BACKGROUND
[0001] Currently, an urban development and planning process plays a major role in the economic
significance of a location in a state. The urban development factor depends on commercial
and marketing activities. Therefore, a strategic planning is required to build a system
that concentrates on a land-use planning, road and rail transportation planning, and
an economic development. Nowadays most of the government and state authorities devises
strategies to improve the infrastructure inside the city limits to boost the economic
significance of the place. However, this led to the development of skyscrapers, and
new streets to get access to various utilities, which in turn increases the road traffic
and congestion as well as the land value.
[0002] There have been many attempts to provide solutions to improve the environment, business
status and transportation away from the city limits and at the same time giving an
experience of using all the utilities at the same place. However, most of the attempts
have their own limitations like lack of coordination among the utilities, cumbersome
set up, expensive funding and so on. A prior art reference
US 5655244 A discusses about a super long bridge with an automatic transporting system wherein
individually controllable trucks and transportation lane configured to provide access
to the public. However, this disclosure does not provide additional utilities such
as a hotel, a hospital, a museum and so on. Furthermore, it includes more limitations
like lack of power supply for the transportation unit and other purposes.
[0003] Additionally, although existing double deck bridges, for example, the Galata Bridge
located in Turkey houses pathways for pedestrians and cyclists and has restaurants,
the bridge in itself is not self-sufficient in terms of energy requirements and waste
management. The lower deck of the bridge houses restaurants and beer parlors that
require energy, which must be supplied from a power plant located away from the bridge.
Moreover, a township comprising utilities, for example, hospitals, museums, etc.,
cannot be sustained on such a bridge. An energy sufficient bridge, which allows development
of a township on a bridge, is required. Further, the lower deck of the Galata bridge
is positioned very close to the water surface, which prevents large ships from passing
underneath. A bridge, which is positioned at a suitable height to allow passage of
ships underneath the bridge, is required.
[0004] Hence, there is a long felt but unresolved need for an infrastructure system at one
place such as a historic bridge located on a waterway to provide a plurality of utilities
such as transportation, business zone, entertainment zone, market zone and so on to
give the public an enthralling experience of an integrated mini-society at one place.
Moreover, an energy sufficient bridge, which allows development of a township on a
bridge, is required. Furthermore, a bridge, which is positioned at a suitable height
to allow passage of ships underneath the bridge, is required.
SUMMARY OF THE INVENTION
[0005] According to the present invention, the present invention relates to a bridge construction
to be placed in a water surface. In an embodiment, the bridge construction comprises
a first deck having a rail track and a pathway. The pathway is configured to provide
access to a pedestrian and a cyclist. The bridge construction comprises a second deck
and a plurality of pillars supporting the decks, where the rail track of the first
deck is configured to provide access to a plurality of interconnected wagons and where
the pathway is formed along either side of the rail track, characterized in, that
the first deck further comprises a central arch structure. In one embodiment, the
second deck comprises a plurality of containers configured to provide an access for
utilities selected from at least one of a hotel, a residence, a hospital, a police
station, a prison, a museum, an educational zone, a business zone, an exhibition zone,
a conference hall and a market zone. In one embodiment, the bridge construction further
comprises an integrated power system configured to be placed in the water surface
and provide power to the utilities of the first deck and second deck, at least one
incineration system configured to treat waste materials and a floating platform to
be floating on the water surface and configured to have a rescue area accessed via
a maritime staircase operably attached to the first deck.
[0006] In one embodiment, the central arch structure comprises a plurality of arches made
from a transparent material. The arches are configured to have a plurality of steel
frames and spans to provide the structural stability of the central arch structure
with the bridge. In different embodiments, a lighting system is implemented in the
bridge construction, which enhances the aesthetic appearance of the bridge.
BRIEF DESCRIPTION OF THE DRAWINGS
[0007]
FIG. 1 exemplarily illustrates a schematic diagram of a bridge construction on a waterway
supported by pillars, incorporating the aspects of the present invention.
FIG. 2 exemplarily illustrates an exploded view of a container configured to be attached
to a second deck of the bridge, incorporating the aspects of the present invention.
DETAILED DESCRIPTION OF THE INVENTION
[0008] FIG. 1 exemplarily illustrates a schematic diagram of a bridge construction 100.
The present invention relates to a bridge construction 100 to be placed in a water
surface 116. In an embodiment, the bridge construction 100 comprises a first deck
102 having a rail track 108 and a pathway 112. The pathway is configured to provide
access to a pedestrian and a cyclist. The bridge construction 100 comprises a second
deck 104 and a plurality of pillars 130 supporting the decks (102 & 104), where the
rail track 108 of the first deck 102 is configured to provide access to a plurality
of interconnected wagons 106 and where the pathway 112 is formed along either side
of the rail track 108, characterized in, that the first deck 102 further comprises
a central arch structure 110. In one embodiment, the second deck 104 comprises a plurality
of containers 114 configured to provide an access for utilities selected from at least
one of a hotel, a residence, a hospital, a police station, a prison, a museum, an
educational zone, a business zone, an exhibition zone, a conference hall and a market
zone. In one embodiment, the bridge construction 100 further comprises an integrated
power system 118 configured to be placed in the water surface 116 and provide power
to the utilities of the first deck 102 and second deck 104, at least one incineration
system 122 configured to treat waste materials and a floating platform 124 to be floating
on the water surface 116 and configured to have a rescue area accessed via a maritime
staircase 126 operably attached to the first deck 102.
