TECHNICAL FIELD
[0001] The present invention relates to a casting facility and a casting method, and more
particularly, to a casting facility capable of adjusting balance between a ladle and
a nozzle such that the ladle may always be positioned in the same position in positioning
the ladle in the casting position, and a casting method.
BACKGROUND ART
[0002] In general, a continuous casting process includes a ladle for receiving the refined
molten steel in a steelmaking process, a tundish for temporarily receiving the molten
steel provided from the ladle, a shroud nozzle for supplying the molten steel of the
ladle to the tundish, a mold for solidifying the melting steel supplied from the tundish
into a predetermined shape to be casted into a cast slab, and a plurality of segments
aligned and installed in one direction in the lower portion of the mold, and cooling
the cast slab drawn from the mold.
[0003] Here, in supplying the molten steel of the ladle to the tundish, a ladle turret as
illustrated in Korean Patent Laid-Open Publication No.
2013-0120149 is used. The ladle turret includes a swing tower which is rotationally driven, and
ladle cradles installed so as to connected to both sides of the swing tower, and mounting
ladles each thereon. In accordance with such a ladle turret, ladles are alternately
positioned at the upper portion of the tundish by the rotation of the swing tower
and the molten steel of the ladle is discharged into the tundish, so that the casting
is continuously performed.
[0004] Such a ladle turret has an advantage in that the ladle may always be stably positioned
at the same position at the upper portion of the tundish. However, the ladle turret
is expensive and has a disadvantage in that the ladle receiving several hundreds of
tons of molten steel is rotated, raised or lowered in order to be positioned at the
casting position, so that a power consumption is large in the continuous casting process.
Further, in the case of a semi-continuous casting in which the casting is terminated
after casting a cast slab having a predetermined length, rather than continuously
casting the cast slab, the operation of the ladle turret as described above becomes
a more inefficient factor in aspect of a power consumption.
[0005] Meanwhile, in the continuous casting facility, the verticality of shroud nozzle is
an important factor in order to prevent molten steel from being re-oxidized by the
mixing of the external air when the molten steel of the ladle is supplied to the tundish.
Generally, the shroud nozzle includes a ladle nozzle connected to the lower portion
of the ladle and, a long nozzle clamped to the lower portion of the ladle nozzle in
order to supply the molten steel of the ladle into the tundish. When the long nozzle
is clamped to the ladle nozzle, such a shroud nozzle differs from a clamping position
between the ladle nozzle and the long nozzle or a verticality formed by the ladle
nozzle and the long nozzle. That is, when the shroud nozzle is clamped to the ladle
nozzle, in the case that the shroud nozzle is shifted to any one side and the array
is disturbed or the misalignment is occurred, the external air may be invaded between
the ladle nozzle and the long nozzle to be mixed into the molten steel. Therefore,
when the long nozzle is clamped to the ladle nozzle, it is desired that the verticality
is adjusted such that the long nozzle or the ladle nozzle is not shifted to any one
side. In order to adjust the verticality, a shroud manipulator as disclosed in Korean
Patent Laid-Open Publication No.
2013-0075570 is used. The manipulator of Korean Patent Laid-Open Publication No.
2013-0075570 includes a shroud arm composed so as to be movable forward and backward with respect
to the long nozzle; a gripping part positioned in the lower side of the shroud arm,
movable forward and backward with respect to the long nozzle, and capable of gripping
the long nozzle; and a hydraulic moving means installed in the lower portion of the
shroud arm and movable the gripping part forward and backward.
[0006] However, there is a problem that the shroud manipulator is expensive and has a complicated
configuration, and requires a large installation area.
DISCLOSURE OF THE INVENTION
TECHNICAL PROBLEM
[0007] The present invention provides a casting facility capable of always positioning a
ladle in the same position and adjusting balance between the ladle and nozzles in
positioning the ladle in the casting position, and a casting method.
[0008] The present invention provides a casting facility disposed in the casting position
by supporting the ladle with a simple structure and including a ladle support device
capable of adjusting balance between the ladle and the nozzle, and a casting method.
TECHNICAL SOLUTION
[0009] A casting facility in accordance with the present invention a ladle for receiving
molten steel; a mold for solidifying the molten steel provided from the ladle to be
casted into a cast slab; a hanger extending in one direction, supporting the ladle,
and being movable; a ladle gripping means extending in a vertical direction, and having
one end connected to the hanger and the other end gripping the ladle; a hanger mounting
part installed on an upper side of the mold, mounting the hanger for supporting the
ladle thereon, and allowing the ladle supported by the hanger to be positioned corresponding
to the upper side of the mold; and a nozzle connected to a lower portion of the ladle
and discharging the molten steel of the ladle.
[0010] The hanger mounting part includes a pair of first mounting stands extending in a
direction crossing the extending direction of the hanger and installed apart from
each other such that both edges of the hanger are installed on the upper portion;
and a pair of second mounting stands installed so as to respectively extend upward
from upper portions of the pair of first mounting stands and having two mounting members
installed apart from each other by a distance lager than the width of the hanger.
