present invention, and FIG. 8B is a control block diagram of the
air conditioner according to another embodiment of the present invention.
[0132] The same parts as those of the air conditioner according to the above-described embodiment
shown in FIG. 1 are denoted by the same reference numerals and a detailed explanation
thereof will be omitted. Only differences from the above-described embodiment will
be described.
[0133] Referring to FIGs. 8A and 8B, the air conditioner according to another embodiment
further includes a third bypass unit, in contrast with the above-described embodiment
shown in FIG. 1.
[0134] The third bypass unit in this embodiment functions to guide a portion of the refrigerant
that has been discharged from the second condenser 23 to the discharge port of the
second evaporator 26.
[0135] When the cooling operation (normal operation) is performed, the third bypass unit
is in a closed state. When the oil recovery operation is performed, the third bypass
unit supplies a portion of the high-temperature and high-pressure refrigerant that
has been discharged from the second condenser 23 to the suction flow channel 21a of
the second compressor 21, which is the discharge port of the second evaporator 26.
The high-temperature and high-pressure refrigerant supplied to the suction flow channel
21a of the second compressor 21 by the third bypass unit converts the refrigerant
within the suction flow channel 21a of the second compressor 21 into a two-phase refrigerant
and increases the temperature. The oil within the suction flow channel 21a of the
second compressor 21 is increased in temperature and solubility and is decreased in
viscosity. The oil, which has high viscosity and remains in the suction flow channel
21a of the second compressor 21 in normal operation, is decreased in viscosity and
is therefore easily recovered to the compressor 21 by the pressure of the refrigerant.
Consequently, there is an effect in that the reliability of the compressor 21 is improved.
[0136] The third bypass unit includes a third bypass pipe 71, which connects the refrigeration
liquid line 26a, which connects the second condenser 23 to the second evaporator 26,
to the suction flow channel 21a of the second compressor 21, which connects the second
evaporator 26 to the second compressor 21, and a control valve 72, which is installed
on the third bypass pipe 71 in order to control the flow of the refrigerant.
[0137] The third bypass pipe 71 guides a portion of the refrigerant condensed by the second
condenser 23 to the discharge port of the second evaporator 26. One end of the third
bypass pipe 71 is connected to the refrigeration liquid line 26a and the opposite
end of the third bypass pipe 71 is connected to the suction flow channel 21a of the
second compressor 21.
[0138] In order to efficiently recover the oil from the suction flow channel 21a of the
second compressor 21, the connection position of the third bypass pipe 71 is important.
In terms of the length and efficiency of the pipe, the connection position between
the third bypass pipe 71 and the suction flow channel 21a of the second compressor
21 may be closer to the second evaporator 26 than to the second compressor 21. The
third bypass pipe 71 is connected to a portion of the suction flow channel 21a of
the second compressor 21 that is located close to the second evaporator 26. Specifically,
the connection positon between the opposite end of the third bypass pipe 71 and the
suction flow channel 21a of the second compressor 21 is closer to the second evaporator
26 than the connection position between the opposite end of the first or second bypass
pipe 61 or 62 and the suction flow channel 21a of the second compressor 21.
[0139] The control valve 72 controls the flow of the refrigerant passing through the third
bypass pipe 71. The control valve 72 may include a solenoid valve or an electronic
expansion valve. The control valve 72 includes an electronic expansion valve, which
enables the opening degree thereof to be variably controlled. The opening degree of
the control valve 72 is controlled in response to the control signal from the control
unit 90. As a result of the opening degree of the control valve 72 being controlled,
the air conditioner according to the embodiment may perform the oil recovery operation
during the cooling operation (normal operation) or may perform only the oil recovery
operation while the cooling operation is stopped.
[0140] FIG. 9 is a diagram showing the flow of refrigerant when the cooling operation, the
refrigeration operation and the oil recovery operation of the air conditioner according
to another embodiment of the present invention are performed at the same time.
[0141] The operation of the air conditioner shown in FIG. 9 has a difference from the operation
of the air conditioner shown in FIG. 7 as to the operation of the third bypass unit.
Hereinafter, only differences between the operation of the air conditioner according
to another embodiment shown in FIG. 9 and the operation shown in FIG. 7 will be described.
