[0001] The present invention relates to a cycle system for heating and/or cooling and a
heating and/or cooling operation method, in particular for partial and low heat load
operation.
[0002] A well known problem in cooling or heating operations is that an air-to-water heat
pump becomes oversized when working at low heat load even though the compressor is
running at its minimum frequency. This especially occurs in tight and well-insulated
houses where heat pumps work at a very low water flow temperature. An air-to-water
heat pump is generally controlled to keep a supply flow temperature at target value,
and the supply flow temperature is controlled by changing the frequency of the compressor.
If the heat load is lower than the minimum capacity with minimum frequency of the
compressor, the heat pump stops running because the supply flow temperature rises
above the threshold of detecting overheating and restarts after the supply flow temperature
has fallen below the threshold of restarting. This results in the heat pump cycling
on and off frequently, deteriorating efficiency, shortening system life and increasing
electricity costs for end-users.
[0003] For a load modulation of the heat pump, besides using a variable speed compressor,
it is also common to use a hot-gas-bypass method to enable the system to run at a
partial heat load. In this method, the hot-gas-bypass circuit is connected to the
evaporator outlet to either control the evaporator cooling capacity (i.e. outlet bypass
circuit) or defrost evaporator (as described in
US 6584794B2) or prevent freezing of the condenser in the reverse cycle-based defrost cycle (as
described in
WO 2011/092802).
[0004] In some cases of cooling application, a different configuration of a hot-gas-bypass
is used to prevent the evaporator from freezing and going off on low pressure by connecting
the hot gas-bypass circuit with the evaporator inlet (i.e. inlet bypass circuit).
For heating application using air source heat pump, both inlet and outlet bypass circuits
can be used.
[0005] In particular, an inlet bypass circuit enables the heat pump to run at partial or
low heat load by bypassing the refrigerant over the condenser during the normal heating
operation. Here, an auxiliary expansion valve is arranged in the bypass circuit in
order to expand hot-gas from the high pressure at compressor discharge to the low-pressure
at evaporator inlet. This configuration is similar to the bypass-circuit described
in
JP 4799252, which is connected after the main expansion valve. Another configuration of a bypass
circuit is to connect the bypass circuit with the main circuit before the main expansion
valve which is similar to the configuration described in
JP 2005-300008. According to this bypass circuit configuration, an auxiliary valve on the bypass
circuit is not required.
[0006] A problem of the bypass circuit configurations in the prior art is that high-pressure
refrigerant at vapour state (i.e. hot gas) is injected directly from the compressor
discharge into the main circuit either after the main expansion valve (bypass-circuit
in
JP 4799252) or before the main expansion valve (bypass circuit
JP 2005-300008). Both bypass circuit configurations cause an increase of refrigerant dryness at
the evaporator inlet. This means that the composition of the refrigerant fed into
the evaporator exhibits a higher fraction of vapour and causes less heat exchange
between the refrigerant inside the evaporator tubes and the ambient air outside the
evaporator tubes. This results in the problem that heat transfer efficiency of the
evaporator is downgraded.
[0007] The problem to be solved by the present invention is therefore to provide a cycle
system for heating and/or cooling and a heating and/or cooling operation method in
which the heat transfer efficiency of the evaporator is not downgraded when a part
of the refrigerant is bypassed under a low heat load condition wherein the heat load
is less than the minimum capacity of the cycle system.
[0008] The problem is solved by the cycle system for heating and/or cooling according to
claim 1 and the heating and/or cooling operation method according to claim 10. Advantageous
embodiments of the cycle system and the heating and/or cooling operation method are
given in the dependent claims 2 to 9 and 11 to 15, respectively.
[0009] The cycle system for heating and/or cooling according to the present invention comprises
a main circuit for circulating a refrigerant having a compressor, a condenser, a first
expansion valve and an evaporator, which are sequentially connected in a flow direction
of the refrigerant, and a bypass passage for bypassing a first refrigerant part around
the condenser, wherein the bypass passage is connected to the main circuit in a first
and a second connection point, wherein the first connection point is arranged between
a compressor outlet and a condenser inlet and the second connection point is arranged
between a condenser outlet and an evaporator inlet.