[0011] The casting facility includes a pair of stoppers installed at lower edges of the
hanger, wherein the pair of stoppers are installed apart from each other by a distance
shorter than a spaced distance between the pair of first mounting stands from lower
portion of the hanger.
[0012] The nozzle includes a first nozzle having the one end connected to the ladle, and
a second nozzle capable of clamping to the first nozzle; a first balance adjustment
part movable forward and backward, gripping the second nozzle to move in a direction
in which the first nozzle is positioned, clamping the second nozzle to the first nozzle,
and supporting the second nozzle; and a second balance adjustment part installed at
a lower side of the hanger mounting part, movable forward and backward, and advancing
to the ladle to which the nozzle clamped by the first and second nozzles is connected,
thus supporting the ladle at a position opposite to the first balance adjustment part.
[0013] The first balance adjustment part is movable along the ladle, wherein the first balance
adjustment part includes a nozzle gripping member capable of gripping the second nozzle;
an arm connected to the nozzle gripping member and movable forward and backward; and
a weight installable on the arm at a position opposite to the nozzle gripping member.
[0014] The casting facility includes a support member installed at the lower portion of
the ladle, and being able to support the arm.
[0015] The second balance adjustment part includes a horizontal moving part movable forward
and backward with respect to a side surface of the ladle at a position opposite to
the first balance adjustment part, and supporting the ladle by being in contact with
the side surface of the ladle during advancement.
[0016] The casting facility includes a protrusion portion formed in any one of the first
and second nozzles; and a clamping part provided on the other nozzle and having a
clamping groove being able to receive the protrusion portion.
[0017] When the hanger is supported on the hanger mounting stand and the ladle is positioned
on the upper side of the mold, the other end of the second nozzle is installed so
as to be inserted into the mold, and the second balance adjustment part is fixed and
installed on an upper portion of a mold cover for covering the upper portion of the
mold.
[0018] The casting facility draws a cast slab in a direction perpendicular to the ground
from the mold.
[0019] The casting facility includes a tundish installed between the hanger mounting stand
and the mold, and when the hanger is supported on the hanger mounting stand and the
ladle is positioned on the upper side of the mold, the other end of the second nozzle
is installed so as to be inserted into the tundish. Also, the second balance adjustment
part is fixed and installed on an upper portion of a tundish cover for covering the
upper portion of the tundish.
[0020] A casting method includes: supporting a ladle receiving refined molten steel therein
to a hanger; clamping a second nozzle to a first nozzle installed at a lower portion
of the ladle; moving the hanger and mounting the hanger on a hanger mounting part
positioned on an upper side of a mold, such that the ladle is positioned on the upper
portion of the mold; moving the molten steel of the ladle through the nozzle to supply
the molten steel to the mold; and solidifying the molten steel in the mold and drawing
a cast slab form the mold, wherein the moving of the hanger and mounting of the hanger
on a hanger mounting part positioned on an upper portion of a mold includes mounting
each of one end and the other end of the hanger on upper portions of a pair of first
mounting stands installed in a direction corresponding to the extending direction
of the hanger.
[0021] The moving of the hanger and mounting of the hanger on a hanger mounting part positioned
on an upper portion of a mold is performed such that one end and the other end of
the hanger are positioned between two mounting members extending upward from upper
portions of the pair of mounting stands and installed apart from in the width direction
of the hanger.
[0022] The clamping of the second nozzle to the first nozzle includes gripping the second
nozzle to a nozzle gripping member being movable forward and backward; operating an
arm connected to the nozzle gripping member and advancing the nozzle gripping member
forward and backward, moving the nozzle gripping member to a lower side of the first
nozzle, and clamping the second nozzle to the first nozzle; and installing an arm
weight at a position opposite to the position of the nozzle gripping member.
[0023] After the clamping of the first nozzle and the second nozzle, the method includes
moving the hanger to the upper side of the mold, and then adjusting balance between
the ladle and the first and second nozzles, wherein the adjusting of the balance includes
operating a horizontal moving part installed in a lower side of the hanger mounting
stand to advance a ladle support member connected to the horizontal moving part toward
the ladle to allow the ladle support member to support a side surface of the ladle,
whereby a force is applied in a direction where the nozzle gripping member is positioned
such that the ladle, and the first and second nozzles are adjusted to be perpendicular
to the ground.
the operating of the horizontal moving part to allow the ladle support member to support
the ladle includes advancing a first moving member connected to the ladle support
member to contact the ladle support member with the outside surface of the ladle;
and in a state in which a second moving member connected to the ladle support member
and movable forward and backward finely relative to the first moving member is in
contact with the ladle, advancing or retracting the second moving member, such that
the ladle, and first and second nozzles are adjusted to be perpendicular to the ground
without being tilted.
[0024] The mounting of the hanger on the hanger mounting part positioned on the upper side
of the mold to allow the ladle to be positioned on the upper side of the mold includes
allowing the lower portion of the second nozzle to be inserted into the mold, wherein
the supplying of the molten steel of the ladle to the mold includes supplying the
molten steel of the ladle to the mold by the first nozzle and the second nozzle.