[0142] Referring to FIG. 9, when the oil recovery operation is performed, the control unit
90 performs control such that the third bypass unit enables heat exchange between
the second refrigerant that has been discharged from the second condenser 23 and the
second refrigerant that has passed through the second evaporator 26. That is, the
control unit 90 performs control such that the third bypass unit guides the second
refrigerant discharged from the second condenser 23 to the discharge port of the second
evaporator 26.
[0143] Specifically, when normal operation is performed, the control unit 90 drives the
second compressor 21 so as to supply cool air to the showcase. When the oil recovery
operation is performed, the control unit 90 drives the second compressor 21 and opens
the control valve 72 so as to supply the second refrigerant discharged from the second
condenser 23 to the suction flow channel 21a of the second compressor 21. When the
oil recovery operation is performed, the control unit 90 may control the opening degree
and the opening time of the control valve 72.
[0144] When the oil recovery operation is performed, the high-pressure refrigerant supplied
by the third bypass unit increases the temperature of the second refrigerant within
the suction flow channel 21a of the second compressor 21. The oil within the suction
flow channel 21a of the second compressor 21 is increased in temperature and solubility
and is decreased in viscosity.
[0145] As is apparent from the above description, in a cooling receiver for an air conditioner
and an air conditioner including the same according to the embodiment of the present
invention, a supercooler and a receiver are integrated, which leads to a compact design,
a simple structure, a low price and improved refrigeration efficiency.
[0146] The air conditioner according to the embodiment of the present invention has an effect
in that two or more components are combined into a single unit, thus leading to a
compact design and a simple structure.
[0147] In addition, the air conditioner according to the embodiment of the present invention
has effects of a low price and improved refrigeration efficiency.
[0148] In addition, the air conditioner according to the embodiment of the present invention
has an effect of overcoming a problem in which recovery of oil is not smoothly performed
due to the considerably low temperature of an evaporator of a showcase.
[0149] The effects of the invention are not limited to the above-mentioned effects, and
other effects not mentioned will be clearly understood by those skilled in the art
from the accompanying claims.
1. An air conditioner comprising:
an air-conditioning cycle circuit (1) including a first compressor (11) for compressing
a first refrigerant, a first condenser (13) for condensing the first refrigerant compressed
by the first compressor (11), a first expansion device (14, 15) for expanding the
first refrigerant that has passed through the first condenser (13), and a first evaporator
(16) for evaporating the first refrigerant that has passed through the first expansion
device (14, 15), the air-conditioning cycle circuit (1) performing an air-conditioning
operation through circulation of the first refrigerant;
a refrigeration cycle circuit (2) including a second compressor (21) for compressing
a second refrigerant, a second condenser (23) for condensing the second refrigerant
compressed by the second compressor (21), a second expansion device (25) for expanding
the second refrigerant that has passed through the second condenser (23), and a second
evaporator (26) for evaporating the second refrigerant that has passed through the
second expansion device (25), the refrigeration cycle circuit (2) refrigerating stored
food through circulation of the second refrigerant;
a cooling receiver (50) for performing heat exchange between the first refrigerant
that has passed through the first condenser (13) and the second refrigerant that has
passed through the second condenser (23);
a first bypass unit for diverting a portion of the second refrigerant that has passed
through the second compressor (21) so as to exchange heat with the second refrigerant
that has passed through the second evaporator (26); and
a control unit (90) for controlling overall operation of the air conditioner,
wherein, when an oil recovery operation is performed, the control unit (90) is configured
to perform control such that the first bypass unit enables heat exchange between the
second refrigerant discharged from the second compressor (21) and the second refrigerant
that has passed through the second evaporator (26).
2. The air conditioner according to claim 1, wherein the first bypass unit includes:
a first bypass pipe (61) connecting a discharge flow channel (21c) of the second compressor
(21), the discharge flow channel connecting the second compressor (21) to the second
condenser (23), to a suction flow channel (21a) of the second compressor (21), the
suction flow channel connecting the second evaporator (26) to the second compressor
(21); and
a first control valve (63) installed on the first bypass pipe (61) in order to control
flow of refrigerant.
3. The air conditioner according to claim 2, further comprising:
a second bypass unit for diverting a portion of the second refrigerant that has passed
through the second compressor (21) so as to exchange heat with the second refrigerant
that has passed through the second evaporator (26).