[0010] The cycle system for heating and/or cooling is characterized in that the bypass passage
includes an internal heat exchanger for exchanging heat between the first refrigerant
part and a second refrigerant part, wherein the second refrigerant part is branched
off from and fed back into the main circuit between the evaporator outlet and the
compressor inlet, and a second expansion valve sequentially connected in the flow
direction of the refrigerant, and in that the main circuit further comprises a liquid
receiver, which is arranged in the second connection point and connected to the bypass
passage or between the second connection point and the evaporator inlet.
[0011] The cycle system for heating and/or cooling according to the present invention enables
to condense hot gas in the bypass passage using an internal heat exchanger before
mixing the condensed refrigerant of the main circuit at either the condenser outlet
or liquid receiver. Due to bypassing a part of the refrigerant over the condenser,
the heat capacity is decreased while the compressor is still running at its minimum
frequency. This results in a supply flow temperature below the threshold for stopping
the compressor.
[0012] Furthermore, while the first expansion valve is the main expansion device of the
main cycle, the second expansion valve functions as a bypass passage controlling device
for modulating the mass flow rate of the first refrigerant part. In a further advantageous
embodiment of the present invention, the first expansion valve is arranged between
the second connection point and the evaporator inlet or between the condenser outlet
and the second connection point.
[0013] Moreover, the cycle system according to the present invention might be further modified
such that the first expansion valve is arranged between the second connection point
and the evaporator inlet, and the main circuit further comprises an additional third
expansion valve which is arranged between the condenser outlet and the second connection
point. In this case, the third expansion valve may be used to fine tune the flow rate
of the refrigerant together with the second expansion valve.
[0014] According to another preferred embodiment the internal heat exchanger comprises at
least a first flow channel for conducting the first refrigerant part and a second
flow channel for conducting the second refrigerant part.
[0015] According to another preferred embodiment the internal heat exchanger is a double-pipe
heat exchanger, a twisted-coil-type heat exchanger, a counter-flow heat exchanger,
a parallel-flow heat exchanger and/or a heat exchanger comprising or consisting of
micro-channels and/or micro-fins on both heat exchange surfaces.
[0016] According to another preferred embodiment the internal heat exchanger comprises a
feed line for feeding the second refrigerant part into the internal heat exchanger,
wherein the feed line comprises a first solenoid valve to control a feed flow of the
second refrigerant part.
[0017] According to another preferred embodiment the internal heat exchanger comprises a
feed line for feeding the second refrigerant part into the internal heat exchanger
and a discharge line for feeding back the second refrigerant part into the main circuit,
wherein the feed line and the discharge line are connected to the main circuit in
a third and fourth connection point, respectively, and wherein the main circuit comprises
a second solenoid valve arranged between the third and fourth connection point for
opening and closing the section of the main circuit A between the third and fourth
connection point and/or for controlling a flow of the refrigerant between the third
and fourth connection point.
[0018] According to another preferred embodiment the condenser is a refrigerant-water heat
exchanger or a refrigerant-air heat exchanger and the evaporator is a refrigerant-air
heat exchanger.
[0019] According to another preferred embodiment the main circuit comprises a four-way valve
arranged between the compressor outlet and the condenser inlet for switching the cycle
system between heating operation and cooling operation.
[0020] The invention also includes a heating and/or cooling operation method performed by
the above-described cycle system for heating and/or cooling. The heating and/or cooling
operation method is characterized in that the bypass passage is activated and/or deactivated
when one or more predetermined conditions are met.
[0021] According to a preferred embodiment the bypass passage is activated by opening the
second expansion valve and deactivated by closing the second expansion valve. In particular,
according to another preferred embodiment, the bypass passage is activated when a
number of compressor restarts for a predetermined time interval is higher than a predetermined
threshold number, and the bypass passage is deactivated when a room temperature is
lower than a predetermined threshold room temperature.