[0025] The mounting of the hanger on the hanger mounting part positioned on the upper side
of the mold to position the ladle on the upper side of the mold includes allowing
the lower portion of the second nozzle to be inserted into the tundish positioned
between the hanger mounting stand and the mold, wherein the supplying of the molten
steel of the ladle to the mold includes supplying the molten steel of the ladle to
the tundish by the first nozzle and the second nozzle.
[0026] The cast slab is drawn from the mold in a direction perpendicular to the ground to
be vertical-casted, or the cast slab is curved-casted in a manner in which the cast
slab is drawn from the mold in a vertical direction and then is casted in a horizontal
direction.
ADVANTAGEOUS EFFECTS
[0027] In accordance with an embodiment of the present invention, a ladle may always be
stably fixed in the same position by hanger mounting stands. Further, the ladle and
nozzles may be disposed so as to be perpendicular to the ground without being tilted
to any one side, so that molten steel may be stably supplied to a mold or a tundish
[0028] The hanger mounting stands in accordance with an embodiment has a simple structure
compared to the conventional turret, and consumes less electric power for driving.
Further, there is an advantage in that the first and second balance adjustment parts
have simple structures compared to the conventional shroud manipulator, thus reducing
the installation space and also having a low cost required for the manufacture and
operation thereof.
BRIEF DESCRIPTION OF THE DRAWINGS
[0029]
FIGS 1 and 2 are views illustrating a casting facility in accordance with an embodiment
of the present invention.
FIG. 3A is a front view illustrating a first nozzle and a second nozzle in accordance
with an embodiment of the present invention. FIG. 3B is a top view, and FIG. 3C is
an enlarged view illustrating a clamping part for clamping a first nozzle and a second
nozzle.
FIG. 4 is a top view illustrating a hanger and hanger mounting stands for mounting
the hanger.
FIG. 2 is a top view of a second balance adjustment part in accordance with an embodiment
of the present invention as viewed from the upper side.
FIG. 6 is a view for explaining the operation of a ladle support device in accordance
with an embodiment of the present invention.
MODE FOR CARRYING OUT THE INVENTION
[0030] Hereinafter, embodiments of the present invention will be described in detail. The
present invention may, however, be embodied in different forms and should not be construed
as limited to the embodiments set forth herein. Rather, these embodiments are provided
so that this disclosure will be thorough and complete, and will fully convey the scope
of the present invention to those skilled in the art.
[0031] The present invention relates to a casting facility including a ladle support device
for supporting a ladle in which molten steel is received in order to supply the molten
steel received in the ladle to a mold or a tundish. More specifically, the present
invention relates to a casting facility having an adjustable ladle support device
such that the ladle in which the molten steel is received may always be stably positioned
in the same position on the upper portion of the mold or the tundish, and a nozzle
for discharging the molten steel is perpendicular to the ground without being tilted
on the upper portion of the mold or the tundish.
[0032] The ladle support device in accordance with an embodiment draws a cast slab from
the mold in a direction perpendicular to the ground, and is applied to a semi-continuous
vertical casting facility for casting a cast slab having an ultra-heavy gauge in thickness.
In the case of the semi-continuous vertical casting facility in accordance with an
embodiment, the molten steel of the ladle is directly supplied to the mold, and the
cast slab is casted in vertical. In other words, in a general curved vertical casting
facility, the molten steel of the ladle is supplied to the tundish, and the molten
steel of the tundish is supplied to the mold to be casted. However, in the vertical
casting facility in accordance with an embodiment, the molten steel of the ladle is
directly supplied to the mold through the nozzle to be casted into a cast slab.
[0033] In addition, in the case of semi-continuous vertical casting facility, the amount
of molten steel required for one charge is small compared to the general curved continuous
vertical casting facility. Therefore, the ladle support device in accordance with
an embodiment is configured such that one ladle is supported.
[0034] FIGS. 1 and 2 are views illustrating a casting facility in accordance with an embodiment
of the present invention. FIG. 3A is a front view illustrating a first nozzle and
a second nozzle in accordance with an embodiment of the present invention, FIG. 3B
is a top view, and FIG. 3C is an enlarged view for explaining a clamping part for
clamping a first and second nozzles. FIG. 4 is a top view illustrating a hanger and
a hanger mounting stand in which the hanger is mounted. FIG. 2 is a top view of a
second balance adjustment part in accordance with an embodiment of the present invention
as viewed from the upper side. FIG 6 is a view for explaining the operation of a ladle
support device in accordance with an embodiment of the present invention.
[0035] Hereinafter, in the following description of a ladle support device in accordance
with an embodiment of the present invention, a vertical casting facility in which
the molten steel of a ladle is directly supplied to a mold without a tundish will
be described as an example.