[0009] In an embodiment as shown in FIG. 1, the central arch structure 110 of the bridge
construction 100 comprises a plurality of arches made from a transparent material.
Preferably, the arches are covered with a glass material to enhance the artistic appearance
of the central arch structure 110 in the bridge as well as to withstand the wind and
impact of storm birds. Further, the floor of the arches is also configured to have
a transparent material so that a person could view the structure below with ease.
The central arch structure 110 further comprises a plurality of steel frames and spans
configured to provide the structural stability of the central arch structure 110 with
the bridge. In an exemplary embodiment, the central arch structure 110 comprises three
arches with steel frames and spans covered by the glass material.
[0010] In an embodiment as shown in FIG. 1, the floating platform 124 is deployed during
the bridge construction. The floating platform 124 could be used as rescue area, and
deployed juxtaposed to the first deck 102 of the bridge via the maritime staircase
126 operably attached therein. In an exemplary embodiment, the maritime staircase
126 could be deployed and connected to the floating platform 124 during a critical
situations encountered by the user or swimmers. For example, if the person dives into
the water from one of the decks, in case if he is unable to swim or save himself,
the maritime staircase 126 person could be deployed to rescue the person in time.
In other embodiments, the floating platform 124 is configured to implement as the
bathing island with eyelashes, and enclosed swimming area with much comfort, which
could also be accessed from the bridge via maritime stairs 126.
[0011] In another embodiment according to FIG. 1, the bridge construction 100 comprises
a lighting system, which enhances the aesthetic appearance of the bridge. The lighting
system 136 comprises a tone lighting arrangement with desired colors covering the
decks (102 & 104), central arch structure 110, pillars 130, and other sections of
the bridge to highlight the bridge construction 100 especially during night. The lighting
system 136 for the second deck allows the user to access various utilities by enhancing
the visibility and appearance of all the utilities during both day and night time.
The plurality of pillars 130 and pliers supports the bridge construction 100 on the
waterway is configured to allow a ship 134 to pass through the structure. Optionally,
one or two platforms can be provided under the bridge for safety and maintenance purpose.
Further, a magnifying glass 132 is configured to be attached to one of the containers
114 to give the user an enhanced view of the city infrastructure from the bridge itself.
[0012] Referring to FIG. 1, the first deck 102 and second deck 104 of the bridge construction
100 on the waterway supported by a plurality of pillars 130 is illustrated. The first
deck 102 of the bridge is deployed with a rail track 108 to enable the rail transportation
through the central arch structure 110 of the bridge. One or two wagons 106 are deployed
on the rail track 108, which is configured to move, and connect to any other existing
rail network in the state. Optionally, the wagons 106 are configured to stay intact
on the rail track so that it provides access to a hospital, a security station and
an emergency vehicle. The middle arch of the central arch structure 100 comprises
ropes on the floor, which may be loosened when the wagons moves along the rail track
108. Further, the bridge construction 100 according to the present invention provides
a set of wagons 106 to act as a backdrop house, a dining car, a sleeping car, an exhibition
vehicle, etc. on the bridge. However, the configuration of wagons 106 on the first
deck 102 of the bridge gives an appearance of trains running on the bridge that stands
on the waterway. A roadway path 112 is also constructed along the sides of the rail
track 108 on the first deck 102 to give access to the pedestrians and cyclists for
commuting purpose. In some embodiments, wagons 106 are configured to assist disabled
people for extended usage. The integrated power system 118 provides power to the wagons
106 of the rail system.
[0013] As shown in FIG. 2, the containers 114 are configured to provide an access for utilities
in the bridge construction 100 on the waterway. The containers 114 are arranged in
the second deck 104 of the bridge to provide access for multiple utilities such as
the hotel, the residence, the hospital, the police station, the prison, the museum,
the educational zone, the business zone, the exhibition zone, the conference hall
and the market zone. The utilities are divided into three zones: a zone-1 providing
access for education and delighting zone, a zone-2 providing access for conference
halls and market square and a zone-3 providing access for hotels, profession and promotional
activities. Therefore, the bridge acts as a point of source for several facilities
to give the user an experience of mini society. In addition to the wagons 106 on the
first deck 102, the containers 114 in the second deck 104 also provides emergency
and police unit for user safety and convenience. In different embodiments, a plurality
of operational departments and modern minimalistic residential are configured to be
arranged on the second deck 104 to serve multiple purposes. The bridge is located
in the banks and the hotels are fitted to give east and west views, and if the iron
plates are replaced by the transparent materials, the user in the bridge can see through
at a distance in sunlight and also providing light and views of people inside the
room shaped container. The containers 114 are mounted and arranged under the roadway
112 of the first deck 102 providing additional stability to the structure.