[0022] According to another preferred embodiment an opening of the second expansion valve
is increased when the bypass passage is activated, the compressor runs at a predetermined
minimum frequency and a supply flow temperature of the refrigerant is higher than
a first predetermined threshold temperature, and the opening of the second expansion
valve is decreased when the bypass passage is activated, the compressor runs at a
predetermined minimum frequency and a supply flow temperature of the refrigerant is
lower than a second predetermined threshold temperature.
[0023] According to another preferred embodiment an average heat supply for a predetermined
interval is calculated, a minimum capacity under an operated supply flow temperature
and ambient temperature conditions is calculated, and the bypass passage is activated
when the average heat supply is lower than the minimum capacity.
[0024] According to another preferred embodiment an opening of the second expansion valve
is increased by the same percentage as by which the average heat supply is lower than
the minimum capacity.
[0025] In the following, some preferred embodiments of the cycle system for heating and/or
cooling as well as of the heating and/or cooling operation method according to the
present invention are described in more detail on the basis of figures 1 to 6. The
described features are not only conceivable in the combinations of the disclosed embodiments,
but can be realized independently of the concrete embodiments in various other combinations.
Figure 1 shows a first embodiment according to the invention of the cycle system for
heating and/or cooling.
Figure 2 shows a diagram with a sequence of starting and ending an operation of the
bypass passage.
Figure 3 shows a flow diagram of a heating operation method according to the first
embodiment of the invention.
Figure 4 shows a diagram with different heat capacities at minimum frequency for different
test conditions.
Figure 5 shows a flow diagram of a heating operation method according to a second
embodiment of the invention.
Figure 6 shows a third embodiment of the cycle system for heating and/or cooling according
to the invention.
[0026] As shown in figure 1, the cycle system for heating and/or cooling according to a
first embodiment of the invention comprises a main cycle A for circulating a refrigerant
having a compressor 1 with compressor inlet 1a and outlet 1b, a condenser with condenser
inlet 2a and outlet 2b, a first expansion valve LEV-A, a third expansion valve LEV-B,
an evaporator 3 with evaporator inlet 3a and outlet 3b, a liquid receiver 5 with liquid
receiver inlet 5a and outlet 5b, a second solenoid valve 9 and a four-way valve which
are sequentially connected in a flow direction of the refrigerant flowing through
the main circuit.
[0027] Furthermore, the cycle system comprises a bypass passage for bypassing a first refrigerant
part over the condenser 2. The bypass passage is connected to the main circuit via
connection points P1 and P2. Connection point P1 is arranged between the compressor
outlet 1b and the condenser inlet 2a. Connection point P2 is arranged between the
third expansion valve LEV-B and the liquid receiver inlet 5a. The bypass passage B
includes an internal heat exchanger 4 and a second expansion valve LEV-C which are
sequentially connected in the flow direction of the first refrigerant part. The internal
heat exchanger 4 has at least two flow channels, wherein the first flow channel forms
a section of the bypass passage B with first internal heat exchanger inlet 4a and
first outlet 4b and conducts the first refrigerant part. The second channel extends
from a second internal heat exchanger inlet 4c to a second internal heat exchanger
outlet 4d and conducts a second refrigerant part which is branched off from and fed
back into the main circuit A between the evaporator outlet 3b and the compressor inlet
1a. The second internal heat exchanger inlet 4c is connected via a feed line 6 with
the main circuit A in connection point P3. The second internal heat exchanger outlet
4d is connected via a discharge line 8 with the main circuit A in connection point
P4. Connection point P3 is arranged between the evaporator outlet 3b and the compressor
inlet 1a. Connection point P4 is arranged between connection point P3 and the compressor
inlet 1a. The feed line 6 includes a first solenoid valve 7.
[0028] In heating operation, the condenser 2 is a water-refrigerant heat exchanger and functions
as an indoor heater, whereas the evaporator 3 is an air-refrigerant heat exchanger
functioning as a cooler. Moreover, the internal heat exchanger 4 is a refrigerant-refrigerant
heat exchanger, wherein heat is transferred from the bypassed first refrigerant part
to the branched off second refrigerant part. In this embodiment 1, the internal heat
exchanger 4 is preferably a counter-flow or parallel-flow heat exchanging device with
hot-gas refrigerant flowing through the first channel and cold-gas or vapor refrigerant
escaping from the evaporator outlet 3b flowing through the second channel.