[0036] Referring to FIGS. 1 and 2, a casting facility in accordance with an embodiment of
the present invention includes a ladle L for receiving refined molten steel; a mold
M for solidifying the molten steel provided from the ladle L; a mold cover C for covering
the upper side of the mold M; a nozzle 2000 for supplying the molten steel of the
ladle L to the mold M; and a ladle support device 1000 supporting the ladle L in which
molten steel is received to be positioned corresponding to the upper side of the mold
M, and adjusting balance between the ladle L and the nozzle 2000. Further, the casting
facility includes a surface plate 10 for drawing a cast slab from the mold M in a
direction perpendicular to the ground, and a surface plate moving device 20 for moving
the surface plate 10 in a vertical direction to the ground.
[0037] As illustrated in FIGS. 1 and 2, the nozzle 2000 includes a first nozzle 2100 fixed
to and installed at the lower portion of the ladle L, and a second nozzle 2200 installed
such that one end thereof is clamped to the first nozzle 2100 and the other end is
positioned in the mold M in order to supply the molten steel of the ladle L to the
mold M.
[0038] As illustrated in FIG. 3, the first nozzle 2100 includes a top nozzle 2110 provided
in the bottom of the ladle L and installed corresponding to a flowing outlet through
which molten steel flows out; and a bottom nozzle 2120 installed corresponding to
the lower side of the top nozzle 2110. Further, a sliding gate 2400 is installed between
the top nozzle 2110 and the bottom nozzle 2120, so that the communication between
the top nozzle 2110 and the bottom nozzle 2120 is adjusted depending on the operation
of the sliding gate 2400.
[0039] The second nozzle 2200 is clamped to the lower portion of the first nozzle 2100,
that is, the lower portion of the bottom nozzle 2120 when molten steel is supplied
to the mold M. Here, the second nozzle 2200 may be referred to as a long nozzle or
a shroud nozzle.
[0040] In clamping the first nozzle 2100 and the second nozzle 2200, it is required that
the first nozzle 2100 and the second nozzle 2200 be perpendicular to the ground with
balance without being tilted to any one side. For this reason, in the present invention,
a clamping part 2300 is provided between the lower portion of the first nozzle 2100
and the upper portion of the second nozzle 2200, so that the first nozzle 2100 and
the second nozzle 2200 are always clamped at the same position without misalignment,
and become perpendicular to the ground.
[0041] The clamping part 2300 includes a protrusion portion 2310 formed on any one of upper
portions of the first nozzle 2100 and the second nozzle 2200, and a clamping groove
2320 provided on the other nozzle 2000 and receiving the protrusion portion 2310.
For example, in the embodiment, the protrusion portion 2310 is provided so as to protrude
upward on the upper portion of the second nozzle 2200, and the clamping groove is
provided in the lower portion of the first nozzle 22100. In this case, the protrusion
portion 2310 is provided so as to be positioned at one side of a hollow portion of
the second nozzle 2200, and the clamping groove 2320 is also provided so as to be
positioned at one side of the hollow portion of the first nozzle 2100.
[0042] Of course, the protrusion portion 2310 may be installed in the lower portion of the
first nozzle 2100, and the clamping groove 2320 may be provided on the upper portion
of the second nozzle 2200.
[0043] Here, when the first nozzle 2100 and the second nozzle 2200 are clamped to the protrusion
portion 2310 and the clamping portion 2320, when each of the first nozzle 2100 and
the second nozzle 2200 are in a state of maintaining balance without being relatively
tilted to any one side while being perpendicular to the ground, the position of the
protrusion portion 2310 and the portion of the clamping groove 2310 are determined.
[0044] The ladle support device 1000 includes a ladle support unit 100 for supporting the
ladle L such that the ladle L may be positioned corresponding to the upper side of
the mold L; balance adjustment unit 200 enabling the ladle L and the nozzle 2000 to
be disposed with balance such that the ladle L and the nozzle 2000 are perpendicular
to the ground without being tilted to any one side during casting, and a weight measurement
means 300 installed in the ladle support unit 100 and measuring the weight of the
ladle L.
[0045] The ladle support unit 100 includes a movable hanger 110 such that the ladle L is
supported and positioned on the upper portion of the mold M; a stopper 130 installed
at both edges of the lower portion of the hanger; a hanger mounting part 120 fixed
and installed on the upper portion of the mold cover and supporting the hanger 110
such that the ladle L supported to the hanger 110 may be positioned corresponding
to the upper portion of the mold M, and a ladle gripping means 140 having one end
connected to the hanger 110 and the other end gripping the ladle L.
[0046] The hanger 110 has a bar shape extending in one direction, and a ring 111 to which
a moving means such as a crane may be clamped is installed on the upper portion of
the hanger 110. As described above, the stopper 130 is installed at both edges of
the lower portion of the hanger. The stopper 130 has a block shape, and plays a role
such that the hanger is mounted at the same position when mounted on a hanger mounting
part 120 described later.
[0047] The hanger mounting part 120 is positioned at the upper side of the mold, and includes
a pair of first mounting stands 121 spaced apart from each other in a direction intersecting
or orthogonal to the extending direction of the hanger 110; and a pair of second mounting
parts 122 installed so as to be spaced apart from each other by a thickness in the
width direction of the hanger 110 on upper portions of each of the pair of first mounting
stands.