[0014] In preferred embodiments, as shown in FIG. 1, the bridge further comprises integrated
power system 118 configured to provide power to the utilities of the first deck 102
and the second deck 104 of the bridge. The integrated power system 118 comprises a
power source selected from at least one of a water turbine and a solar panel 120.
The water turbines are installed in nearby places of the bridge so that the power
generated can be easily transferred to the utility system for usage. Further, the
solar panels 120 are implemented to arrange on a plurality of predetermined positions
of the second deck 104. The water turbines and solar panels 120 acts as the integrated
power system 118 to supply power to all the utilities of the bridge. The bridge also
comprises the incineration system 122 to treat the waste materials for additional
power generation, which could be used to supply power to many applications such as
heating the water and so on. Optionally, a water purification system is configured
to provide drinking water requirements to the utilities of the bridge.
[0015] The bridge construction 100 enables promoting 'Blue and green' environmental policies
of the state and as it comprises power, heating, lighting and waste incineration,
it can be modeled as a mini-society. The operation of the bridge allows for minimum
transport of things and helps to promote recycling of energy from consumption locally.
The architectural expression of the bridge gives an appealing vison when viewed from
far away in the sunlight from the West. Being away from the land, the bridge still
accommodates residential, overnight guests, liberal business, exhibitions, experience
orientated activities, and museums. The lighting arrangement 136 for the bridge gives
a historically unique impression for the place when viewed during the night. The bridge
provides access to pure drinking water, where needs and consumption of water is achieved
on the bridge itself without having access to the land. The combustion of waste by
the incineration system 122 provides additional power capability for the utilities
in the bridge. Overall, the bridge developments act as a historic achievement enabling
industrialism development in the state, and acts as a ship with several facilities
on the sea.
[0016] The foregoing examples have been provided merely for the purpose of explanation and
are in no way to be construed as limiting of the present concept disclosed herein.
While the concept has been described with reference to various embodiments, it is
understood that the words, which have been used herein, are words of description and
illustration, rather than words of limitation. Further, although the concept has been
described herein with reference to particular means, materials, and embodiments, the
concept is not intended to be limited to the particulars disclosed herein; rather,
the concept extends to all functionally equivalent structures, methods and uses, such
as are within the scope of the appended claims. Those skilled in the art, having the
benefit of the teachings of this specification, may affect numerous modifications
thereto and changes may be made without departing from the scope and spirit of the
concept in its aspects.
1. A bridge construction (100) to be placed in a water surface (116), the bridge construction
(100) comprising a first deck (102) having a rail track (108) and a pathway (112)
configured to provide access to a pedestrian and a cyclist, a second deck (104) and
a plurality of pillars (130) supporting the decks (102 & 104), where the rail track
(108) of the first deck (102) is configured to provide access to a plurality of interconnected
wagons (106) and where the pathway (112) is formed along either side of the rail track
(108), characterized in, that
the first deck (102) further comprises a central arch structure (110),
the second deck (104) comprises a plurality of containers (114) configured to provide
an access for utilities selected from at least one of a hotel, a residence, a hospital,
a police station, a prison, a museum, an educational zone, a business zone, an exhibition
zone, a conference hall and a market zone, and
the bridge construction (100) further comprises an integrated power system (118) configured
to be placed in the water surface (116) and provide power to the utilities of the
first deck (102) and second deck (104), at least one incineration system (122) configured
to treat waste materials and a floating platform (124) to be floating on the water
surface (116) and configured to have a rescue area accessed via a maritime staircase
(126) operably attached to the first deck (102).
2. The bridge construction (100) of claim 1, wherein the floating platform (124) is configured
to use selectively as a bathing island and a swimming pool.
3. The bridge construction (100) of claim 1, wherein the central arch structure (110)
comprises a plurality of arches made from a transparent material.
4. The bridge construction (100) of claim 1, wherein the central arch structure (110)
comprises a plurality of steel frames and spans configured to provide structural stability
of the central arch structure (110).
5. The bridge construction (100) of claim 1, further comprising a lighting system (108)
configured to enhance the aesthetic appearance of the bridge.
6. The bridge construction (100) of claim 1, wherein the plurality of pillars (130) supporting
the bridge is configured to allow one or more ships (134) to pass through the bridge.
7. The bridge construction (100) of claim 1, further comprises a water purification system
configured to provide drinking water to the utilities of the bridge.
8. The bridge construction (100) of claim 1, wherein the integrated power system (118)
comprises a power source selected from at least one of a water turbine and a solar
panel.
9. The bridge construction (100) of claim 1, wherein the solar panels (120) are configured
to arranged on a plurality of predetermined positions of the second deck (104).
10. The bridge construction (100) of claim 1, wherein the wagon (106) is configured to
provide access for at least one of a hospital, a security station and an emergency
vehicle.