[0029] The first expansion valve LEV-A is the main expansion valve of the main circuit A
for expanding the refrigerant before entering the evaporator 3. The second expansion
valve LEV-C expands the first refrigerant part flowing trough the bypass passage and
can be used to control the flow rate of the first refrigerant part. The third expansion
valve LEV-B is used to fine tune the flow rates of the refrigerant flowing through
the main circuit A and the bypass passage B.
[0030] The first solenoid valve 7 is used to open and close the feed line 6 as well as to
control the flow rate of the second refrigerant part through the feed line 6, the
second channel of the internal heat exchanger 4 and the discharge line 8. The second
solenoid valve 9 is used to open and close the section of the main circuit A between
connection points P3 and P4 as well as to control a flow of the refrigerant in this
section of the main circuit A.
[0031] The four-way valve 10 is used to switch between a heating operation and a cooling
operation of the cycle system. The connection point P1 of the main circuit A and the
bypass passage B can be either before or after the four-way valve 10 in the flow direction
of the refrigerant.
[0032] The hot compressed refrigerant which is discharged at compressor outlet 1b passes
the four-way valve 10. At connection point P1 a first refrigerant part is branched
off into the bypass passage B. In the main circuit A, the high-pressure hot gas refrigerant
enters the condenser 2 where it is cooled and condensed emitting heat to an indoor
heater. The condensed refrigerant is expanded by expansion valve LEV-B and collected
as low-pressure cold liquid refrigerant in the liquid receiver 5. The high-pressure
hot gas first refrigerant part passes the first channel of the internal heat exchanger
4 where it is cooled and condensed. The cooling is effected by the low-pressure cold
gas second refrigerant part branched off at the evaporator outlet 3b and flowing through
the second channel of the internal heat exchanger. The condensed first refrigerant
part is expanded by expansion valve LEV-C and collected as low-pressure cold liquid
refrigerant in the liquid receiver 5. The cold liquid refrigerant discharged from
the liquid receiver 5 is further expanded by expansion valve LEV-A and enters the
evaporator 3. In the evaporator 3, the cold liquid refrigerant is evaporized and discharged
as low-pressure cold gas refrigerant. At connection point P3 the second refrigerant
is branched off from the main circuit A to be circulated through the internal heat
exchanger 4. The remaining low-pressure cold gas refrigerant continues along the main
circuit A to the compressor inlet 1a. At connection point P4 the branched off second
refrigerant part, which has been heated up due to the heat exchange with the first
refrigerant part in the internal heat exchanger 4, is fed back into the main circuit
A.
[0033] Due to the heat exchange with the cold second refrigerant part, the hot gas first
refrigerant part is cooled down and condensed in the internal heat exchanger before
being expanded in the expansion valve LEV-C to reduce its pressure from the discharge
pressure of the compressor 1 to the pressure of the liquid receiver 5. By bypassing
the first refrigerant part through the bypass passage B, the refrigerant which reaches
the condenser 2 at a lower flow rate causes a reduction of heating capacity below
the minimum capacity of the main circuit A, which is the cycle system without the
bypass passage B. This enables the compressor 1 to run continuously without on-off
cycling at low heat load. The hot gas first refrigerant part in the bypass passage
B is condensed before merging with the refrigerant in the main circuit A. In the liquid
receiver 5 the condensed refrigerant is collected before fed into the evaporator 3.
Due to connecting the bypass passage outlet with the liquid receiver 5 via the main
circuit A, excess gas can be stored in the liquid receiver 5 even if the hot gas is
not completely condensed. This prevents refrigerant dryness at evaporator inlet from
being increased as occurs in the conventional bypass circuit in the prior art, and
a reduction of heat transfer efficiency at evaporator 3 can be avoided. Furthermore,
due to being heated by the bypassed hot gas first refrigerant part in internal heat
exchanger 4, the temperature of the refrigerant coming from the evaporator outlet
3b is increased before reaching the compressor inlet 1a. This helps to increase a
superheat degree at the compressor inlet 1a protecting compressor 1 from sucking refrigerant
liquid.