[0048] The first mounting stands 121 extend in a direction intersecting with or orthogonal
to the extending direction of the hanger 110, and are provided as a pair. In this
case, the pair of first mounting stands 121 are preferably installed apart from each
other such that both edges of the hanger 110 may be supported on the pair of first
mounting stands 121 when the hanger 110 is positioned on the pair of first mounting
stands.
[0049] The second mounting stands 122 are installed on upper portions of each of the pair
of first mounting stands 121, and the second mounting stands 122 include a pair of
mounting members 122a spaced apart from each other in the extending direction of the
first mounting stands 121 and installed so as to face each other. In accordance with
such second mounting stands 122, one end and the other end of the hanger 110 are each
mounted on the first mounting stands 121 so as to be positioned between the pair of
mounting members 122a, so that the hanger 110 is mounted on the hanger mounting part
120. In this case, the stopper 130 is mounted on the lower portion of the hanger 110,
and the stopper 130 is mounted so as to be in close contact with inner surfaces of
the first mounting stands 121, thereby enabling the hanger 110 to be mounted at the
same position all the time.
[0050] The balance adjustment unit 200 includes a first balance adjustment part 210 performing
an adjusting operation such that the first nozzle 2100 and the second nozzle 220 is
not tilted to any one side; a second balance adjustment part 220 positioned in the
lower portion of the hanger mounting part 120, mounted and installed on the upper
portion of the mold cover C, and movable forward and backward with respect to the
side surface of the ladle L, thus performing an adjusting operation such that the
ladle L is not tilted to any one side; and a support member 230 mounted on the lower
portion of the ladle L to allow the first balance adjustment part 210 to be supported
in a floating state.
[0051] The first balance adjustment part 210 includes an arm 211 movable forward and backward
with respect to the second nozzle 2200 positioned at the lower side of the first nozzle
2100; a nozzle gripping member 212 mounted on a front end of the arm 211 and gripping
the upper portion of the second nozzle 2200 at the time of advancement; a weight unit
213 installed at the lower portion of the arm 211 at a position opposite to the nozzle
gripping member 212, and having a predetermined weight.
[0052] The arm 211 has a bar shape formed extending in one direction. When the arm 211 is
advanced and the nozzle gripping member 212 grips the second nozzle 2200, the arm
211 passes through the support member 230 mounted on the lower portion of the ladle
and is supported by the support member 230. Here, one side of the support member 230
has an opened ring shape and is supported in such a manner that the arm 211 is mounted
on a ring.
[0053] The arm 211 in accordance with an embodiment is a hydraulic cylinder type, but is
not limited thereto, and may be changed into various means movable forward and backward.
[0054] The nozzle gripping member 212 has an opened shape in a direction where the second
2200 nozzle is positioned, for example, a shape of "C" in English alphabet or " ⊏
" in Korean consonant.
[0055] The first balance adjustment part 210 clamps the second nozzle 2200 to the first
nozzle 2100 installed at the lower portion of the ladle L. That is, when the ladle
L in which molten steel is received arrives at a casting position, the arm 211 moves
forward in a state in which the second nozzle 2200 is gripped or supported by the
nozzle gripping member 212 of the first balance adjustment 210, and the upper portion
of the second nozzle 220 is positioned corresponding to the lower portion of the first
nozzle 2100, so that the first nozzle 2100 and the second nozzle 2200 are clamped
to each other.
[0056] When the first nozzle 2100 is thus clamped to the second nozzle 2200, a weigh is
installed on the arm 211. In this case, a rotation moment causing the arm to continuously
rotate is generated due to the weight of the weight, so that a force causing the ladle
L and the nozzle 2000 to be tilted in a direction opposite to the first balance adjustment
part is generated.
[0057] Therefore, in an embodiment of the present invention, the second balance adjustment
part 220 is installed between the hanger mounting part 120 and the mold cover C, and
a pushing force is applied from the direction opposite to the first balance adjustment
part 210 to the direction in which the first balance adjustment 210 is positioned,
so that the ladle L and the nozzle 2000 is adjusted so as to be perpendicular to the
ground without being tilted.
[0058] As illustrated in FIG. 5, the second balance adjustment part 220 includes a ladle
support member 221 220 movable forward and backward, and supporting the side surface
of the ladle when advancing; a horizontal moving part 222 for horizontally moving
the ladle support member 221; and a fixing part 223 mounted on the mold cover C, and
supporting the horizontal moving part 222 on the upper portion thereof.
[0059] It is preferable that the ladle support member 221 has such a shape that at least
the inner surface thereof coincides with the outer peripheral surface of the ladle
L so as to be easily in contact with and support the side surface of the ladle L.
That is, the inner surface of the ladle support member 221 may have a curved or bent
shape so as to coincide with the shape of the outer surface of the ladle support member
221. Of course, the embodiment is not limited thereto, and the ladle support member
221 may be in a flat-plate form having no curvature.