4. The air conditioner according to claim 3, wherein the second bypass unit includes:
a second bypass pipe (62) connecting the discharge flow channel (21c) of the second
compressor (21) to the suction flow channel (21a) of the second compressor (21); and
a second control valve (64) installed on the second bypass pipe (62) in order to control
flow of refrigerant,
wherein the first bypass pipe (61) and the second bypass pipe (62) are arranged such
that a connection position between the first bypass pipe (61) and the discharge flow
channel (21c) of the second compressor (21) is closer to the second compressor (21)
than a connection position between the second bypass pipe (62) and the discharge flow
channel (21c) of the second compressor (21) and such that a connection position between
the first bypass pipe (61) and the suction flow channel (21a) of the second compressor
(21) is closer to the second compressor (21) than a connection position between the
second bypass pipe (62) and the suction flow channel (21a) of the second compressor
(21).
5. The air conditioner according to claim 4, further comprising:
a check valve installed on the discharge flow channel (21c) of the second compressor
(21) in order to prevent the second refrigerant that has passed through the second
compressor (21) from flowing backward,
wherein the check valve is disposed between a branch point of the first bypass pipe
(61) and a branch point of the second bypass pipe (62).
6. The air conditioner according to any one of claims 1 to 5, wherein, when a predetermined
time has elapsed since a start of operation of the air conditioner, the control unit
(90) is configured to perform the oil recovery operation.
7. The air conditioner according to any one of claims 1 to 6, further comprising:
an oil level sensor (22) for detecting an amount of oil within the second compressor
(21),
wherein, when an oil level value transmitted from the oil level sensor (22) is lower
than a reference oil level value, the control unit (90) performs the oil recovery
operation.
8. The air conditioner according to claim 4, wherein, when the oil recovery operation
is performed, the control unit (90) is configured to perform control such that the
first control valve (63) is open.
9. The air conditioner according to claim 8, further comprising:
an outdoor air temperature sensor (83) for measuring a temperature of outdoor air,
wherein, when the oil recovery operation is performed and the temperature of outdoor
air is lower than a predetermined temperature, the control unit (90) is configured
to perform control such that the second control valve (64) is open, and
when the oil recovery operation is performed and the temperature of outdoor air is
higher than the predetermined temperature, the control unit (90) is configured to
perform control such that the second control valve (64) is closed.
10. The air conditioner according to any one of claims 1 to 9, wherein, when the oil recovery
operation is performed, the control unit increases an operation speed of the second
compressor (21) to be higher than in normal operation.
11. The air conditioner according to any one of claims 1 to 10, further comprising:
a condenser fan (23a) for supplying outdoor air to the second condenser (23),
wherein, when the oil recovery operation is performed during a cooling operation,
the control unit (90) is configured to rotate the condenser fan (23a) at a maximum
speed, and
when the oil recovery operation is performed during a heating operation, the control
unit stops the condenser fan (23a).
12. The air conditioner according to claim 1, further comprising:
a third bypass unit for diverting a portion of refrigerant discharged from the second
condenser (23) to a discharge port of the second evaporator (26).
13. The air conditioner according to claim 12, wherein the third bypass unit includes:
a third bypass pipe (71) connecting a refrigeration liquid line, the refrigeration
liquid line connecting the second condenser (23) to the second evaporator (26), to
a suction flow channel (21a) of the second compressor (21), the suction flow channel
(21a) connecting the second evaporator (26) to the second compressor (21); and
a control valve (72) installed on the third bypass pipe (71) in order to control flow
of refrigerant.
14. The air conditioner according to claim 12, or 13, wherein, when the oil recovery operation
is performed, the control unit (90) is configured to perform control such that the
third bypass unit diverts the second refrigerant discharged from the second condenser
(23) to the discharge port of the second evaporator (26).
15. The air conditioner according to claim 1, further comprising:
a discharge temperature sensor (81) for measuring a temperature of a refrigerant discharged
from the second evaporator (26),
wherein, when a discharge temperature value transmitted from the discharge temperature
sensor (81) is lower than a reference discharge temperature value, the control unit
(90) performs the oil recovery operation.