[0034] Figure 2 shows a diagram with a sequence of starting and ending a bypass passage
operation of the cycle system according to the first embodiment. It is known that
supplied heat of cycle systems as in the present invention is controlled based on
a temperature difference between a target flow temperature and a measured flow temperature.
The target flow temperature T
target_flow is also determined by an ambient temperature or a temperature difference between
a set room temperature and a measured room temperature. A frequency range of the compressor
is designed to avoid overloading, vibration etc. A maximum frequency is 120Hz and
a minimum frequency is 30Hz, for example. In the present invention, a supply flow
temperature at the minimum frequency T
frequency_min is used as an input parameter to activate the bypass passage (T
frequency_min = T
target_flow + ΔT
1, ΔT
1 is 1.5°C for example, smaller than the threshold of stopping the cycle system). The
room temperature is used to terminate the bypass passage operation when heat load
is required to be increased. The frequency is fixed at a minimum frequency during
bypass passage activation.
[0035] As shown in figure 2, the cycle system as shown in figure 1, for example, is operated
in whole compressor frequency range as long as the measured flow temperature is below
a target flow temperature. When the measured flow temperature equals the target flow
temperature, the compressor frequency is fixed to the minimum frequency. The bypass
passage is activated when the measured flow temperature rises above the target flow
temperature + ΔT
1 and remains activated as long as the measured room temperature is higher than the
target room temperature - ΔT
2. When the measured room temperature is equal to or lower than the target room temperature
- ΔT
2, the bypass passage is deactivated.
[0036] A specific example of a heating operation carried out by the cycle system according
to the first embodiment with the bypass passage is shown in figure 3. This control
is based on the control strategy in which the flow temperature and the number of compressor
restarts within a predefined interval (5 times per hour for example) are used as a
trigger for the bypass passage activation. When a room temperature drop is detected,
which means that an increase of supplied heat is required, the bypass passage needs
to be deactivated to return to normal heat load mode. LEV-C is controlled within a
predefined control interval, which is every 1 minute for example. And a ratio of increment
and decrement of valve openings is also predefined, which is 10% for example.
[0037] In the heating operation of figure 3, it is checked in step ST1, whether the compressor
is running at a minimum frequency. If the answer is no (N), the cycle system remains
in the normal cycle (i.e. without bypass passage). If the answer is yes (Y), it is
checked in step ST2, whether the supply flow temperature is higher than the target
flow temperature + ΔT
1. If N, the system remains in the normal cycle. If Y, it is checked in ST3, whether
the number of compressor restarts is above a threshold. If N, the system remains in
the normal cycle. If Y, the bypass passage is activated and the system proceeds to
a control loop including steps ST4 to ST10 for controlling the opening degree of the
expansion valve LEV-C. In step ST4, it is checked, whether the supply flow temperature
is lower than a target flow temperature - ΔT
2. If N, the system proceeds to step ST5. If Y, the system proceeds to step ST8. In
step ST5, it is checked whether the supply flow temperature is higher than the target
flow temperature + ΔT
1. If N, the system proceeds to step ST10. If Y, the system proceeds to step ST6. In
step ST6, it is checked whether expansion valve LEV-C is completely open. If Y, the
system proceeds to step ST10. If N, the opening of LEV-C is increased (step ST7) and
the system proceeds to step ST10.
[0038] In step ST8, it is checked, whether expansion valve LEV-C is completely closed. If
Y, the system proceeds to step ST10. If N, the opening of LEV-C is decreased (step
ST9) and the system proceeds to step ST10.
[0039] In step ST10, it is checked whether the room temperature is below the target room
temperature - ΔT
3. If N, the bypass passage remains activated and the system returns to step ST4. If
Y, expansion valve LEV-C is closed deactivating the bypass passage and the system
returns to the normal cycle operation.