[0060] The horizontal moving part 222 includes: a pair of first moving members 222a installed
apart from each other in the width direction of the ladle support member 221, and
having one end connected to the ladle support member 221; a pair of first driving
members 222b for moving the pair of the first moving members 222a forward and backward;
a second moving member 222c positioned between the pair of first moving members 222a
and having one end connected to the ladle support member 221; and a second driving
member 222d for moving the second moving member 222c forward and backward.
[0061] Here, the first moving member 222a may be a roll, and the first driving member 222b
may be a roll guide for moving the first moving member 222a forward and backward.
The roll guide extends in a direction where the ladle support member 221 is positioned,
and the first moving member 222a may move forward and backward along the first driving
member 222b. Further, the second moving member 222c and the second driving member
222d in accordance with an embodiment is configured such that advance and retract
movement may be finely adjusted compared to the first moving member 222a and the first
driving member 222b. Therefore, the second driving member 222d may have a handle shape,
and the second driving member 222d may be a means movable forward and backward depending
on the rotation direction of the second driving member 222d, and adjusting the forward
and backward distances depending on the amount of rotation.
[0062] As described above, when the weight 213 is installed on the arm 211 of the first
balance adjustment part 210, the second balance adjustment part 220 prevents the ladle
L and the nozzle 2000 from being tilted in the direction opposite to the position
of the first balance adjustment part 210 to allow the ladle L and the nozzle 2000
to maintain balance without being tilted or to be perpendicular to the ground. That
is, when the weight 213 is installed on the arm 211 of the first balance adjustment
210, or after being installed, when the first and second moving members 222a and 222c
of the horizontal moving part 222 of the second balance adjustment 220 move forward
to support the ladle L with the ladle support member 221, the ladle L and the nozzle
2000 maintain balance without being tilted due to the pushing force or supporting
force of the horizontal moving part 222.
[0063] The embodiment is described as an example in which the ladle support device 1000
is applied to the vertical casting facility, the ladle L is positioned corresponding
to the upper side of the mold M, and the molten steel of the ladle L is directly supplied
to the mold L. However, the embodiment is not limited thereto, and a separate tundish
may be installed on the upper side of the mold M. In this case, the ladle support
device 1000 supports the ladle L to be positioned corresponding to the upper side
of the tundish, and thus may allow the molten steel of the ladle L to be supplied
to the tundish. Further, as another example, the embodiment may be applied to a conventional
curved casting facility in which the cast slab is drawn in a vertical direction and
then drawn in a curved direction, rather than to a vertical casting facility. Therefore,
the hanger mounting part 120 of the ladle support device 1000 may be positioned on
the upper side of the tundish cover C for covering the opening on the upper side of
the tundish, and the second balance adjustment part 220 may be positioned on the upper
side of the tundish.
[0064] Hereinafter, a casting process in accordance with an embodiment of the present invention
will be described with reference to FIGS. 1 to 6.
[0065] In the steel making process, refined molten steel is received in a ladle L, and the
ladle L supported by the hanger 110 is transferred to the position of the casting
process by a moving means such as a crane (see FIG. 6A). Subsequently, by using the
first balance adjustment part 210, the second nozzle 2200 is clamped to the first
nozzle as illustrated in FIG. 6B. That is, in a state in which the upper portion of
the second nozzle 2200 is gripped and supported by the nozzle gripping member 212
of the first balance adjustment part 210, the arm 211 moves forward toward the first
nozzle 2100 installed in the lower position of the ladle L, and the protrusion 2310
of the second nozzle 2200 is inserted into the clamping groove 2320 of the first nozzle
2100, so that the first nozzle 2100 and the second nozzle 2200 are clamped. In this
case, when the protrusion portion 2310 provided in the second nozzle 2200 is inserted
into the clamping groove 2320 of the first nozzle 2100 so that the first nozzle 2100
and the second nozzle 2200 are clamped, the first nozzle 2100 and the second nozzle
2200 is in a state of maintaining balance without being relatively tilted to any one
side. Thereafter, the arm 211 of the first balance adjustment 210 is hung so as to
being supported by the support member 230 connected to the lower portion of the ladle
L, and the weight 213 is installed on the arm 211.
[0066] In addition, as illustrated in FIG. 6C, a hanger 110 in which a ladle L is supported
moves by using a moving means, and is mounted on a hanger mounting part 120. That
is, one end and the other end of the hanger 110 are mounted so as to be positioned
between a pair of mounting members 122a of a second mounting stand 122 on an upper
portion of a first mounting stand 121. In this case, a stopper 130 is installed at
the lower portion of the hanger 110, and the stopper 130 may not move to the outside
of the first mounting stand 121, so that the hanger 110 is always mounted and installed
on the constant position of the hanger mounting part 120. Also, as the hanger 110
is mounted on the hanger mounting part 120, the lower portion of the second nozzle
2200 passes through the opening of the mold cover C to be installed so as to be positioned
in the mold M.
[0067] When the hanger 110 is mounted on the hanger mounting part 120, the first driving
member 222b of the second balance adjustment part 220 is operated and the pair of
first moving members 222a move forward, so that the ladle support member 221 is in
contact with and supported by the side surface of the ladle L. Thereafter, the second
driving member 222d is operated as needed to finely advance or retract the second
moving member 222c, so that the ladle L is finely adjusted so as to be perpendicular
without being tilted to any one side. Accordingly, even when a force is generated
which is tilted to a positon opposite to or facing the position of the first balance
adjustment 210 by the weight of the weight part 213 of the first balance adjustment
part 210, by applying a force in which the second balance adjustment pushes the ladle
L 220 in the direction in which the first balance adjustment 210 is positioned, the
ladle L and the nozzle 2000 are prevented from being tilted, and each of which may
be perpendicular to the ground.
[0068] When the ladle L and the nozzle 2000 are thus positioned corresponding to the upper
portion of the mold M and the balance is adjusted, the casting is started. That is,
when a sliding gate 2400 positioned between a top nozzle 2110 and a bottom nozzle
2120 of the first nozzle 2100 is operated to communicate the top nozzle 2110 and the
bottom nozzle 2120, the molten steel of the ladle L is supplied to the mold M through
the top nozzle 2110, the bottom nozzle 2120 and the second nozzle 2200. The lower
portion of the mold M is sealed by a surface plate 10 before the molten steel is supplied
to the mold M, so that the molten steel supplied to the mold M is solidified in the
mold M. Thereafter, the surface plate 10 continuously descends in a direction perpendicular
to the ground to draw the cast slab from the mold M. In this case, the molten steel
is supplied to the mold M until a cast slab having a targeted length is casted, and
the surface plate 10 descends. When the cast slab having the targeted length is casted,
the sliding gate 2400 is closed, the supply of molten steel to the mold M is stopped,
the cast slab is completely drawn from the mold M, and then the descending is stopped
to terminate the casting.
[0069] Thus, the ladle L may always be stably fixed in the same position by the hanger mounting
part 120 and the stopper 130 in accordance with an embodiment of the present invention.
Further, the ladle L and the nozzle 2000 may be disposed so as to be perpendicular
to the ground without being tilted to any one side by the first and second balance
adjustment parts 210 and 220, so that molten steel may be stably supplied to the mold
M or the tundish. In addition, the hanger mounting stand 120 in accordance with an
embodiment has a simple structure as compared with the conventional turret, and consumes
less electric power for driving. Also, the first and second balance adjustment parts
210 and 220 have simpler structures than the conventional shroud manipulate, and thus
provides advantages of a less installation space and low cost.
INDUSTRIAL APPLICABILITY
[0070] In accordance with the casting facility and the casting method disclosed in the present
invention, the ladle may always be stably fixed at the same position by hanger mounting
stands. Further, the ladle and the nozzle may be disposed so as to be perpendicular
to the ground without being tilted to any one side by the first and second balance
adjustment parts, so that molten steel may be stably supplied to the mold or the tundish.
1. A casting facility, comprising:
a ladle for receiving molten steel;
a mold for solidifying the molten steel provided from the ladle to be casted into
a cast slab;
a hanger extending in one direction, supporting the ladle, and being movable;
a ladle gripping means extending in a vertical direction, and having one end connected
to the hanger and the other end gripping the ladle;
a hanger mounting part installed on an upper side of the mold, mounting the hanger
supporting the ladle thereon, and allowing the ladle supported by the hanger to be
positioned corresponding to the upper side of the mold; and
a nozzle connected to a lower portion of the ladle and discharging the molten steel
of the ladle.
2. The casting facility of claim 1, wherein the hanger mounting part comprises:
a pair of first mounting stands extending in a direction crossing the extending direction
of the hanger and installed apart from each other such that both edges of the hanger
are installed on the upper portion; and
a pair of second mounting stands installed so as to extend upward from upper portion
of each of the pair of first mounting stands, and having two mounting members installed
apart from each other by a distance larger than the width of the hanger.
3. The casting facility of claim 2, comprising:
a pair of stoppers installed at lower edges of the hanger,
wherein the pair of stoppers are installed apart from each other by a distance shorter
than a spaced distance between the pair of first mounting stands from lower portion
of the hanger.
4. The casting facility of any one of claims 1 to 3, wherein the nozzle comprises:
a first nozzle having the one end connected to the ladle, and a second nozzle capable
of clamping to the first nozzle;
a first balance adjustment part movable forward and backward, gripping the second
nozzle to move in a direction in which the first nozzle is positioned, clamping the
second nozzle to the first nozzle, and supporting the second nozzle; and
a second balance adjustment part installed at a lower side of the hanger mounting
part, movable forward and backward, and advancing to the ladle to which the nozzle
in which the first and second nozzles are clamped is connected, thus supporting the
ladle at a position opposite to the first balance adjustment part.
5. The casting facility of claim 4, wherein the first balance adjustment part is movable
along the ladle,
wherein the first balance adjustment part comprises:
a nozzle gripping member capable of gripping the second nozzle;
an arm connected to the nozzle gripping member and movable forward and backward; and
a weight installable on the arm at a position opposite to the nozzle gripping member.