[0040] Figures 4 and 5 show a further preferred embodiment of a heating operation carried
out by the cycle system of figure 1. The control strategy is based on monitoring supplied
heat from the cycle system. This supplied heat is compared with a minimum heat capacity
of the cycle system derived from the performance map of the cycle system which is
saved in a controller (not shown in figure 1) of the cycle system. The supplied heat
is calculated with the following formula:

where,
Qsupply : Supplied heat (kW), ρwater: Density of water (kg/L),
Cp,water : Specific heat (kJ/kgK), Fw: Water flow rate (L/s),
Twater, supply : Supply flow temperature, Twater, return : Return flow temperature.
[0042] Where,
Q: Capacity (kW), tw: measured supply flow temperature, ta: measured ambient temperature
t1,t2: reference data of ambient temperature, w1, w2: reference data of supply flow
temperature.
[0043] Figure 5 shows a flow diagram of a heating operation according to the second embodiment
of the cycle system of the present invention with bypass passage. During normal cycle
(i.e. with bypass passage deactivated), it is checked in step ST1, whether the compressor
is running at minimum frequency. If the answer is no (N), the system remains in the
normal cycle operation. If the answer is yes (Y), the bypass passage is activated
and the system proceeds to step ST2. In step ST2, the current supplied heat and minimum
capacity are calculated. After that, the system proceeds to step ST3. In step ST3,
it is checked, whether the supplied heat is 10% lower than the minimum capacity. If
Y, the system proceeds to step ST4. If N, the system proceeds to step ST6. In step
ST4, it is checked, whether the expansion valve LEV-C is completely open. If Y, the
system returns to step ST2. If N, the opening degree of LEV-C is increased by 10%
and the system returns to step ST2. In step ST6, it is checked, whether expansion
valve LEV-C is completely closed. If N, the opening of LEV-C is decreased and the
system returns to step ST2. If Y, bypass passage is deactivated and the system operates
in normal cycle.
[0044] Figure 6 shows a third embodiment of the cycle system for heating and/or cooling
according to the present invention. In the following, only the differences between
the cycle system according to the first embodiment shown in figure 1 and the cycle
system of the third embodiment are described. In contrast to the cycle system of figure
1, in the cycle system of figure 3 the internal heat exchanger 4 is reversely connected
to the main circuit A. In the cycle system of figure 3, the first internal heat exchanger
inlet 4a and outlet 4b are connected to the second channel of the internal heat exchanger
4 and the second internal heat exchanger inlet 4c and outlet 4d are connected to the
first channel of the internal heat exchanger 4. In addition, feed line 6, discharge
line 8 and solenoid valves 7 and 9 have been omitted in the cycle system of embodiment
3. The reversed connection of the internal heat exchanger 4 results in a reversed
pressure level for the internal heat exchanger 4. On the low-pressure side, which
is connected to the evaporator outlet 3b, the flow rate of the refrigerant is increased
compared to the cycle system of the first embodiment. The performance of the internal
heat exchanger 4 of figure 6 is changed due to the heat transfer coefficient changes.
Moreover, the internal heat exchanger 4 of embodiment 3 can be more compact than in
embodiment 1.
[0045] Another difference consists in that, in the cycle system of figure 6, the second
connection point P2 is arranged within the liquid receiver 5. The liquid receiver
5 of the third embodiment has one more inlet 5c which enables to merge the refrigerant
flows from the condenser 2 and the internal heat exchanger 4 inside the liquid receiver
5. This improves energy conservation within the cycle system.
[0046] The cycle system according to the third embodiment is also configured to carry out
the heating operation methods shown in figures 3 and 5 and the associated description.