6. The casting facility of claim 5, comprising:
a support member installed at the lower portion of the ladle and being able to support
the arm.
7. The casting facility of claim 6, wherein the second balance adjustment part comprises:
a horizontal moving part movable forward and backward with respect to a side surface
of the ladle at a position opposite to the first balance adjustment part, and supporting
the ladle by being in contact with the side surface of the ladle during advancement.
8. The casting facility of claim 5, comprising:
a protrusion portion formed in any one of the first nozzle and the second nozzle;
and
a clamping part provided on the other nozzle and having a clamping groove being able
to receive the protrusion portion.
9. The casting facility of claim 7, wherein when the hanger is supported on the hanger
mounting stand and the ladle is positioned on the upper side of the mold, the other
end of the second nozzle is installed so as to be inserted into the mold,
wherein the second balance adjustment part is fixed and installed on an upper portion
of a mold cover for covering the upper portion of the mold.
10. The casting facility of claim 9, drawing a cast slab in a direction perpendicular
to the ground from the mold.
11. The casting facility of claim 7, comprising a tundish installed between the hanger
mounting stand and the mold,
wherein when the hanger is supported on the hanger mounting stand and the ladle is
positioned on the upper side of the mold, the other end of the second nozzle is installed
so as to be inserted into the tundish,
wherein the second balance adjustment part is fixed and installed on an upper portion
of a tundish cover for covering the upper portion of the tundish.
12. A casting method comprising:
supporting a ladle receiving refined molten steel therein to a hanger;
clamping a second nozzle to a first nozzle installed at a lower portion of the ladle;
moving the hanger and mounting the hanger on a hanger mounting part positioned on
an upper side of a mold, such the ladle is positioned on the upper side of the mold;
moving the molten steel of the ladle through the nozzle to supply the molten steel
to the mold; and
solidifying the molten steel in the mold and drawing a cast slab from the mold,
wherein the moving of the hanger and mounting of the hanger on a hanger mounting part
positioned on an upper portion of a mold comprises:
mounting each of one end and the other end of the hanger on upper portions of a pair
of first mounting stands installed in a direction corresponding to the extending direction
of the hanger.
13. The method of claim 12, wherein the moving of the hanger and mounting of the hanger
on a hanger mounting part positioned on an upper portion of a mold is performed such
that one end and the other end of the hanger are positioned between two mounting members
extending upward from upper portions of the pair of mounting stands and installed
apart from in the width direction of the hanger.
14. The method of claim 13, wherein the clamping of the second nozzle to the first nozzle
comprises:
gripping the second nozzle to a nozzle gripping member being movable forward and backward;
operating an arm connected to the nozzle gripping member and advancing the nozzle
gripping member forward and backward, moving the nozzle gripping member to a lower
side of the first nozzle, and clamping the second nozzle to the first nozzle; and
installing an arm weight at a position opposite to the position of the nozzle gripping
member.
15. The method of claim 14, after the clamping of the first nozzle and the second nozzle,
comprising moving the hanger to the upper side of the mold, and then adjusting balance
between the ladle and the first and second nozzles,
wherein the adjusting of the balance comprises:
operating a horizontal moving part installed in a lower side of the hanger mounting
stand to advance a ladle support member connected to the horizontal moving part toward
the ladle to allow the ladle support member to support a side surface of the ladle,
whereby a force is applied in a direction where the nozzle gripping member is positioned
such that the ladle, and the first and second nozzles are adjustable to be perpendicular
to the ground.
16. The method of claim 15, wherein the operating of the horizontal moving part to allow
the ladle support member to support the ladle comprises:
advancing a first moving member connected to the ladle support member to contact the
ladle support member with the outside surface of the ladle; and
in a state in which a second moving member connected to the ladle support member and
movable forward and backward finely relative to the first moving member is in contact
with the ladle, advancing or retracting the second moving member, such that the ladle,
and first and second nozzles are adjusted to be perpendicular to the ground without
being tilted.
17. The method of claim 16, wherein the mounting of the hanger on the hanger mounting
part positioned on the upper side of the mold to allow the ladle to be positioned
on the upper side of the mold comprises:
allowing the lower portion of the second nozzle to be inserted into the mold,
wherein the supplying to the mold of the ladle comprises:
supplying the molten steel of the ladle to the mold by the first nozzle and the second
nozzle.
18. The method of claim 16, wherein the mounting of the hanger on the hanger mounting
part positioned on the upper side of the mold to allow the ladle to be positioned
on the upper side of the mold comprises:
allowing the lower portion of the second nozzle to be inserted into the tundish positioned
between the hanger mounting part and the mold,
wherein the supplying to the mold of the ladle comprises:
supplying the molten steel of the ladle to the tundish by the first nozzle and the
second nozzle.
19. The method of claim 17 or claim 18, wherein the cast slab is drawn from the mold in
a direction perpendicular to the ground to be vertical-casted, or
the cast slab is curved-casted in a manner in which the cast slab is drawn from the
mold in a vertical direction and then is casted in a horizontal direction.