1. Cycle system for heating and/or cooling comprising
a main circuit for circulating a refrigerant having a compressor, a condenser, a first
expansion valve and an evaporator, which are sequentially connected in a flow direction
of the refrigerant, and
a bypass passage for bypassing a first refrigerant part around the condenser, wherein
the bypass passage is connected to the main circuit in a first and a second connection
point, wherein the first connection point is arranged between a compressor outlet
and a condenser inlet and the second connection point is arranged between a condenser
outlet and an evaporator inlet,
characterized in that
the bypass passage includes an internal heat exchanger for exchanging heat between
the first refrigerant part and a second refrigerant part, wherein the second refrigerant
part is branched off from and fed back into the main circuit between the evaporator
outlet and the compressor inlet, and a second expansion valve sequentially connected
in the flow direction of the refrigerant, and
the main circuit further comprises a liquid receiver, which is arranged in the second
connection point and connected to the bypass passage or between the second connection
point and the evaporator inlet.
2. Cycle system according to the preceding claim, wherein the first expansion valve is
arranged between the second connection point and the evaporator inlet or between the
condenser outlet and the second connection point.
3. Cycle system according to claim 1, wherein the first expansion valve is arranged between
the second connection point and the evaporator inlet, and the main circuit further
comprises a third expansion valve arranged between the condenser outlet and the second
connection point.
4. Cycle system according to one of the preceding claims, wherein the internal heat exchanger
comprises at least a first flow channel for conducting the first refrigerant part
and a second flow channel for conducting the second refrigerant part.
5. Cycle system according to one of the preceding claims, wherein the internal heat exchanger
is a double-pipe heat exchanger, a twisted-coil-type heat exchanger, a counter-flow
heat exchanger, a parallel-flow heat exchanger and/or a heat exchanger comprising
or consisting of micro-channels and/or micro-fins on both heat exchange surfaces.
6. Cycle system according to one of the preceding claims, wherein the internal heat exchanger
comprises a feed line for feeding the second refrigerant part into the internal heat
exchanger, wherein the feed line comprises a first solenoid valve to control a feed
flow of the second refrigerant part.
7. Cycle system according to one of the preceding claims, wherein the internal heat exchanger
comprises a feed line for feeding the second refrigerant part into the internal heat
exchanger and a discharge line for feeding back the second refrigerant part into the
main circuit, wherein the feed line and the discharge line are connected to the main
circuit in a third and fourth connection point, respectively, and wherein the main
circuit comprises a second solenoid valve arranged between the third and fourth connection
point for controlling a flow of the refrigerant between the third and fourth connection
point.
8. Cycle system according to one of the preceding claims, wherein the condenser is a
refrigerant-water heat exchanger or a refrigerant-air heat exchanger and the evaporator
is a refrigerant-air heat exchanger.
9. Cycle system according to one of the preceding claims, wherein the main circuit comprises
a four-way valve arranged between the compressor outlet and the condenser inlet for
switching the cycle system between heating operation and cooling operation.
10. Heating and/or cooling operation method performed by the cycle system according to
one of the preceding claims, wherein the bypass passage is activated and/or deactivated
when one or more predetermined conditions are met.
11. Heating and/or cooling operation method according to the preceding claim, wherein
the bypass passage is activated by opening the second expansion valve and deactivated
by closing the second expansion valve.
12. Heating operation method according to one of the two preceding claims, wherein
the bypass passage is activated when a number of compressor restarts for a predetermined
time interval is higher than a predetermined threshold number, and wherein
the bypass passage is deactivated when a room temperature is lower than a predetermined
threshold room temperature.
13. Heating operation method according to the preceding claim, wherein
an opening of the second expansion valve is increased when the bypass passage is activated,
the compressor runs at a predetermined minimum frequency and a supply flow temperature
of the refrigerant is higher than a first predetermined threshold temperature, and
wherein
the opening of the second expansion valve is decreased when the bypass passage is
activated, the compressor runs at a predetermined minimum frequency and a supply flow
temperature of the refrigerant is lower than a second predetermined threshold temperature.
14. Heating operation according to claim 11, wherein
an average heat supply for a predetermined interval is calculated,
a minimum capacity under an operated supply flow temperature and ambient temperature
conditions is calculated, and
the bypass passage is activated when the average heat supply is lower than the minimum
capacity.
15. Heating operation method according to the preceding claim, wherein an opening of the
second expansion valve is increased by the same percentage as by which the average